Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6120604_APPROVED PLANS_20120626
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW I O�D� V(O('�� DOC TYPE ❑ CURRENT PERMIT pAPPROVED PLANS ❑ HISTORICAL FILE DOC DATE 26/ YYYYMMDD GENERAL NOTES 1. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATIONS OF FORT BRAGG, NORTH CAROLINA UNLESS OTHERWISE NOTED. 2. EXISTING PAVEMENT, CONCRETE, AND OTHER UNSUITABLE MATERIALS SHALL NOT BE USED AS FILL AND SHAL L BE DISPOSED OF OUTSIDE THE PROJECT LIMITS AT THE CONTRACTOR'S EXPENSE. CONTRACTOR IS RESPONSIBLE FOR PERMITTING AND FEES FOR DISPOSAL. EXISTING O fl T SITE LEGEND CURB 8 GUTTER 24" CURB & GUTTER 2' CONCRETE RIBBON CURB GRADING, ROADS, & SIDEWALK 1. ALL SELECT AND BORROW MATERIAL SHALL MEET CRITERIA SET FORTH BY SECTIONS 1016 AND 1018 OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION'S STANDARDS AND SPECIFICATIONS FOR ROADS AND STRUCTURES. 2. UNLESS OTHERWISE NOTED IN THE CONTRACT DOCUMENTS ALL MATERIALS AND CONSTRUCTION METHODS FOR ROADWAYS & STORM DRAINAGE IMPROVEMENTS TO FORT BRAGG ROADWAYS SHALL CONFORM TO THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARDS & SPECIFICATIONS. 3. CONTRACTOR SHALL PLACE AND COMPACT FILL MATERIALS FOR THAT PORTION OF THE FILL UNDER PARKING AREAS, DRIVEWAYS, CONCRETE PADS, AND SIDEWALKS, COMPACT TO A DENSITY OF NO LESS THAN 95 PERCENT OF THE MAXIMUM STANDARD PROCTOR DRY DENSITY AS DETERMINED BY AASHTO METHOD T99. OTHER FILL MATERIAL SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 90 PERCENT OF THE MAXIMUM STANDARD PROCTOR DRY DENSITY AS DETERMINED BY AASHTO METHOD T99. UTILITIES LEGEND COMMUNICATIONS OHC OVERHEAD CABLE LINE UGC UNDERGROUND CABLE LINE T TELEPHONE LINE FO FIBER OPTIC/TELEPHONE LINE PAVEMENTS PAVEMENT SAWCUT LINE —••—••—••—•, NATURAL GAS NEW ASPHALT PAVEMENT G NATURAL GAS MAIN © NATURAL GAS METER NEW CONCRETE PAVEMENT A POWER/ELECTRIC OFE OVERHEAD ELECTRIC LINE SITE IMPROVEMENTS UGE UNDERGROUND ELECTRIC LINE ----iAVCE UNKNOWN ELECTIC LINE BUILDING/STRUCTURE pp POWER POLE AREA LIGHT/LUMINAIRE SIGNS SANITARY SEWER TOPOGRAPHY/GRADING —241— GROUND/GRADE CONTOUR (MINOR) 291 �391— GROUND/GRADE CONTOUR (MAJOR) 291 3ee.ee 296.9 SPOT ELEVATION VEGETATION TREELINE/WOODSLINE ® # STAND ALONE TREE OR BUSH i SS PIPE SS ® MANHOLE CO CLEANOUT Co STORM DRAINAGE SD STORM PIPE SD — CATCH BASIN, DROP INLET, 0 OPEN -THROAT INLET OD STORM MANHOLE QD /` � STORM OUTLET/ENDWALL WATER — W WATER MAIN w FIRE HYDRANT ASSM. N VALVE H OW WATER MANHOLE 0 o WATER METER DRAINAGE 1. DEWATERING: THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL EXCAVATIONS DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETED. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE OR MORTAR HAS SET (MINIMUM 24 HOURS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL BE DISPOSED OF IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION TO ADJACENT PROPERTY OR OTHER CONSTRUCTION. UTILITIES 1. ALL PIPE BEDDING SHALL BE CLASS "C" UNLESS OTHERWISE T Y THE ENGINEER. DIRECTED B E ENGI EE . 2. ALL STORM DRAINAGE PIPES SHALL BE RCP CLASS III UNLESS OTHERWISE NOTED ON THE PLANS. 3. THE ENGINEER AND THE CONTRACTOR SHALL INSPECT ALL EXISTING PIPES USED IN THE FINAL DRAINAGE SYSTEM AND AGREE ON THE CONDITION OF THE PIPES PRIOR TO CONSTRUCTION. IF DAMAGE OCCURS TO THESE PIPES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF THE PIPE(S). 4. THE CONTRACTOR SHALL CONTACT THE LOCATOR AT 910-394-2776 BEFORE COMMENCING ANY WORK. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES WHETHER INDICATED ON THE DRAWINGS OR NOT. THE CONTRACTOR WILL ASSURE THE PRESENCE ONSITE OF A REPRESENTATIVE OF THE GAS COMPANY WHEN WORKING IN THE VICINITY OF ANY GAS MAINS. STANDARD ABBREVIATIONS A.D. AREA DRAIN FT. FOOT. FEET OUAN. QUANTITY APPX. APPROXIMATELY GND. GROUND R RADIUS BLDG. BUILDING HC HANDICAP RCP REINFORCED CONCRETE PIPE CB CATCH BASIN HYD. HYDRANT RED. REQUIRED CEM. CEMENT HW HEAD WATER RET. RETURN CFS CUBIC FT PER SECOND I.E. INVERT ELEVATION R/W RIGHT-OF-WAY C.O. CLEAN OUT IN. INCHES S.B. SEDIMENT BASIN CONC. CONCRETE INV. INVERT SCH. SCHEDULE CUMM CUMMULATIVE L.F. LINEAR FEET SO STORM DRAIN DB DEED BOOK MAX. MAXIMUM SECT. SECTION DET. DETAIL MECH. MECHANICAL SF SILT FENCE DIP DUCTILE IRON PIPE MH MANHOLE SPEC. SPECIFICATIONS D.S. DOWN SPOUT MIN. MINIMUM SO. FT. SQUARE FEET DWG.(S) DRAWING(S) MISC. MISCELLANEOUS SS SANITARY SEWER E EAST, EASTING MPH MILES PER HOUR STA. STATION EA. EACH N NORTH, NORTHING STD. STANDARD EL., ELEV. ELEVATION N/A NOT APPLICABLE SW SIDEWALK ELEC. ELECTRIC NO. NUMBER TEL. TELEPHONE EQUIP. EQUIPMENT O.C. ON CENTER TYP. TYPICAL EX., EXIST. EXISTING P.G. PAGE W WATER FES FLARED END SECTION P.P POWER POLE W/ WITH FF FINISHED FLOOR ELEVATION PSI POUNDS PER W.G. WATER GAUGE SQUARE INCH WV WATER VALVE Z ~ J U >= J Z a CL w z 2 m 00 ■ ■ of 0 O O O 'A uI M O 00 00 w v v O� o VM o 0) r� z�N2�Z �~ U cN )Z�a)C 'QdjO�V v N=_(ONJ °''�E I �LL i„U oLOL(L lz SEAL ; �NS•.CAR, It, 0 35 ., B ON top t ISSUED FOR CONSTRUCTION NO. DATE DESCRIPTION MIA wo.Mr . m M. wios or ar or«cm.p M.h.. a a. Ititrl�l m prICh 11 1. IM�rle enl /pf Ilr yiNle ovoew me cll.m Mr 0 oneove. W me mw lyrO/ ryliap ON MY pppppM .I IIiWI vI.M OIIIiR IipI1M bq OW„M1Im111ysM COI IISi��l 1 W .11100 0. DATE: MAY 30. 2012 CSE PROD. n BAR_0029 DRAWN JBR DESIGNED JBR CHECKED CHU PROJ. MDR. GAR AIRMEN'S CAMPUS B309 PARKING LOT PROJECT STATUS 100% FINAL DESIGN GENERAL NOTES & LEGEND G-2 I U" / P4&K,4c DO m r r M m m --A FIN n a z z 2 7aD N 0 r N D ? z x o a D xcls X�l, x� X f, '' o No� • S9 1 r2 •4�? D upi 8J Z ti z x a v N •' LA Ci4 E 1+ C) D p AR E$1 ti ti `� ac o N z - 3E CONC six 24 " C&G �Z J- 21 o�C�1 0 N W 9 L x1]! �Zr N l rn � �+ X r K Ile �e2!9 � r 'A' x / 92 N0 Do �!8 4 = p / ' / / yr •� 0 m a ODD m 7�C 3 r: a / zw m m r ' —1 f�Tl x `-n C rn x 7c 9 111 cn Xr, • s e/ 11 s r 1 � 1 � X2' 1 ti '9s/ .woo mor r0* ; � Gf: � m 0 x cic zn �.,o-� / 24' C&G D N 2� Aj a 0 � X X c'p f 0� / A • ev 24' C&G ' °9 Nti Z— =i �! •ev / / / / O : N N x0 O .. ^ x 3 ti CZ z x ilD / Q/ Z .DN ; a x DVf f3 n0 .r.. : N. O x NNN 2 �D Dm ma •" / ;O / O ODD Go ^ N n r-1 _'I N.AcJ D CN C9 . / z0 r' 0 �� om r� 0 C O 2l9X ; • 9, bt2 C' f9s 0 C D .-. „rn m m N o _ Z:�.. a �o rnm• r � n • fi a m 3 n D o � z Z ao ci D a Di n m z m O n D Cf) � m � m cm o m m �J9 ? m x 22e 19 �e � mmz' r- a0 m_ D .0 v In O 2 m V D -i _NANmr co.-v3 C al0m0M .m a in ba �z mZ � a r 4. -,w: GRAPHIC SCALE 30 0 '15 30 sa (IN FEET) Asp 0 z J V > J Z — a Z z a00 m U (0) tY w O O 0 00 L0 0 E00 V Olt Irl pmL M (1) O NF4LLcZ 0) o co Z O c U .EL O �.- V)<zw�OvL LL OcoE U �-LLa Z w w zU MCI uiw SEAL EXISTING CONDITIONS SHOWN ARE BASED ON A TOPOGRAPHIC SURVEY AS PERFORMED BY MCKIM & CREED, INC. NO. DATE DESCRIPTION • 1n fir ea�aols a• irsin. Ot at ad ell a sf aK.lp. it IMsllpa all i� i1M iDiC1/1C �s0�s ab GI I«N 1� melee I1 as s*�00►s0. y.p e! ap Mra�' mil an Was Oennr+ volftl rYMrorl,Aiipla sn ad 1 am by i1r1100001fEagB 1: Wl~ 1 DATE! MAY 30, 2012 CSE PROD. +r BAR_0029 DRAWN JBR DESIGNED JBR CHECKED CNr pR0J • MICR. GAR AIRMEN'S CAMPUS B309 PARKING LOT PROJECT STATUS 100% FINAL DESIGN EXISTING CONDITIONS PLAN \/X-01 aoL a N m W � A n v 0 C7 czzx•-- K D N N m m Ln 0 - �s.Q Au,moo N N � n� tjbnv I_ t �� C7 0 r z G� O -+ � N C] br m DD OD X D m m_ r ; x co � N_ m m m -r n X A G7 D 0 a � o co Oco -0 n N N� m N4-f m N m j�M 74; K // m m 70 0 a; X 0 p4Rk11vG ;y SAWCUT AND MATCH TO EXISTING PATHWAY 0 0 I C) D r a L1J N X(n D� rm my cn m CONCRETE RAMP, LIMING, AND STAIRS. SEE DETAILS. 01 — - 24' C&GLn ". SAWCUT AND � �°� 8' WIDTH � MATCH TO EX. MATCH TO EXISTING CONCRETE 6' WIDTH SIDEWALK �. TOP BACK OF CURB z � SIDEWALK �,; CONCRETE R9.4 SIDEWALK 0M- w R12' �W a w •'.�_8' WIDTH 0 A � D D n ' ° ' :� CONCRETE r .., n��' D m .s mon X S I DEwALK �N - Z m . m m x7 b m rn n co r 12 s� MATCH TO 14 Nc +� `m EXISTING +IG . vEw SIDEWALK..' -- 24,E ST.D . R4� R8 _ , T-YP g� wj G�NC I ,A .. CONC.JW.E .. o .. R.I.BBOtV. , R4 :. "'SIDEWALK- . R4:' � CURB;..T1PP... � Z z n 6 ' cooD 9 Z: $ m m m r , "'' m. z + `� tCO .'� 24 2 - so • Z m 'm , m r , co it Q N r m 2' `. CONC.: ' R4' R6' , rn n : RIBBON ASPHALT RA',.&MENT 4" _STD m 8' WIDTH N SDEECR WALK' N �g N R13' SAWCUT AND MATCH TO EXISTING PATHWAY 0 0 0 0 Or Z •-' o� cz, o �r D fn .0 O C7 S 0 0 'TYP .. CLAP, R6 01 ,; Qr m r D na z R6' r Q A .p 24' C&G D N . p - 8' WIDTH A m � `' CONCRETE z n SIDEWALK 0 ' a oc�n6 C, 1 MATCH TO EXISTING LARGE MATURING TREES - IN ACCORDANCE WITH D cP FORT TYP• 2 P .0 TOP BACK OF CURB BRAGG IDG, 24' C&G 1p4 1p4 n 2 N N O 0 -— M X z D N Z z; / ?in roo 9A 'VW00N D m NN 0 00. -. W N W D N m w� mmz - r ao m 0 <--0nZ 0 0: + Z CDN7C A w m t9 fp .m n D v m m m z '-• x r - - MO m Om -- D 0 D;-a Z Z.000D _4 2 7C D -. cn m r NAAX 4° coNNWm3 C �R'm fl w n x m + D n D r n X z T 0 r SAWCUT AND MATCH TO EXISTING ROADWAY 6' WIDTH CONCRETE SIDEWALK SAWCUT AND MATCH TO EXISTING ROADWAY 6WIDTH CONCRETE SIDEWALK NOTES: E 1. COORDINATE SI E PLAN Wi H GRADING AND DRAINAGE PLAN (CG-01), STORMWATER MA AGEMENT PLANS (B -01 $ BMP-02), EROSION CONTROL PLAN (EC-01), AM CONSTRUCTION SEOUENCE (G-3). i 2. ALL SITE WORK INVOLVING EARTH ISTURBING ACTIVITIES SHALL OCCUR WITH THE LIMITS CONS T UCTION (LOC), AS SHOWN ON THE EROSION C1 TROL PL (EC-01). 3. THE CONTRACTOIR' SHALL C LY WITH GENERAL AND EROSION CONTROL NOTM (SEE SHEE S 6-2 �ND G-3). GRAPHIC SCALE 30 0 15 30 60 (IN FEET) AS SHOWN J V � J Z aoo m V V W O 0 O 00 U} 00 o 'T d, 0 C)0) L U (n w rt�0 +�co M IN L c Z L \ �1 � 0 c U) �ZoCU .ELNom._ (A = cO�NJ �>co u_w (,rn U. LL a Z SEAL 0-7 400' -- 'sv ; 7 , I SSLED Fag CONS TRUCTION NO. DATE DESCRIPTION Well% a an hwUYAMr of w.�a. t�oft i�tM�iM a�i7 N� Mb t/iC tnrsaas as al tan, kr =c1h n : p'�a0. MuM o� ana ftn r n�tano a+ tars Aoeanr+t .tu,d, rtrra�Ma�+ar�etan art aas�ta+ib Cal Fly yt'�E,gt�s. I: DATE: MAY 30. 2012 CSE PROD. w BAR-0029 DRAW JBR DESIOWD JBR CHECKED CNN PROD. MGR. CAR AIRMEN'S CAMPUS B309 PARKING LOT PROJECT STATUS 100% FINAL DESIGN SITE -PLAN CS-01 ..LL' _ - ]T._ 1 • li Li i. _ r ,r!•i�� _i:i_Li,.._.._ _..! .: t;; •Sl�..t '1• .{!� y� �j. L•Vy _ ...f�-i i'� .. .. .. ' YI-1 TYPE III EXISTING YARD INLET (REPLACE IF REO'D BY CONDITIONS) GRATE = 207.28, INV. IN (E) ■ 205.46' (EX. 6") INV. IN (S) a 205.15, (EX. 1811) IW . IN (SE) ■ 205.15 (NEW 1511) INV. OUT (N) a 205.14, (EX. 1811) p4RKING DI-1 TYPE = 4':4' CONCRETE DROP INLET WITH TRASH RACK, GRATE = 214.0 DEPTH = 5.25 FT INV. IN (N) 210.0 (3-611) INV. OUT (S) = 208.75 (15") DI-2 TYPE ■ 41x4' CONCRETE DROP INLET WITH TRASH RACK GRATE = 218.45 DEPTH 4.15 FT INV. IN (N) = 214.3 (611) INV. IN (E) a 214.3 (6") INV. OuT (S) a 214.3 (1511) 7's MH-1 TYPE 5'0 PRECAST CONC. MANHOLE, LID = 215.7 DEPTH = 7.80 FT INV. IN (N) a 200.00 (15") INV. IN (E) ■ 208.00 (15") INV. OUT (W) ■ 207.90 (15") TYPE = CONC. DROP INLET TYPE ■ 410 PRECAST CONC. MANHOLE, GRATE = 209.00 LID ■ 211.7 DEPTH = 3.00 FT DEPTH a 4.40 FT INV. IN (E) ■ 206.10 (1511 ) INV, IN (E) ■ 207.40 (1511) INV. OUT (NW) 111 206.00 (15") INV, OUT (W) 207.30 (1511) r_� O N � A n O -- 0 CzZX•-' A N N m -cnw.1 " m x "SL P vc .p CD r 0 0 W 24' D N r- CD \BI ORE TE(1�' I ON \BASIN. SEE DETAIV.- (3)µ35 F "Y PER HJPE ERDRAAIN,TYP•- I z CB-1 I TYPE a CONC. CATCH BASIN GRATE ■ 218.05 DEPTH = 2.25 FT INV. OUT (W) ■ 215.80 (15") CB-2 CONCRETE L ING STAIRS TYPE ■ CONC. CATCH BASIN AND RAMP. E D�TAILS.- GRATE = 217.23 DEPTH 2.25 FT INV. IN (E) = 214.98 (15") INV. OUT (W) = 214.88 (1511) x� x x2,s x�I, x2 o D (nn ' 8! N LAN, � 219A1t 1 7± a W/TBC 24 • G ��� 219. , 219 3 ti n n N D crF FT r 1 I 0 a l Da ull z n IN � � u, I A D ( . zr 2jg ` c) X xlp ).45± / 0 i 9- 9.� ? 219.4 / 19.75 r9 x D 6. 7 4 53 LF \ ° oo :;' w N m w 15"s RCP 1 � � .LOGGING AIL �c 9 m p _ 6 Sp 6 LF � 5 A Rf1b 1 f ry 1 \ 1 sw z ' TBSw \ w 1 1 1 1` o0 e ,2 ° x m s OZ x -- W. t•.y- 2 , - c� rn - 2ca. NDPE 219 4 '. 5 �F 21z9 25 iINDERDRAIN:. Z ,- 8'"gib PERT HDPE '. 23 12"0-Arcp .S.T09IA1 PIPI~o :.� UNOE'RDRAIN ITi+1V .('E) 117 6 z kjN&Rb"'JN m � .. 219 AiVWT , - T YP m C7 21 Sm . 214 55.. C co ' 218 }5rn e __ $_ - 1 u w ldy� 219 _ 8 1 •, I -z'•irn g.S2-i ,�� � 219-A, 1S6.LF 219:C 219.> 8 ' . PERF : DPE .• 19 95.':.: UNDEADRA. IN •. t.9 wvoEIDRA I Iv 219 v 2 t 6 0.: 2L 0 '�~ r�+ 219.3± 2 s :.fir" 1 19.. 95 :�'"'~22!'•' �. B I DAB'1 ENT ION ASI.N::Is1.AND x ' .:` •% S� DE TAI�..S :,.. 22 .. :. .. 220 :.. :.... 0. 3 , � \ O� /. / 0-4 �m ` � Zo 1 / / / / z� 0 O M \ / x x \ c,_ z .; z \ \ z no I �2 D m z � / i r 24' x2� RCF r� 1 6)17 1 , - 0mn /I 3 t f` x NNOO r333 DlNV cZ Z 3O N N '�:7,p® ql 1•�'9 f 9 � x� �. D z 0 -•i D fp mmz r - a3 m D C:'l_AZ D D V Lo O .D - -i ?T11M .p - m m V 3 W�ts� co n D u al mmz_3;s m ox C 0z D ,D 0) U7 O 0 .D - z z.DWD D .-cnm r NN• N A P. £ 91 �m NDw`9n� n -• r .0 0 0 r CD NOTES: I 1. COORDIN TE GRADING AND DR INAGE PLAN WITH SITE PLAN (CS-01), STORMWA ER MANAGEMENT PLA S (BMP-01 & BMP-02) EROSION CONTROL PLAN (EC-0 ), AND CONSTRUCTION SEOUEN6E (G-3). 2. ALL SIT WORK INVOLVING EARTH DISTURBING ACTIVITIES SHALL OCCUR WITH THE LIMITS OF ONSTRUCTION (LOC), AS SHOWN ON THE ERO ION CONTROLPLAN EC-01). 3. THE CONTRACTOR SHALL COMP Y WITH GENERAL AND EROSION CONTROL NOTES (SEE SHEETS 6-2 AND 0-3). GRAPHIC SCALE 30 0 15 30 60 (IN FEET) AS SHOWN CMD z J V > J Z - a a wm z m a00 m(0) (m) ME O O 0 O 00 In 00 E W 'q O� O 1 MMMMEM" ?A U1j w()CO ME" W w za) MCI o 0) L U 00 O (D CC W N I.L C Z L LZOc iz U a 6 O 0.() 0-_ (0 U) UC ��O � LL >1 o (a s U �LL0- lz UNqT SEAL ,,101186.,.. .•�' N CAR ''•., aVF"'�SS . � �� .v <); '`fs• B•�aJ:•'' o*� ISSUED FOR CONSTRUCTION NO. DATE DESCRIPTION 1 •1 - a 1gprMyr with NO cst�spfa PN 011s 0►N1Msd Ilfe'sln. a f/e Intlrttelrl,f pf ssr.lar. 1s In 17pr � � 1f1c pa9rY ad c1101M frr �e101 ff Apr ■YN �•ODsr ffvl= 01 N,la dxum of >.1Nrie1 ,rlfye sidle lmla, atl a0epf1ae11" C., sfo CO V%Irrr 1 `f rtlewl DATE: MAY 30. 2012 CSE PROD. a BAR-0029 DRAWN JBR DESIGNED JOR CHECKED CNN PROJ• MGR. GAR AIRMEN'S CAMPUS B309 PARKING LOT PROJECT STATUS 100% FINAL DESIGN GRADING AND DRAINAGE PLAN CG-01 -L IVE 'DA'K - TREE .(S'.) , LN ACCORDANCE'. W ITH FORT.'' Ll BRAGG ' LDG.I' TYPl, ; .21.9'. 25 3 Lr- T 2 u 0' R,CP , ..STORM. - P lPE NV. (E) - 217._6 ITV . (.W) 7-2: 1 7 219.5. ------- -D----- -8........ 217.5 .............. .-..---.--SQ-...... 18— eb V. 'AS SHOWN (IN FEE 22G. -, C_. I 'j. UNDERDRA IN C L E AN Q UT . -.T YP i 21.9':-'55 21.9.6 1000 v 1 219 , I P D 21 7 5 'C . � a ' 5D - - - - - - - - - - - . w - - 2. . . . . . . . . . 1 8 +� 21.9 J : 5'S ;a� 21 n 219..E /i I I WASHED 219. .SOD;. TYP UNDERDRAIN I NV . 21-5. 0 i -220 + — _.._ I 21 9. 3 — 220 .'0 .0Ile BIORETENTION BASIN ISLAND — PLAN VIEW PER. Lf►�4�rLr,' WUX WA W, a W, I A va, ®r , vil 1100, ■ :rt om►�--_a�►�1�1I►—�_�►_� Wm►_1�_ON 0WN0�� m_�►_—�II►_���►�—_ �_V ' - • - , - r r r' FINISHED GRAD[ (TOP OF SOD) BIORETENTION BASIN ISLAND — SECTION B—B "WASHED" SOD 2' BIORETENTION SOIL MEDIA* MIX: 85-88% SAND, 8-12% FINES, 3-5% ORGANICS MIN. DRAINAGE: 1 TO 2 IN/HR RATE WASHED SAND 4-WOVEN FILTER FABRIC NO. 57 STONE BASIN SECTION DETAIL (Z—Z) NOT TO SCALE *NOTE: THE PHOSPHORUS INDEX (P-INDEX) FOR THE SOILD MEDIA SHALL BE BETWEEN 10 AND 30. SIDEWALK (SEE PLAN) 2' RIBBON CURB AND 15' WIDTH ASPHAL T PAVEMENT — — — — — — — — — — — — — — — — — — — — — — — — — — — — — r .o 6" WIDTH x 611 DEPTH RIVER ROCK 12"0 RCP STORM PIPE BETWEEN "WASHED" SOD AND CURB WAVER SIDEWALK) "WASHED" SOD 5' WIDTH BIORETENTION SOIL WDIA i 1 2' DEPTH BIO[RETENTIOV SOIL MEDIA LAYER --------� (SEE SECTION Z-Z) 8 "0 AVRE UNDERDRA IN — - — - � 1 ' DEPTH BIORE TEN TION SUBDRAINAGE LAYER WITH OWERDRAIN PIPE (SEE SECTIOIIV Z-Z) BIORETENTION BASIN ISLAND — SECTION C—C NOT TO SCALE WO VOLUME TOTAL DA = 0.44 AC IMP. AREA = 0.31 AC I(A) = 71% RV = 0.68 IN R(D) = 1.0 IN TREATMENT VOL. = 1,093 CU. FT. TREATMENT VOL. PROVIDED = 11433 CU. FT. NOTES: 1. COORDINATE WITH GRADING AND DRAINAGE PLAN (SHEET CG-01) 2. SEE DETAIL SHEET DT-03 FOR RISER AND CLEANOUT DETAILS. (9 Z H J V � J Z - a z�mma z a00 m (0) V ME 0 O 0 �\ 0It � 0 UCIO Wrn N U W +� X a)O OD a} co �Nli cZ L �UoCo 00 z�C a � o •m.- cA-(NJ {�V00.- O (a U r-LLa Z SEAL 0 75 B $0 dy^JO ISSUED FOR CONS TRUC T ION NO. DATE DESCRIPTION Thls Ooorint. tagaihfr rith tlls opncspta are Ors qna prsfantaa tlsrain. as Dn ipatrlalWll of awvtq. Tf int*laaa aHr Far itla apscifI proaM oV client for which it an praporaa• of om lfiWQ R rfl farm an this aanrant rtthWt rittpn allthWiZatICn am aOODfion % [all Sipl ljrgilr arf. PA Mali M rltllmt IiE6ilit� to Cori Siy, Erginars. Pi 1 DATE: MAY 30, 2012 cSE PRO.I. is BAR_0029 DRAWN JBR DESIGNED JBR CHECKED CHW PROJ. NCR. GAR AIRMEN'S CAMPUS B309 PARKING LOT PROJECT STATUS 100% FINAL DESIGN BIORETENTION BASIN ISLAND DETAIL SHEET BMP-01 GRAPHIC SCALE 10 0 5 10 20 TO ELEVATION OF a BIO.KENTIr 25.0 fl ° D AS SHOWN (IN FEEL] 215 7 ,� v 'x p v p a d a BOTTOM ELE ATION OF BIORETENTIT BASIN CO = 213.0 1 a o BIORET NTION BASIN D �j FOR ST�RMWATER MGMT D S � ° O ^ CO RIPRAP 1 FOREBAY a a o �a o cUr<)o v C-0 ° SD P l 1 N CD / � � p. a ° z� 5 0.- 2� �2�7GC --� 4101 CONCRETE �jIfAFFLE BOX 1 DROP INLET WITH1TRASH RACK (%Er GRAp LNG —Pt AN ) ° . 4 VERTICAL 0 2 4 10 HORIZONTAL 0 5 10 AS SHOWN (IN FEET) 4' x 4' CgIVCRE71E CA RIM ELEV. = 21 T� INV. IN ( l = .9,10.00 INV. OUT I SEEG14ADl N PL A ---~-!— 1 FINISHED GRADE P BIORETENTION BASIN - PLAN VIEW 20.0 J W FINISH GRADE — (z 213. 0 ) 211.0 —SOIL AEDIA LAYER—' —SLIB—DRAINAGE LAYER- 6 " 0 PERFORATED 10PE UAi1DERDRAIN rlf 0. 3X r TYP. OF 3 35' L ZA ESl 4 , 00 IN —.....�� f f f ff BIORETENTION BASIN - SECTION "WASHED" SOD 21 BIORETENTION SOIL MEDIA* MIX: 85-88% SAND, 8-12% FINES 3-5% ORGANICS MIN. DRAINAGE: 1 TO 2 IN/HR RATE WASHED SAND *NOTE: N—WOVEN FILTER FABRIC THE PHOSPHORUS INDEX (P—INDEX) FOR NO. 57 STONE THE SOILD MEDIA SHALL BE BETWEEN 10 AND 30. BASIN SECTION DETAIL (Y-Y) NOT TO SCALE WO VOLUME TOTAL DA = 0.83 AC IMP. AREA = 0.54 AC I(A) = 65% RV = 0.63 IN R(D) = 1.0 IN TREATMENT VOL. = 1,915 CU. FT. TREATMENT VOL. PROVIDED = 2,454 CU. FT. NOTES: 1 COORDINATE WITH GRADING AND DRAINAGE PLAN (SHEET CG-01) 2. SEE DETAIL SHEET DT-03 FOR RISER AND CLEANOUT DETAILS. c!) z f� J U > --� Q Z - = oc a z Imm CL z 2 a00 Lu 0 0 0) o 00 Lr) SEW v: o', U� O I C) 0) Lq W 00 m W a)NLLCZ oc0 LD � a) CO (/) J _ E_ U LL w oW (a U �LLa. Z SEAL 't v I SSLCD FOR COWS TRUC TI M NO. DATE DESCRIPTION 1i Do0r11t. tagstt� ■i" Ills OOAaapfi Ord d'"14 pramtw wain. a m irlafrr�nt a tsrrTp. is EMarlOfO pnl)l 40Y TfN �pacifia OlrPaaa ar10 nits: for r liah it rrn prepor u R Of an0 topraw ralIslas an this OOOatrnt oifnwt rPttsn 4~ttOtiam WO o0vtTon by Coll Sign Erghors. Ps Sol l a rllflouF liability to Call SignEngirwrs. PA 1 DATE: MAY 30. 2012 CSE PROD. x SAR_0029 DRA11N JOR DESIGNED JBR CHECKED CHW PROD. MGR. GAR AIRMEN'S CAMPUS B309 PARKING LOT PROJECT STATUS 100% FINAL DESIGN BIORETENTION BASIN DETAIL SHEET BMP-02