Loading...
HomeMy WebLinkAboutSW6120204_HISTORICAL FILE_20120320STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW OL�O�I DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE afjL�9,/%!i� YYYYMMDD transmiftal March 20, 2012 to: Robert Patterson from: Vito Grieco,_P.E. company: DENR — Div. of Water Quality title: Civil Project Manager address: 512 N. Salisbury Street tel: (843) 566-0161 Archdale Bldg., 9th Floor Raleigh, NC 27604 subject: Revised Permit Application Package NCDENR Stormwater Management Permit Application SOF Admin I Company Operations Facility Fort Bragg, North Carolina ADC Project No. 11181 The following items are attached: ITEM # DATE DESCRIPTION ADC Engineering Response to NCDENR DWQ Comments 1. 13 Mar 2012 (1 Copy) Stormwater Management Permit Application Form (SWU-101) 2. Revised Page 3 Only (1 Copy) Revised Infiltration Basin Supplement (SW401) 3. 13 Mar 2012 For Basin A (1 Copy) Revised Design Analysis with Calculations 4. 13 Mar 2012 Appendix i Only (1 Copy) Revised Drawing Sheets 5. 13 Mar 2012 Sheets C001, C100, C200, C300, C400, C631, C700, C710 and C721 (2 Full Size Sets; signed, sealed & dated [folded to 8.5x14]) The enclosed revised documents are provided in response to comments received on March 6, 2012. If you have any questions or comments, please do not hesitate to contact me. 1226 YEAMANS HALL ROAO copy by email wl applications only: HANAHAN. SC 29416 v Danny Farmer — RC Construction Co., Inc 843-566-0161 v Michael Jakubiak — USACE fax 843-566-0162 v Roy Selvidge — LS3P Associates, Ltd. AOCENGINEERING.COM MAR 2 1 2012 DENR • WA i rR QUALITY M,MASAANNDSTr7W' ATERBRANCH delivered by: UPS Ground 11181_4,TRN.2012 0320.NCDENR•DWQ.SW ComPes Pkg.doc engineering speciatisls SITE SERVICES Patterson, Robert From: Patterson, Robert Sent: Thursday, March 15, 2012 2:17 PM To: 'Vito Grieco'; Chris Cook Cc: 'david.a.heins.civ@mail.mil'; 'lee.p.ward.civ@mail,mil'; Lawyer, Mike; Lynne Shaw; Jeff Webb Subject: RE: SW6120204 - SOF Admin 1 Company Operations Facility - Additional Information Request Vito, These appear to address my comments. Only thing I see is that the talcs and supplement show 239.1 for the infiltration basin outlet elevation, but the plans and detail show 239.0. See sheets C300, C311, C631, C700, C710, and C721. Thanks Robert. D. Patterson, PE Environmental ]:ngiuecr NCDENR I DWQ I Stormwatter Permitting 1617 Mail Service Center, Raleigh, NC 27699-1617 Mail 1 512 N. Salisbury St, 91h Floor, Raleigh, NC 27604 i,ocrtt.ion tt, I'arculti (919) 807-6375 1'hom: 1 {919) 807-6494 F.ax I Robert. Patterson amedenr.gov l;rttad I http://nortal.nccienr.orgjweb/wq/ws/su Website 6,A Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties Unless the content is exempt by statute or other regulation, From: Vito Grieco[mailto:VitoG@adcengineering.com] Sent: Tuesday, March 13, 2012 1:23 PM To: Patterson, Robert; Chris Cook Cc: 'david.a.heins.civ@mail.mil'; 'lee. p.ward.civ@mail. mil'; Lawyer, Mike; Lynne Shaw; Jeff Webb Subject: RE: SW6120204 - SOF Admin / Company Operations Facility - Additional Information Request Mr. Patterson, Please ignore the drawing sheets that were sent previously (C300, C700, and C710) as they were the old drawings and not the revised. Attached are the revised sheets. Sorry for the confusion. Vito Grieco PE Direct 843-735-5174 vitocOadcenaineerina.com Main 843-566-0161 Fax 843-566-0162 ADCENGINEERING.COM From: Vito Grieco Sent: Tuesday, March 13, 2012 9:55 AM To: 'Patterson, Robert'; Chris Cook Cc: 'david.a.heins.civ@mail.mil'; 'lee.p.ward.civ@mail.mil'; 'Lawyer, Mike'; Lynne Shaw; Jeff Webb Subject: RE: SW6120204 - SOF Admin / Company Operations Facility - Additional Information Request Stormwater Project No. SW6120204 SOF Admin / Company Operations Facility Mr. Patterson, Enclosed piease find a comment response letter, revised plan sheets, and revised calculation excerpts for your review. Upon your acceptance, we can/will send 2 full size sets of plans folded to 8.5x1+ and 1 copy.of the revised calculations (both signed, sealed, dated, and with a revision date). Please let us know the revisions are acceptable at your earliest convenience. Thanks, Vito Grieco PE Direct 843-735-5174 vitog(cDadceng ineering,com Main 843-566-0161 Fax 843-566-0162 ADCENGINEERING.COM From: Patterson, Robert Finailto:robert.pattersonCa)ncdenr.gov] Sent: Tuesday, March 06, 2012 12:10 PM To: Chris Cook Cc: david.a.heins.civ(&mail.mil; lee.p.ward.civ(abmail.mil; Lawyer, Mike; Vito Grieco Subject: SW6120204 - SOF Admin / Company Operations Facility - Additional Information Request Christopher, Please see attached. An original is also in the mail. Please let me know if you have any questions. Thanks. Robert D. Patterson, PE Environmental Engineer NCDENIR I DWQ I Stormwater Permitting 1617 Mail Service Center, Raleigh, NC 27699-1617 Mail 1 512 N. Salisbury St, Raleigh, NC 27604 1 91h Floor Location &, Parcels (919) 807-6375 Phone 1 (919) 807-6494 Fax I Robert, Patterson rt:ncdenr.eov ].mail I http://portal,ncdenr.org/web/wd/ws/su Websitc bA Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records taw and may be disclosed to third parties unless the content is exempt by statute or other regulation, 1226 YEAMANS HALL ROAD HANAHAN, SC 2941D 843-566-0161 fax 843-566-0162 ADCENGINEERING.COM comment response to: Robert Patterson from: Vito Grieco, P.E. company: DENR — Div. of Water Quality title: Civil Project Manager address: 512 N. Salisbury Street tel: (843) 566-0161 Archdale Bldg., 9th Floor Raleigh, NC 27604 subject: ADC Response to NCDENR DWQ Comments NCDENR Stormwater Management Permit Application SOF Admin I Company Operations Facility Fort Bragg, North Carolina Stormwater Project No. SW6120204 I ADC Project No. 11181 Comment # Comment Resolution The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on February 29, 2012. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: Will the future buildings and their associated yes, the future buildings will be treated by 1, impervious area be treated by a separate separate BMP in a future submittal. p BMP in a future permit submittal? Table in IV.10. on SWU-101: a. The off -site DA is shown as zero, but a. Grading plan on sheet C300 is revised based on the grading, it appears that to provide a diversion to re-route the there is off -site area east of the basin existing off -site area to the east of the 2, draining to the basin. Please revise the infiltration basin. table and sheet DA2 as needed. b. Will comply. This portion of the form b. The on -site streets and existing BUA are was incorrectly filled out and has been shown as zero, but the DA to the basin revised, appears to include both. Please revise as needed. The supplement form, calculations, and The Infiltration Basin Supplement Form and plans inconsistently show the volume Infiltration Basin Calculations are revised to provided, storage elevation, storage SA, and reflect the corrected values. Values listed bottom SA. These should all be based on in the plans on the C700 series are the 2.5x design storm. Also, page 2 of the reflective of the "Initial Storage" conditions 3' basin calculations (the table and info below and not the "Final Infiltration Storage". The it) shows two different volumes at the values were incorrectly left on the C710 storage elevation 239'. Please make all Intermediate and Final Erosion Control Plan consistent. and have been removed. The information below the table on page 2 of the Basin Calculations has been revised to reflect the correct volume, engineering specialists SITE SERVICES delivered by: UPS & email 11181 4.COMRES.2012 0308.NCDENR•SW. Patterson comments 2012 0306.doc General General General Please add language to the construction sequence and/or detail D on C721 that states the orifice for the temporary skimmer Sheets C710 and detail D on sheet C721 must be grouted/sealed closed when have been revised per comment. transitioning to the permanent infiltration basin. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 6, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Noted. Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. All revised original signed documents must be returned or new originals must be provided. Copies are not acceptable. Any revised calculations or plans must be Enclosed are sealed, signed and dated sealed, signed, and dated; and have a revised documents (2 sets) and Design revision date shown. Please reference the Analysis with Calculations (1 set) in State assigned project number SW6120204 reference to any changes as mentioned — on all correspondence. If you have any both dated revised March 8, 2012. questions concerning this matter please feel free to call me at (919) 807-6375, or at robert.patterson@ncdenr.gov. Page 2 of 2 March 13, 2012 ADC Engineering Response to DENR-DWQ Comments Stormwater Project No. SW6120204 / ADC Project No. 11181 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Govemor Mr. Christopher B. Cook, PE ADC Engineering, Inc. 1226 Yeamans Hall Rd. Hanahan, SC 29410 Dear Mr. Cook: Division of Water Quality Charles Wakild, P.P. Director March 6, 2012 Dee Freeman Secretary Subject: Request for Additional Information Stormwater Project No. SW6120204 SOF Admin / Company Operations Facility Cumberland County The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on February 29, 2012. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Will the future buildings and their associated impervious area be treated by a separate BMP in a future permit submittal? 2. Table in IV.10. on SWU-101: a. The off -site DA is shown as zero, but based on the grading, it appears that there is off -site area east of the basin draining to the basin. Please the table and sheet DA2 as needed. b. The on -site streets and existing BUA are shown as zero, but the DA to the basin appears to include both. Please revise as needed. 3. The supplement form, calculations, and plans inconsistently show the volume provided, storage elevation, storage SA, and bottom SA. These should all be based on the 2.5x design storm. Also, page 2 of the basin calculations (the table and info below it) shows two different volumes at the storage elevation 239'. Please make all consistent. 4. Please add language to the construction sequence and/or detail D on C721 that states the orifice for the temporary skimmer must be grouted/sealed closed when transitioning to the Permanent infiltration basin,. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 6, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If ycu need additional time to submit the information:, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this ietter. The request must Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Lacalion: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919.807-6300 l FAx 919.807-6494 Internet: wwi.roNaterquality.org An Equal Opportunely 1 Alfirmative Action Employer NorthCarohna �17aturallt, Mr. Christopher B. Cook, PE SW6120204 — SOF Admin / Company Ops Facility March 6, 2012 indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. All revised original signed documents must be returned or new originals must be provided. Copies are not acceptable. Any revised calculations or plans must be sealed, signed, and dated; and have a revision date shown. Please reference the State assigned project number SW6120204 on all . correspondence. If you have any questions concerning this matter please feel free to call me at (919) 807-6375, or at robert.patterson@ncdenr.gov. Sincerely, Robert D. Patterson, PE Environmental Engineer Stormwater Permitting Unit cc: SW6120204 File ec: David Heins — Fort Bragg DPW Lee Ward — Fort Bragg DPW / WMB Mike Lawyer— Fayetteville Regional Office Page 2 of 2 Application Completeness Review x First Submittal ❑ Re -submittal Development/Project Name: 9 OF Receiving stream name River Basin: Gg,�� y.f A_„ Bill Diuguid 4 High Density Projects that require a 401 /404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): W1,4 Latitude and Longitude: 35 D 7 / 8 Al — f7g S9 z(, {<,y�_ Jurisdiction Fo g-,L ;&g r r Project Address: -H o S. Engineer name and firm: CI s o I)C r Phone: _?*'s -SG G - 6 (a t Email: eti Is the project confirmed to be in the State MSI Stormwater Permit jurisdictio ? es or ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets 5?4gh Density ❑ Other ❑ 4 1/404 im acts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) ck for $505.00 included Veriginal signature (not photocopy) on application Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: http://www,secretary.state.nC.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed restriction statement B/ Sealed, signed & dated calculations Gv" Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale r"Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement G Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road ia' Two sets of sealed, signed & dated layout & finish grading plans with appropriate details ,5�rrfaf ar' arrative Description of stormwater management provided ils report provided 41 as 4ek Wetlands delineated or a nt5teon the plans or in the accompanying documents that none exist on site and/or adjacent property W, 4-6jh# $ 00 ' 1:cr ,4 F/a o W T -',ue_ jG / nl o i;4,rncT V,D etails for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; a/ imensions & slopes provided o r 1 tSainage areas delineated 1� ❑ Pervious and impervious reported for each ❑ Areas of high density :MP operation and maintenance agreements provided Application complete ❑ Application Incomplete Returned: (Date) Comments May 5, 2011 Revision, Bill Diuguid 1226 YEAMANS HALL ROAD HANAHAN. SC 2941D 843-566-0161 fax 843-566-0162 AOCENGINEERING.COM February 28, 2012 to: Robert Patterson from: Vito Grieco, P.E. company: DENR — Div. of Water Quality_ title: Civil Project Manager address: 512 N. Salisbury Street tel: (843) 566-0161 Archdale Bldg., 91, Floor Raleigh, NC 27604 subject: Permit Application Package NCDENR Stormwater Management Permit Application � � SOF Admin I Company Operations Facility i} Fort Bragg, North Carolina �J ADC Project No. 11181 FEB 2 9 2012 The following items are attached: DENR• WATER OUALITY WEX'kNDS AND STORMWATER BRANCH ITEM # DATE DESCRIPTION 1. 17 Feb 2012 Stormwater Management Permit Application Form (SWU-101) (1 Original & 1 Copy) Infiltration Basin Supplement - Operation & Maintenance Agreement (SW401 0&M) 2. 17 Feb 2012 For Basin A (1 Original (1 Basin)) Infiltration Basin Supplement (SW401) 3. 27 Jan 2012 For Basin A (1 Set; signed & sealed) 4. 31 Jan 2012 Stormwater Application Processing Fee ($505, Check #048411) 5. 30 Nov 2011 Geotechnical Engineering Report (1 Bound Copy) 6. 01 Feb 2012 Design Analysis with Calculations (1 Bound Copy; signed, sealed & dated) 7. 01 Feb 2012 Site Drawings (2 Full Size Sets; signed, sealed & dated [folded to 8.5x14]) The enclosed documents are provided to obtain a Stormwater Management Permit for the subject project. If you have any questions or comments, please do not hesitate to contact me. engineering specialists SITE SERVICES delivered by: UPS Overnight 11181_3a.TRN.2012 0228.NCDENR-DWU.SW App Pkg_Final.doc copy by email wI applications only: v Danny Farmer — RC Construction Co., Inc. Michael Jakubiak — USACE Roy Selvidge — LS3P Associates, Ltd. Page 2 of 2 February 28, 2012 NCDENR Stormwater Submittal ADC Project No. 11181 048411 r,DATE': s INVOICE NO gi _11 i V J DESCRIPTION> ' n. :INVOICE`AMOUNTz` :,; DE000TiON;; :;: ^" -, BALANCE.�� ormwa er view `- 5 5-.00 7i6w,y�k -yea sa, AECK ' 1 31 ; '' cHECI� ' 4 8 411=:` TOTALS 5 0 5' 0 0 0 0 505.00 DATE _12' NUMBER= . -`K ` PLEASE DETACH THIS PORTION AND RETAIN FOR YOUR RECORDS. ' ' R C, CONSTRUCTION', U I.; aR S�� MUST OD$57 0 r i S L N Z e i 842 :,GREENWOOD,' MISSISS10138930 048411 ay. ************************** -**'*:*****Five 'hundred five dollars and no cents DATE CHECK,NO. AMOUNT January. 31,.-201.2 48411 $********505.00 . PAY.. NCDENR TOTHi .F'ayettev, 13e .Regional Office oR F ' 225 Green 'STreet, Suite - 714 of ..... . -Faye.ttev,i•1'1e:; NC" .M01 ACCOUNTS PAYABLE