Loading...
HomeMy WebLinkAboutSW6120201_HISTORICAL FILE_20120220STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW l%OtU( DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS 60 HISTORICAL FILE DOC DATE YYYYMMDD r. BLAKELY DESIGN GROUP 700 EXPOSTT.ION PLACE, SUITE 105 RALEIGH, NORTH CAROLINA 27615 OJEUTEi ®1F UMMSEITURR, (919) 870-1868 FAX (919) 870.0752 OA1'1: J06 NO. ATTENTION TO ----- Cl._!QNL1S._.F.._.t71�'11.W/'fl..l�._ ....__.._..-._.__...._.__._......._._............... AE: _ . SIC' ,Du�r�... _ _................ ................... �,P�I�cY-�r WE ARE SENDING YOU/ VAttaChed ❑ Shop drawings ❑ Copy of letter ❑ Under separate cover via the following items: ❑ Prints ZPIans ❑ Samples ❑ Specifications ❑ Change order ❑ COPIES DATE NO. DESCRIPTION Ann1 eo 5, A,X_�; THESE ARE TRANSMITTED as checked below: :�O/rvour pppproval ❑ Approved as submitted use ❑ Approved as noted As requested ❑ Returned for corrections REMARKS COPY TO ❑ For review and comment ❑ ❑ FOR SIDS DUE ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints 19 ❑ PRINTS RETURNED AFTER LOAN TO US SIGNED: ff enclosures are not as noted, kindly notify us at �12@[NVVRY FEB 2 0 2012 DENR ' WATER QUALITY WETLANDS AND STORWWATER WARCH (to be provided by owr7) ,�ev�nrc. NCDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) most be printed, filled out and submitted along with all of the required information. 1':.PROjECT1NFORMATION °r" ' w 1 Project name McStor Self Storage Contact name Taylor Blakely Phone number (919) 870-1868 Date May 26, 2011 Drainage area number 1 Il."DESIGN INFORMATION. Site Characteristics Drainage area 158,123 ft2 Impervious area 110,821 ft2 Percent impervious 70.1 % % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? n (Y or N) 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity 3.16 inlhr Pre -development 1-yr, 24-hr peak flow 2 yr 15.23 Wisec Post -development 1-yr, 24-hr peak flow 2 yr ! 15.47 fl'Isec Pre/Post 1-yr, 24-hr peak control #VALUE! Wlsec Storage Volume: Mon -SA Waters Minimum volume required 8,922.0 ft' Volume provided 10,180.0 ft3 Storage Volume: SA Waters 1.5" runoff volume ft' Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided W Cell Dimensions Pending depth of water Ponding depth of water Surface area of the top of the bioretention cell Length: Width: -or- Radius Media and Soils Summary Drawdown time, ponded volume Drawdown time, to 24 inches below surface Drawdown time, total-. In -situ soil: Soil permeability Planting media soil: Soil permeability Soil composition % Sand (by volume) % Fines (by volume) % Organic (by volume) Phosphorus Index (P-Index) of media Form SW401-Bioretention-Rev.8 June 25, 2010 12 inches 1,00 ft 10,180.0 fl2 159 ft 64 ft ft OK OK OK OK OK Qo,�) hr hr 0 hr in/hr 2.00 in/hr OK 85% OK 10% OK 5% OK Total: 100% (unitless) Parts I and 11. Design Summary, Page 1 of 2 fto be provided by DINO) Basin Elevations Temporary pool elevation —'Type of bioretention cell (answer 'Y" to only one of the two following questions): fs this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil 398.69 fmsl y (Y or N) OK n (Y or N) 397.6 fmsl 0 inches Insufficient mulch depth, unless installing grassed cell. 395.1 fmsl 2.5 ft 4ft Are underdrains being installed? y (Y or N) How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 1 ft the bottom of the cell to account for underdrains Bottom of the cell required 390.1 fmst SHWT elevation fmsl Distance from bottom to SHWT 390.1 ft Intemal Water Storage Zone (IWS) Does the design include IWS n (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 397.6 ft Planting Plan Number of tree species 0 Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the n (Y or N) bioretention cell? Does volume in excess of the design volume Flow evenly distributed nla (Y or N) through a vegetated filter? What is the length of the vegetated filter? ft Does the design use a level spreader to evenly distribute flow? nla (Y or N) Is the BMP located at least 30 feet from surface waters (50 feet if (Y or N) SA waters)? y Is the BIAP located at feast 100 feet from water supply wells? y (Y or N) Are the vegetated side slopes equal to or less than 3:1? T y _ (Y or N) Is the BMP located in a proposed drainage easement with access y {Y or N) to a public Right of Way (ROW)? Inlet velocity (from treatment system) <05 ft/sec Is the area surrounding the cell likely to undergo development in n (Y or N) the future? OK Excess volume must bypass cell. Enter Data Enter Data OK OK OK OK Insufficient inlet velocity unless energy dissipating devices are being used. OK Are the slopes draining to the bioretention cell greater than 20%? ' n (Y or N) OK Is the drainage area permanently stabilized? y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8 inches gravel followed by 3-5 ft of grass) �( Grassed swale Forebay Other Form SW401-8ioretention-itev.8 June 25, 2010 Paris I and II. Design Summary, Page 2 or 2 Permit No: Ito be assigned by DWQ) III, REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporfing documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan initials Sheet No. 1, Plans (1" - 50' or larger) of the entire site showing; Design at ultimate build -out, G-% Off -site drainage (if applicable), kA GAL ouZAI Delineated drainage basins (include Rational C coefficient per basin), C - 2 G- Z a Cell dimensions, 3 C-2 C-2a.- Pretreatment system, -�$ C-2 - High flow bypass system, TB G , Z Maintenance access, --f$ G-' Recorded drainage easement and public right of way (ROW), -11,15 c ^Z Clean out pipe locations, -fig G.y Overflow device, and Boundaries of drainage easement. 2. Plan details (1" = 30' of larger) for the bioretention cell showing: G 2 C 2 0. Cell dimensions r$ G • Z a Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), G- 2 Design at ultimate build -out, Off -site drainage (if applicable), G . 2 Clean out pipe locations, G_Zc- C-2-Overflow device, and Boundaries of drainage easement. a3 G'-2a, Indicate the P-Index between 10 and 30 3. Section view of the bioretention cell 0' = 20' or larger) showing: Side slopes, 3:1 or lower Underdrain system (if applicable), and %8 Bioretention cell layers (ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone 4 applicable), #57 stone, underdrains (if applicable), c4c` g �j° y�' SHWT level(s), and overflow structure] 5or j e 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information, All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, �rf G -Z a Soil composition (°% sand, % fines, % organic), and �� G"• 2e4 P-index. 5. A detailed planting plan (1" = 29 or larger) prepared by a qualified individual showing: C-'1�exl A variety of suitable species, Sizes, spacing and locations of plantings, 9 Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. C'z 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the G entire drainage area is stabilized. The supporting calculations (including underdrain calculations, if applicable). Gjg _:r8. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 7 J!'aL 9. A copy of the deed restriction. Form SW401-13i0r0ention-Rev.7 Pad III, Page 1 of 1 BLAKELY DESIGN GROUP Landscape Architecture Site Planning 700 Exposition Place, Suite 105, Raleigh, N. C. 27615 Telephone (919) 870-1868 Facsimile (919) 870-0752 e-mail taylor@blakelydesign.net February 17, 2012 t210 RZr&)JW .6�st>11 pJ�icu1 vnl _ � a� s��FSro � POµ01-V4 C7 - K A4%L N 1NV.X 3 5Ffi/2.5f1' ,d 1.4 iu%R Q �. -mlo x 10,1�a$�> xCf /i2�x(�+"/3s � a _ ,175 e. f -$. 416(d M''e, vp = 51A -9 d Vt,slO,1$os• TiJOR, Dg) 7p� ✓p,Q � 1)RAUJ 49a/h) -'l'65 la. 28 M05• -M /s 15 W1r1 'Al ¢8 ,4k. �M)") /U04 SEle PjA5(1A4Q953 (.DID , DfJ 4�A d ) _rAE_ed10114Sd4*1z:5�w ,*'F FILL Sale LoasE use Pdjeosgy 4 o. 4 5- A�_10M,u,g 01-Me Al 7ZP 9411 vs41 X 4 X2 Ifs to 106 s�F k d.�. � 0, V - 1G2 -1-s _- g /Ia2 4. ­7s = z7, 764- sec• T 5 w V 7/ llr_�. UuD rP/J�U�I PIX 51 z1uG dgZGtl PcP2; 1"d C Al 0 7 MES lu FG!*)14AKV41' Qf .33 c.f.:s.X do = 3.3 c.f s. 16a.1 D¢ 16/CCQXh.;.s"!' o.5/g MX Dc 14XC33X .Cyb 1 .�5 3 4'e0 = 16x �•°4661319 A�Xo -16x ,3#7 � �07 �1 -7;�rOa 11,525 2 - *W PPFs M1*MdA4 5 - r...11 PiPts OF pRovt A-0 uR'j 4 _13e,Ra 1�wY-4X Application Completeness Review 03/First Submittal ❑ Re -submittal Date Received: Z 7 /-1- Date Reviewed: Z 8 By Bill Diuguid (d, DevelopmentlProject Name: W c- TG R S e: Receiving stream name lM /ka- _sg * tr µ l gf 8-zo-13 - Classification: C Ever Basin: C,4 PE p.�A-& For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy, High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): /V ,+ Latitude and Longitude:.3 } rf 0 1 — 76 Z q V Jurisdiction C-+ Project Address: 1i1 G W Y Z r7 h_ o -To FEou sae/ y1 i- _ Engineer name and firm: R 4 yA�oR Bc-R,-r- 4. _ , A* K,`& G --fl 4-XIa Phone: 919 -B7a — L. L S Email: Txly0X SL4f_,rL_y P9XJJ ;A . ArE i is the project confirmed to be in the State MSI Stormwater Permit jurisdiction? GR-Yes or ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets [R'High Density ❑ Other 00 ----a-401/404 im acts'to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) UA o Check for $505.00 included :��Qriginal signature (not photocopy) on application Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check Spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. w1pr --a- ,/For subdivided projects, a signed and notarized deed restriction statement 4Baled, signed & dated calculations Gorrect supplement and 0&M provided for each BMP on site (check all that were provided & number of each) 5 Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road 5 Two sets of sealed, signed & dated layout & finish grading plans with appropriate details ❑ arrative Description of stormwater management provided Soils report provided --a-- Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or adjacent property t, Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; 91/ Dimensions & slopes provided ,Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density r� BMP o eration and maintenance agreements provided r�Application complete ❑Application incomplete Returned: (Date) C�osr< ��►ow[,� Comments May 5, 2011 Revision, Bill aiuguid NODE R North Carolina Department of Environment and Natural Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Governor Mr. B. Taylor Blakely, RLA Blakely Design Group 700 Exposition Place, Ste 105 Raleigh, NC 27615 Dear Mr. Blakely: Director February 10, 2012 Resources Subject: Request for Additional Information Stormwater Project No. SW6120201 McStor Self Storage Harnett County Dee Freeman Secretary The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on February 7, 2012. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: l . Pretreatment is shown on the cross-section of the bioretention cell but not shown on the plan view or indicated on the supplement form. Please revise these to show the provided pretreatment. 2. Please provide calculation for sizing the under drains. 3. Please include the III. Required Items Checklist that goes along with the supplement form. It can be found as one of the tabs for the excel document. Please verify all items are include in your submittal. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to February 27, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Caroiina 27699-1617 Location: 512 N. Salisbury St. Ralegh, North Carolina 27604 Phone: 91 M07-6300 L FAX: 919.807.6494 Internet: www.ncwaterquality,org An Fqual Opportunely 4 Affirmativc Aclion Employer NorthCarolina Amorally SW6120201- McStor Self Storage If you have any questions concerning this matter please feel free to call me at (919) 807-6368. Sincerely, �;S7 --I Brian Lowther Environmental Engineer cc: Fayetteville Regional Office SW6120101 File Frank McLeod - owner • DRAINAGE CALCULATIONS for McStor Self Storage N. C. Hwy 27 HARNETT COUNTY, N. C. HARNETT COUNTY PIN. 9565-79-6200.000 BLAKELY DESIGN GROUP 700 EXPOSITION PLACE, SUITE 105 RALEIGH, N. C. 27615 (919) 870-1868 fax: (919) 870-0752 R f 1 i 0 BLAKELY DESIGN GROUP Landscape Architecture Site Planning 700 Exposition Place, Suite 105, Raleigh, N. C. 27615 Telephone (919) 870-1868 Facsimile (919) 870-0752 e-mail taylor@blakelydesign.net February 6, 2012 DRAINAGE CALCULATIONS TOTAL LOT SIZE = 3,63 ACRES TOTAL DRAINAGE AREA = 3,63 ACRES (no offsite drainage) USE RATI❑NAL METHOD - formula = Q=CIA WHERE Q = peak flout from drainage area (c.f.s.) C = runoff coefficient (cilmension(ess) .25 for taWn & Woods .95 for impervious area I = rainfall Intensity for a given time to peak (7.22 In./hr.- 10 yr. storm) A = drainage area In acres PRE -DEVELOPMENT (10 year storm) PRE -DEVELOPMENT (2 year storm) 1110 = CIA Q2 = CIA p10 = (.25)(7.22 In./hr.)(3.63 ac.) Q2 = (.25)(5.76 In./hr.)(3.63 ac.) 1R10 = 6.55 c.f.s. 02 = 5.23 c.F.s. C PAST-DEVELIIPHENT FIND C COMPOSITE, INPERVIMS AREA=2.54 AC., LAWN AREA-1.09 AC. (2.54 ac.)(.95) + (1,09 ac.)(.25) comp. = 3.63 ac, comp, = .74 POST -DEVELOPMENT (10 year storm) POST -DEVELOPMENT (2 year storm) Q10 = CIA Q2 = CIA 010 = (.74)(7.22 In./hr.X3.63 ac,) Q2 = (.74)(5.76 In./hr.)(3.63 oc.) 010 = 19,39 c.f.s. Q2 = 15A7 c.f.s. REQUIREMENT IS TO DETAIN DIFFERENCE IN PRE -DEVELOPMENT AND POST DEVELOPMENT, 2 YR. & 10 YR. STORM PRE -DEVELOPMENT PEAK DISCHARGE, 10 YR. STORM = 6.55 c.f.s. POST DEVELOPMENT PEAK DISCHARGE WITH BID-RETENTI❑N, 10 YR, STORM = 0.0 c.f.s. PRE -DEVELOPMENT PEAK DISCHARGE, 2 YR. STORM = 15.47 c.f.s. POST DEVELOPMENT PEAK DISCHARGE WITH BID-RETENTI❑N, 2 YR, STORM = 0.0 c.f,s. BLAKELY DESIGN GROUP Landscape Architecture Site Planning 700 Exposition Place, Suite 105, Raleigh, N. C. 27615 Telephone (919) 870-1868 Facsimile (919) 870-0752 e-mail taylor@blakelydesign.net February 6, 2012 BIG -RETENTION DESIGN & SIZING DRAINAGE AREA TO BID -RETENTION = 3.45 AC. IMPERVI❑US AREA (at max. louidout) = 2.54 ac. = 73.67. Rv = 0.05 + 0.9 (Ia) Ia = IMPERVI❑US FRACTI❑N Rv = 0.05 + 0.9 (.736) Rv = 0,7124 V = (3630)(Rd)(Rv)(A) V = VOLUME OF RUNOFF THAT MUST BE CONTROLLED FOR DESIGN STORM (c.f.) Rd = DESIGN STORM RAINFALL DEPTH (h) CUSE 1') A = WATERSHED AREA (ac.) V = (3630)(1')M7124)(3.45) V = 8,922 c,f, surface area @ 12' depth = 8,922 s.f. surface area provided @ 12' depth = 10,180 s.f. Table of Contents Hydraflow Hydrographs by Intelisolve McStor Self Storage, Harnett Co..gpw Monday, Feb 6 2012, 4:24 PM Hydrograph Return Period Recap....................................................................... 1 2 - Year SummaryReport .................................................................................................................. 2 HydrographReports............................................................................................................. 3 Hydrograph No. 1, Rational, Pre-Development.................................................................. 3 Hydrograph No. 2, Rational, Post-Development................................................................ 4 Hydrograph No. 3, Reservoir, Bio-Retention Basin............................................................ 5 PondReport .................................................................................................................. 6 10 -Year ....................................................................... Summary Report ....................... .................... 7 HydrographReports............................................................................................................. 8 Hydrograph No. 1, Rational, Pre-Development.................................................................. 8 .................. Hydrograph No. 2, Rational, Post -Development ........................................ ...... 9 Hydrograph No. 3, Reservoir, Bio-Retention Basin.......................................................... 10 PondReport ................................................................................................................ 11 100 - Year Summary Report.......................................................................... .. 12 .................................... HydrographReports........................................................................................................... 13 Hydrograph No. 1, Rational, Pre-Development................................................................ 13 Hydrograph No. 2, Rational, Post-Development.......................................................... I... 14 Hydrograph No. 3, Reservoir, Bio-Retention Basin.......................................................... 15 PondReport ................................................................................................................ 16 Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow (05) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational 4.178 5.223 — — 6.549 ------ -- -- 8.815 Pre -Development 2 Rational 12.37 15.46 19.39 26.09 Post -Development 3 Reservoir 2 0.000 0.020 — 0.020 0.021 Bio-Retention Basin Proj. file: McStor Self Storage, Harnett Co..gpw Monday, Feb 6 2012, 4:23 PM Hydrafiow Hydrographs by lntelisolve Hydrograph Summary Report Hyd. No. Hydrograph type (origin} Peak flow (cts) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 Rational 5.223 1 5 1,567 — Pre -Development 2 Rational 15.46 1 5 4,638 ---- ------ - - Post -Development 3 Reservoir 0.020 1 10 3,383 2 396.84 4,629 Bio-Retention Basin McStor Self Storage, Harnett Co..gp Return Period: 2 Year Monday, Feb 6 2012, 4;23 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 3 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre -Development Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 3.630 ac Intensity = 5.755 in/hr OF Curve = WakeCounty.IDF Q (cfs) 6.00 5.00 4.00 3.00 r 01 1.00 0.00 11 0 Hyd No. 1 Pre -Development Hyd, No. 1 -- 2 Yr 5 Monday, Feb 6 2012, 4:23 PM Peak discharge = 5.223 cfs Time interval = 1 min Runoff coeff. = 0.25 Tc by User = 5.00 min Asc/Rec limb fact = 111 Hydrograph Volume = 1,567 cuft Q (cfs) 6.00 5.00 4.00 3.00 2.00 EN11107 `4- 0.00 10 Time (min) Hydrograph Plot 4 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Post -Development Hydrograph type = Rational Storm frequency = 2 yrs Drainage area = 3.630 ac Intensity = 5.755 in/hr OF Curve = WakeCounty.IDF Q (cfs) 18.00 15.00 12.00 • m .M 0.00 -y 0 Hyd No. 2 Post -Development Hyd. No. 2 -- 2 Yr I Monday, Feb 6 2012, 4:23 PM Peak discharge = 15.46 cfs Time interval = 1 min Runoff coeff. = 0.74 Tc by User = 5.00 min Asc/Rec limb fact = 1 /1 Hydrograph Volume = 4,638 tuft Q (cfs) 18.00 15.00 12.00 3.00 N- 0.00 10 Time (min) 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Feb 6 2012, 4:23 PM Hyd. No. 3 Bio-Retention Basin Hydrograph type = Reservoir Peak discharge = 0.020 cfs Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 396.84 ft Reservoir name = Bio-Retention Basin Max. Storage = 4,629 cuft Storage Indication method used. Q (cfs) 18.00 W11112I 12.00 •M 3.00 0.00 -u 0 5 10 Hyd No. 3 Bio-Retention Basin Hyd. No. 3 -- 2 Yr 15 19 24 - Hyd No. 2 Hydrograph Volume = 3,383 cult Q (cfs) 18.00 15.00 12.00 m 3.00 ., ..L 0.00 29 34 39 44 48 Time (hrs) Pond Report [•� Hydraflow Hydrographs by Intelisolve Pond No. 1 - Bio-Retention Basin Pond Data Bottom LxW = 159.0 x 64.0 ft Side slope = 3.0:1 Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sgft) I 0.00 396.40 10,176 0.08 396.48 10,283 0.16 396.56 10,391 0.24 396,64 10.499 0.32 396.72 10,608 0.40 396.80 10,717 0.48 396,88 10,827 0.56 396.96 10,937 0.54 397,04 11,047 0.72 397.12 11,158 0.80 397,20 11,269 0.88 397.28 11,381 0.96 397.36 11,494 1.04 397.44 11,606 1.12 397.52 11,720 1.20 397.60 11,833 1.28 397.68 11,948 1,36 397.76 12,062 1.44 397.84 12,177 1.52 397,92 12,293 1.60 398.00 12,409 Culvert 1 Orifice Structures [A] [B] [C] [D] Rise (in) = 18.00 0.00 0.00 0.00 Span (in) = 18.00 0.00 0,00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 392.60 0.00 0.00 0.00 Length (ft) = 38.00 0.00 0.00 0.00 Slope (%) = 0.70 0.00 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 0.60 Multistage = nla No No No Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0 00 Monday, Feb 6 2012, 4:24 PM Bottom elev. = 396.40 ft Depth = 1.60 ft ncr. Storage (cult) 0 818 827 836 844 853 862 871 879 888 897 906 915 924 933 942 951 960 970 979 988 Weir Structures Total storage (cult) 0 818 1,645 2,481 3,325 4,178 5,040 5,910 6,790 7,678 8,575 9,481 10,396 11,320 12,253 13,195 14,147 15,107 16,077 17,065 18,043 [A] [B] [C] [D] Crest Len (ft) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 397.40 0.00 0.00 0,00 Weir Coeff. = 3.33 0.00 0.00 0.00 Weir Type = Riser - --- Multi-Stage = Yes No No No Ezfiltration = 0.080 inlhr (Wet area) Tailwater Elev. = 0.00 ft Stage 1 Discharge Now GulvertiDWICe outflows have been anatyzed under inlet and outlet oonlral. Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0,40 0.20 0 00 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18,00 Total 0 Discharge (cfs) Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cult) Inflow hyd(s) Maximum elevation (ft) Maximum storage (tuft) Hydrograph description 1 Rational 6.549 1 5 1,965 ------ Pre -Development 2 Rational 19.39 1 5 5,816 — Post -Development 3 Reservoir 0.020 1 10 3,433 2 396,95 5,806 Bio-Retention Basin McStor Self Storage, Harnett Co..gp Return Period: 10 Year Monday, Feb 6 2012, 4:24 PM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 8 Hydraflow Hydrographs by Intelisolve Monday, Feb 6 2012, 4:24 PM Hyd. No. 1 Pre -Development Hydrograph type = Rational Peak discharge = 6.549 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.630 ac Runoff coeff. = 0.25 Intensity = 7.217 inlhr Tc by User = 5.00 min OF Curve = WakeCounty.IDF Asc/Rec limb fact = 1/1 Q (cfs) 7.00 5.00 4.00 3.00 2.00 1.00 0.00 11 0 Hyd No. 1 Pre -Development Hyd. No. 1 -- 10 Yr 5 Hydrograph Volume = 1,965 cuk Q (cis) 7.00 . iI 5.00 4.00 3.00 2.00 1.00 Y- 0.00 10 Time (min) Hydrograph Plot 9 HydraFlow Hydrographs by Intelisolve Monday, Feb 6 2012, 4:24 PM Hyd. No. 2 Post -Development Hydrograph type = Rational Peak discharge = 19.39 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 3.630 ac Runoff coeff. = 0.74 Intensity = 7.217 inlhr Tc by User = 5.00 min OF Curve = WakeCounty.IDF AsclRec limb fact = 111 Q (cfs) 21.00 18.00 15.00 12.00 • m AM 3,00 MID 0 Hyd No. 2 Post -Development Hyd. No. 2 — 10 Yr 5 Hydrograph Volume = 5,816 cuft Q (cfs) 21.00 18.00 15.00 12.00 M 3.00 "- 0.00 10 Time (min) Hydrograph Plot 10 Hydraflow Hydrographs by Intelisolve Monday, Feb 6 2012, 4:24 PM Hyd. No. 3 Bio-Retention Basin Hydrograph type = Reservoir Peak discharge = 0.020 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 396.95 ft Reservoir name = Bio-Retention Basin Max. Storage = 5,806 cuft Storage Indication method used. Hydrograph Volume = 3,433 cuft Q (cfs) 21.00 18.00 15.00 12.00 •M CAM 0.00 A 0 5 10 Hyd No. 3 Bio-Retention Basin Hyd. No. 3 -- 10 Yr 15 19 24 - Hyd No. 2 Q (cfs) 21.00 18.00 15.00 12.00 [:16r+1 3.00 0.00 29 34 39 44 48 Time (hrs) Pond Report 11 Hydraflow Hydrographs by Intelisoive Monday, Feb 6 2012, 4:24 PM Pond No. 'I - Bio-Retention Basin Pond Data Bottom LxW = 159.0 x 64.0 ft Side slope = 3.0,1 Bottom elev. = 396.40 ft Depth = 1.60 ft Stage ! Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 396.40 10,176 0 0 0.08 396.48 10,283 818 818 0.16 396.56 10,391 827 1,645 0.24 396.64 10,499 836 2,481 0.32 396,72 10.608 844 3,325 0.40 396.80 10,717 853 4,178 0.48 396.88 10,827 862 5,040 0.56 396.96 10,937 871 5,910 0.64 397.04 11,047 879 6,790 0.72 397,12 11,158 888 7,678 0.80 397.20 11,269 897 8,575 0.88 397.28 11,381 906 9,481 0.96 397.36 11,494 915 10.396 1.04 397.44 11,606 924 11,320 1.12 397.52 11,720 933 12,253 1.20 397.60 11,833 942 13,195 1.28 397.68 11,948 951 14,147 1.36 397.76 12,062 960 15,107 1.44 397.84 12,177 970 16,077 1.52 397.92 12,293 979 17,055 1,60 398,00 12,409 988 18,043 Culvert ! Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 18.00 0.00 0.00 0.00 Crest Len (ft) = 12.00 0.00 0.00 0.00 Span (in) = 18.00 0.00 0.00 0.00 Crest El. (ft) = 397.40 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 0.00 0.00 0.00 Invert El. (ft) = 392.60 0.00 0.00 0.00 Weir Type = Riser - -- --- Length (R) = 38.00 0.00 0.00 0.00 Multistage = Yes No No No Slope (%) = 0.70 0.00 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0,60 0.60 0.60 0.60 Multistage = nla No No No ExCiItration = 0.080 inlhr (Wet area) Tailwater Elev. = 0.00 It Stage (ft) 2,00 -7 1.80 - 1.60 -- 1.40 -- 1.20 - 1.00 - - 0.80 -- 0.60-- 0.40 - - 0.20 - - 000-- Stage ! Discharge Note: Culver110660a ouNlows have been analyzed under inlet and outlet control Stage (ft) 2,00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0 nn 0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 Total Q Discharge (cfs) 12 Hydrograph Summary Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Volume (cuft) inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description 1 Rational 8.815 1 5 2,644 -- -- Pre -Development 2 Rational 26.09 1 5 7,827 -- — - - Post -Development 3 Reservoir 0.021 1 10 3,517 2 397.13 7,817 Bio-Retention Basin McStor Self Storage, Harnett Co..gp Return Period: 100 Year Monday, Feb 6 2012, 4:24 PM Hydrafiow Hydrographs by Intelisolve Hydrograph Plot 13 Hydraflow Hydrographs by Inlelisolve Monday, Feb 6 2012, 424 PM Hyd. No. 1 Pre -Development Hydrograph type = Rational Peak discharge = 8.815 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 3.630 ac Runoff coeff. = 0.25 Intensity = 9.713 inlhr Tc by User = 5.00 min OF Curve = WakeCounty.IDF Asc/Rec limb fact = 1/1 Q (cfs) 10.00 WITIA . M E99z9>t W81011 M Hyd No. 1 Pre -Development Hyd. No. 1 -- 100 Yr 5 Hydrograph Volume = 2,644 cult Q (cfs) 10.00 MI MI K911 2.00 y- 0.00 10 Time (min) Hydrograph Plot 14 Hydraflow Hydrographs by Intelisolve Monday, Feb 6 2012, 4:24 PM Hyd. No. 2 Post -Development Hydrograph type = Rational Peak discharge = 26.09 cfs Storm frequency = 100 yrs Time interval = 1 min Drainage area = 3.630 ac Runoff coeff. = 0.74 Intensity = 9.713 inlhr Tc by User = 5.00 min iDF Curve = WakeCounty.IDF Asc/Rec limb fact = 111 Q (cfs) 28.00 24.00 20.00 16,00 12.00 8.00 4.00 0.00 0 Hyd No. 2 Post -Development Hyd. No. 2 -- 100 Yr 5 Hydrograph Volume = 7,827 cuR Q (cfs) 28.00 24.00 20.00 16.00 12.00 8.00 4.00 Y- 0.00 10 Time (min) Hydrograph Plot 15 Hydraflow Hydrographs by Intelisolve Monday, Feb 6 2012, 4:24 PM Hyd. No. 3 Bio-Retention Basin Hydrograph type = Reservoir Peak discharge = 0.021 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 2 Max. Elevation = 397.13 ft Reservoir name = Bio-Retention Basin Max. Storage = 7,817 cuft Storage Indication method used. Hydrograph Volume = 3,517 tuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 [1104 4.00 0.00 A 0 Bio-Retention Basin Hyd. No. 3 -- 100 Yr Q (cfs) 28.00 24.00 20.00 16.00 12.00 m 4.00 1- 0.00 5 10 15 19 24 29 34 39 44 48 Time (hrs) Hyd No. 3 Hyd No. 2 Pond Report 96 Hydraflow Hydrographs by Intelisolve Pond No. 1 - Bio-Retention Basin Pond Data Bottom LxW = 159.0 x 64.0 ft Side slope = 3.0:1 Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) I 0.00 396.40 10,176 0.08 396,48 10.283 0.16 396.56 10,391 0.24 396.64 10,499 0,32 396.72 10,608 0.40 396.80 10,717 0.48 396.88 10,827 0.56 396,96 10,937 0.64 397.04 11,047 0.72 397.12 11,158 0.80 397.20 11,269 0.88 397.28 11,381 0.96 397.36 11,494 1.04 397.44 11,606 1.12 397.52 11,720 1.20 397.60 11,833 1.28 397.68 11,948 1.36 397.76 12,062 1.44 397.84 12,177 1.52 397.92 12,293 1.60 398.00 12,409 Culvert l Orifice Structures [A] [B] [C] [D] Rise (in) = 18,00 0.00 0,00 0.00 Span (in) = 18.00 0.00 0.00 0.00 No. Barrels = 1 0 0 0 Invert El. (ft) = 392.60 0.00 0.00 0.00 Length (ft) = 38.00 0.00 0.00 0.00 Slope (%) = 0.70 0.00 0.00 0.00 N-Value = .013 .013 .013 .013 Orif. Coeff. = 0,60 0.60 0.60 0.60 Multi -Stage = nla No No No Stage (ft) 2.00 1.80 1,60 1,40 1.20 1.00 0.80 0.60 0.40 0.20 0 00 Monday, Feb 6 2012, 4:24 PM Bottom elev. = 396.40 ft Depth = 1.60 ft ncr. Storage (cuft) 0 818 827 836 8" 853 862 871 879 888 897 906 915 924 933 942 951 960 970 979 988 Weir Structures Total storage (cuft) 0 818 1,645 2,481 3,325 4,178 5,040 5,910 6,790 7,678 8,575 9,481 10,396 11,320 12,253 13,195 14,147 15,107 16,077 17,055 18,043 [A] [B] [C] [D] Crest Len (ft) = 12.00 0.00 0.00 0.00 Crest El. (ft) = 397.40 0.00 0.00 0.00 Weir Coeff. = 3.33 0.00 0.00 0,00 Weir Type = Riser - - - Multi -Stage = Yes No No No EAltration = 0.080 inlhr (Wet area) Taiiwater Elev. = 0.00 ft Note: CulverlJOrif" outflows have been analyzed under inlet and pullet control. Stage 1 Discharge Stage (ft) 2,00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 n nn 0.00 2.00 4.00 6.00 8.00 10.00 12,00 14.00 16.00 18.00 Total Q Discharge (cfs) Bio-Retention Basin stage Top of pond 2.00 12.00 ft Ri;er Icy. $98.00 1.00 3.0 0.00 _---_------ _ r r r r r r r r Cuh-A • $8.0 LF of 18.0 in @ 0.701 (100 yr) S di01) 110 r 11TC ? yr Schematic only. Not for construction. Hydraflow Hydrographs Pond Draw Project: McStor Self Storage, Harnett Co..gpw Monday, Feb 6 2012, 4:18 PM Bio-Retention Basin ,59.4 ft 6b.4 ft Outle structure --/ Inv. 3$2.60 sac40 qoR n Plan View IITS --� (100 yr) (,0 yr) -(2 yr) Schematic only. Not for construction. Hydraflow Hydrographs Pond Draw I Project: McStor Self Storage, Harnett Co..gpw I Monday, Feb 6 2012, 4:20 PM Southeastern Soil & Environmental Associates, Inc, P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (910) 822-4540 Email mike@southewlemscit.com January 16. 2012 Mr. Taylor Blakely Blakely Design Group 700 Exposition Place, Suite 105 Raleigh, NC 27615 Re: Hydraulic conductivity (permeability) analysis & seasonal water table determination (SHWT) for stormwater retention areas, McStor Self Storage, NC Hwy. 27, Harnett County, North Carolina Dear Mr. Blakely, An evaluation of soil properties and hydraulic conductivity (Ksat) has been conducted at your request on the aforementioned property. The purpose of the investigation was to determine soil water table depths (SHWT). In addition, Ksat was to be provided at a specified depth for use with bioretention pond design. Saturated hydraulic conductivity of the unsaturated zone was measured in a similar method as described in the Soil Science Society of America Journal, Vol. 53, no 5, Sept. - Oct. 1989, "A Constant Permeameter for Measuring Saturated Hydraulic Conductivity of the Vadose Zone" and Comparison of the Glover Solution with the Simultaneous Equations Approach for Measuring Hydraulic Conductivity." Soils at this site are most similar to the Blaney soil series (see attached boring log). Two borings were advanced to 8.0 feet. Seasonal High Water Table (SHWT) as determined by evidence of colors of chroma 2 or less (and/or concentrations of high redox mottles) was encountered at a depth of 90 inches below the ground (see attached chart). [Note: Mottling noted (less than chroma 2) in the soil boring log from 44 to 73 inches is related to lateral water movement.] Two compact constant head permeameter (CCHP) tests were conducted at a depth of 3.5 feet. Hydraulic conductivity at this depth was extremely slow and averaged 0.082 inches per hour (.208 cm/hr.) SOIUSITE EVALUATION • SOIL PHYSICAL ANALYSIS • LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING • SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS, EVALUATION 8 DESIGN The attached map shoes locations of sample points as well as Ksat locations. The attached chart provides a list or measured rates at the pond location. I trust this is the information you require at this time. Sincerelv, Mike Eaker President sorc s E oOf Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 28311 Phone/Fax (91 U) 822-4540 Email mikefsowheastemsoil.com Measured Ksat Rates, McStor Self Storage, NC Hwy. 27, Harnett County, NC Ksat Ksat Location Depth in em/hr in/hr 1 42 0.210 0.083 2 42 0.206 0.081 SOIL/SITE EVALUATION • SOIL PHYSICAL ANALYSIS • LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGEIMOUNDING • SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS, EVALUATION & DESIGN Southeastern Soil & Environmental Associates, Inc. P.O. Box 9321 Fayetteville, NC 2a371 Phone/Fax (910) 822-4540 Email mike 6southesstemsoil.com Typical Soil Boring Log, McStor Self Storage, NC Hwy. 27, Harnett County, NC This map unit consists of well drained soils on uplands. These soils formed in loamy and sandy sediments. Slopes range from 1 to 2 percent. A - 0 to 6 inches; dark grayish brown (1 OYR 4/2) loamy sand; weak fine granular structure; very friable; many fine roots; abrupt smooth boundary_ E - 6 to 24 inches; yellowish brown (I OYR 5/4) loamy sand; single grained; loose; very friable; abrupt smooth boundary. BtI - 24 to 36 inches; yellowish brown (I OYR 5/6) sandy clay loam; weak medium subangular blocky structure; friable to firm; gradual, wavy boundary. 13t2 - 36 to 40 inches; yellowish brown (l OYR 5/6) sandy clay loam; many prominent red (2.5YR 5/8) mottles; weak medium subangular blocky structure; firm; gradual, wavy boundary. BC - 40 to 44 inches; yellowish brown (I OYR 5/6) sandy clay loam; many prominent red (2.5YR 5/8) and very pale brown (I OYR 7/3) mottles; weak medium subangular blocky structure; firm; brittle in about 20 percent of the mass; gradual wavy boundary. C I - 44 to 73 inches; yellowish brown (I OYR 5/6) sandy clay loam; many coarse red (2.5YR 5/8) and prominent light gray (I OYR 7/2) mottles; massive structure; firm; brittle in about 30 percent of the mass; gradual wavy boundary. C2 - 73 to 90 inches; red (2.5YR 5/8) sandy clay loam; pockets of sandy loam; massive; firm; clear smooth boundary. 2Cg - 90 to 96 inches; light gray (10YR 7/1) clay; massive parting to angular blocky; very firm; SH WT @ 90 inches (1 OYR 7/ 1) SOIUSITE EVALUATION • SOIL PHYSICAL ANALYSIS - LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGE/MOUNDING • SURFACE/SUBSURFACE WASTE TREATMENT SYSTEMS, EVALUATION & DESIGN Southeaste r-n-foil_&-En ironmental.-Associates ----- -_ P.O. Box 9321 Fayetteville, NC 28311 k' = Soil Boring - McStor Self Storage Harnett County, NC US State Plane 1983 Scale 1:2,500 MCSTOR.SSF North Carolina 3200 N NAD 1983 (Canus) 0 _ 300.0 1/16/2012 �I OPS Pathfinder C"ce US Survey Feet p'Yrimbic SOtUSITE EVALUATION • SOIL PHYSICAL ANALYSIS - LAND USE/SUBDIVISION PLANNING GROUNDWATER DRAINAGEIMOUNDING • SURFACEISUBSURFACE WASTE TREATMENT SYSTEMS, EVALUATION 8 DESIGN C. .t / %'• HARNETT COUNTY TAX ID# Excise Tax: 220.00 2011015254 FOR REGISTRATION REGISTER OF DEEDS KiJh9ERLY 5, HRRGROVE HARNETT COUNTY, NC 2011 OCT 19 01:22: 51 PM BK : 291 B PG: 534-537 FEE : $26. 00 NC REV STAMP:$220,00 �NSr���(ENr # MINN N NORTH CAROLINA GENERAL WARRANTY DEED Parcel Identifier No.09 9566 0001 Verified by County on the day of 20 By: Mail/Box to: Lynn A. Matthews, Attorney This instrument was prepared by: Lynn A. Matthews, Attorney at Law Brief description for the Index: commercial lot/Mire Branch Estates THIS DEED made this 13`h day of October, 2011, by and between GRANTOR BNS DEVELOPMENT, LLC A North Carolina limited liability company Post Office Box 727 Dunn, NC 28335 GRANTEE B. Franklin McLeod III and W. Stewart McLeod 6513 Wakefalls Drive Wake Forest, NC 27587 Enter in appropriate block for each Grantor and Grantee: name, mailing address, and, if appropriate, character of entity, e.g. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Johnsonville Township, Harnett County, North Carolina and more particularly described as follows: See Exhibit A attached hereto and made a part hereof. NC Bar Association Form No. 3 © 1976, Revised © 1/1/2010 Printed by Agreement with the NC Bar Association The property hereinabove described was acquired by Grantor by instrument recorded in Book 2082 page 554. All or a portion of the property herein conveyed _ includes or _X_ does not include the primary residence of a Grantor. A map showing the above described property is recorded in PC 4D, Slide 5C and PC#F, Slide 85D. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: 2012 ad valorem taxes not yet due and payable. Easements, restrictions and rights of way of record. Matters evident by a visible inspection of the premises. Matters that would be sbown by a current survey of the real property described herein. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. BNS DE OPMENT, LLC (SEAL) (Entity Na) Print/Type Name: SEAL Print/Type N4 & Title: QaM E. Norris, Manager Print/Type Name: By: Print/Type Name & (SEAL? Print/Type Name: ley: (SEAL) Print/Type Name & Title: Print/Type Name: State of North Carolina - County or City of Harnett 1:, the undersigned Notary Public of the County or City of Harnett and State aforesaid, certify that DarME.Non-is personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this day of October 2011. My Commission Expires: Lynn A. Matthews, Notary Public (Affix Seal) State of North Carolina County of Harnett 1, the undersigned Notary Public of the County or City of Harnett and State aforesaid, certify th y E. Norris personally came before me this day and acknowledged that he is the manager of BNS Deveio ent, C a North Carolina limited liability company, and that by authority duly given and as the act of such entity, he s' the pit ng instrument in its name on its behalf as its act and deed. Witness my hand and Notarial stamp or seal, this y of c e 20 My Commission Expires: 5/31/2016 �C�,..•••• ••.,�'. •� L n . Matthews, Notary Public (Affix Seal) •NOTARY .tn =� PUBLIC pay • ........ , NC Bar Association Form No, 3 0 1976, Revised © 1/1r2010 Printed by Agreement with the NC Bar Association F, EXHIBIT A LEGAL DESCRIPTION Beginning at an existing iron on the eastern right of way on NCSR 1201(Ponderosa Road) and the southwestern corner of lot 17 of Mire Branch Subdivision as shown on map recorded at Plat Cabinet F, Slide 30D, Harnett County Registry; thence with lot 17 of Mire Branch Subdivision, N 58 degrees 44'55" E 175.10 feet to an existing iron stake, being the southeast corner of lotl7 and the southern corner of lot 16 and southwest. corner of lot 15, Mire Branch Subdivision; thence with lot 15, N 58 degrees 44' 55" E 126.53 feet to an existing pipe; corner of lot 15; thence continuing with lotl5, S 65 degrees 22'51 "E 234.47 feet to an existing iron stake in the western righf-of way of NC 27 W; thence with the western right of way of NC 27 W the following calls: S 10 degrees 49' 59" W 103.49 feet, S 04 degreesl 1'00"W 103.54 feet, S 01 degree 58'00 E 87.80 feet, S 05 degrees 55' 30" E 53.43 feet, S 09 degrees 22'00" E 141.45 feet id the intersection of the eastern right of way of NCSR 1201 (Ponderosa Road); thence with the eastern right of way of NCSR 1201( Ponderosa Road) the following calls: N 62 degrees 49'00" W 139.15 feet, N 57 degrees 16' 30 W 96.98 feet, N 50 degrees 48' 45" W 97.15 feet, N 44 degrees 36'12" W 96.93 feet, N 38 degrees 33'39" W 96.98 feet, N 32 degrees 47'36" W 98.16 feet, N 31 degrees 12'23" W 25.51 feet to point of beginning, containing 3.62 acres. Said tract Iying south of Mire Branch Subdivision as shown on plat recorded in Plat Cabinet F, Slide 30D. Being shown as "Commercial" lot on plat map entitled "Mire Branch Estates, Section 4" and recorded in Plat Cabinet "F", Slide 86-D, Harnett County Registry. The above description was taken from an unrecorded map entitled Franklin McLeod by Bennett Surveys Inc. dated April 13, 2011, all bearings in this description are based on NC Grid NAD 83. HARNETT COUNTY TAX ID# 0 By 1 2011015254 FOR REGISTRATION REGISTER OF DEEDS KIMl3ERLY S. HFRGROVE 2011 OCT !9 01 &5N PM 8�; 2918 PG; 534-531 FEE; $26. 00 NC REV STAMP: $220, 00 f NSTRU�ENr # 20f f ���2�4 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: 220.00 Parcel Identifier No,09 9566 0001 Verified by County on the day of 120 By: Mail/Box to: Lynn A. Matthews, Attorney This instrument was prepared by: Lynn A. Matthews, Attorney at Law T Brief description for the Index: commercial lot/Mire Branch Estates THIS DEED made this 13t` day of October, 2011, by and between GRANTOR BNS DEVELOPMENT, LLC A North Carolina limited liability company Post Office Box 727 Dunn, NC 28335 GRANTEE B. Franklin McLeod III and W. Stewart McLeod 6513 Wakefalls Drive Wake Forest, NC 27587 Enter in appropriate block for each Grantor and Grantee: name, mailing address, and, if appropriate, character of entity, e.g. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot orparcel of land situated in the City of , Johnsonville Township, Harnett County, North Carolina and more particularly described as follows: See Exhibit A attached hereto and made a part hereof'. NC Bar Association Form No. 3 © 1976, Revised t0 1/1/2010 Printed by Agreement with the NC Bar Association The property hereinabove described was acquired by Grantor by instrument recorded in Book 2082 page 554, All or a portion of the property herein conveyed — includes or _X_ does not include the primary residence of a Grantor. A map showing the above described property is recorded in PC #D, Slide 5C and PC#F, Slide 85D. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor, will warrant and defend the title against the lawful claims of all persons whomsoever, other than the following exceptions: 2012 ad valorem taxes not yet due and payable. Easements, restrictions and rights of way of record. Matters evident by a visible inspection of the premises. Matters that would be shown by a current survey of the real property described herein. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. BNS DE )PMENT, LLC {Entity N ) Print/Type NaZ & Title: Danny. E. Norris, Manager Print/Type Name: (SEALS Print/Type'Name: By: (SEAL) Print/Type Name & Title: _ Print/Type Name: By: Print/Type Name & Title: (SEAL) Print/Type Name: State of North Carolina - County or City of Harnett I, the undersigned Notary Public of the County or City of Harnett and State aforesaid, certify that PME.Nonis personally appeared before me this day and acknowledged the due execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this day of October 2011. My Commission Expires: (Affix Sea]) State of North Carolina Lynn A. Matthews, Notary Public County of Harnett 1, the undersigned Notary Public of the County or City of Harnett and State aforesaid, velcertify thh personally came before me this day and acknowledged that he is the manager of BNS Deo ent liability company, and that by authority duly given and as the act of such entity, he s�Cy the�i g u its behalf as its act and deed.. Witness my hand and Notarial stamp or seal, this of C�`ct : e 20 My Commission Expires: 5/31 /2016 (Affix Seal) NC Bar Association Form No. 3 © 1976, Revised © 1/1/2010 Printed by Agreement with the NC Bar Association �`• P, Ill ti 1 .•IAoYAR,. _ _'- PUBLIco C 60.00w.' E. Norris Carolina limited t in its name on Notary Public EXHIBIT A LEGAL DESCRIPTION Beginning at an existing iron on the eastern right of way on NCSR 1201(Ponderosa Road) and the southwestern corner of lot 17 of Mire Branch Subdivision as shown on map recorded at Plat Cabinet F, Slide 30D, Harnett County Registry; thence with lot 17 of Mire Branch Subdivision, N 58 degrees 44'55" E 175.10 feet to an existing iron stake, being the southeast corner of lotl7 and the southern corner of lot 16 and southwest. corner of lot 15, Mire Branch Subdivision; thence with lot 15, N 58 degrees 44' 55" E 126.53 feet to an existing pipe; corner of lot 15; thence continuing with lotl5, S 65 degrees 22'51"E 234.47 feet to an existing iron stake in the western right `of way of NC 27 W; thence with the western right of way of NC 27 W the following calls: S 10 degrees 49' 59" W 103.49 feet, S 04 degrees 1'00"W 103.54 feet, S 01 degree 58'00 E 87.80 feet, S 05 degrees 55' 30" E 53.43 feet, S 09 degrees 22'00" E 141.45 feet to the intersection of the eastern_right of way of NCSR 1201 (Ponderosa Road); thence with the eastern right of way of NCSR 1201( Ponderosa Road) the following calls: N 62 degrees 49'00" W 139.15 feet, N 57 degrees 16' 30 W 96.98 feet, N 50 degrees 48' 45" W 97.15 feet, N 44 degrees 3612" W 96.93 feet, N 38 degrees 33'39" W 96.98 feet, N 32 degrees 47'36" W 98.16 feet, N 31 degrees 12'23" W 25.51 feet to point of beginning, containing 3.62 acres. Said tract lying south of Mire Branch Subdivision as shown on plat recorded in Plat Cabinet F, Slide 30D. Being shown as "Commercial" lot on plat map entitled "Mire Branch Estates, Section 4" and recorded in Plat Cabinet "F", Slide 86-D, Harnett County Registry. The above description was taken from an unrecorded map entitled Franklin McLeod by Bennett Surveys Inc. dated April 13, 2011, all bearings in this description are based on NC Grid NAD 83.