Loading...
HomeMy WebLinkAboutSW6120204_APPROVED PLANS_20120323STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW _& DOC TYPE ❑CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE YYYYMMDD 1 2 3 El 5 IN C N i AO 0 U U 0 a LOCATION MAP SCALE CIVIL ABBREVIATIONS BTTM BOTTOM BM BENCHMARK BMP EROSION CONTROL BEST MANAGEMENT PRACTICES BW BOTH WAYS CB CATCH BASIN CI CAST IRON CGP NPDES CONSTRUCTION GI-NERAL PERMIT SCR 100000 CL CENTERLINE CMP CORRUGATED METAL PIPE. CO CLEANOUT CONC CONCRETE CPV CAR POOL / VAN POOL CY CUBIC YARDS DCVA DOUBLE CHECK VALVE ASSEMBLY DI DROP INLET DIA DIAMETER DIP DUCTILE IRON PIPE IDS DOWNSPOUT EL ELEVATION EXST EXISTING EW EACH WAY FEV FUEL EFFICIENT VEHICLE FIFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FH FIRE HYDRANT FIN FINISHED FM FORCE MAIN GI GRATE INLET HDPE HIGH DENSITY POLYETHYLENE IAW IN ACCORDANCE WITH IE INVERT ELEVATION JB JUNCTION BOX LF LINEAR FEET LP LIGHT POLE MAX MAXIMUM MH MANHOLE MIN MINIMUM NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES NCDOT NORTH CAROLINA DEPARTMENT OF TRANSPORTATION N01 NOTICE OF INTENT NOT NOTICE OF TERMINATION NTS NOT TO SCALE ONUS OLD NORTH UTILITY SERVICES, INC. OC ON CENTER ODSA OPERATOR OF DAY TO DAY SITE ACTIVITIES ONUS OLD NORTH UTILITY SERVICE PC POINT OF CURVATURE PP POWER POLE PT POINT OF TANGENT PVC POLYVINYL CHLORIDE PVMT PAVEMENT RAID RADIUS RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN READ REQUIRED RPBP REDUCED PRESSURE BACKFLOW PREVENTER R/W RIGHT OF WAY SABC STABILIZED AGGREGATE BASE COURSE SF SQUARE FEET SSMH SANITARY SEWER MANHOLE SWPPP STORM WATER POLLUTION PREVENTION PLAN S SEWER SB SILT BARRIER SD STORM DRAINAGE CA SS SANITARY SEWER SERVICE ;;'�'� o��:tfo4�j': STA STATION SUS SANDHILLS UTILITY SERVICE TBM TEMPORARY BENCH MARK = SEAL22331 - TC TOP OF CURB - I I� --�c TG TOP OF GUTTER TIP TOP OF PAVEMENT TYP TYPICAL VC VITRIFIED CLAY W WATER Hr/ WITH SIGNATURE WS WATER SERVICE wV WATER VALVE CHRISTOPHER B. COOK PRINTED NAME PROJECT ENGINEER SOF ADMIN COMPANY OPERATIONS FACILTY FORT BRAGG, NORTH CAROLINA GENERAL NOTES 1. ALL CONTRACTORS/SUPCONTRACTORS/PERSONS THAT WILL BE ENGAGED IS LAND DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION CONTROL AND STORM WATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS AND PERMITS. 2. TOPOGRAPHIC AND BOUNDARY INFORMATION BY ADC ENGINEERING, INC. OCCURRED FROM 11 /1 /2011 TO 11 /4/2011 AND 11 /7/2011. 3. ALL ELEVATIONS REFER TO NAVD 88 DATUM. 4. THE EXISTING UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABI..E INFORMATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL UTILITIES PRIOR TO BEGINNING ANY WORK. IF UTILITIES OTHER THAN THOSE SHOWN HEREON ARE ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY AND TAKE APPROPRIATE MEASURES TO PROTECT THE LINE(S) AND ENSURE CONTINUED SERVICE. THE CONTRACTOR SHALL VERIFY THE CONNECTION POINTS OF NEW UTILITIES TO EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 5. THE CONTRACTOR SHALL INSTALL TREE PROTECTION BARRICADES PRIOR TO BEGINNING EARTHWORK OPERATIONS. 6. THE CONTRACTOR SHALL PLACE 4" OF TOPSOIL IN ALL DISTURBED AREAS NOT TO BE PAVED. THE CONTRACTOR SHALL ALSO PROVIDE TEMPORARY AND PERMANENT SEEDING IN ALL AREAS INSIDE OR OUTSIDE THE LIMITS OF CONSTRUCTION THAT ARE DISTURBED BY THE CONTRACTOR'S OPERATIONS. 7. CONTRACTOR SHALL GRADE ALL AREAS TO DRAIN FOR POSITIVE FLOW PRIOR TO I71NAL APPROVAL. 8. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, SHORING AND TEMPORARY SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 9. ALL UTILITY WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF SANDHILL UTILITY SERVICES, LLC, OLD NORTH UTILTY SERVICE (ONUS), NEC, AND FORT BRAGG DPW. WHERE ANY DISCREPANCIES EXIST BETWEEN THESE DOCUMENTS AND AGENCY REQUIREMENTS, THE REQUIREMENTS OF THE PROVIDING AGENCY SHALL BE ADHERED TO. 10. IN PERFORMING CONSTRUCTION OBSERVATION VISITS TO THE JOB SITE, THE ENGINEER SHALL HAVE NO CONTROL OVER NOR RESPONSIBILITY FOR THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK. 11. THE CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE WORK IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR, WHO IS ALSO RESPONSIBI-E FOR COMPLYING WITH ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY ANY REGULATORY AGENCY. 12. IT IS THE CONTRACTORS RESPONSIBILITY FOR DESIGN, ADEQUACY AND IMPLEMENTATION OF ALL DEWATERING. ALL DEWATERING ACTIVITIES SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE STORMWATER POLLUTION PREVENTION PLAN. 13. CONTRACTOR SHALL CONTACT N.C. ONE CALL SERVICE (1---800--632-4949) AND DPW FACILITIES MAINTENANCE DIVISION (1-910-396-0321) PRIOR TO ANY WORK. CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING AND PROTECTING ALL UTILITIES. CONTACT THE CONTRACTING OFFICER IN THE EVENT THAT UTILITIES CONFLICT WITH NEW FACILITIES. 14. ACCORDING TO THE INFORMATION PROVIDED BY USACE, THERE ARE NO WETLANDS WITHIN THE LIMITS OF THIS PROJECT, TRAFFIC CONTROL NOTES 1. CONTRACTOR SHALL PERFORM ALL NECESSARY COORDINATION WITH FT BRAGG DPW FOR WORK WITHIN THE EXISTING ROADWAY, INCLUDING BUT NOT LIMITED TO PREPARATION OF AND OBTAINING APPROVAL OF ALL NECESSARY TRAFFIC CONTROL PLANS AS WELL AS PLANNING AND EXECUTION OF ALL NECESSARY COORDINATION MEETINGS. CONTRACTOR SHALL ALSO ENSURE ALL TRAFFIC CONTROL AND ROAD CLOSURES ARE COORDINATED IN ADVANCE WITH POST SECURITY AND THE FIRE DEPARTMENT. 2. CONTRACTOR SHALL MAINTAIN NCDOT SITE VISIBILITY TRIANGLES AT ALL ACCESS POINTS FOR THE DURATION OF CONSTRUCTION. 3. ALL TRAFFIC CONTROL SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS (MUTCD), CURRENT EDITION. SEDIMENT AND EROSION CONTROL SHALL BE STRICTLY ENFORCED I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED AND APPROVED BY ME AND THAT AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF NORTH CAROLINA. SIGNATURE PRINTED NAME PROJECT MANAGER DESIGN CERTIFICATION: I HEREBY CERTIFY THAT THIS PLAN HAS BEEN DESIGNED IN ACCORDANCE WITH THE 2009 STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL OR CURRENT REVISIONS ,""""f., THEREOF, AND DEPARTMENT OF THE ENVIRONMENT STORMWATER,,`';"k CARp�''-; MANAGEMENT REGULATIONS. SD 1 3 Z 01 f 2 012 DATE DESIGNER'S SIGNATURE INC REGISTRATION No. CHRISTOPHER B. COOK 022331 P.E PRINTED NAME SIGNATURE PRINTED NAME USACE REVIEWER SIGNATURE NORTHERN TRAINING AREA AND THE OVERHILLS AREA. • r • HAUL ROUTE MAJOR ROADS STREETS ++ H4 RAILROADS ----- INSTALLATION BOUNDARIES ® INTERSTATE ROUTE o U. S. ROUTE 87 STATE ROUTE LAKES PRINTED NAME LIST OF DRAWINGS SHEET TITLE ISSUED REVISED C001 CIVIL LEGEND, ABBREVIATIONS & NOTES 317/2012 C100 EXISTING SITE & DEMOLITION PLAN 3/7/2012 1 C200 SITE PLAN 31712012 1 C300 GRADING & DRAINAGE PLAN 3/7/2012 C310 STORM DRAINAGE PROFILES 317/2012 C311 STORM DRAINAGE PROFILES 3/7/2012 C400 SITE UTILITIES PLAN 3/7/2012 C620 CIVIL DETAILS - PAVEMENT 3/7/2012 C621 CIVIL DETAILS - SIGNAGEI MARKINGS 31712012 C622 CIVIL DETAILS - SITE STRUCTURES 3/7/2012 C630 CIVIL DETAILS - STORM DRAINAGE 3/7/2012 C631 CIVIL DETAILS - STORM DRAINAGE 3/7/2012 C700 INITIAL EROSION CONTROL PLAN 3/7/2012 C710 INTERMEDIATE AND FINAL EROSION CONTROL PLAN 3/7/2012 C720 CIVIL DETAILS - EROSION CONTROL 3/7/2012 C721 CIVIL DETAILS - EROSION CONTROL 3/7/2012 C722 CIVIL DETAILS - EROSION CONTROL 3/7/2012 C730 SW PPP 1 EROSION CONTROL NOTES 3/7/2012 C731 SW PPP 1 EROSION CONTROL NOTES 31712012 ENVIRONMENTAL COMPLIANCE Xppro,-Fed $:omiwa*:�'4r Parmit L-�acuaWntc ssonstructior it accordan ? witi- ;Wiese docunwr* R; requited by ine stormwaler permit North Carodirw rules require that the st,rmwa>> lvste,A donew tnupect during construr'.im certify conform ww, jF plant And spe'..;; *srn' Certify mWitance with its .aamiwater rules. ! 15A NCAC 2H .10Q8(I)) Permit #. S✓ 6 Z D z- G4-t Gate 3 Z !'V...._ ..0 . 11G .,t510t5 of ` ',I9i•: `Tote SIGNATURE PRINTED NAME WATER MANAGEMENT BRANCH CORRECTED FINAL SITE/STRUCTURAL 07 MAR 2012 c SIX = SEAL "—TUT�c �a"'L N N 0 r z W O z U O p z F U a Z 0 U W Z a w O U � o 5; w a ac W co o W U] 0 0 N � 0 ;t, ar zU) ioo 0 < ZOX ZQ WZ 10 af r- z � z � U= H-= Z Lw 3V Z' Wr- a UEw Wo m �a 12z nlu 02 zz UU y ao LuLL �J m Q co -j a: U- 0 w Q uj U' L L �' Za W Z o ° d� LLI p U) '� m N Z ao 0< r00. a a¢ w< U) m w � U 0 o w co LLi Q 2 OZO w U) V) r 1- af Z 30 0o 0 0 p OZ' 0 Z >w ¢Na w CL Y1 C7 JNU a � w J U a O Z LL U) 06 Z 0 U Z 1-- 0 O w O Q ELQ 0 co ° Q W 00 CIDz o Z z w Z o a CO w J LL. J_ 0 U SHEET IDENTIFICATION cool L 2 3 ---- - - -.- uT- - in� �o � ;� J -- �r._.a u�T'y Q �C�C3�t3D;fl60� o,"t �� ,� �20 O Q�� ,\ 1 -'- 7 Ol"HOLLY O�^ LY �Q�'..� C LL i H L-... . - G71�"Q Y, _..,.. _0.1."HOLLY,Q 11 FH _ .._ . 24 8; cy - ... c� SSMH 7 - RIM: 258.25 IE A:249.96 I � �- - mow- -I� - - wB w. w - -w'IE 13:249.99 - - - I N: 499237.71 - w I CURB INLET I I --�- PSYORS ROAD IE C:249.63 70 E. 2002738.Q4 I I � HOODED 9 _ I I ELEV: 261.62 36" RCP RIM: 262.02 -� / s - - s - - - s - - - WEIR:261,42 - - - - - _-i LY - UT -_ - - v -."uT Y UT - UT �' - UT - - UT. LE. B: 253 42, - - - UT - - - - - - - - - _- {" LARGE SATELLITE DISH LARGE SATELLITE DISH AN TEN N A ' 1/ ANTENNA—' 1 STORY BRICK FFE='264.1 17- 11 6 4 �N.T�NNA - ALL SATELLITE DISH , 11 El END UNKNOWN A C ma's - -'=s - - - / . 7 i S5MN B ~-- r 10, k7 , SSMH " 10 RIM: 257 07 --'" 255-- IE...A 251 34 ' - IE_ A 24 s -- I �P RY ' "IE B: 257.98 I E B 24 53 y✓ 4 . _ IE C:251,22 " - %"P XE - -~ Y IF C 24: ARP v - i ERRY -- r i P � ... x-. i o XE4- �o�x£ 14 LE. A - a6.65 �, P XE I.E. [3:!/F40) \TYP y \ \, xE 1 �oT7"P xE XE. 2 ' 50 �� 13 TYP 5'P XE -- -250 , 0� -------_---25D-__---- f i zso i _ / yip y, l / f'P xE moo. P XE _ ._ _._ / \ 11 y /., -_o-12-P Z / �PI?-XE �oPP XE O r/ / , 3 _ P \\ /\P xE 4 i O'7 will i �V �8\�v! 3824 �I` rp 499 07� P Q ELEV: 257: p --- a \ I �WV u5 P _ r - w - z „P _ I _ I / f a , s„ p z P,P 4 C: -- ,, 2.'P Of'P CURB INLET ~ \� HOODED 8 RIM:258.48 xE c I WEIR: 257.90 t.E. A:252.20 To I LE. B:252.50 3"F Xr, I x ------ I.E. C: 252.23 r3 P ° AP I % A - I`/�� F I I EL _ c � I to, c c -�,\Ix XF P /\ ° \' o -I \ XE �I�P \\P I I �y x , F� 01 \ \ I I xF � I 4,Rrs op D��� \\P T., �',.P / AREA/�IITHIN PR( J2 of��21P LIMITS BUT NOT WITHIN °"�P 7 DISTURBED A PI x-LP I i �.-7" 4 AREA WITHIN PROJECT ` �\ LIMITS BUT NOT WITHIN DISTURBED AREA P \ �I\ P I �..R I l �P 4I P Is,P III 3"P 4REA WITHIN PROJECT LIMITS BUT NOT WITHIN I DISTURBED AREA SSMH 30 �- ,. EIMA239,70 I_ / 9 / �_ 1 IE B: 239.25 A 12 PVC - - 12- PVC - - - - s 0" VCP %P 4 ` IE C: 239.Q5 - - S �� S 5 -S -S -S 5 -S 2 qs - - - - - - - - - - - - - - - - - - - - - - M 2r`L ss H 4 _ RIM: 250.52 �h"P .�. ..^ P N c I I ��� / / � P '` PRl �- 0 , 0 C L_T13 {I / _ �}P xE r• R,Ip, 246.93P IE A: �'40.65* ���, 1Z� I , � �� hF;P• 245.69 SSMH 4 I I I t <s- �J o ` 5-----'- -- IE E'J: 242.15* RIM, 247.16 cn_-i 2c^ * I_ IE A• 2.57 66 � y IE 8:237.91 I -I Iw �z4s IE C:237.71 ° y \ 3'r IE s a� - L -� J CURB INLET D:2 .64 �o EAD a II HOODED 26 10 I 7 / j - RCP�N T 5 P RIM:243.15 Y RIM: 243.72'- 3"P DROP INLET 2` WEIR: 242.47 DROP INLET 16' - _ I WEIR:242.40 �\ i RIM: 242.89 - RIM:243.42 I I 1 _ n�x: E 5G* - WEIR: I. A.237. 2_ ` DROP INLET 20 I I I I • 240. /i\ \ x� \ BM POTTON SPINDL ` / �; IE 0.83 3 RIM: `,._. * I % 8 _ I��. :24 * 8:2 7. 2 N. 498884.93 WEIR:241.72 IE IN:239.54 i I I / 0 � l IE IN: 239.98 �o�xE �� E: 2002786.02 9� P XE': IE:240.57* * CATCH BASIN DR P NLET 24 / \ El 243 65 IE OUT: 239.22* RIM:241.79 RIM:243.25 � I � -/ � - 5 GENERAL NOTES: 1. SEE SHEET C001 FOR CIVIL NOTES AND ABBREVIATIONS. 2. PRIOR TO ANY LAND DISTURBING ACTIVITY INSTALL EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE C700 SERIES. ALL CONTRACTORS/SUBCONTRACTORS/PERSON THAT WILL BE ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION CONTROL, AND STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS, AND PERMITS. 3. UTILITY LOCATIONS SHOWN ARE APPROXIMATE. FIELD LOCATE AND PROTECT ALL UTILITIES. NOTIFY ENGINEER IF DISCREPANCIES ARE FOUND AND DOCUMENT ON AS --BUILT DRAWINGS. ASTERISK (*) DENOTES UTILITY PIPE/STRUCTURES THAT COULD NOT BE VERIFIED IN SURVEY AND ARE BASED ON SURVEY IN RFP PROVIDED BY 4D SITE SOLUTIONS, INC. 4. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB/WALL. 5. SPOT ELEVATIONS ADJACENT TO CURB ARE TOP OF PAVEMENT a ELEVATIONS. KEYNOTES: 1. COORDINATE RELOCATION OF ELECTRICAL SWITCHGEAR WITH SANDHILLS UTIITY SERVICE (SUS). SEE C400 AND ELECTRICAL DRAWINGS FOR PROPOSED NEW LOCATIONS. 2. COORDINATE RELOCATION OF GUY WIRE WITH SANDHILLS UTILITY SERVICE, 3. REMOVE ASPHALT ROADWAY IN ITS ENTIRETY. SAWCUT AT LIMITS OF REMOVAL. 4. REMOVE CURB AND GUTTER INCLUDING CONCRETE DRIVEWAYS. SAWCUT AT LIMITS OF REMOVAL. 5. REMOVE ASPHALT DITCH IN ITS ENTIRETY TO LIMITS SHOWN. SEE SHEET C300 FOR NEW STORM DRAINAGE. 6. COORDINATE REMOVAL/ABANDONMENT OF EXISTING SEWER MAIN WITH OLD NORTH UTILITY SERVICE (ONUS). IF ONUS DOES NOT REMOVE THE PORTION UNDER THE BUILDING, ONUS SHOULD FILL THAT PORTION OF PIPE WITH FLOWABLE FILL. SEE SHEET C400 FOR PROPOSED NEW SEWER LOCATION. 7. COORDINATE REMOVAL OF EXISTING MANHOLE WITH ONUS. 8. REMOVE STORM DRAINAGE LINE TO LIMITS SHOWN. SEE SHEET C300 FOR NEW STORM DRAINAGE SYSTEM. 9. REMOVE STORM DRAINAGE CATCH BASIN IN ITS ENTIRETY. 10. COORDINATE REMOVAL/ABANDONMENT OF WATER MAIN AND APPURTENANCES WITH ONUS, SEE SHEET C400 FOR PROPOSED NEW WATER SYSTEM LOCATION. 11. COORDINATE REMOVAL/ABANDONMENT OF EXST UNDERGROUND ELECTRIC WITH SUS. SE E EE C400 AND ELECTRICAL DRAWINGS FOR PROPOSED NEW LOCATIONS. 12. RELOCATE TELECOM AS NECESSARY TO FACILITATE CONSTRUCTION OF STORM WATER MANAGEMENT AREA. SEE SHEET C400 AND ELECTRICAL DRAWINGS FOR PROPOSED NEW LOCATION. 13. CLEAN AND GRUB TREE STUB IN ITS ENTIRETY AND REMOVE TREE. GOVERNMENT MAY DEEM SOME TIMBER SALEABLE AND REMOVE PRIOR TO CONTRACTOR CLEARING OPERATION. 14. CLEAR, GRUB, AND STRIP TOPSOIL UNDER AND BEYOND THE LIMITS OF ALL NEW STRUCTURES AND PAVEMENTS AND AREAS TO BE GRADED. 4 15. PLUG DOi NSTREAM STORM PIPE/STRUCTURE TO BE ABANDONED. 16. COORI7l LOWERING OF EXISTING WATER LINE WITH ONUS. 17. CONTRACTOR SHALL PROTECT SATELLITE DISHES AND WILL NOT DISTURB ANY TRANSMISSION LINES ASSOCIATED WITH DISHES IN THIS AREA. EXISTING SITE DEMOLITION LEGEND WATER LINE W/ VALVE = W SANITARY SEWER PIPE - s T SANITARY SEWER SERVICE _SS_ WATER SERVICE w - - w - - I.E.: 240.20 - w-ULIl242.23w - w E2399� - - - 141 , �. ..^ STORM DRAIN �w~ -- - _ w -w- - -, w- w. - - w w ` -w =- -- v} RCp �- - - J EXISTING TREE - PH _ .. .__ J _. SIZ - 16 9 \ / 6' -- � -�-��•j/ " _ � INLET 27 *. 0- 6" RCP `� I. l� // RIM:243.24 3 SON TAY ROAD I 14 RCP -•- i �Q /// / WEIR:(VARIES) 241,62-241.81 • I 1 3 / / /. I: LE. A:236.29 TREE TO BE DEMOLISHED X SIZEi aFE 15.- 3 i pro LE. B: 237.71 i E. C. 236.34 RCP, / / // POWER POLE OPP DROP INLET 19 ; _ � - - T 4 / /// RIM: 242.62 -' H7G41 WEIR: 24"1.33 I� , � '� DROP IN, 18 / G_ .��.... RIM:242.38 INVERTS INACCESSIBLE - - - - ur - -' - ur - - - - ur - - UT - ur - - r - - - r - - - ur - - - ur - - - - uT - - - - ur - -�7 � Z{ WEIR: 240.98 Tj / - - - - - url t Ur - - - . LIT 1* MH7G42 DROP INLET 1 J -- E: 38 / ..� RV : 242.77 I I� - - LIT / "/ CATCH BASIN 45 W IF�:241.11 o P � � � CURB INLET RIM: 240.41, ' I • 237.66* I ., I +_ - `�� / T UT .. D '8 i Q /,� HOODS ' I.E.: FULL OF DEBRIS: x - - - x - I -� y �� // / / RIM: 242.67 I1,E. El� 3 17 Lam- �\ I / _I:E. B:23. 12 --- -_- ---- --- I �� /' _ 'F x- x= x x- x- x� �I I I�� 8 -�- .p _ r �! _1 _ zns- - IA l TYP -I I 12 //✓/;/I - - d • / r, d � 7" -- - - - SDMH 48 RIM: 240,99 .E. A:236.39 I " -/ / ; - . I.E. B:236.34 I.E. C:237.19 BURIED BOX IN AREA 1J / / / i I CATCH BASIN 44 RIM:241,87 I.E.: 238.81 15" HDP#-" PRIB H 43 C �Q 11 ! A: 238.87 Irn a: 237 98 1 1 m: 1� 1 BUILDING H-1617 1 STORY METAL FFE=242.3 SDMH 46 RIM: 241.88 E. h:2 5.13 S 'ILDING H-1725 0 P /� I I ` /// E. 8:2 4.73 1 STORY METAL F, o 1 FFE=248.9 x1pIP T b ' / --�----- �' -� --- I � w - - / - 4 - _ - - - - - w - � � _r' - w - -- w - - w - - w - - w SANITARY MANHOLE 0 SEWER CLEANOUT o00 CATCH BASIN lu cB FIRE HYDRANT _6 TRANSFORMER 1E CONTOUR __-- 24 ---- SPOT ELEVATION ITEMS TO BE DEMOLISHED FENCE POWER LINE (OVERHEAD) POWER LINE (UNDERGROUND) TELEPHONE LINE (OVERHEAD) TELEPHONE LINE (UNDERGROUND) GAS LINE LIMITS OF CONSTRUCTION/ LIMITS OF DISTURBANCE HORIZONTAL SCALE 30 0 15 30 60 ( IN FEET ) 1 inch = 30 ft. X23.45 - X -- - P - -UP-- -- T -- --UT-- --G-- 120 CORRECTED FINAL SITE/STRUCTURAL 07 MAR 2012 SEAL 0- a a N N p w a ¢ o l Co z w z O 0 z 0 a a z w u) Z Q d w V 0 oN LLLLj w o J � Q Y J_LLL a 0 ON CD U Lr) z CD Co 0 n, ZX O o O 0 aoLu Ua m� D ILL U= 1-= ZW a p U°f tn� Q� V -�uj Lu w o Uy U L UU Y r, aa. Z Z ww m om _j_j w LL w w w U 2 U] y Z o� 0.o L CoN � O p0 pQ 5 wQ 0- Z [nQ U) w Z U Z �U Z CO ~ M CJ J N 0 0 Q a- �o sZ Cr (D Jo Ko OZ }Z J n�.a s� QN of mug= N LL -0 JNcis Q r � �irrE U Q LL i L (1' O z O U z 0 z O U (D Co 00 LL 00 In OJ w ❑ F=- � � Z z ❑ Q 0 U) X SHEET IDENTIFICATION C100 u 10 2 3 4 0 000 0 00 00 00 0 00 0000 �� 0 0 0 ( 0 / \/ ,P /�„�� o AREA WITHIN PROJECT I� 00 0 0 �o 00o I BM 5824 iy�°y�P/\� 01"HOLLY 01"HOLLv Qj00.II.C�C2�.Q0 0i "Q}s}v 1°'0 n ��. /n ^O O LIMITS BUT NOT WITHIN �✓ LLY 0 7 „"V �`�' -_.�. 499290.95�o p ��' DISTURBED AREA r O1"HOLLY 01"HOLLY 1FF 01"HOLLY W�1"HOLE 0 - }- ® ��P� . �„P cv/ �p ELEV: 257.27 a 0- 0- - - :499293.13 0 BM 5825 N: 499237.71 Q02995.r ®wv177 56i E N, 49931C74 --E: 2002738.04 PSYOPS ROAD ELEV: 261.62 E.20031 n o 82' STAND OFF BIKE RACK *GW f GW *GW 0GW *GW *GW rGW �GW JB \ / \ Q0 LARGE SATELLITE blSH 6 I �� P •o 2 - LARGE SATELLITE ©rSH yJ ANTENNA / \ Z2_ 71 XE: x 1 STORY BRICK 7 ; r„P �'xANTENN "P xE FF-E=264.1 *GW GW GW GW GW GW GW GW °1� P 111'P I AN NNA /\ /\ �1p 33' UNOBS�D SPACE ce x SMALL SATELLITE FISH ' - •Gw P • W Cg B P p _ 11"P s PP rr 1 / LI JB Eiec QAIe LI _ i 0 _ O ❑S . o s f - �FP .. SB D p �yw z'F XE -P I° ° \ - x DB D s LOW CCCUPANC' DS I P\/ / t I x: PRIMARY y1„P GA II-IERING To xE �°�P ? N: 499193.63 (A:499153-32NSB E. 200298961 - . _ o7E 2002799 84 - 10 / Z 3"P Z �.' FRiaw y xE - N: 499130.38 ��to�� P xEERRY og"P�X<0"PZ E: 2002778.48 C/1 _I °> 7\ _ - �� 1 z NEW SOF P �- Q ADMIN/COMPANY Co n P f / CJ 0"P O U XE XE " OPERATIONS FACILITY m �TP� ��� AHEAD " i CO o O AREA �11 HIN PRdJ�C Q„ ° P � ¢ � " LIMITS BUT NOT WITHIN° P \ .-._.-- / \ xE o � _u I DISTURB b A�E� �,3 �o XEXE N: 499075.60 D �� 2 P �' r _I- ��p ,�P,X�y°_P �p�P z / \� �' E' 2002790 11 ►'� 1 T\ I _,�.. - / r 499070.88 /\ TEc'J`J_1��I�� „ 11 I \5' 499063.33 E:200818.96 U - U Ua UF: 2003008.73 'xE oboy ITZ,:E2002767.97 IN: 499103.64 psP x= _ 'o ! ITEEJ I I D R i R I CS - AREA WITHIN PROJECT CJ;I - i i �R R i i_ CJi i_; IIIIiIl a ,CJI I i CJi j _ o�P �"P B / ///, , // ❑ --r---+_ + 1 -----,--7---z---�_ R ---�- 07. P ! v� LIMITS BUT NOT WITHIN / / DS D DISTURBED � \ � REED AREA co .. - ! ! I Z„ _I� I'_1 ` b 5' XE _ .I i' I l ... I �i- I ,, I 1 - f � E -;_ I I -. I � i ■�� , i � U _ �I -,i . �! `�I �! �I �i ! �I .._ �i �! �! �! ,. -�! � �1 �i �! �! -�! �I �.. 2fl Cal.;. Ci! U,, - LJ, CJ,, CJL,., t) VI _ U! -rl__ �' U! CJI' 01 01 .L1lj Ul ,C ��.. tJl C3, CD, � A '�' P -f - 1 -�{ -I--- '---L---1-�-1- - �___ -1 L- /\ Y\ 4 - ;_�---T�--t..-r---'�r- 4 � Q Q U U --- 10 I ;. 1 � Lei 1 1- - ! ,:. f-�-`=--�---GJ� =- 5--- �=---1----�I I _ - I --- 1-. I �:1 I ,;.I � �;.. - -` _ d� .. J T _T .--1---;__T'- --- P E 1, 0', p �� X�` I� C622 P - 1ITYP.I--CJI_ w LJ LrJ w / . o�P XE o XE 1:. I -4990M.LL L,_ LL_ LL r CB } T i.,:. 1.38.07 Efl. N: II _;1 CJI;.--= I-.n --..h---�--,-1----+-- r---r- ,-7- -1- . r--,-r---r Y-----I--:--F- -r - -�--- I-- 1----r---r--- S73'018"W E: 2003 52,6 - - --- -- /\ _ I- I I ! I 1 1 I I -r I I .. I I I L:. I+ l E .. ! I f. I I r" °�T��13 P XE �o-ly P XE .y - i ,_ -1 - I;. _ ,.. ' .„. .;. -. 1 I- I - R.: i ' I I 5 }. i� I I' I I I -' I I c. l r I. E. I I I I '. I <. DUMPSTER AND _ P / / \xE 1 i I 1 I I I _ o B R CYCLING AREA y y N: 49898 7.52 JB �_N: 499037.34 D P C622 '/ ENCLOSURE I ! E: 2002785.50 O E: 2003020.27 - S /\ T ES F LL_ LL PP /\ f w w w T" P X E i :_ _ .- L. _.... ......., ,. , , ,. , : - - �o C620 I w w LLJ y BM COTTON SPINDL ' N: 498884.93�'' E: 2002786.02 ELEV: 743,65 i i F- AI V 0 i E .'7 /b �o�4.'a r I✓ S O s"P xE - / > > w �4 jE 1 � l III C621 / BUILDING H-1617 1 STORY METAL FEE-242.3 r �0 1 I I I _ _ I 1- P I O I - _ I I _ _ - OPP I x xhP T w - - - MH7G42 T 0 - -w- - - -w- - El- cry.t" BUILDING H-1725 1 STORY METAL EEE-248.9 ---ww- - - -w- -- - -w- - -- -w- - - -w 5 GENERAL NOTES.- 1. SEE SHEET C001 FOR CIVIL NOTES AND ABBREVIATIONS. 2. PRIOR TO ANY LAND DISTURBING ACTIVITY INSTALL EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE C700 SERIES. ALL CONTRACTORS/SUBCONTRACTORS/PERSON THAT WILL BE ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION CONTROL AND STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS, AND PERMITS. 3. UTILITY LOCATIONS SHOWN ARE APPROXIMATE. FIELD LOCATE AND PROTECT ALL UTILITIES. NOTIFY ENGINEER IF DISCREPANCIES ARE FOUND AND DOCUMENT ON AS -BUILT DRAWINGS. ASTERISK (*) DENOTES UTILITY PIPE/STRUCTURES THAT COULD NOT BE VERIFIED IN SURVEY AND ARE BASED ON SURVEY IN RFP PROVIDED BY 4D SITE SOLUTIONS, INC. 4. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB/WALL. 5. SPOT ELEVATIONS ADJACENT TO CURB ARE TOP OF PAVEMENT ELEVATIONS. KEYNOTES: 0 1. INSTALL NEW 'FUEL EFFICIENT VEHICLE' AND 'CARPOOL/VANPOOL' SIGNAGE & STRIPING IAW K/C621. 2. INSTALL NEW STOP SIGN IAW DETAIL F/C621. 3. INSTALL NEW CROSSWALK SIGN WITH AHEAD SIGN IAW DETAIL F/C621. 4. INSTALL NEW CROSSWALK SIGN WITH ARROW SIGN IAW DETAIL F/C621. 5. TAPER CURB TO FLUSH OVER 2 FT HORIZONTAL. 6. SEE STRUCTURAL SHEETS FOR EXTERIOR STAIR DETAILS & ARCHITECTURAL SHEETS FOR HANDRAILS DETAILS. CIVIL LEGEND - SITE HEAVY DUTY ASPHALT PAVEMENT - INSTALL IAW DETAIL A/C620, HEAVY DUTY CONCRETE PAVEMENT - INSTALL IAW DETAIL B/C620. STANDARD CONCRETE PAVEMENT WALKS - INSTALL IAW E/C620. STOP BAR - INSTALL IAW DETAIL H/C621. CROSSWALK - INSTALL IAW DETAIL J/C621. ACCESSIBLE PARKING SPACE AND AISLE - INSTALL IAW DETAIL G/C621. NEW TRAFFIC SIGN INSTALL TAW DETAIL A/C621. C, CONTRACTION (OR DOWELED) JOINT - INSTALL IAW G/C620. EJ- EXPANSION JOINT - INSTALL IAW G/C620• TEEj THICKENED EDGE EXPANSION JOINT - INSTALL IAW G/C620. TE - THICKENED EDGE - INSTALL IAW G/C620. R REINFORCEMENT - INSTALL IAW B/C620. * GW GEOTHERMAL WELL - SEE MECHANICAL DRAWINGS -- CURB AND GUTTER - INSTALL IAW DETAIL D/C620 I I LIMITS OF CONSTRUCTION/LIMITS OF DISTURBANCE HORIZONTAL SCALE 30 0 15 30 so ( IN FEET ) 1 inch = 30 ft. 120 17 TClCz:lqt N N N W X 0r a z w 0 Z o U a z a U � d Z uj �LLJ o rn U 0. w Q U W )LL oU5: w ❑ Ir w -4t LY Q 0 0 N � N Cab 00 .,V) It < cr, zY Zg !YZ ti o QX o �0 �� _ U= �= Zof �� z� w� 0 Q � (.5 I��i w L�jo ¢ N o 02 z UU ao uj mJ LL LL Z w ~ o m Z Q > Ill � o U) 0 U) ❑ uJ N W aNi ❑❑ o¢ rj) a- N in¢ ua z U Z�U m - LLI Z EL U) CD co m J N Z 0 ❑ 0Lu o z u(Da Ci moo JO 0ZF- U) - (n J _ Y Z, c.a iLu QN2 J_ v uj K mto= m it C'1 JNU _J U Q LL 0) Z O U Z LLJ &CL 0 CL Z Co (3) LL1 CD Ill-_ 0-~ U) 0 O LL U LL 0 U) SHEET DENTIFICATION C200 CORRECTED FINAL SITE/STRUCTURAL 07 MAR 2012 L0 A0 0 U E u 0 0 C a o 1 2 3 I r rr { L / :'l j,y„p. y W. 8W _. v _ _ -. 8W ; 8W 8W 8W SW --- B V - -- 8'vV _ - w wv "� s z 8M. 5825 - :<. P S RPAD :. , ELEV. 261.62: ,RIM: 257-00 S _ -s' s s- s- V - . 261 _ ;,, ..259.22 9.09 �.. -260 5.22 255.09 _ S xN TE .. 256 5.12 254.99 _- - 255 2 1.62 1 STQRY BRICK ' ANTE _ - 251.48 FFE='264.1 - n ' co. A ' S„ RC 2 251.30 � 1 P c a s, 15" RCP Ce � 251.7o c �, 25 50 252.00 B c ,; 1 251.50 251.50 AL B / 5 25�� 0 0 12" PVC _ 1.1 _., 6 2 _ , 2 0 co N s L W OC PANC 251.98 D 251.98 252.00 - PRIMARY GATH ERING ERING / FD CB Al CB Al2 ' t RIM: 249.00 RIM: 249.50.E Al2A CB A13 5w6 RIIM: 250.50 RIM. 00 .)2.00)1)1. 250.50 _ J 0 _ 2 - i C / - 51. 4 N 2 ti N CB A 10 c-s o0 CD / I r z _. j RIM: 248:Q0 N r 251.59 252.00 ¢ 25i 190 '! - • NEW SOF 25 251.98 Q J�AD 251.25 c .. ^> OPERATIONQMFACILITY v. co ...\ Q _ - .43 " � - ' FFE: 252.0 ai 51251.62 _ 2 98 251. tt 252.00 CB B2 / 25 .50 251.77 DS } RIM 248 00 25 2'�1.98 252.00 251.90 'DS10 S ' 2.OQ 251.98 __ 251,98 t CB cy Z// DS S DS fN: RIM:250.50 v 2 51 CB A7 y.: .:.`r..s,..._.. _. �r-:. .-......... .... t_. '._ �.Q'. ... CH q8 _ �r F ._._ .. �,-_ CAB A6 _. .... _ RIM 0 - RIM 2 , r- IN B1B 1 . 249,80 I OUT: 246.10 249.8 ' , JB BIA• # • RIM: 249-00 4 a AREA WITHIN PROJECT BM 5824 LIMITS BUT NOT WITHIN N: 499290.95 I 260 - DISTURBED AREA 2002989' ,� `' - -J } FHWJ a T 5 GENERAL NOTES: 1. SEE SHEET C001 FOR CIVIL NOTES AND ABBREVIATIONS. 2. PRIOR TO ANY LAND DISTURBING ACTIVITY INSTALL EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE C700 SERIES. ALL CONTRACTORS/SUBCONTRACTORS/PERSON THAT WILL BE ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION CONTROL AND STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS, AND PERMITS. 3. UTILITY LOCATIONS SHOWN ARE APPROXIMATE. FIELD LOCATE AND PROTECT AL UTILITIES. NOTIFY ENGINEER IF DISCREPANCIES ARE FOUND AND DOCUMENT ON AS -BUILT DRAWINGS. ASTERISK (*) DENOTES UTILITY PIPE/STRUCTURES THAT COULD NOT BE VERIFIED IN SURVEY AND ARE BASED ON SURVEY IN RFP PROVIDED BY 4D SITE SOLUTIONS, INC. 4. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB/WALL. 5. SPOT ELEVATIONS ADJACENT TO CURB ARE TOP OF PAVEMENT ELEVATION S. 6. WATER AND SEWER TO BE DESIGNED BY ONUS. ALIGNMENT AND ELEVATIONS SHOWN HEREON ARE PROPOSED. FINAL ONUS PLANS AND PROFILES NEED TO BE REVIEWED AND COORDINATED, PRIOR TO ANY WORK, TO ENSURE THAT THERE ARE NO CONFLICTS. 7. SEE DETAIL F/C631 FOR PIPE AND STRUCTURE TABLES. KEYNOTES: 0 1. INSTALL DOWNSPOUT BOOT IAW DETAIL D/C631. 2. PROTECT EXISTING POWER POLE AND LIGHT POLE FROM ALL GRADING ACTIVITIES. CIVIL LEGEND -- GRADING AND DRAINAGE cD CATCH BASIN - INSTALL IAW DETAIL D/C630. cs CONTROL STRUCTURE - INSTALL IAW DETAIL B/C631. El LAWN INLET - INSTALL IAW DETAIL C/C631. Je JUNCTION BOX - INSTALL IAW DETAIL A/C630. B HOODED CURB INLET - INSTALL IAW DETAIL E/C631. STORM DRAINAGE PIPE - INSTALL IAW DETAIL C/C630. 0DS DOWNSPOUT - SEE ARCHITECTURAL PLANS RCo ROOF DRAINAGE PIPE - PVC 30 �RCO ROOF DRAINAGE CLEANOUT -- INSTALL IAW E/C631 p58 SPLASH BLOCK (PAD) - INSTALL IAW B/C630. PRECEAST FLARED END SECTION X 2Q 40 NEW FINISH GRADE SPOT ELEVATION 11 -- NEW FINISH CONTOUR EXISTING SPOT EXISTING CONTOUR DRAINAGE FLOW ARROW PERMANENT RIP RAP APRON - INSTALL IAW B/C721 LIMITS OF CONSTRUCTION/LIMITS OF DISTURBANCE HORIZONTAL SCALE 0 15 30 60 ( IN FEET ) 1 inch = 30 ft. 120 CORRECTED FINAL SITE/STRUCTURAL 07 MAR 2012 ;3U21 SEAL) 0C a a N_ N O N N W h m z W 0 Z U0 z O p U � a_ z z 0 W a W U w O(1) W w d � uj Q o ul 4t W a Y 0 0 N H b oLO co a z z4 o 2 0 �0. mw O ¢ O U= J w �= zr Zui 0 :� w OM W� � u Lu w3: U� N_ O N }� ❑C WW L QM a h ZZY m �= J m 0 U- U- Z y m w � a U gg ZU3:-:5 mnQ b O NZoo oa a ap� ¢ 1n¢ V) w w Z U Z wF-Z °' o LL Z m J N O ❑ p 10 ' 0 Z F- �� r�� a O (D �6 <�o ~ Z O .a ; 0 0 z f-- Z ci J �_ 7 � U) U) aW ¢Nw IL u O w M O qg OU JNN C) Q >� J_ U Q Z r1L V! O d 4� Z Ill a{7 p fL O � ca h Ow � L � Z 1❑i C? U CZ_ C _Z ❑ ❑ Q V ! T� ILL SHEET IDENTIFICATION C300 1/26/2012 2;30:51 PM 2 3 0 D a V 258 255 252 249 246 243 C B 240 -0+25 0+00 0+ 0 1+00 STORM ALIGNMENT 3 PROFILE A0 0 V u 258 255 252 249 246 243 240 258 255 252 249 246 243 240 U OU j ry a Lo C� d Sri L N p O T Qa 0NQQ; � �"' zzo NN 0L6 LnLn N N 258 255 252 249 246 a 0.96% 243 240 -0+25 0+00 04-50 STORM ALIGNMENT 4 PF_ FILE U APPROXIMATE LOCATfON OF NEW RELOCATEI) TELECOM. COORDINATE LOCATION AND DEPTH O WiTH TELECOM PLANS AND NEC. o "t 246 o 246 o N U N 1D O aE LL! t17 � LL 243 --- -� 243 -- II 240 II - — 0 -- - -- �� � I;I I LI 237 ......... - - - --- - 237 34 LE 18" RCP Q 1.74% EXST C(,,VM D CTBANK — - 234 234 Co Co N N -0+25 0+00 0+50 STORM ALIGNMENT 5 PROFILE 0. 0. U U 246 243 240 237 234 231 246 243 240 237 234 RCP Q 0.29% 231 -0+25 0+00 0+50 STORM ALIGNMENT 6 , PROFILE CIVIL LEGEND DRAINAGE PROFILES — - — — EXISTING GRADE NEW GRADE HORIZONTAL GRAPHIC SCALE 30 0 15 30 60 120 ( IN FEET ) 1 inch = 30 ft. VERTICAL GRAPHIC SCALE 3 0 1.5 3 6 12 ( IN FEET ) 1 inch = 3 ft. ,,+,IIIl4Flllllf f/'/' Coy _2 SEAL _ 22331 = '•f 1111F11111j1'` 0 O N .. N W Z° OX QQ Zp o �Z w o 0 <o F- I U � m w �- �= I zx LijU x CN z— � JF O� w ❑ 00� !iw w m ❑T �ui ❑ ON ZZ Y U } J- a.0 Wua � J J w w ❑ w Q N ct Lu LLI ZF- U o uZJ Z LL a) o O v m J N Z 000 U cry Z r � � F- �OZ cn z �p o 0Yo EE Z OU Z mi Qz _j >- 77 QNJ Co Lu 0. C� cc s coo �N0 era Q ZEN U 1Q- 11 fir V% Co Z J O LL z a V Co O I,— V 0 Z Q O ° U � z 0 ❑ Q U) LL O En SHEET IDENTIFICATION C311 ISSUED FOR CONSTRUCTION SITE STRUCTURAL 01 FEB 2012 r A r F ❑r C ►l 2 3 _-- -_- --- Q. 0&c�a�o oo(7)UT -LIT - r J-0= �°. e ao 000 0% _�r 01"HOLLY 01"HOLLY / O1"HOLLY 01"HOLLY 11 FH OT"HOLLY w1(]1"HOLLY sw aw aw aw aw -- -��.,u -� aw -- - - - - - - - _ RIM: 258.25 -lz IE A:249.96 - - - w- - -I w - -wBM 582� -w- - -w- - - -w- - -w- - - -w IE B:249.99 - - --w-{LI- / N: 499237.71 PSYOPS ROAD IE C: 249.63 I /- 2002738, 04 I I i$r ELEV: 261.62 cn S S S 5 S -� -----------�----=�'---=-��-= --gyp--- .._ - UT - LIT - - - UT -- - - - LIT - - - - LIT - - - - LIT - - - U - - U - - UT JB 7 777 LARGE SATELLITE 61sH LARGE SATELLITE DISH AN TE A 8 (i ANTE IN q 1 STORY BRICK _ FFE=264.1 -' rI A NT N 2 C 3 ICB SMALL SATELLITE DISH - ^ U -- - - N 6 4CB I 41's -UP- u% % Ds L01 B Ds DS END UNKNOWN A C BP �' °s---- s---s----s-- 5 3 `o DS 5 Ds. L WOCCUPANCYDs, Ds SSMH B PRIMARY 8 GATHERING _ / i4 RIM 257.[ : Cs DS/ I E C:-%51 _'2 - 0 1 / o Y., ER\Y�T"P XE - C7 ERRY O 92 P�� i; OCD %l 6 Q 'z NEW SOF 6 P Q �ADMIN/COMPANY / CID u CS O.PERATIONS FACILITY P / % % P XE % CD r xE %% 1 a fiE: 248.1 I E: 247. 6 _ xE / f O �XE _ - 4 IL . P XE I C \ % \ ISDS IDS CE CB i %%\%�o "P E - XE moo, lP XE _ _ __ _-__ .... - - CB -- 7. a 4 P XE y� _ _ - JB` 12 PVC A - - -s = - - -s - - - -s - - - -s - - - -s - - -s - - - -S - - - -- - -s - - - -s - - - s - -s - - - =sue - - �o�xE- - 7 I �- g1 SSMH 22 % % T PP UP RIM: 250.52 o"P XE SSMH 14 /, RIM: 247.16 I I IE A:237.66 IE B:237.91 1 I G IE D.237.64 c - .;S 09;P XE VN o,s"P XE BM COTTON SPINDL � � N: 498884.93 _0T§`p XE E: 2002786.02 � %ELEV: 243.65 - ---- ,--- w - - -- w w � C8 - - -w- - - -w- - - -w- - -w- - - -w- = 4 w - w- � -w - - -w = +- w - - - ' is r H7G41 - UT 9 1 � -- -- - - LIT - - - - UT - - - - UT - - UT - - UT - - T - - ��11T- - - - LIT - - - - UT - - - -- UT - - - UT - - - UT - - UTI 1 lJT _ I� � � � UT ! I� -- - - -- X ---- --- - -- b I . NEW I ! INFILTRATIO1 AREA I! f BUILDING H-1617 1 STORY METAL P - - � - FFE=242.3- -] - g • p SSMH / I kc fRim.241.87 / I 1 QL / _ 98 �1 cp- OPPvi n Izh.,P ABM 5824 499290.95 4 P I I AREA WITHIN PROJECT LIMITS BUT NOT WITHIN 1 a - DISTURBED AREA or- w- - - -w- - - -w- - - -w- wl LL �c 5 P %..P 7 P XE . o"P E SIP E�\ P , ��'P \ /I\2°P XE %%2 P' �02Yp XY _o�l� P %%,P %T"P / \ \ o, P P N / 3"P Z _ \ . XE o 7. P J �o p AREA m IT PRdJ CT o, �T2IP LIMITS BUT NOT WITHIN ° P - DISTUR D A~E%� 0 •%� PxE /\/7 % �aTyP ��.,P P P % A FH WV i r+ a � I } } I I � I I I I 4� � I I I I 0. I I I ! I I X � t I I I I I SI I I t I I I ', L � t I ! 11 EL I I I -I 1 fu ! ! ! } I I I X c I � CI I - `l _ AREA WITHIN PROJECT n } LIMITS BUT NOT WITHIN } ...... DISTURBED AREA - , rr1 a} I - - - fl SSMH 30 RIM: 246.40 I_ IE A: 239.70 j 1 IE B:239.25 A 1 IE C:239.05 B -S -- - -S - -s C - 1 I I _ 1 - I r-w----w- 19W i n / r i / / MH7G42 UT ur F- / / I / I "P { I T P D } "P n I p\z I � J I } I I - I I I I' X Q- Okl w BUILDING H-1725 1 STORY METAL FFE=248.9 9 GENERAL NOTES: 1. SEE SHEET C001 FOR CIVIL NOTES AND ABBREVIATIONS. 2. PRIOR TO ANY LAND DISTURBING ACTIVITY INSTALL EROSION AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE C700 SERIES. ALL CONTRACTORS/SUBCONTRACTORS/PERSON THAT WILL BE ENGAGED IN LAND DISTURBING ACTIVITIES SHALL COMPLY WITH ALL EROSION CONTROL AND STORMWATER POLLUTION PREVENTION REQUIREMENTS CONTAINED THROUGHOUT THE DRAWINGS, SPECIFICATIONS, AND PERMITS. 3. UTILITY LOCATIONS SHOWN ARE APPROXIMATE, FIELD LOCATE AND PROTECT ALL UTILITIES. NOTIFY ENGINEER IF DISCREPANCIES ARE FOUND AND DOCUMENT ON AS -BUILT DRAWINGS. ASTERISK (*) DENOTES UTILITY PIPE/STRUCTURES THAT COULD NOT BE VERIFIED IN SURVEY AND ARE BASED ON SURVEY IN RFP PROVIDED BY 4D SITE SOLUTIONS, INC. 4. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB/WALL. 5. SPOT ELEVATIONS ADJACENT TO CURB ARE TOP OF PAVEMENT ELEVATIONS. KEYNOTES: 0 1. INSTALL FIRE SPRINKLER SERVICE LINE. STUB -UP INSIDE BUILDING ABOVE FIFE WITH BLIND FLANGE. COORDINATE LOCATION AND ELEVATION WITH ARCHITECTURAL DRAWINGS AND FIRE PROTECTION DRAWINGS. FLUSH FIRE LINE IAW FIRE PROTECTION SPECIFICATIONS AND COORDINATE FLUSHING WITH FIRE PROTECTION ENGINEER AND GENERAL CONTRACTOR. PROVIDE ALL MATERIALS, INSTALLATION, TESTING, AND CERTIFICATIONS IAW NFPA REQUIREMENTS. 2. WATER METER, BACK FLOW PREVENTER IN HOT BOX TO BE INSTALLED AND PROVIDED BY OLD NORTH UTILITY SERVICES (ONUS). 3. POST INDICATOR VALVE, BACK FLOW PREVENTER IN HOT BOX TO BE INSTALLED AND PROVIDED BY ONUS. 4. SEE ELECTRICAL PLANS FOR BUILDING CONNECTIONS. 5. WATER MAIN AND SERVICES SHALL BE INSTALLED BY ONUS UP TO 5 FEET FROM THE BUILDING. 6. SEWER MAIN AND SERVICES SHALL BE INSTALLED BY ONUS UP TO 10 FEET FROM THE BUILDING. 7. ELECTRICAL WORK TO BE PERFORMED BY SANDHILLS UTILITY SERVICE (SUS). S. INSTALL GEOTHERMAL PIPING IAW HVAC (M-SERIES) DRAWINGS . 9. COORDINATE ALL WORK RELATED TO THE RELOCATION OF EXISTING TELECOM SERVICES WITH NEC. 10. COORDINATE LOWERING OF WATER MAIN BELOW NEW STORM DRAIN PIPE WITH ONUS. LOWERED WATER LINE SHALL BE CENTERED AT STORM PIPE CROSSING. SEE C310 FOR NEW WATER LINE ELEVATION. 11. ENCASE SEWER PIPE IN CONCRETE AS REQUIRED BY ONUS AT STORM PIPE CROSSING. SEE SHEET C310. UTILITY NOTES: 1. GENERAL CONTRACTOR SHALL COORDINATE ALL SITE UTILITIES AND STORM DRAINAGE INSTALLATION SCHEDULES TO AVOID POTENTIAL UTILITY CONFLICTS'. 2. FIRE SER+VICE LI NE E AND AL L ASSOCIATED FIR E SERVICE ITEMS SHALL BE CONSTRUCTED IN ACCORDANCE WITH NFPA 24 REQUIREMENTS. 3. WATER AND SEWER TO BE DESIGNED BY ONUS. ALIGNMENT AND ELEVATIONS SHOWN HEREON ARE PROPOSED. FINAL ONUS PLANS AND PROFILES NEED TO BE REVIEWED AND COORDINATED, PRIOR TO ANY WORK, TO ENSURE THAT THERE ARE NO CONFLICTS. CIVIL LEGEND WATER AND SEWER FIRE HYDRANT ASSEMBLY - I. STA LATION BY QNUS �wv WATER VALVE - I T LLA ON BY ONUS ZPIV POST INDICATOR VALVE - INSTALLATION BY ONUS 44 BFP BACKFLOW PREVENTER - INSTALLATION BY ONUS YFDC FIRE DEPARTMENT CONNE CTION - SEE PLUMBING DRAWINGS METER AND METER VAULT - INSIALLAIION BY ONUS 05 SEWER MANHOLE - INSTALLATION BY ONU ws WATER SUPPLY SERVICE - INSTALLATION BY ONUS. FW FIRE WATER SERVICE - INSTALLATION BY ONUS -up- UNDERGROUND POWER - INSTALLATION BY SUS •PP NEW POWER POLE - INSTALLATION BY SUS •GP NEW GUY POLE - INSTALLATION BY SUS ❑E NEW TRANSFORMER - INSTALLATIOU BY SUS OWS R G TNEW COOLING TOWER - INSTALL IAW MECHANICAL DRAWINGS TOWE E NEW ELECTRICAL WITCH S GEAR - INSTALL IAW ELECTRICAL DRAWINGS. COORDINATE ALL WORK WITH SUS. 1• LIMITS OF CONSTRUCTION/LIMITS OF DISTURBANCE HORIZONTAL SCALE 30 0 120 I-tw---- - - -w - I- ��� - -w--- - - -w- - - -w- - - -w- - - -w4-- ( IN FEET ) 1 inch = 30 ft. CORRECTED FINAL SITE/STRUCTURAL 07 MAR 2012 +kl l,l IF RO C ., 3 13 6 tom: HER ' SEAL a a N N N N W cr m N r z W 0 U Z z z Q v 0- Z V I- W 0 CL W a � n w � 0 wLL o C� W Vo W w a Y Q 0 0 N F- 0 Cq 01n z co n' OZX O o Z6 ww n O �z Vz w �J U= H = LL ZOf IN J Z 111f- O) �� W OURS LLW >j 0 N mY Q� Wuj 02 n0 zz U U 5.:Q W W J J_ w J m LL LL Z y m �� > mom. u) o oN O uj7D no ❑Q �Q aQ tn¢ w Z U 0 U C)z Lu m o co F- (h J N LL - Z 0 0 0 co cn z I- u~i� wLou Z �so 8,90, F- O Z J ,� O 2 W J C >- C j a®a ac "' } Z >- LI7Df Q N 7 •� n� L_ oU` JNU ¢ I�r a LL W O z ZEL d lt.l C7 11 l 0 ti L0~ >_ z Co ct) J co F- I- LL 0 z LL O W SHEET IDENTIFICATION C400 2 4 5 C z 0 6" DOME 16'-4r FILL POST WITH 3" ALUMINUM PIPE CONC. n '� 3" ALUMINUM PIPE 2 — BO' LOCKING ASSEMBLY COMMERCIAL HINGES 6" DIAMETER — SCHEDULE 40 ALUMINUM PIPE SIDEWALK ...,F :::. too F; /\/\/ / i \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ CONCRETE \/\\/\\ \\ \\\ \\\ \\\/\\//\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/�/\\/\\/\/\/\/\/\/\� FOOTING //j//j /// ////// //// /// / // /\ \\\\\\\//\//\//\\//\//\//\//\//\//\//\//\//\//\//\//\//\//\//\//\//\//\//\//� \ \\ \\ /\ \%\�/jam%j�/j%j\ \//////��/�/ /� \/� \//� \/\\/�// 1 �24` DIA. (MIN.) NOTE: PROVIDE 6" DIAMETER SCHEDULE 40 ALUMINUM PIPE TO SUPPORT --T OPEN POSITION (PERPENDICULAR TO GATE) NOTES 1. MATERIALS AND DIMENSIONS OF GATE SHOWN ARE PRELIMINARY AND SHALL BE DETERMINED BY MANUFACTURER. GATE IS NOT REQUIRED TO BE RATED FOR FORCE AND PENETRATION. 2. MANUFACTURER IS RESPONSIBLE FOR THE DESIGN OF THE GATE INCLUDING, BUT NOT LIMITED TO, SUPPORTS, FOUNDATIONS, HINGES, AND FRAME. THE ARM SHALL NOT SAG GREATER THAN 1" OVER ITS LENGTH. 3. SHOP DRAWINGS SHALL BE SUBMITTED TO FORT BRAGG FIRE DEPT AND PROVOST FOR REVIEW AND APPROVAL. A SECURITY SWING GATE NOT TO SCALE EXPANSION JOINTS NOT TO SCALE � QA PSe�P� 6" DOME FILL POST WITH CONC. 2-180' COMMERCIAL HINGES 6" DIAMETER- -SCHEDULE 40 ALUMINUM PIPE GRADE CONCRETE 24" DIA. (MIN.)� NEW 6" CURB a� A.1-- PLAN EZ-SET 15'0t' Radius E;L1'4`1310 (BRICK RED) FZNNrI5`I'I' t F.L.LOW) L-:%NvI5C-C1 (CHARCOAL CiRFY) O,ZI,I. P � Y e i 111�faiimen mp-Oied a'. rim al 1he FI Q-.f sytlr�ts- -Forx Head Scrers holler . ,Ufa prr panc lj ..__ ],d�l�lrrE)�poli+�� TAPPED 8s IOKI €�fil'.Ijcl 1.37 I .Sil I hroc ArOor E7-SET Detectable WaTninK Prinels C;uathty dtith Ce'eiea.tl de�t�l�[inria. a d e Uj a. a d a a to x a �� d cn'n , 5X MAX. LONGITUDINAL I .° I e ba a I eC to I o e° 5,% MAX 1 LONGITUNNAL MR NU SLOPE N. dor ° 2% MA y IdNU SLa SLOPE. I e .d .-a- e d ° w CL 0 ° . O m 2% MAX J CROSS SLOPE 6' 64 1 - e /\\j 4 - 4 a e t\/AA// ;vim//v//vv�w \ w//v�//v�//v�'�� SECTION A —A CONCRETE FLUME DETAIL NOT TO SCALE (D E -SET Detcetable'4i►'arniing Panels In I.iITc I'dtt�rn tis illi Imulia.in itco H IS" i'Amcnc + ; c' L1 L10 . l % CCd! ./ \ _ V -� } V Wt. - `-41 T� � 'Q '4Lro0 � e1 ... �1 �' �d �� M' i • l . I 4'�1 i J ,.-�, { _ y� f�Cs2� lit �, 0 47 U-0 OD • c' c Ole Q ce 00 @ 0, iI ! ci (ED l IDprrj%Inr9C' *tt)rx. Ilcad Screw� ESET E:I2R1' (BRICK RED) FZ2YP (YELLOW) FZ2C:0 )C'ITARCOAL OREV) 4 Typically 0.5" A 1, t f + 4. .� 71t� Ft�lerscrs iElthi g.� halt talk! CI,i� lr ytisl�ta, TQrx 11vad Stror Folenrr Opmgng 'I'AIPPE0 ,..-�3i�-ICI 1.3ft 11, a Tcrl4t;t id Suimloo' "T"I W, IEZr-SET Delectable WirnInR Psneh v"jiltly with fcdieral reguintkms. TAPER CURB FROM HEIGHT OF 6" TO 0" OVER A DISTANCE OF 2' EZ-SET Detectable Warning Panels In• Liric Pnalcrn wills Iocmlivn of $ THS' I" astimca NOTES: 1. CONTRACTOR TO UTILIZE THIS TYPE OR APPROVED EQUIVALENT. 2. CONTRACTOR TO INSTALL IAW W/ MANUFACTURER'S SPECIFICATIONS. 3. CONTRACTOR TO UTILIZE DIFFERENT SIZES/SHAPES PROVIDED BY MANUFACTURER TO ACCOMMODATE FIELD CONDITIONS, DETECTABLE WARNING PANELS NOT TO SCALE *Tor,-( Bead. Scrm I ISSUED FOR CONSTRUCTION SITE STRUCTURAL 01 FEB 2012 ,,`tttUnntlt�tyie 0. I OL M. _ y ? I' / rVV7 qN vo-" SEAL F N N zz Obi Co a wOHO�© Fm w Co W�z z �0 �jz cli = ZLd Ld Jm Zm C) OAS Lt W w r o tiico 2 W 0 h� or Za Z U } 0-0 Ww co ❑� W J zp U z -0 W (D F- �i 5 M a > 0 Nz ❑❑ ❑a u,a a tna U) >z W Z U CU W U uZi Z °' J lL Z' O ❑ `" to ai v Cn Z O 0 (D �� acnZ ❑ 1L a' H Z U U00 :: �� 0ZN Z U JJ � c8i� w a N } yz 7 W 7 W M Q Co Ix Ca �' rrr ap C7 J N U !Ir Li J II� to U W LL fY O_ U � U � a C5 U} 0 z to Cl) a � 2 O O U- —.1 Z_c W ❑ C ❑ J_ Q L 0 U SHEET IDENTIFICATION C622 1 3 4 5 C, 12 C NEW BUILDING r A' 0 U U 0 E 0 0 USF 669 RING AND K>_ COVER OR APPROVED EQUIVALENT. RIM= (SEE PLAN) FINISHED GRADE d ° a „A„ a a_ q E (D IE=(SEE PLAN} L- I O SUMP/SEDIMENT d SECTION m SECTION A RETENTION (SEE F/631) a d a NEW PIPE L--------�J SEE PLAN � 6" GRAVEL BASE 6" THICK REINFORCED CONCRETE WITH #4 ® 6" O.C.E.W. FOR BRICK OR CAST —IN —PLACE CONSTRUCTION SEE NOTE 1. SECTION A -A PLAN NOTES: 1. FOR CONSTRUCTION OF THE STORM DRAINAGE MANHOLE WALLS EITHER CONCRETE MASONRY, CAST —IN —PLACE CONCRETE, OR PRECAST CONCRETE MAY BE USED. FOR CONCRETE MASONRY THE WALLS SHALL BE 8" THICK. FOR CAST—i'J—PLACE CONCRETE THE WALLS SHALL BE MIN. 6" THICK WITH REINFORCING STEEL #4's 0 6" O.C.E.W, FOR PRECAST CONSTRUCTION THE WALLS SHALL BE DESIGNED BY MANUFACTURER FOR SOIL LOADING AND HS 20 TRAFFIC LOADING. 2. IF STRUCTURE DEPTH EXCEEDS 4', METAL STEPS ARE TO BE PLACED ON WALL SPACED 16" O.C. 3. TOP SLAB SHALL BE PRECAST DESIGNED BY MANUFACTURER FOR HS-20 TRAFFIC LOADING. 4. "A" & "B" DIMENSIONS ARE MINIMUM REQUIRED MEASUREMENTS. 5. WHERE "A" & "B" DIMENSIONS VARY, THE LARGER DIMENSIONS SHALL BE THE WALL OF STRUCTURE WHERE LARGEST PIPE DIAMETER PENETRATES. Jg A JUNCTION BOX DETAIL NOT TO SCALE JUNCTION BOX STRUCTURE TABLE STRUCTURE ')A,. IN „Br, IN „0pr IN LOAD RATING* JB A2** 48 48 6 HEAVY DUTY JB A413 48 48 6 HEAVY DUTY JB B1 48 48 6 HEAVY DUTY JB B3 48 48 6 HEAVY DUTY JB B4 48 48 6 HEAVY DUTY *"HEAVY DUTY" LOAD RATING AS DEFINED BY US FOUNDRY IS SUITABLE FOR AASHTO H-20/HS-20 TRAFFIC LOADINGS. **CONTRACTOR TO VERIFY FXISTING PIPE BFFORE DETERMINED NEW BOX SIZE PIPE SIZE VARIES „C„ "A" C„ m r- FLAN NOT TO SCALE SECTION NOT TO SCALE g SPLASH PAD DETAIL NOT TO SCALE Bc + 24" 12" FINAL BACKFILL MIN' / -N V \\\j 4" GRANULAR 0.5 Bc MATERIAL BEDDING &aBE TRENCH DETAIL NOT TO SCALE SEE TEE NOTE "B"— INSIDF WALL DIMENSION, ChOTE 1 SEE SCHEDULE US FOUNDRY 4138 FRAME & 6235 GRATE OR APPROVED EQUIVALENT I i Ld ill U) Z d e v E a d d a z d I' da 0 An° 4. - d n a a J W ¢ Li Li 0 W d n 4 l _. .... z --- — e d Li Lu W O- ° q d d a v 4 dd PLAN. VIEW — TYPE 2 CATCH BASIN FINISHED GRADE, PAVING, OR TURF NOT SHOWN THIS VIEW SEE "B"---- INSIDE WALL SEE NOTE DIMENSION, NOTE SEE SCHEDULE 1 US FOUNDRY 4138 FRAME & 6235 GRATE OR APPROVED EQUIVALENT CATCH BASIN STRUCTURE TABLE # A IN B IN TYPE* LOAD RATING** B A4A 36 36 TYPE 2 HEAVY DUTY CB A5 36 36 TYPE 2 HEAVY DUTY CB A6 36 24 TYPE 2 HEAVY DUTY CB A7 36 24 TYPE 2 HEAVY DUTY CB A8 36 24 TYPE 2 HEAVY DUTY CB A9 24 24 TYPE 1 HEAVY DUTY CB A10 24 24 TYPE 1 HEAVY DUTY CB A11 24 24 TYPE 1 HEAVY DUTY B Al2 24 1 24 TYPE 1 HEAVY DUTY B A 1,31 24 1 24 TYPE 1 HEAVY DUTY CB E32 1 48 j.. 48 TYPE 2 HEAVY DUTY RIM=SEE PLANS GROUT BED, TYP SEE NOTE 3 PIPE SIZE VARIES TYP, SEE PLANS IE=SEE PLANS SUMP/SEDIMENT RETE (SEE F/C631) SEE NOTE 6� FINISHED GRADE a d a q. d PIPE SIZE VARIES, TYP 6" GRAVEL BASE, REFER TO SPECIFICATIONS SECTION VIEW TYPE 2 CATCH BASIN RIM=SEE PLANS GROUT BED, TYP PIPE SIZE VARIES TYP, SEE PLANS IE=SEE PLANS FINISHED GRADE SUMP/SEDIMENT RETENTIONLi i (SEE F/C631) SEE NOTE 6 4 d c d *SELECTED GRATE TO BE USED OR APPROVED EQUIVALENT, **"HEAVY DUTY" LOAD RATING AS DEFINED BY US FOUNDRY IS SUITABLE FOR AASHTO H-20/HS-20 TRAFFIC LOADINGS, NOTES: 1. FOR CONSTRUCTION OF THE CATCH BASIN AND JUNCTION BOX WALLS EITHER SOLID CONCRETE MASONRY, CAST —IN —PLACE CONCRETE, OR PRECAST CONCRETE MAY BE USED. FOR CONCRETE MASONRY THE WALLS SHALL BE MIN 8" THICK. FOR CAST —IN —PLACE CONCRETE THE WALLS SHALL BE MIN 6" THICK WITH REINFORCING STEEL #4's 0 6" O.C.E.W.. FOR PRECAST CONSTRUCTION THE WALLS SHALL BE DESIGNED BY MANUFACTURER FOR SOIL LOADING AND HS 20 TRAFFIC LOADING. 2. IF STRUCTURE DEPTH EXCEEDS 4', METAL STEPS ARE TO BE PLACED ON WALL SPACED 16" O.C. 3. TOP SLABSHALL BE PRECAST DESIGNED BY MANUFACTURER FOR HS-20 TRAFFIC LOADING. 4. A' & B' DIMENSIONS ARE MINIMUM REQUIRED MEASUREMENTS. 5. WHERE "A" & "B" DIMENSIONS VARY, THE LARGER DIMENSIONS TYPICALLY APPLIES THE WALL OF STRUCTURE WHERE LARGEST PIPE DIAMETER OR SHARPER PIPE ANGLE PENETRATES. 6. FOR MASONRY OR CAST —IN —PLACE CONSTRUCTION, BOTTOM SLAB SHALL BE MIN. 8" THICK WITH #4'S 0 6" O.C.E.W. FOR PRECAST BOTTOM SHALL BE DESIGNED BY MANUFACTURER HS-20 LOADING. 7. REFER TO PIPE AND STRUCTURE TABLES FOR FRAME AND INVERT ELEVATIONS. Ce CATCH BASIN DETAILS NOT TO SCALE ISSUED FOR CO PIPE SIZE I VARIES, TYP 6" GRAVEL BASE, REFER TO SPECIFICATIONS SECTION VIEW TYP E 1--.-CATCH BASIN RECESSED PVC C.O. PLUG 3" BELOW GRADE IN SIDEWALK 1% MINIMUM SLOPE CAST IRON CLEANOUT FRAME & COVER 6" OR 8" PVC SWEEP OR 2 45' BENDS IN PAVED AREA RECESSED PVC C.O. PLUG CAST IRON CLEANOUT 3" BELOW GRADE FRAME & COVER FINISH GRADE 12%12"x6" CONCRETE COLLAR #4 EACH SIDE 1 % MINIMUM SLOPE 6" OR 8" PVC SWEEP OR IN LAN DSCAPEO_ AREA 2 45' BENDS E r♦ v y r NSTRUCTION SITE S NOT TO SCALE TRUCTURAL 01 FEB 2012 SEAL N co N z p BLS w pX zo cKz w rn F CSww �p Ur 07,J p F— Jam' � LL W UN �N zfe f— Jr zr W�— 0 C) LL w co W Y O T Z Z U r ap wW m B 6i lL LL W� } 6 o u m$ � o N ❑ Z Y `^ O N 00 ¢ c(n< a Ina U) w Lu Z U U Z Z w p LL. Z J N U) 0 O � 0 cn rn � Z �O Goo O Z - �3 rnw w CLw �¢ z 0 U � z O Q Q z m U~} 0 o U F-- z W p J j LL O U U) SHEET IDENTIFICATION C630 J 1 2 3 4 5 \ V; 10 TOP ELEV. = 241.0 PLAN GRATE Il EXST 36" RCP II REINFORCED CONCRETE WALLS & FLOORS SEC110N A' P U U U O Q 0 C a 100 YR. ELEV. = 239_.6 10 YE, ELEV. _ 39.02. B C631 1 TOP = 239.1 EL= 2 8.0 2 YE, ELEV. = 237.05 3 1 YR. ELEV. = 236.21 \\\ ,::� �.: \\\\\ FISA ELEV. = 235.04 BTTM ELEV = 235.0 4" SAND CLEAN BED ACROSS ENTIRE BOTTOM A INFILTRATION BASIN A SECTION NOT TO SCALE \//\ EXST 36" RCP NOTES: 1. CONTRACTOR SHALL REMOVE ANY AND ALL ENCOUNTERED RESTRICTIVE SOIL LAYERS WITHIN THE LIMITS OF THE POND TO ENSURE PROPER INFILTRATION. GALVANIZED STEEL EXPANDED METAL GRATE CAPABLE OF SUPPORTING 150 LBS/SF ATTACHED WITH EXPANSION ANCHORS. 8" 3' GRATE NOTE: SEE DETAIL D/C720 FOR TEMP. SLEEVE FOR SKIMMER. SEAL COMPLETELY AFTER REMOVAL OF SKIMMER. II I I EXST 36" RCP II II #4 0 8" B.W. WALLS & FLOOR ECCENTRIC RI (IF RE( SEE PLANS FOR MATERIAL AND SLOPE I 1 I L-----------J T CONTROL STRUCTUR NOT TO SCALE DRAINTECH/ADS 12" SQUARE GRATE AND RISER (NON -TRAFFIC RATED) OR APPROVED EQUAL TT P1 I Gf\ I I V I 1 f ALJ lI� I LI\J LAWN INLEFul T DETAIL NOT TO SCALE R VARIES o DOWNSPOUT w (SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS) 0 RECTANGULAR CAST IRON DOWNSPOUT 3 SHOE WITH ONE COAT OF RUST INHIBITED PRIMER (MATCH DOWNSPOUT z DIMENSIONS) +1.5'1 MIN.m FINISHED GRADE (SEE PLAN FOR SIZE REQUIREMENTS) �- HDPE OR PVC PIPE ® 0.5% MIN SLOPE (SEE PLAN FOR SIZE) HDPE OR PVC WYE HDPE OR PVC ROOF DRAIN ® 0.5% MIN SLOPE (SEE PLANS FOR SIZE) b• ►►►1:1:1411111 :rr m r a D 12436 24 x36 CURB INLET WITH CAST IRON FRAME GRATE, AND HOOD UP TO 6'-0" INSIDE DEPTH, OPTIONAL RISERS AVAILABLE CAST IRON HOOD, FRAM_ AND VEII� GRATE 3295 z-,- APPROX V'd-iG'- is 510 LBS. OUTSIDE I HEIGHT B OF BOX 1 31" POUND TI-IIN WALL KNOCKOUTS. SLEDGE OUT AS REQUIRED. (TYP. 2 PLACES) BOX DESIGN LOAD: H-20 FULL TRAFFIC FOR COMPLETE DES'GH AND PRODUCT INFORVATION, CONTACT J=NSFrJ-IPFCAST_ 4'-0- OPTIONAL EXTENSION C HEIGHT EXTENSION MODEL NO. C WEIGHT PS243606 6" 450 LBS. RS243612 12" 90C LBS. 9JEUMSEJI 0124M4-v1,dwg 02001 DD1 Jensen Precast PREE49T, OR APPROVED EQUAL 18"x31" THIN WALL KNOCKOUTS. SLEDGE OUT AS REQUIRED. (TYP. 2 PLACES) PIPE TABLE FROM STRUCTURE CB A4A CB A5 TO STRUCTURE OUT A4 JB A413 UPSTREAM ELEVATfON 238.20 239.50 DOWNSTREAM STRUCTURE 237.30 239.30 MATERIAL RCP RCP LENGTH (FT) 80' 39' DIAMETER 24 24 SLOPE 0.51 % CB A6 CB A5 239.80 239.50 RCP 72 24 0.42% CB A7 CB A6 240.95 240.55 RCP 80' 18 0.50% CB A8 CB A9 C8 A7 CB A8 241.35 241.90 240.95 241.60 RCP RCP 80' 52' 18 15 0.50% 0,57% CB A10 CB A9 242.30 241.90 RCP 81' 15 0.50% CB Al CB Al2 CB A13 C8 A10 CB Al CB Al2 242.70 245.10 245.50 242.30 244.70 245.10 RCP RCP RCP 74' 73' 80' 15 15 15 0.54% 0.55% 0.50% CB B2 JB B1 243,60 243.30 RCP 87' 36 0.35% :_XST DI 18 OUT A3A 238.40 237.80 RCP 34' 18 1.74% HCI 83A JB B3 249.00 247.00 RCP 69' 15 2.89% IN B1 B JB B1 A 246.10 246.00 RCP 8' 15 1,26% JB A4B CB A4A 238.96 238.20 RCP 76' 24 1.01 % JB B1A JB B1 244.00 243.00 RCP 245' 15 0,41% JB 33 CB 32 244.10 243,60 RCP 111' 36 0.45% JB 84 JB B3 250.50 249,50 RCP 73' 36 1.35% LI Al2A CB Al2 245.30 245,10 PVC 21' 12 0,96% F:11 A14 CB A13 247.00 246.80 PVC 25` 12 0.79% STRUCTURE TABLE STRUCTURE NAME: TOP OF GRATF/ GUTTER ELEV BOTTOM ELEV SUMP DEPTH CB A4A 241.50 237.70 0.50 CB A5 249.50 239.00 0.50 CB A6 249.80 239.30 0.50 CB A7 249.80 240.45 0.50 C8 A8 249.80 240.85 0.50 CB A9 250.50 241.40 0.50 CB A10 248.00 241.80 0.50 CB A11 249.00 242.20 0.50 CB Al2 249.50 244.60 0.50 CB A13 251.00 245.00 0.50 CB 32 248.00 242.60 1.00 CS A3 239.10 235.10 0.50 HCI B3A 256,00 248,50 0.50 JB A4B 244,80 238.46 0,50 JB B1 248.62 241.00 1.00 JB E31 A 249.00 243.50 0.50 JB 33 254.50 243.10 1.00 JB 34 257.00 249.50 1.00 LI Al2A 250.50 245.30 0.00 LI A14 250.50 247.00 0.00 r PIPE AND STRUCTURE TABLE CORRECTED FINAL SITE/STRUCTURAL 07 MAR 2012 SEAL J EL N_ N a N Q N w cC Q h M z w 2 0 U 0o o o F- 0 DZ U a 0-1U r � co cn z w a w ❑ U ❑ w 0 � w w � w a 4t J - d' a Y or a N sb Z� Oa O ZX zo �Z 0rn F-6 mw W V N z N Z w J Z r W �_ O O� 0 tLw wp 1- N COY ❑a�2 Aw 02 5z U U } d o w W i- CO J J CCI LLI U- LL ❑ w J a� Z` } � U �� moo cn ❑ Z t ~O co w � W N �y ?� a J CO NZ no oa v)¢ a¢ cn¢ rn l.0 111 Z U U UZ.1 � Z p1 LL Z J N C] U O O co a O (D ~❑ UUO 0 (D "o oz� �� 0YW z ¢c a -� of OCR JNU J U W U a U Z_ z O z o 0 z j Lmcot a � 1 U) O U- J U Q - I- Z Lu 2 O 0 .j Q O U SHEET IDENTIFICATION C631 1 2 K 0 5 0 A IV 2 A' 0 STORM WATER POLLUTION PREVENTION PLAN NOTES 1. STORM WATER POLLUTION PREVENTION PLAN SWPPP CONSTITUENTS INCLUDE: A. APPROVED DRAWINGS B. (NOI) NOTICE OF INTENT C. (CGP) NORTH CAROLINA NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES D. CGP COVERAGE LETTER FROM NCDENR E. NCDENR OR LOCAL APPROVAL OF SEDIMENT AND EROSION PLANS F. GRADING PLANS OR STORM WATER MANAGEMENT PLANS 2. OPERATOR OF DAY TO DAY SITE ACTIVITIES ODSA A. THE PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ODSA RESPONSIBILITIES IDENTIFIED HEREIN AND AS IDENTIFIED IN THE CGP. 3. MAINTAIN SWPPP ON SITE A. THE CONTRACTOR SHALL MAINTAIN THE SWPPP ON SITE AND ALL CONSTITUENTS AT ALL TIMES FOR USE OF ALL THOSE IDENTIFIED AS HAVING RESPONSIBILITY UNDER THE SWPPP WHENEVER THEY ARE ON THE CONSTRUCTION SITE AND FOR USE BY INSPECTING OFFICIALS. 4. SWPPP DURATION A. THE CONTRACTOR SHALL IMPLEMENT AND MAINTAIN THE SWPPP AS WRITTEN FROM THE COMMENCEMENT OF THE CONSTRUCTION ACTIVITY UNTIL FINAL STABILIZATION IS COMPLETE. 5. SWPPP AREA OF COVERAGE A. TOTAL PROJECT (LEED LIMITS) AREA 4.4 ACRES B. TOTAL DISTURBED AREA 4.0 ACRES C. THIS SWPPP APPLIES AND IS LIMITED TO AREAS OF CONSTRUCTION IDENTIFIED IN THE APPROVED DRAWINGS. 6. PRE CONSTRUCTION CONFERENCE A. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL SCHEDULE & ORGANIZE AN ON -SITE PRE -CONSTRUCTION CONFERENCE. THE CONTRACTOR SHALL ENSURE THAT ALL PERSONS THAT WILL BE CONDUCTING LAND DISTURBING ACTIVITY ARE IN ATTENDANCE. B. THE CONTRACTOR SHALL SUBMIT INSPECTION REPORTS AS REQUIRED BY NCDENR. C. THE CONTRACTOR WILL PREPARE MINUTES OF THE SWPPP PRE -CONSTRUCTION CONFERENCE AND WILL PROVIDE THOSE TO THE CONTRACTING OFFICER WITHIN 7 DAYS OF THE SWPPP PRE -CONSTRUCTION CONFERENCE. 7. CONTRACTOR CERTIFICATIONS (ALL PROJECTS) A. ON BEHALF OF THE OWNER AND BEFORE ANY LAND DISTURBANCE ACTIVITIES CAN BEGIN, THE CONTRACTOR SHALL ENSURE THAT ALL CONTRACTORS, SUBCONTRACTORS AND OTHER PERSONS THAT WILL BE ENGAGED IN LAND DISTURBANCE ACTIVITIES SIGN A CO-PERMITTEE AND ATTEND A SWPPP PRE -CONSTRUCTION CONFERENCE. B. THE CONTRACTOR SHALL INSURE THAT COPIES OF ALL CERTIFICATIONS ARE MAINTAINED ON -SITE WITH THE SWPPP. C. CONTRACTORS AND SUBCONTRACTORS ELECTING OR CONTRACTED TO BE CO-PERMITTEES SHALL SIGN A CERTIFICATION STATEMENT AS FOLLOWS: a. CO-PERMITTEE CERTIFICATION : "I CERTIFY BY MY SIGNATURE BELOW THAT I PARTICIPATED IN A PRE -CONSTRUCTION CONFERENCE ONSITE OR, WHEN ALLOWED, OFFSITE WITH THE INDIVIDUAL WHO IS RESPONSIBLE FOR THE OPERATIONAL CONTROL OF THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP); AND I ACCEPT THE TERMS AND CONDITIONS OF SWPPP AS REQUIRED BY THE GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES PERMIT NUMBER NCR 010000) ISSUED TO THE OWNERIOPERATOR OF THE CONSTRUCTION ACTIVITY FOR WHICH I HAVE BEEN CONTRACTED TO PERFORM CONSTRUCTION RELATED PROFESSIONAL SERVICES. FURTHER, BY MY SIGNATURE BELOW, I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY WITH, THE TERMS AND CONDITIONS OF TFIE STATE OF NORTH CAROLINA GENERIC PERMIT FOR STORMWATER DISCHikRGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION PREVENTION PLAN PREPARED THEREUNDER." COMPANY NAME: PRINTED NAME OF PERSON: TITLE SIGNATURE: DATE: STREET ADDRESS: CITY, STATE, ZIP: PHONE: (DAY) 8. ALLOWABLE NON STORM WATER DISCHARGES A. THE CONTRACTOR IS AUTHORIZED FOR THE FOLLOWING NON -STORM WATER DISCHARGES, PROVIDED THE NON -STORM WATER COMPONENT OF THE DISCHARGE IS IN COMPLIANCE WITH THE CGP. a. DISCHARGES FROM FIRE FIGHTING ACTIVITIES. b. FIRE HYDRANT FLUSHINGS. c. WATER USED TO WASH VEHICLES WHERE DETERGENTS ARE NOT USED. d. WATER USED TO CONTROL DUST IN ACCORDANCE WITH THE CGP. e. POTABLE WATER INCLUDING UNCONTAMINATED WATER LINE FLUSHINGS. f. ROUTINE EXTERNAL BUILDING WASH DOWN THAT DOES NOT USE DETERGENTS. g. PAVEMENT WASH WATERS WHERE SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE NOT OCCURRED AND WHERE DETERGENTS ARE NOT USED. h, UNCONTAMINATED AIR CONDITIONING OR COMPRESSOR CONDENSATE. L UNCONTAMINATED GROUND WATER OR SPRING WATER j. FOUNDATION OR FOOTING DRAINS WHERE FLOWS ARE NOT CONTAMINATED WITH PROCESS MATERIALS SUCH AS SOLVENTS. k. UNCONTAMINATED EXCAVATION DEWATERING. 9. CONSTRUCTION WASTE MATERIALS A. THE CONTRACTOR SHALL PREVENT THE DISCHARGE OF ALL BUILDINGICONSTRUCTION MATERIALS OR OTHER SIMILAR MATERIALS TO SURFACE WATERS OF THE STATE THROUGH THE USE OR ROLL -OFF CONTAINERS INTENDED FOR THE COLLECTION OF SUCH MATERIALS. ANY OTHER MEANS SHALL BE SUBMITTED BY THE OPERATOR AS AN AMENDMENT TO THE SWPPP AND APPROVED BY FDEP PRIOR TO INITIATION. 10. SANITARY FACILITIES A. ALL PERSONNEL INVOLVED WITH CONSTRUCTION ACTIVITIES MUST COMPLY WITH STATE AND LOCAL SANITARY OR SEPTIC SYSTEM REGULATIONS. TEMPORARY SANITARY FACILITIES WILL BE PROVIDED AT THE SITE THROUGHOUT THE CONSTRUCTION PHASE. THEY MUST BE UTILIZED BY ALL CONSTRUCTION PERSONNEL AND WILL BE SERVICED BY A COMMERCIAL OPERATOR. 11. CONCRETE WASTE FROM CONCRETE READY -MIX TRUCKS A. DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRUCKS WILL TYPICALLY NOT BE ALLOWED ON THE CONSTRUCTION SITE UNLESS PROPER MEASURES ARE TAKEN TO ENSURE A SPECIFIED AREA IS PERIODICALLY CLEANED AND ALL WASTE MATERIAL IS COMPLETELY REMOVED AT THE END OF CONSTRUCTION. PRIOR APPROVAL MAY BE REQUIRED. 12. FUEL TANKS A. TEMPORARY ON -SITE FUEL TANKS FOR CONSTRUCTION VEHICLES SHALL MEET ALL STATE AND FEDERAL REGULATIONS. TANKS SHALL HAVE APPROVED SPILL CONTAINMENT WITH THE CAPACITY REQUIRED BY THE APPLICABLE REGULATIONS. THE TANKS SHALL BE IN SOUND CONDITION FREE OF RUST OR OTHER DAMAGE WHICH MIGHT COMPROMISE CONTAINMENT. FUEL STORAGE AREAS WILL MEET ALL EPA, OSHA AND OTHER REGULATORY REQUIREMENTS FOR SIGNAGE, FIRE EXTINGUISHER, ETC. HOSES, VALVES, FITTINGS, CAPS, FILLER NOZZLES, AND ASSOCIATED HARDWARE SHALL BE MAINTAINED IN PROPER WORKING CONDITION AT ALL TIMES. B. A SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN MUST BE DEVELOPED IF ABOVE GROUND OIL STORAGE CAPACITY AT THE CONSTRUCTION SIE EXCEEDS 1,320-GALLONS. CONTAINERS WITH A STORAGE CAPACITY OF 55-GALLONS OR LESS ARE NOT INCLUDED WHEN CALCULATING SITE STORAGE CAPACITY. THE GENERAL CONTRACTOR SHALL WORK WITH THE ENGINEER TO DEVELOP AND IMPLEMENT A SPCC PLAN IN ACCORDANCE WITH THE OIL POLLUTION PREVENTION REGULATION AT TITLE 40 OF THE CODE OF FEDERAL REGULATIONS, PART 112,(40 CFR 112). 13. HAZARDOUS MATERIAL MANAGEMENT AND SPILL REPORTING PLAN A. ANY HAZARDOUS OR POTENTIALLY HAZARDOUS MATERIAL THAT IS BROUGHT ONTO THE CONSTRUCTION SITE WILL BE HANDLED PROPERLY IN ORDER TO REDUCE THE POTENTIAL FOR STORM WATER POLLUTION. ALL MATERIALS USED ON THIS CONSTRUCTION SITE WILL BE PROPERLY STORED, HANDLED, DISPENSED AND DISPOSED OF FOLLOWING ALL APPLICABLE LABEL DIRECTIONS. MATERIAL SAFETY DATA SHEETS (MSDS) INFORMATION WILL BE KEPT ON SITE FOR ANY AND ALL APPLICABLE MATERIALS. B. IN THE EVENT OF AN ACCIDENTAL SPILL, IMMEDIATE ACTION WILL BE UNDERTAKEN BY THE GENERAL CONTRACTOR TO CONTAIN AND REMOVE THE SPILLED MATERIAL. ALL HAZARDOUS MATERIALS WILL BE DISPOSED OF BY THE CONTRACTOR IN THE MANNER SPECIFIED BY FEDERAL, STATE AND LOCAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. AS SOON AS POSSIBLE, THE SPILL WILL BE REPORTED TO THE APPROPRIATE AGENCIES. AS REQUIRED UNDER THE PROVISIONS OF THE CLEAN WATER ACT, ANY SPILL OR DISCHARGE ENTERING WATERS OF THE UNITED STATES WILL BE PROPERLY REPORTED, THE GENERAL CONTRACTOR WILL PREPARE A WRITTEN RECORD OF ANY SPILL OF PETROLEUM PRODUCTS OR HAZARDOUS MATERIALS IN OWNER WITHIN 24-HOURS OF THE OCCURRENCE OF THE SPILL. A SPILL REPORT FORM IS LOCATED IN APPENDIX F. C. ANY SPILLS OF PETROLEUM PROD HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED BY EPA OR THE STATE OR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSE CENTER (1-800-424-8802). THE REPORTABLE QUANTITY FOR HAZARDOUS MATERIALS CAN BE FOUND IN 40 CFR 302. a. IN ORDER TO MINIMIZE THE POI ENTIAL FOR A SPILL OF PETROLEUM PRODUCT OR HAZARDOUS MATERIALS TO COME IN CONTACT WITH STORM WATER, THE FOLLOWING STEPS WILL BE IMPLEMENTED. b. ALL MATERIALS WITH HAZARDOUS PROPERTIES WILL BE STORED IN A SECURE LOCATION, UNDER COVER, WHEN NOT IN USE. G. THE MINIMUM PRACTICAL QUANTITY OF ALL SUCH MATERIALS WILL BE KEPT ON THE JOB SITE AND SCHEDULED FOR DELIVERY AS CLOSE TO TIME OF USE AS PRACTICAL. d. A SPILL CONTROL AND CONTAINMENT KIT WILL BE PROVIDED AT THE STORAGE SITE. e. ALL OF THE PRODUCT IN A CONTAINER WILL BE USED BEFORE THE CONTAINER IS DISPOSED OF. ALL SUCH CONTAINERS WILL BE TRIPLE RINSED, WITH WATER PRIOR TO DISPOSAL. THE RINSE WATER USED IN THESE CONTAINERS WILL BE DISPOSED OF IN A MANNER IN COMPLIANCE WITH STATE AND FEDERAL REGULATIONS AND WILL NOT BE ALLOWED TO MIX WITH STORM WATER DISCHARGES. f. ALL PRODUCTS WILL BE STORED IN AND USED FROM THE ORIGINAL CONTAINER WITH THE ORIGINAL PRODUCT LABEL. g. ALL PRODUCTS WILL BE USED IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCT LABEL. h. THE DISPOSAL OF EXCESS OR USE 3D PRODUCTS WILL BE IN STRICT COMPLIANCE WITH INSTRUCTIONS ON THE PRODUCTS LABEL. 14. BEST MANAGEMENT PRACTICE (BMA MAINTENANCE A. IF SITE INSPECTIONS IDENTIFY BMP'S THAT ARE NOT OPERATING EFFECTIVELY, THE CONTRACTOR SHALL CONDUCT MAINTENANCE AS SOON AS PRACTICAL AND BEFORE THE NEXT STORM EVENT. B. IF SITE INSPECTIONS IDENTIFY A NEED, THE CONTRACTOR SHALL MODIFY BMP'S OR PROVIDE ADDITIONAL BMP'S AS NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR FDEP'S STANDARDS. IMPLEMENTATION SHALL BE BEFORE THE NEXT STORM EVENT WHERE PRACTICAL. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICAL, THE SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BR'P'S MUST BE IMPLEMENTED AS SOON AS PRACTICAL. 15. INSPECTIONS A. RESPONSIBILITY -THE CONTRACTOR IS RESPONSIBLE FOR ALL INSPECTIONS. B. CONTRACTOR SHALL INSTALL A RAIN GAUGE ONSITE AND SHALL RECORD DAILY RAINFALL AMOUNTS. C. INSPECTION INTERVALS a. RAIN EVENT - THE CONTRACTOR SHALL INSPECT THE SIZE AND ALL BMP'S AFTER EVERY RAIN EVENT EXCEEDING 0.5 INCHES. b. WEEKLY - AFTER CONSTRUCTION BEGINS, THE CONTRACTOR SHALL INSPECT THE SITE AND ALL BMP'S AT LEAST ONCE EVERY 7 DAYS. c. MONTHLY -AFTER TEMPORARY STABILIZATION IS COMPLETE, THE CONTRACTOR SHALL INSPECT THE SITE AND ALL BMP'S AT LEAST ONCE PER MONTH. C. INSPECTION AREAS - INSPECTIONS SHALL INCLUDE: a. ALL AREAS OF THE SITE DISTURBED BY CONSTRUCTION ACTIVITY b. ALL AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION. D. INSPECTOR QUALIFICATION - INSPECTORS SHALL BE: a. A QUALIFIED INSPECTOR CERTIFIED THROUGH A CONSTRUCTION SITE INSPECTOR COURSE APPROVED BY NCDENR. b. AN INDIVIDUAL WITH REGISTRATION EQUIVALENT TO THE SWPPP PREPA^ER. E. INSPECTORS SHALL INSPECT FOR: a. EVIDENCE/POTENTIAL OF POLLUTANTS ENTERING THE STORM WATER SYSTEM. b. PROPER OPERATION OF SEDIMENTATION AND EROSION CONTROL MEASURES BEST MANAGEMENT PRACTICES (BMP'S) c. DISCHARGE LOCATIONS TO MEASURE EFFECTIVENESS OF EROSION CONTROL MEASURES d. CONSTRUCTION ENTRANCES FOR EVIDENCE OF OFF -SITE SEDIMENT TRACKING 16. INSPECTION REPORTS A. WEEKLY INSPECTION REPORTS - THE CONTRACTOR SHALL DOCUMENT ALL INSPECTIONS WITH A REPORT. a. WEEKLY INSPECTION REPORT CONTENTS - • INSPECTION DATE • INSPECTOR NAME • INSPECTOR TITLE • INSPECTOR QUALIFICATION • WEATHER INFORMATION SINCE LAST INSPECTION OR SINCE CONSTRUCTION ACTIVITY STARTED: o ESTIMATED START TIME OF EACH STORM EVENT o ESTIMATED DURATION OF EACH STORM EVENT o ESTIMATED RAINFALL AMOUNT IN INCHES OF EACH STORM EVENT o DESCRIPTION OF DISCHARGES KNOWN TO OCCUR • DESCRIPTION OF DISCHARGES OCCURRING AT TIME OF INSPECTION • LOCATION(S) OF DISCHARGES OF SEDIMENT OR OTHER POLLUTANTS FROM THE SITE • LOCATION(S) OF BMP'S THAT NEED MAINTENANCE • LOCATION(S) OF BMP'S THAT FAILED TO OPERATE AS DESIGNED OR PROVED INADEQUATE FOR A PARTICULAR LOCATION. • LOCATION(S) WHERE ADDITIONAL BMP'S ARE NEEDED THAT DID NOT EXIST AT THE TIME OF INSPECTION. • CORRECTIVE ACTION REQUIRED INCLUDING ANY CHANGES TO THE C"VPPP NECESSARY AND IMPLEMENTATION DATES. B. MONTHLY SITE INSPECTION REPORT a. MONTHLY SITE INSPECTION REPORT CONTENTS- • SUMMARY OF WEEKLY INSPECTION REPORTS FOR THE MONTH. • LISTING ALL DEFICIENCIES WITH: o DATE OF DISCOVERY o NAME, ADDRESS, TELEPHONE NUMBER OF PARTY RESPONSIBLE FOR CORRECTIVE ACTION o STATEMENT WHETHER THIS DEFICIENCY WAS PREVIOUSLY LISTED IN A MONTHLY REPORT o LISTING OF CORRECTIVE ACTIONS TAKEN WITH DATE. o STATEMENT ON WHETHER SWPPP WAS UPDATED TO DEAL WITH DEFICIENCIES o COPY OF EACH INSPECTION REPORT CONDUCTED THAT MONTH AS AN APPENDIX. o CO-PERMITTEE AND NON-CO-PERMITTEE CERTIFICATIONS AS APPENDICES (ONE ORIGINAL AND ONE COPY) • THE CONTRACTOR SHALL PREPARE AND SUBMIT MONTHLY REPORTS (ORIGINAL & ONE COPY) TO FDEP AND, IF APPLICABLE, THE APPROPRIATE MS4 ON OR BEFORE THE 28TH DAY OF THE MONTH FOLLOWING THE REPORTING PERIOD. • THE CONTRACTOR SHALL SUBMIT THE FIRST MONTHLY REPORT TO DHEC AFTER CONSTRUCTION BEGINS ON THE FACILITY AND SHALL INCLUDE THE ORIGINAL AND ONE COPY OF ALL CO-PERMITTEE AND NON-CO-PERMITTEE CERTIFICATIONS. • THE CONTRACTOR SHALL INCLUDE IN SUBSEQUENT MONTHLY REPORTS ADDED CO-PERMITTEE CERTIFICATIONS SINCE THE FIRST MONTHLY REPORT. • THE CONTRACTOR MAY ESTABLISH ELECTRONIC METHODS OF MONTHLY REPORTING WITH FDEP AS APPROVED BY FDEP ON A CASE BY CASE BASIS. • UNTIL CONSTRUCTION STARTS, THE CONTRACTOR SHALL REPORT THAT CONSTRUCTION ACTIVITY HAS NOT STARTED. • THE CONTRACTOR SHALL SUBMIT MONTHLY REPORTS UNTIL THE NOTICE OF TERMINATION IS SUBMITTED TO FDEP. C. INSPECTION REPORT RECORDS a. ALL INSPECTION REPORTS SHALL BE ADDED TO THE SWPPP AND MAINTAINED IN ACCORDANCE WITH RECORD REQUIREMENTS. b. ONCE A DEFINABLE AREA HAS BEEN FINALLY STABILIZED, THE CONTRACTOR SHALL MARK THIS ON THE SWPPP AND NO FURTHER SWPPP OR INSPECTION REQUIREMENTS APPLY TO THAT PART OF THE SITE. 17. ACTIVITY LOG A. THE CONTRACTOR SHALL RECORD AND MAINTAIN WITH THE SWPPP AN ACTIVITY LOG OF THE FOLLOWING: a. START DATES OF MAJOR GRADING ACTIVITIES b. TEMPORARY CEASE DATES OF PORTIONS OF THE SITE WHERE CONSTRUCTION HAS STOPPED FOR MORE THAN 14 DAYS. c. START DATES WHEN STABILIZATION MEASURES ARE INITIATED. 18. RECORDS A. AFTER RECEIVING FINAL APPROVAL AND AFTER FINAL STABILIZATION IS COMPLETE, THE CONTRACTOR SHALL SUPPLY THE OWNER/OPERATOR WITH ALL SWPPP DOCUMENTATION. B. THE OWNER/OPERATOR SHALL MAINTAIN ALL SWPPP DOCUMENTATION FOR A PERIOD OF 3 YEARS FOLLOWING FINAL STABILIZATION. 19. SWPPP AMENDMENTS A. THE CONTRACTOR SHALL AMEND THE SWPPP IN ACCORDANCE WITH THE REQUIREMENTS OF THE CGP WHEN: a. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, OR MAINTENANCE AT THE CONSTRUCTION SITE THAT WILL CAUSE OR HAVE THE POTENTIAL TO CAUSE OR CONTRIBUTE TO VIOLATIONS TO FDEP'S WATER QUALITY STANDARCS. b. INSPECTIONS BY SITE OR REGULATORY STAFF DETERMINE THAT THE SWPPP IS INEFFECTIVE. c. INSPECTIONS REQUIRED MODIFIED OR ADDITIONAL BMP'S. d. ALL SWPPP AMENDMENTS MUST BE IAW THE CGP AND COMPLETE WITH 7 CALENDAR DAYS OF INSPECTION. B, ALL AMENDMENTS TO THE SWPPP MUST BE ACKNOWLEDGED BY CONTRACTORS AND SUBCONTRACTORS. 20. ADDITIONAL SWPPPS A. FOR ANY STORM DRAINAGE OR OTHER DISCHARGE NOT SPECIFICALLY INCLUDED IN THIS SWPPP, THE CONTRACTOR SHALL PREPARE, SUBMIT AND OBTAIN APPROVAL FOR A SEPARATE SWPPP TO COVER THE PROPOSED ACTIVITY PRIOR TO ENGAGING IN THE PROPOSED ACTIVITY. THESE ACTIVITIES MAY INCLUDE BUT ARE NOT LIMITED TO DEDICATED ASPHALT PLANTS, DEDICATED CONCRETE PLANTS, ETC. B. THE CONTRACTOR SHALL ENSURE THAT ANY ADDITIONAL SWPPP'S DO NOT COMPROMISE OTHER RELATED SWPPP'S FOR THE PROJECT. 21. INDUSTRIAL DISCHARGES A. THIS SWPPP DOES NOT IN ANY WAY AUTHORIZE STORMWATER DISCHARGES FROM INDUSTRIAL ACTIVITY. 22. NOTICE OF TERMINATION NOT A. WITHIN 30 DAYS OF ACHIEVING FINAL STABILIZATION OF THE ENTIRE SITE, THE CONTRACTOR SHALL SUBMIT A NOTICE OF TERMINATION IAW THE CGP REQUIREMENTS. FINAL STABILIZATION IS DEFINED AS A MINIMUM OF 70% PERMANENT COVER ON 100% OF THE SITE. ISSUED FOR CONSTRUCTION SITE STRUCTURAL 01 FEB 2012 rem �~ 1 1 1 E llllli' SEAL a n. w r 0 z 0 a_ U ul Y (V U-)co N zz 0 p m z`n oP°z w UX z0 af w ww �o U� m_j x �x Z� U r }- _lam Z� w� 0 co o� o� LLw w a m °`— 22 Y OJ zz C) ? do ww m J J m ❑ w wLL ❑ w ¢ U cl) cn cn m a ~ w in N 00 ❑a' r°na z a cn¢ w w Z U U z m o L ❑ w c) O z O co ¢cnz o O Jozo Z m.` z � �/j `l w w Of w aY¢ �� "'max Cf Co NNu� cgs J U U) Q w w ri) O z Z O F U J O z w ( I— CL O co Z O ti O z 0) ca a (0 It o 0 U) z_ W C ❑ IL U) o U) SHEET IDENTIFICATION C730 1 2 Ell 5 i DEWATERING NOTES 1. THE DESIGN, ADEQUACY AND OPERATION OF ANY AND ALL DEWATERING ACTIVITIES IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 2. THE CONTRACTOR SHALL PROTECT ALL ADJACENT PROPERTIES, RIGHTS OF WAYS, NATURAL AREAS AND EXISTING UTILITY SYSTEMS FROM EROSION AND SEDIMENTATION ASSOCIATED WITH DEWATERING ACTIVITIES. 3. DEWATERING DISCHARGES SHALL ALWAYS BE DIRECTED THROUGH SUITABLE BEST MANAGEMENT PRACTICE (BMP) SUCH AS SEDIMENT TRAPPING DEWATERING BAG. STANDARD NOTES 1. FOLLOWING INITIAL SOIL DISTURBANCE OR RE -DISTURBANCE, PERMANENT OR TEMPORARY STABILIZATION SHALL BE COMPLETED WITHIN SEVEN (7) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) AND FOURTEEN DAYS (14) AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE PROJECT SITE. A. WHERE STABILIZATION BY THE 14TH DAY IS PRECLUDED BY SNOW COVER OR FROZEN GROUND CONDITIONS STABILIZATION MEASURES MUST BE INITIATED AS SOON AS PRACTICAL. B. WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS TEMPORARILY CEASED, AND EARTH -DISTURBING ACTIVITIES WILL BE RESUMED WITHIN 14 DAYS, TEMPORARY STABILIZATION MEASURES DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE. 2. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN (7) DAYS. IF SITE INSPECTIONS IDENTIFY BMP'S THAT ARE DAMAGED OR ARE NOT OPERATING EFFECTIVELY, MAINTENANCE MUST BE PERFORMED AS SOON AS PRACTICAL OR AS REASONABLY POSSIBLE AND BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. 3. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER AND TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE ANY SEDIMENTS BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE STATE. 4. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 5. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED. 6. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 7. ALL WATERS OF THE STATE, INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE CLEARLY MARKED IN THE FJELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WATERS OF THE STATE. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WATERS OF THE STATE. 8. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED FROM BECOMING A POLLUTANT SOURCE IN STORNA WATER DISCHARGES. PERMANENT STORMWATER MANAGEMENT MAINTENANCE PLAN 1. PRIOR TO FINAL ACCEPTANCE, MAINTENANCE OF ALL PERMANENT STORMWATEF. MANAGEMENT STRUCTURES IS THE RESPONSIBILITY OF THE CONTRACTOR. 2. EXCEPT AS OTHERWISE CONTRACTED OR AS SPECIFIED FOR WARRANTY, MAINTENANCE OF ALL PERMANENT STORMWATER MANAGEMENT STRUCTURES AFTER FINAL ACCEPTANCE IS THE RESPONSIBILITY OF THE OWNER. 3. IN ADDITION TO MAINTENANCE REQUIRED DURING CONSTRUCTION AS INDICATEDAND SPECIFIED ELSEWHERE, PERMANENT STORMWATER MANAGEMENT STRUCTURE MAINTENANCE SHALL MEET THE FOLLOWING MINIMUM REQUIREMENTS SO AS TO PREVENT EROSION BY WIND OR PRECIPITATION: A. VEGETATED AREAS (TURF/PLANTING BEDS/PLANTS/TREES/SHRUBBERY) a. ALL VEGETATED AREAS SHALL BE PROPERLY MAINTAINED BY MOWING, PRUNING, WATERING, FERTILIZING AND AS OTHERWISE REQUIRED TO MAINTAIN FULL AND HEALTHY VEGETATION. b. ALL PLANTING BEDS WITH MULCH SHALL BE PROPERLY MAINTAINED BY THE REPLACEMENT OF MULCH AS OTHERWISE REQUIRED TO MAINTAIN COMPLETE COVERAGE OF THE BED(S). c. AREAS OF PLANTS THAT DIE OR SUBSIDE SHALL BE REPLACED AS NEEDED. d. VEGETATED AREAS SHALL BE REGULARLY CLEANED OF LITTER, DEBRIS AND OTHER REFUSE THAT MAY POLLUTE SURROUNDING PONDS, INFRASTRUCTURE OR NATURAL AREAS. e. INSPECTION AND CLEANING INTERVALS SHALL MATCH MOWING INTERVALS BUT SHALL NOT EXCEED ONCE PER MONTH. B. PAVEMENTS/IMPERVIOUS SURFACES a. ALL PAVEMENT DISTRESSES SUCH AS POTHOLES, CRACKING OR OTHER FAILURE SHALL BE PATCHED TO PREVENT EROSION OF UNDERLYING SOILS. b. EXCESSIVE PETROLEUM PRODUCE BUILDUP OR OTHER CHEMICAL BUILDUP OR SPILL SHALL BE CLEANED TO PREVENT MIGRATION TO SURROUNDING WATER BODIES OR STORM DRAINAGE SYSTEMS. c. PAVED AREAS SHALL BE REGULARLY CLEANED OF LITTER, DEBRIS AND OTHER REFUSE THAT MAY POLLUTE SURROUND PONDS, INFRASTRUCTURE OR NATURAL AREAS. d. INSPECTION AND CLEANING INTERVALS SHALL MATCH MOWING INTERVALS BUT SHALL NOT EXCEED ONCE PER MONTH. C. STORM DRAINAGE STRUCTURES & PIPING a. ALL STORM DRAINAGE STRUCTURES (CATCH BASINS, CURB INLETS, MANHOLES, FLUMES, JUNCTION BOXES, ETC..) AND PIPING SHALL BE VISUALLY INSPECTED REGULARLY CLEANED OF LITTER, DEBRIS, SEDIMENT AND OTHER REFUSE THAT MAY POLLUTE SURROUND PONDS, INFRASTRUCTURE OR NATURAL AREAS. INSPECTION SHALL INCLUDE BASIN OUTFALL STRUCTURE PIPING TO ENSURE IT IS CLEAR OF DEBRIS OR SEDIMENT AND FUNCTIONING PROPERLY. b. EXCESSIVE BUILDUP OF SEDIMENT OR NOTICEABLE DECREASE IN FLOW MAY INDICATE A BLOCKAGE OR PIPE FAILURE. IN THIS CASE, INSPECT FULL LENGTHS OF PIPE RUNS FOR FAILURE OR BLOCKAGE AND CLEAN OR REPAIR ACCORDINGLY. c. INSPECTION AND CLEANING INTERVALS SHALL NOT EXCEED ONCE PER YEAR, D. SLOPES a. SLOPES OR BANKS SHALL BE INSPECTED, MAINTAINED AND REPAIRED AS NOTED FOR THE SURFACE TYPE NOTED ABOVE. E. INFILTRATION BASINS a. OUTLET STRUCTURES AND PIES SHALL BE KEPT CLEAN, FREE FROM OBSTRUCTIONS AND IN GOOD WORKING ORDER AT ALL TIMES. b. REMOVE ALL LITTER AND DEBRIS AND OTHER REFUSE THAT MAY POLLUTE SURROUNDING PONDS, INFRASTRUCTURE, OR NATURAL AREAS OR THAT MAY PREVENT OUTLET STRUCTURES FROM FUNCTIONING PROPERLY. c. MAINTAIN INFILTRATION BASIN PERIMETERS, INCLUDING SIDE SLOPES, BERMS AND SURROUNDING AREAS AS SPECIFIED ABOVE FOR VEGETATED AREAS AND PAVEMENTS. d. MAINTAIN BOTTOMS IN KEEPING WITH THE SAND MATERIAL SPECIFIED FOR THE INFILTRATION BASIN BOTTOMS. e. REMOVE SEDIMENT BUILDUPS FORM INFILTRATION BASIN BOTTOMS AS NECESSARY. f. INSPECTION AND CLEANING INTERVALS SHALL NOT EXCEED ONCE PER MONTH. F. DISCHARGE POINTS & ENERGY DISSIPATERS a. VEGETATED DISCHARGE LOCATIONS SHALL BE MAINTAINED WITH HEALTHY VEGETATION AS NOTED ABOVE FOR TURF. b. ENERGY DISSIPATERS SHALL BE REPAIRED WHEN NEEDED. c. DISCHARGE POINTS AND ENERGY DISSIPATERS SHALL BE REGULARLY CLEANED OF LITTER, DEBRIS AND OTHER REFUSE THAT MAY POLLUTE SURROUND PONDS, INFRASTRUCTURE OR NATURAL AREAS. d. INSPECTION, CLEANING, AND REPAIR INTERVALS SHALL NOT EXCEED ONCE PER YEAR. NCDNNR LAND QUALITY SELF -INSPECTION REQUIREMENTS 1. EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTION LAND -DISTURBING ACTIVITIES LARGER THAN 1 ACRE MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING. 2. ALL OF THE EROSION AND SEDIMENTATION CONTROL MEASURES, INCLUDING SEDIMENTATION CONTROL BASINS, SEDIMENTATION TRAPS, SEDIMENTATION PONDS, ROCK DAMS, TEMPORARY DIVERSIONS, TEMPORARY SLOPE DRAINS, ROCK CHECK DAMS, SEDIMENT FENCE OR BARRIERS, ALL FORMS OF INLET PROTECTION, STORM DRAINAGE FACILITIES, ENERGY DISSIPATERS, AND STABILIZATION METHODS OF OPEN CHANNELS MUST BE INSPECTED. 3, TEMPORARY OR PERMANENT GROUND COVER MUST BE PROVIDED ON EXPOSED GRADED SLOPES AND FILLS WITHIN 7 CALENDAR DAYS OF THE COMPLETION OF A PHASE OF GRADING. PERMANENT GROUND COVER MUST BE PROVIDED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (60 DAYS IN HQW ZONES), WHICHEVER TERM IS SHORTER, UPON THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT, 4. ACTUAL DIMENSIONS OF THE SEDIMENTATION CONTROL BASINS HAVE TO BE CHECKED, USUALLY WITH A TAPE MEASURE, AND COMPARED TO THE DIMENSIONS OF THE APPROVED PLAN. 5. IF THE APPROVED EROSION AND SEDIMENTATION PLAN CANNOT BE FOLLOWED, A REVISED PLAN SHOULD BE SUBMITTED FOR REVIEW. A SIGNIFICANT DEVIATION MEANS AN OMISSION, ALTERATION OR RELOCATION OF AN EROSION OR SEDIMENTATION CONTROL MEASURE THAT PREVENTS THE MEASURE FROM PERFORMING AS INTENDED 6. SELF INSPECTION REPORTS A. A "SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS 113A-54.1" IS AVAILABLE FOR USE AT: http://www.dlr.enr.state.nc.us/pages/Sediment%20-%2OSelf-Inspection°/420201009101New%20Self%201nspection%20FAQ.pdf. IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL SPREADSHEET. B. AN ALTERNATE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE. RULE 15A NCAC 04B.0131 STATES THAT 11... DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR BY COMPLETING, DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN." C. REPORTS ARE TO BE COMPLETED AFTER EACH PHASE OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS COMPLETE AS FOLLOWS: a. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES; b'. CLEARING AND GRUBBING OF EXISTING GROUND COVER; c. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS; d. INSTALLATION OF STORM DRAINAGE FACILITIES; e. COMPLETION OF CONSTRUCTION OR DEVELOPMENT; f. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. D. THE RECORDS MUST BE MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR AT THE SITE. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. ANY INSPECTION REPORTS SHALL ALSO BE MADE AVAILABLE ON THE SITE. STORMWATER AS -BUILT REQUIREMENTS FORT BRAGG IDG FORT BRAGG INSTALLATION DESIGN GUIDE - SECTION 3.1.16 MAPPING AND UTILITIES. PLANS SHALL BE PREPARED ACCORDING TO THE FOLLOWING SPECIFICATsONS. SPECIAL REQUIREMENTS FOR SITE WORK (DESIGN AND AS -BUILT PREPARATION): a. A SINGLE MAP OF THE ENTIRE SITE SHALL BE PREPARED INDICATING THE EXISTING SITE CONDITIONS AND REQUIRED DEMOLITIONS. b. A SINGLE MAP INDICATING PROPOSED UTILITIES AND OTHER CONSTRUCTIONS TO INCLUDE THE FOOTPRINT OF STRUCTURES, PAVING (INCLUDING CURBING), SIDEWALKS, AND OTHER RELEVANT PLANIMETRIC FEATURES. c. THE MAP WILL BE REGISTERED TO THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM - ZONE 3200 - NAD83 - U.S. SURVEY FEET. ELEVATION UNITS WILL BE MSL GRS80 U.S. SURVEY FEET. d. DUE NORTH ON THE MAP WILL BE AS VIEWED FROM THE BOTTOM OF THE MAP. ROTATION AND TRANSLATION OF COORDINATE SYSTEMS WILL NOT BE ALLOWED NOR WILL ORIENTATION TO MAGNETIC NORTH. THE MICROSTATION VIEW MAY BE ROTATED FOR PLOTTING PURPOSES BUT THE ORIENTATION OF THE MAP MUST BE GEOGRAPHICALLY CORRECT WHEN SELECTING'TOP VIEW' IN MICROSTATION. e. THE MAP WILL CONTAIN A LABELED COORDINATE GRID WITH SPACING APPROPRIATE TO THE MAP EXTENTS. FOR INSTANCE, A MAP SCALE OF 1"=30' WILL HAVE COORDINATES LABELED AT 100' INTERVALS NORTH/SOUTH AND EAST/WEST. f. ALL UTILITIES ON THE MAP WILL BE CLEARLY LABELED AS TO SIZE AND MATERIAL. WHERE UTILITIES ARE TO BE ENCLOSED IN CONDUITS OR DUCT WORK, A SECTION OF THE DUCT WILL BE SHOWN CLEARLY INDICATING THE DIMENSIONS AND MATERIAL OF THE DUCT, THE CONTENTS OF THE DUCT SUCH AS WIRE SIZE AND TYPE OF CONDUCTOR, WHETHER CONDUCTOR IS PRIMARY OR NEUTRAL, NUMBER OF CONDUCTORS, HOT WATER SUPPLY OR RETURN, PIPE SIZE, INSULATION TYPE AND THICKNESS, ETC. g. THE MAP WILL SHOW THE INVERT AND RIM ELEVATION OF ALL MANHOLES AS WELL AS THE INVERT OF EACH PIPE JOINING A MANHOLE AND THE INVERT AND CHARACTER OF ALL OUTFALLS. NCDENR LAND QUALITY SECTION EROSION AND SEDIMENTATION CONTROL PLAN APPLICATION CHECKLIST EROSION & SEDIMENTATION CONTROL PLAN APPLICATION CHECKLIST THE FOLLOWING ITEMS SHALL BE INCORPORATED WITH RESPECT TO SPECIFIC SITE CONDITIONS, IN AN EROSION & SEDIMENT CONTROL PLAN: LOCATION INFORMATION X PROJECT LOCATION (ROADS, STREETS, LANDMARKS) X NORTH ARROW AND SCALE GENERAL SITE FEATURES (PLAN ELEMENTS) X LEGEND: NORTH ARROW, SCALE, ETC. X PROPERTY LINES X EXISTING CONTOURS (TOPOGRAPHIC LINES) X PROPOSED CONTOURS X LIMITS OF DISTURBED AREA (PROVIDE ACREAGE TOTAL, DELINEATE LIMITS, AND LABEL) X PLANNED AND EXISTING BUILDING LOCATIONS AND ELEVATIONS X PLANNED & EXISTING ROAD LOCATIONS & ELEVATIONS X LOT AND/OR BUILDING NUMBERS N A GEOLOGIC FEATURES: ROCK OUTCROPS, SEEPS, SPRINGS, WETLAND AND THEIR LIMITS, STREAMS, LAKES, PONDS, DAMS, ETC. N A EASEMENTS AND DRAINAGEWAYS N A PROFILES OF STREETS, UTILITIES, DITCHLINES, ETC. A a STOCKPILED TOPSOIL OR SUBSOIL LOCATIONS IF THE SAME PERSON CONDUCTS THE LAND -DISTURBING ACTIVITY & ANY RELATED BORROW OR WASTE ACTIVITY, THE RELATED BORROW OR WASTE ACTIVITY SHALL CONSTITUTE PART OF THE LAND -DISTURBING ACTIVITY UNLESS THE BORROW OR WASTE ACTIVITY IS REGULATED UNDER THE MINING ACT OF 1971, OR IS A LANDFILL REGULATED BY THE DIVISION OF SOLID WASTE MANAGEMENT. IF THE LAND -DISTURBING ACTIVITY AND ANY RELATED BORROW OR WASTE ACTIVITY ARE NOT CONDUCTED BY THE SAME PERSON, THEY SHALL BE CONSIDERED SEPARATE LAND -DISTURBING ACTIVITIES AND MUST BE PERMITTED EITHER THRU THE SEDIMENTATION POLLUTION CONTROL ACT AS A ONE -USE BORROW SITE OR THROUGH THE MINING ACT. STREAM DISTURBANCE OVER 150 LINEAR FEET MAY REQUIRE 401 WATER QUALITY CERTIFICATION VIA THE DIVISION OF WATER QUALITY EROSION CONTROL MEASURES (ON PLAN) X LEGEND X LOCATION OF TEMPORARY MEASURES X LOCATION OF PERMANENT MEASURES _x_ CONSTRUCTION DRAWINGS AND DETAILS FOR TEMPORARY AND PERMANENT MEASURES _x MAINTENANCE REQUIREMENTS OF MEASURES CONTACT PERSON RESPONSIBLE FOR MAINTENANCE SITE DRAINAGE FEATURES X EXISTING AND PLANNED DRAINAGE PATTERNS (INCLUDE OFF -SITE AREAS THAT DRAIN THROUGH PROJECT) METHOD OF DETERMINATION OF AND CALCULATIONS FOR ACREAGE OF LAND BEING DISTURBED x SIZE AND LOCATION OF CULVERTS AND SEWERS SOIL INFORMATION: TYPE, SPECIAL CHARACTERISTICS SOIL INFORMATION BELOW CULVERT STORM OUTLETS NAME AND CLASSIFICATION OF RECEIVING WATER COURSE OR NAME 01:: MUNICIPAL OPERATOR (ONLY WHERE STORMWATER DISCHARGES ARE TO OCCUR) UPDATED 8/04 STORMWATER CALCULATIONS - X PRE -CONSTRUCTION RUNOFF CALCULATIONS FOR EACH OUTLET FROM THE SITE (AT PEAK DISCHARGE POINTS) X DESIGN CALCULATIONS FOR PEAK DISCHARGES OF RUNOFF (INCLUDING THE CONSTRUCTION PHASE & THE FINAL RUNOFF COEFFICIENTS OF THE SITE) X DESIGN CALCS OF CULVERTS AND STORM SEWERS DISCHARGE AND VELOCITY CALCULATIONS FOR OPEN CHANNEL AND DITCH FLOWS (EASEMENT & RIGHT-OF-WAYS) Q A DESIGN CALCS OF CROSS SECTIONS AND METHOD OF STABILIZATION CF EXISTING AND PLANNED CHANNELS (INCLUDE: TEMPORARY LININGS) X DESIGN CALCS AND CONSTRUCTION DETAILS OF ENERGY DISSIPATERS BELOW CULVERT AND STORM SEWER OUTLETS (DIAMETERS & APRON DIMENSIONS) X DESIGN CALCS AND DIMENSION OF SEDIMENT BASINS X SURFACE AREA AND SETTLING EFFICIENCY INFORMATION FOR PROPOSED SEDIMENT TRAPS AND/OR BASINS VEGETATIVE STABILIZATION N A AREA & ACREAGE TO BE VEGETATIVELY STABILIZED METHOD OF SOIL PREPARATION SEED TYPE & RATES (TEMPORARY & PERMANENT) FERTILIZER TYPE AND RATES MULCH TYPE AND RATES NOTE: PLAN SHOULD INCLUDE PROVISIONS FOR GROUNDCOVER ON EXPOSED SLOPES WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS (WHICHEVER IS SHORTER), FOLLOWING COMPLETION OF ANY PHASE OF GRADING; PERMANENT GROUNDCOVER FOR ALL CONSTRUCTION OR DEVELOPMENT FINANCIAL RESPONSIBILITY;OWNERSHIP FORM X COMPLETED, SIGNED & NOTARIZED FR/O FORM X ACCURATE APPLICATION FEE ($50.00 PER ACRE ROUNDED UP THE NEXT ACRE WITH NO CEILING AMOUNT) CERTIFICATE OF ASSUMED NAME, IF THE OWNER IS A PARTNERSHIP NAME OF REGISTERED AGENT (IF APPLICABLE) COPY OF THE MOST CURRENT DEED FOR THE SITE NOTE: FOR THE EXPRESS PERMITTING OPTION, INQUIRE AT THE LOCAL REGIONAL OFFICE FOR AVAILABILITY. NARRATIVE AND CONSTRUCTION SEQUENCE X NARRATIVE DESCRIBING THE NATURE & PURPOSE OF THE CONSTRUCTION ACTIVITY X CONSTRUCTION SEQUENCE RELATED TO EROSION AND SEDIMENT CONTROL (INCLUDING INSTALLATION OF CRITICAL MEASURES PRIOR TO THE INITIATION OF THE LAND -DISTURBING ACTIVITY & REMOVAL OF MEASURES AFTER AREAS THEY SERVE ARE PERMANENTLY STABILIZED) BID SPECIFICATIONS RELATED ONLY TO EROSION CONTROL ISSUED FOR CONSTRUCTION SITE STRUCTURAL 01 FEB 2012 � s�ALJ a a w r a z 0 a cc U co w dw a N Zii "O ZT a w px zo a° Z w m Fo ww o rz 0� U F x �x zLu Lu F _,� z—w{— Aoo) �w or �2 ON Z `V Z J 0 a- C) } ff1 � J m w Luj J U w cz7 mod "' z c C o wwN 7 Da J NZ 00 0¢ via a. Ina w w Z U 0 Lu co a O O V) C6 C) cn Z ¢c~nz Z_ _ S0 Quo Z Z� N`1cn W J 7 mw r,,InQ Q000 J04U J L w H O Z O_ z Z � O f Z Q O u) z m a O O U O w _ d o a. U O U) SHEET IDENTIFICATION C731