Loading...
HomeMy WebLinkAboutSW6120505_CURRENT PERMIT_20120817STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW O�f DOC TYPE /YC� CURRENT PERMIT `❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE I t�0/,2ag'1 YYYYMMDD AAC&INA NCDENR North Carolina Department of Environment and Beverly Eaves Perdue Governor Mr. Jing Mester Right Star Properties, LLC 486 NC Hwy 24-87 Cameron, NC 28326 Division of Water Quality Charles Wakild, P.E. Director August 17, 2012 Subject: Approved Plan Revision Stormwater Permit No. SW6120505 Bay -wood Plaza Cumberland County Dear Mr. Mester: DENR-FRO AUK 21 2012 Natural Resources DWQ Dee Freeman Secretary The Stormwater Permitting Unit received a request for a plan revision for Stormwater Management Permit Number SW6120505 on August 17, 2012'. The plan revision includes revisions to remove the proposed driveway onto Clinton Rd.; and does not change the total allowable amount of BUA on the site. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please be aware that all terms and conditions of the permit issued on June 19, 2012 remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be submitted to and approved through the Division of Water Quality prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375; or robert.patterson@ncdenr.gov. Sincerely, for Charles Wakild, P.E. enclosures - approved revised plans cc: 'SW6120505 File w/ enclosures ec: Joe Faulkner, RLA - CE Group, Inc. Mike Lawyer- Fayetteville Regional office Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6494 InterneL www.ncwalerquallty.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturally ,dil rrrw NC®ENR North Carolina Department of Environment and Natural Resources Beverly Laves Perdue Governor Mr. Jing Mester Right Star Properties, LLC 486 NC Hwy 24-87 Cameron, NC 28326 Division of Water Quality i^, iail2s I"v'aldd, P.E. Director June 19, 2012 Subject: Stormwater Permit No. SW61120505 Haywood Plaza High Density Commercial Wet Pond Project Cumberland County Dear Mr. Mester: Dee Freernan Secretary The Stormwater Permitting Unit received a complete Storrnwater Management Permit Application for Baywood Plaza on June 18, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2006-246. We are forwarding Permit No. SW6120505, dated June 19, 2012, for the construction, operation and maintenance of the subject project and the stormwater BM Ps. This permit shall be effective from the date of issuance until June 19, 2020 and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to follow the procedures for transfer of the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Fayetteville Regional Office. if you have any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375; or robert.patterson@ncdenr.gov. Sincerely, for Charles WakiId, P.E. Wetlands and Storrnwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 LGCallon: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6494 internet: www.ncwaterquality.org cc: SW6120505 File ) ec: Mike Lawyer - Fayetteville Regional Office Joe Faulkner, RLA - CE Group, Inc. One NorthCarolina Natumllff 1 An Equal Opportunity l Affirmative Action Employer State Stormwater Permit Pert -nit No. SW5120505 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Right Star Properties, LLC Baywood Plaza 4427 Clinton Road, Vander, Cumberland County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and S.L. 2006-246 (hereafter referred to as the "stormwater rules`) and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 19, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The stormwater control has been designed to handle the runoff from 48,078 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.6 of this permit, and per the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system per the approved plans. Page 1 of 6 State Stormwater Permit Permit No.SW6120505 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, aSres: 1.38 Onsite, ft : 59,298 Offsite, ft2: 956 b. Total laipervioQs Surfaces, fie: 48,078 Buildings ft`: 14,430 Roads/Parking, ft2: 27,285 Other, ft2. 2,895 Offsite, ft 956 956 C. Pond Avg. Depth, feet: 3.0 d. TSS removal efficiency: 90% e. Design Storm, in.: 1.0 f. Permanent Pool Elevation, FMS�: 139.50 g. Permitted Surface Area @PP ft . 3,104 h. Permitted Storage Volunne, ft�: 6,405 at temporary pool i. Storage Elevation, FMSL: 140.90 j. Controlling Orifice: 1.0" O pipe k. Permanent Pool Volume, ft3: 6,127 I. Forebay Volume, ft3: 1,312 m. Receiving Stream/River Basin: Locks Creek 1 Cape Fear n. Stream index Number: 18-32 o. Classification of Water Body: "C" II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction,, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The stormwater treatment system shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. Page 2 of 6 State Stormwater Permit Permit No.SW6120505 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at aii times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, 6 any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Page 3 of 6 State Stormwater Permit Permit ,No.SW6120505 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to cuter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in'force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10.The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11.The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12.The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 19th day of June, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Charles Wakild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No.SW6 i 20505 Baywood Plaza Stormwater Permit No. SW6120505 Cumberland County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit Permit No.SW61120505 Certification Requirements: 1. The -drainage area to the system contains approximately the permitted acieage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. .3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ,4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. .15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 Page 6 of 6 s "e DWQ USE ONLY date Receivtrl Fee Paid rx ress onh Permit Number g' /� i z ��9 5 l✓� 1 2 oS State of North Carolina Department of Environment and Natural Resot.arces Division of Water Quality STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This form may he pholocepied for use as an orisiaal 1. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW6120505 2, Project Name: Ba •wood Plaza 3. Permit Holder's name (specify that name of the corporation, individual, etc.): Right Star ProWrties, LLC 4. Print Owner/Signing Officiai's name and title (person logally responsible for permit): LingLvlester. Member-,''y1anaQer 5. Mailing Address for person listed in item 2 above: 486 NC I-Iwv. 24-87 City:Cameron State:NC"/_ip:28326 ..... Phone 019 ) 633-1306 Fax: (9-19 ?_ 498-0519 Emaii: 'i1 ngfang1'130@N ahoo.com 11. PLAN REVISION INFORMATION 1. Summarize the plan revision proposed (attach additional pages if needed): NCOOT changes to access reciuircNl the removal of the vrovosed driveway onto Clinton ]toad. There are no changes to the overall pgrrnitted impervious area or drainage bash t7owin to proWsed +et pand BMP uChxre_ 111. SUBMITTAI. REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item.. ni 'zls • Original & I copy of Hie flan Revision Application Dorm _ • Two (2) copies of revised plans (must lh• rettisions of original approved plan sheet(s)) If applying for Express review kkn1y available it; 20 em+tal countirs): • Application fiee of $500.00 (made payable to NICDENR) Plan Revision Form Rev 13.haly2010 Page I oft VI. APPLICANT'S CER,riRC'ATION I, (print or type name of lrerson listed in General ljr onrration, item 3) Jing Nester Member -Manager certify that 1 have authorized these plan revisions and that the information included on this plan revision application is, to the bps. t of my icnowl(h1ge, correct and complete. Signature: f ' Date: e lb �� Z Plan Revision Form Rev Muly2010 Page 2 of2 DWQ USH ONLY Date eceived Pee Paid Permit Number 4, ,05 A B503 Applicable ules: ❑ Coastal SW - 1995 ❑ Coastal SW - 2008fUrPh li - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwa ter Management Plan ❑ Other WQ M not Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM [Iris farm may be photocopied fc}r use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should tv consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Ba wood Plaza 2. Location of Project (street address): 4427 Clinton Road City: Vander County:Cunilxmrland Zip:28312 3. Directions to project (from nearest major intersection): Located in the northeast quadrant at the intersection of Baywood Road (SR 1831) and Clinton Road (SR 1006 4. Latitude:350 02' BY' N Longitude:780 46 22.44" W of the plain entrance to the project. II. PERMIT INFORMATION: 1.a.Specify whether project is (cheek one): ®New ❑Modification b.lf Ill is al?l?Ilcation is being submitted as the result of a modification to an existing permit, list the existing permit number its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed" ❑ Completed* *provide a detiigijer's certification N p 2. Specify the type ofFHil t (check one): ❑Low Density,h Density ❑Drains to an Offsite Slorrowater System 1 �r 3. If this application is being submitted as the result of a previously returned application or a teller from DWQ requesting a state stormwater management permit application, list the storinwa ter project number, if assigned, and ill(,, previous name of the project, if different than currently proposed, 4.a. Additional Project Requirements (cheek applicable blanks; information on required stale pernlitscan Ile obtained by contacting the CuSIonler Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 2.80 acof Disturbed Area ❑NPDES Industrial Stormwaler 0404/401 Permit: Proposed Impacts b.If any of these permits have already Ix:en acquired please provide the Project Narne, Project/Pernlit Number, issue date and the type of each permit: ~r ' T. Dorm S WU- l0l Version 07Jun 2010 Page I of 6 Lld r_or? a 7Y III. CONTACT INFORMATION I. it. Print ApplicanL / Signing, Of ficial's name and tills; (specifically the developer, properly owner, lessee, designated y�0vernment official, individual, etc.. who awns the project): Applicant/Organization: Risyht Star Properties, LLC _ �^ Signing Official & Title:finl, Mester, Member -Manager b.Contact information for person listed in item'la above: Street Address: 486 NC Hwy, 24-87 CitV: Cameron State: NC Zip: 28326 Mailing Address (if applicable): City: State: Zip: Phone: &10-911) 633-1306 Fax. f919 ) 498-0519 Email: 'in Fan �1130 ahcxz.com c. Please check the appropriate box. The applicant listed above: is: ® The prol'terty owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact information, item 2a and 21) lx!low) ❑ Purchaser's (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 26 below) ❑ Developer* (Complete Contact Information, item 2a and 211 below.) 2.it. Print Property Owner's name and title butow, if you arc the lessee, Purchaser or developer. (This is the person who owns the property that the project is loc:aled on): Property Owner/Organization 7"4 Signing; Official & Title: h.Contact information for person listed in item 2a above; Street Address: City: Mailing Add ress (if City: State: Zip: State: Zip: Phone; f ) Fax: Email: 3. it. (Optional) Print the; name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization; a Signing Official & Tit h.Contacl information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: Email: Fax: ( ) -- - Form SWIJ-101 Version 07.1un2010 Page 2 47 4. Local jurisdiclion for building permils: Cumberland County __ Paint of Contact: Gary Faulkner Phone #: (910 ) 321-6648 IV. PROJECT INFORMATION 1. In fhe space provided below, brie(1 summarise how the storMwater runoff will be treated. Stormwater runoff from4-iarkinst area sheet flows to catch basins which are directed to at BM We( Detention Pond forebay. There is ap4)roiximatc 1,922 sf of impervious area which could not drain into tale pond, however lhc_pond has been designed to (real this additional impervious area 2.a.If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific: Development Plan or PUD Approval Date: ❑ Valid 13tidding Permit Issued Date: ❑ Other: Dale: b.If claiming vested rights, identify the: re,'ulation(s) the project has been desil;ned in accordance with: ❑ Coastal SW -- 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear _ River basin. 4. Total Property Area: "1.85 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = Total Project Area+:1.85 acres Total project area shall be calculated to exclude the following the nornial pool of impounded structures, t1w area between the banks of streams and rivers, tine area below the Normal High Water (NHVI) line or Mean High Water (MHVV) line, and coastal wetlands landward f onz the NNW (or MHIV) line. The resultantject area is used to calct.rlate rrzlerall perec,iit built upotn area (PLIA). Nnri-coastal ruetlan,ls 1at2clwarcl r f tice NHW pro(or MHVV) lure may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 =62 wo 9. How many drainage areas does fhe project have?2 (Forkigh denszttf, count 1 fir each proposed en�ntneererl stormwater BMP. For lozo fit114t/ and other projects, use 7 for the whole property area) 10. Complete the followint; information for each drainage area identified in Project Information item 9. if there are Mora than four dramage areas in fhe project, attach an additional sheet with the information for each area provided in the same format as below. Dorm S WU-101 Version 07.1un2010 11age 3 o1' 7 QYM9.5 4vee9 ,eD� V/ Basin Information Drainage Area 1 Drainage Area 2 Drainage Area Drainage Area Receiving Stretim Name Locks Creek Locks Creek Stream Class * C C Stream Index Number * 18-32 18-32 Total Drainage Area (so 60,251 21,092 On -site Drainage Area (sf) 59,298 21,092 Off -site Drainage Area (sf) 956 0 6 Proposed Impervious Area" si 50,0(i) ova -VA 04-nV4 1,927 % Im pervious Area*. total 83`i„ 19.1% Impervious— Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 14,430 On -site Streets (so On -site Parking, (sf) 27,285 493 On -site Sidewalks (so 2,512 1,429 Other on -site (so 64 Future (so 2,831 Off -site (sf) 956 Existing; BUA*** (so t) Total (so: 48,078 1922 " Stream Class and fides Number can he determined at: http://rurtnl.tsetse"ir.or��/zvehlruq[ps/csrr/classifcations ** Inrrervious area is deftted as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalk, gravel areas, etc, "** Report only that amount of existing BLIA that will remain after development. Do not report any existing RUA that is to be removed and which 71411 be replaced hit new 13UA. 1-1. plow was the tiff -site impervious area listed alxwe determined? Provide documentation. Based twon on - ground land survey Pn)ieets in Union County: Contact Dll'Q Central Office stuff to check if the project is located i0thin a Threatened & Isndangered Species it alershed that may be subject 10 more stritrgent stonnu>ater requirements as per NC.,I C 0213.0600. V. SUPPLEMENT AND O&M FORMS The applicable slate stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from hit �: �ortaLnrdenr.or wch we ws scr hm manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hlth[lporlaLnrdenr.org;f weh/wdf ws/su/States4v/ formsdc.xs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriator office may he found by locating project on the interactive online snap at hilr�://rorial.ncdenr.org;f web%wcg/ws/su/maw.) Please indicate that the following required information have been provided by initialing in the space Provided for each item. All original documents MUST be, signed and initialed in blue ink. Download the latest versions for each submitted application package from lit tg):%jhorla1.nc;denr.ors,/web/wu/wsjnu/statesw/forms dcx:s. n' Is 1. Original and cme copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per d'art V11 belmo) 3. Original of the applicable Supplement Form(s) (sealed, signed and (fated) and O&M agreernent(s) for each BMP. Form SWU-101 Version 07.Iun2010 Page 4 of 7 4. Permit application processing fee of $505 payable to NCOENR. (For an Express review, refer to littl2://www.enviielli.orgy/haves/anestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permii Ccx)rdinator for additional information and to schedule the required application nureting.) 5. A detailed narrative (one to two pages) describing the stormwater trealmenI/ilia nagement for 6. A USCS map identifying the site location. If the receiving; stream is reported as class SA or the _ receiving; strew►n drains to class SA waters within'/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineo!r and firm. r,. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g;. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of lidal waters, and any coastal wetlands landward of the, MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the hanks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned propertyl project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing; contours, proposed contours, spot elevations, finished fl(x-)r elevations. I. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must he delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring, locations with the existing elevations and toning logs. Include an 8.5"01" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and ihc, method of determining the infillration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifi/ the SHWI' prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed hook: 9655 & 8799 Payp No- 7j6 i� 67 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC _ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must Ile listed as an active corporation in good standing; with the NC Secretary of State, otherwise the applictation will be returned. htt www.sec:reta .state.nc.us Cor porRtion-,CSearcii.as x Form SWU-101 Vcrsion 07.tun2010 Page 5 of 7 VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For it II subdivisions, oulparcels, and future development, the appropriate property restrictions and protective covenants are required to he recorded prior to the sale of any lot. 11 lot sizes vary significantly or the proposed BUA allocations vary, a table listing; each lot number, lot size, and the a[Iowa Me'imill-upon area must lie provided as an attachment to the, compieted and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can !xt downloaded from blip://Portal.ncderv.opt;/��eb/wct%ws/su/statetiN'/lorms dcxs. Download the latest versions foreac:h submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible; for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting; engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Joe Faulkner, RLA LEED AP (Registered Landscape Architect) Consulting Firm: CE Group, Inc. Mailing Address: 301 Glenwood Avenue Suite 220 City: Raleigh T Statc!:NC Zip:27603 Phone: (919 ) 367-8790 ext 102 Fax: (919 ) 322-0032 Email: joe :el;roupinc.com IX. PROPERTY OWNER AUTHORIZATION (►f Contact 171forrnation, item 2 has been filled out, complete this action) 1, (print or hlpe name of pepsin listed in Contact Informatioi, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or ttlpe name (f person listed in Contact Information, item 1a) with (print or type name (f orb anization listen in Contact Information, item 1a) to develop the project as currently proposed. A copy of the leas: agreement or pending; properly sales contract has lien provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SVAJ-101 Version 07Jun2010 Page 6 47 As the legal property owner 1 acknowledge, understand, and agree by nny signature below, that if nny designated agent (entity listed in Contact Information, itern 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending, sale, responsibility for compliance with the DWQ Stormwaler permit reverts back to nne, the property owner. As [lie properly owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise 1 will tv operating a stormwater Irealment facility without a valid permit. l understand that the operation of it stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,0(X) per day, pursuant to NCGS 143-215.6. Signatu re: Datc a Notary Public for the State of , County of do hereby certify that personally appeared before me this_ day of _ . and acknowledge the due execution of the application for a stormwaler permit. Witness my hand and official seal, SEAL My commission expires, X. APPLICANT'S CERTIFICATION 1, (print or type name of permmi listed in Ccmtact Inf)rmation, item Ia) _ling Mester certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the reoluired deed restrictions and protective covenants will be recorded, and that the proposed project complies with tine rcxduirenienls of the applicable stormwater rules uculer 15A NCAC 21-I .1000, SL 2006-246 (Ph. 11 - Post Construction) or SL 2008-21"1. Signature:_ /lY� _ Date: `c 30 2012- 1, /Ua-1whg '9 ! (Lc.itloe' a Notary Public for the State of lvL C/A Rd'lno- , County of LE e , do hereby certify that i U personally appeared kJ before nw this3�� day of r) Z D I_Z, and acknowledge the, due exeCUtlOn ofthe application for a stormwater permit. Witness my hand and official seal, Lee North I Commission SEAL My commission expires_ _ 6 Z 7/ ,;t-O/ U Form SWU-101 Version 07Jun2010 Page 7 of 7 Permit Nuinher: 5V.6 12 0T-0 S (to he provided by DIFQ) Drainage Area Numtx:r; % Wet Detention Basin Operation and Maintenance Agreement will keep a maintenance record on this BMP. This maintenance record will he kept in a log in a known set location. Any deficient BM P elemenLs noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the intgl;rity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ® does ❑ does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the: plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. -- If the hasin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Ronzove the trash debris. The perimeter of the wet Arens of here soil and/or Regrade the soil if iw essary to detention basin erosive gullies have formed. remove the gully, and then plant a ground (.over and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of 1011 . approxiinately six Inches. Form SW40I-Wet Detention Basin O&M-Re%A Page 1 of 4 Perinit Number: .S h/ 6 ) Z O,SZ>.s (to he provided btu DFt'Q) Drainage Area Number: I BMP element: Potentialproblem: How I will remediate the problem - The inlet device: pipe or The. ripe is clogged. Unclog the pipe. Dispose of the Swale sediment off -site. The ripe is cracked or Replace the pipe. otherwise: dance► ed. Erosion is occurring; in the Regrade the %wale if necessary to Swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the it depth greater than the sediment and remedy the probleni if original design depth for possible. Reniove the sediment and sediment storage. dispose of it in a location where: it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent ►ulure erosion robicros. Words are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather duin spraying. The vegetated shelf Best professional practices Prune according; to hest professional show that pruning is needed practices to maintain optimal plant health. Plants arc dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil lest indic;Iles it is necessary. Wends are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has acc,unu►lale d to Search for the source of the a depth greater than the sediment and remedy the: problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause lnipacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmite% or other Remove the plants by wiping them invasive plants cover 50'% of with pesticide (do not spray). the basin Surface. Form SW40 i-Wet IX;tention Basin O&M-Rev.4 Page 2 of 4 Permit Numlxr: S Wb 1 z oSos (to he provided by DII'Q) Drainage Area Numly:r: I BMP element: Potentialproblem: How I will rernediate theproblem: The embankment Shruhs have started to brow Remove shrubs immediately, on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove bea ve rs. A tree has staarted to 1;row on Consult a dam safety specialist to the embankment. remove the tree. An annual insp(_tion by an Make all needed repairs. appropriate professional shows that the embankment needs re air.(if a _licabie The outlet device C1o1,,ginl; has a-curred. Clean out the nutlet device. Dispose of the sediment off -site. The outlet device is damaged Re air or rc dace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Waler Quality Rgdonal Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in lire hlrinkv) Q Permanent Pool l".levation 139.5 Sediment Removal L . 137 Ile anen 1'cxol -------------- Voluune Sediment Removal Llevation 134.5 Vl Bottom Elevatio 136 ft Min.---------------------------------------Lu Sediment Bottom l lcvation 133.5 Storage S lora gc FOREBAY MAIN POND Dorm SW401-Wet Detention Basin O&M-Rev.4 Page 3 o1'.4 Permit Number: S wG l Z n 5 D! (to be provided by DJJ'Q) 1 acknowledge and agree by my signature below that i am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Baywood Plaza BMI' drainage area number: Print name: Jing Mester Title: Member- manauet r Right Star Properties,�LLC Address: 486 NC HM. 24-87 Cameron, NC 28326 Phone:A-633-1306 Signat Note: The legally responsible party should not be a homeowners association unless more than 50% of' the lots have been sold and a resident ol'the suhdi%rision has been named the president. 1, �Jottaut,,O_ A a Notan, Public for the State of �pcti, Caw County of Lec do hereby certify_ that r\q (YIe-5 personally appeared before me this 3oi'-' day, of At! ZorZ ; and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal. Natasha ATaylor Notary Public Lee County North Carolina M Commission Ex Tres 6 7 2016 SEAL My commission expires % /7/ Zo / 0 Form SW401-Wet Detention Basin O&M-Rcv.4 Pate 4 of 4 Permit No. SW<I 2-05DS (to be provided by DWD) Aof w ArFR TA02 4G y NCDENR Q Y STORM WATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, tilled out and submitted along with all of the required information. I,11P,ROJECUNF,ORMATION Project name.,,,; .,. , Baywood' Pima Contact person i 1, : Joe Faulkner. CE Group Inc: ':= Phone number 919-367.8790 ext. 102 I Date 24'Apr 12 Drainage area number d 11.1D=SIGN11NFOR MAT10N Site Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity; 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Past -development 1-yr, 24-hr peak flow PrelPost t-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevations) Top of 10ft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume [T ...r,-..60,254{ 82.98 % 1.T in 3 _tx is r'r •rF 4,0011.. ft3 40 ' OK, volume provided is equal to or in excess of volume required. YV� , „-1(YorN) E3.0:in 0.42I (unifless) `I 0.85 ; (unifless) ig..; 5.20!inmr OK 3.05 ft3lsec 6.10 ft3lsec 3.05 ft3lsec 140.90"fmsl 39.50? fmsl ! 140.00,fmsl 140.00'fmsl 139.004ms1 134.50' fmsi s.::,133.50`fmsl 11.00 ft.. Y, J(YorN) 3 140.9, fmsl OK Form SW401Met Detention Basin-Rey,9-411e112 Parts I. E II. Design Summary, Page i of 2 Permit (to be provided by DING) Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, A,--P,, Area, bottom of 1Oft vegetated shelf, A,_,„ Area, sediment cleanout, top elevation (bottom of pond), Ab t-p d a5;5674 2,802 ft' 4.65 (unitless) OK c' 2,092W Volumes Volume, temporary pool s,i.', '���6;405ift3 OK Volume, permanent pool, Vp _pw ! 6,127i ft' Volume, frebay (sum of forebays if more than one forebay) 't `' 1,312' ft3 Forebay °% of permanent pool volume 21.4% °% OK SAIDA Table Data Design TSS removal Coastai SAIDA Table Used? Mountain/PiedmontSAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vp„r _PW Area provided, permanent pool, Av«m_,,d Average depth calculated Average depth used in SAIDA, d. (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A ._,d Area, bottom of 1Oft vegetated shelf, Ate, ,h q Area, sediment cleanout, top elevation (bottom of pond), A,,_P, d "Depth` (distance b/w bottom of 1Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA. d. (Round to down to nearest 0 5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak Flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of ffowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: is a, ,9Q% (YorN) y (Y or N) 4.65 (unitless) ,N: I ° "',l(Y orN) 6,127 fO 3,104 ff + ,;;ft Need 3ftmin, ift :Y i (Y or N) 3.104 ft' 2,092 ft' 46�it�► _ 3,00 ft OK 1:1 3.0 ft OK . _w_ Y -. _7!(Y0,N) C;,,� E ,. . 1.00 in )in2 ,` � 0.60 (unitless) o (Y or N) ;(unitless) (unitless) ,ft ft 3.05' ft3lsec E 6.10 ft3lsoc 0.03 folsec 3.04 days OK, draws down in 2-5 days. !' 3 OK .10:1 OK s`.,...,.. 10.0,ft OK 3.:1 OK 2.3.:1 OK Y (Y or N) �1:0,ft OK OK € < N 1,_�' (Y or N) OK ..Y. € (Y or N) OK ')(YorN) OK iDue to'elevations pond,will. regtfire pumping out to drain. .,.:. . Form SW401-Wet Detention Basin-Rev.9-4118112 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) Jill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page! Plan Initials Sheet No. i S 1. Plans (1" 50' or larger) of the entire site showing: t 3 Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High Flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and - Filter strip. 3. Section view of the wet detention basin 0" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. ia"! l 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified CAUS on the plans prior to use as a wet detention basin. `T 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, Q to verify volume provided. {j 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. q -tiZ Form SW401-Wet Detention Basin-Rev.9-4118112 Part III. Required Items Checklist, Page 1 of 1 P=@ E- owp= 00 AUG 1 7 2012 DENR - WATER QUALITY Wetlands t� SUiumatu Branch TO: NCDENR Division of Water Quality Stormwater Permitting Unit — 9th Floor 512 N. Salisbury Street Raleigh, NC 27604 ATTENTION: Robert Patterson, PE CE GROUP 301 GLENWOOD AVENUE, SUITE 220 RALEIGH, NC 27603 Phone: (919) 367-8790 E-Mail: ioe@cecgroupinc.com Transmittal DATE: 8/16/12 PROJECT NO: 127-144 Baywood Plaza — 4427 Clinton Road Cumberland County, NC Permit #SW6120505 Quantity I Drawing No. I Description Sets I Revised Site Development Plans for Baywood Plaza II 1 1 1 Stromwater Mangement Permit Plan Revision Application 11 REMARKS Robert, please find attached the revised plans per recent NCDOT permitting requirements. Since a majority of the plans changed I have attached the full set minus the utility and site details which have nothing to do with the stormwater bmp. CC: Cll� Group, Inc. Signed Me Faulkner, RLA LEED AP HK 08655 PG0756 FILED R13CTRONICALLY MORRLAND COUNTY NC J. LEB W&RPaN, JR. FILED Jun 03, 2011 AT 01;51;00 FM BOOK 08655 START PAGE 075d EM PAGE 0757 INSTRU14ENT 18009 RECORDING $22.o0 EXCISE TAX $260.00 Prepared By: Attorney Steve Bunce Return To: Hutchens, Seater & Britton Revenue Stamps $260.00 Tax Pin Number. 0466-78-8437 NORTH CAROLINA CUMBERLAND COUNTY GENERAL WARRANTY DEED THIS DEED made and entered into this 24th day.of May, 2011, by and between William Roy Downing, unmarried, hereinafter called "Grantor," whose mailing address is i 2225 Tom Geddie Road, Eastover, NC 28312 and Right Star Properties, LLC, a Limited Liability company, whose mailing address is 468 NC HWY 24-87 Cameron, NC 28326 hereinafter called "Grantee". The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall Include the singular, plural, masculine, feminine, or neuter as required by context. WITNESSETH-, The Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant; bargain, sell and convey unto the Grantee in fee simple (with the exceptions hereinafter stated, if any), all the certain tract or parcel of land situated in the City of Fayetteville in Eastover Township, Cumberland County, North Carolina, and more particularly described as follows: BEING all of Tract 1, containing 1.38 acres as shown on a plat entitled "RECOMBINATION MAP FOR WiLLIAIVI Roy DOWNING AND WIFE, MARTHA LOUISE DOWNING" according to a plat of same being duly recorded in Book of Plats 114, Page 53, Cumberland County Registry, North Carolina and being the same property conveyed to William Roy Downing and wife, Martha Louise Downing by deed recorded in Book 3535, Page 360, aforesaid registry. Martha Loul�e Downing died in Cumberland County on June 29, 2609 and the property passed to William Roy Downing as the surviving tenant by the entirety. See Death Book 266, Page 185. It is intention of this deed to convey with the above described property that certain manufactured home located on said property which manufactured home has been converted to real estate and is more particularly described as one 1992 Destiny with vehicle identification number 028924AB. This property does not include the primary residence of the Grantor(s). Submitted electronically by "The Law Firm of Hutchens, center & Britton, P.A." in compliance with North Carolina statutes governing recordable documents and the terms of The submircer agreement with Che Cumberland county Register of needs. BK 08655 PG0757 TO HAVE AND TO HOLD the aforesaid tract or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple; that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated, if any. Title to the property hereinabove described is subject to the following exceptions'. a. County and/or Municipal Zoning Ordinances, Rules and Regulations. b. Restrictive Covenants, Easements and Rights of way of record. C. 2011 Cumberland County Ad Valorem Taxes_ IN WITNESS WHEREOF, the Grantors have hereunto set their hands and seals, the day and year first above written. STATE OF NORTH CAROLINA COUNTY OF CUMBERLAND I, certify that the following person(s) appeared before me this day, each acknowledging to me that he or she signed the foregoing document for the purpose stated therein and in the capacity indicated: William Roy Downing, Date: S j� t3 Uiv O , �Q ;•y 2' Qu-.0 l%�BE7Pilaf� ���• C�--� gNotary Pu is jJ j4 Id S ' (JU 11%GG Printed Name of Notary Public My Commission Expires: 16 8799 0067 BAD aIgq PGOQb1 FILED CUMBERLAND COUNTY NC J. LEE WARREN, JR. REGISTER OF QEEDS FILED Dec 30, 2011 AT 10:16:00 am BOOK 08799 START PAGE 0067 END PAGE 0068 INSTRUMENT # 43138 RECORDING $26.00 EXCISE TAX $206,00 uts NORTH CAROLINA GENERAL WARRANTY DEED Fxcisc Tax: $206.00 Parcel Identification No.: 0466-78-9302 Verified by Cumberland County By: Mail/Box tw " e-r 5r P� r w r r n — S /U ? '5-(0 This instrument was prepared by: The Real Estate Law Firm _ _ File No 29601-1 IJJ-BMC Brief description ror the index: 4427 Clinton Road, Vander, NC 283-12 THIS DEED made this _ day of December, 2011 , by and between GRANTOR Estate of Elaine Godwin Nunnery, Gwen P bell and C Parker Poole, Heirs of Elaine Godwin Nunnery, and Stewart M. Bell, spouse of Gwen P. Sell 1710 Winterlochen Road Fayetteville, NC 28305 GRANTEE Right Star Properties, LLC, 4427 Clinton Road Vander, NC 28312 The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in or near the Town of Vander, Eastover Township, Cumberland County, North Carolina and more particularly described as follows: BEING all of Lot Number 5 in a subdivision known as PROPERTY OF LOIS BELL GODWIN and the same being duly recorded in Book of Plats 70, at lyabe 71, Cumberland County Registry, North Carolina. Parcel Identification No. 0466-78-9302 Property Address: 4427 Clinton Road, Vander, NC 28312 The property hercinabove described was acquired by Grantor by instrument recorded in Book 5703, Page 72, and I I -E-327 . All or a portion of the property herein conveyed _ includes or �x_ does not include the primary residence of the Grantor. A map showing the above described property is recorded in Plat Book 70 Page 71. 8799 0068 BX08199 P000bB TO HAVE AND TO }TOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that the Grantor is seized of the prernises in fee simple, has the right to convey the same in fee simple, that title is marketahle and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claim of all persons whomsoever, other than the following exceptions: Restrictions, easements and Rights -of -way of Record. Ad -valorem taxes not yet due and payable. IN WETNESS WHrRVOF, the Grantor has duly executed the foregoing as of the day and year first written. Estate of Elaine Godwin Nunnery Z t —� (S1 Al,) (Entity Name) it P. Bell Hy: / �Lc (SEAL) Title: Gwen P. Bell, Executrix rt M. Bell a By: ����,/ `� ^� (SEAL) Title: C.-Parker Poole / BY: — �r mcF,rt`^�;� StatcofNorthCarolina CountyofCumbtrland Q I, the undersigned Notary Public of Cumberland County, Stale of North Corolino certify that. w; 'pTAriy is Gwen P. Bell and Stewart N1. Bell personally appeared before this day and, being first duly asworn, acknowledged the due execution of the foregoing instrument for the purposes therein tdexpressed, Witness my hand and Notarial stomp or seal, this day of Uccember, 2011 a (C �" ••• �. ` ` 3 MyCommisslnn Expires'. .1Ptiti m f} State of North Carolina County of •J �',�� '•.,�`:•„ 0 1, the undersigned Notary Public of Cumberland County, State of North Carolina, certify that Gwen P. Dell personally appeared before me this day and, being first duly sworn, Estate Godwin acknowledged that she is the Executrix of [fie of Elaine Nunnery, and that she UY;C , . t. r,« U executed the foregoing instrument on behalf of the Estate for the purposes therein stated. �,- •- Witness my hand and Notarial Stamp or seal this _ day ofDccembcr, 2011 .._. I oa }} My Commission Expires i c N r State of North Carolina County of 4Fqw90 rr �ss'`sttUHcr�� '--•l�'x�Or,..••'••• i �i1"� � 1, the undersigned Notary Public of, � a•b County, Slate of North Caroline, certify that C. Parker Poole appeared before this day and, being first duly swam, acknowledged r�ar� / . -y` z personally due foregoing instrumetu for Witness jai the execution of the the purposes therein expressed. my Co'MZ ••�a j p �G hand and Notarial Slatnp or seal, this _ j. day of December, 2011 . r_:d 11L 0 J t. m Witness my hand and Notarial stamp or seal this l5� day of_t•7 EL. My Commission Expires: oh k' �if; ,``ti V�� Notn t tic The foregoing Certiflcate(s) of is/are certified to be correct. This instrument and this cerlificale are duly registered at the date and time and the Book and Page shown an the first page hereof. Register of Deeds for -COUNTY