Loading...
HomeMy WebLinkAboutSW6120106_HISTORICAL FILE_20120120STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 1�f/�Y DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE YYYYMMDD �1 Chavis' Inc. P.O. Box 56B Maxion, NC 28364 Phone: (910) 844-2000 Fax: (910) 390.4333 e-mail: fitz.chavis@ehavisinc.com LETTER OF TRANSMITTAL To: Pro'ect Desc.: Towle Stadium Wetlands and Storm Water Branch Project No.: FA-11021-9P 1617 Mail Service Center Solicitation/Contract No.: W91247-1 1 -C-0007 -Raleigh, NC 27699-1617 Date: 1-18-2012 WE ARE SENDING YOU: ® Attached ❑ Under Separate Cover Via , the following items: ❑ Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Subcontract ❑ Specifications ❑ Change Order ❑ Copy of Letter ® Other —Erosion & Storm Water Calc's TRANSMITTED AS CHECKED BELOW: ❑ For Approval & Resubmission ❑ Approved as Submitted ❑ For Your Use ❑ Approved as Noted ❑ Submit ❑ As Requested ❑ Returned for Corrections ❑ Return ❑ For Review & Comment ❑ For Bids Due ❑ Samples Returned after Loan to CHAVIS' INC SUBMITTALS: ❑ Submit Copies for Approval by ❑ Re -submit Copies for Approval by ❑ Re -Submit Copies for Approval Copies for Distribution Corrected Prints ® Other For Review & Approval ❑ Prints Returned After Loan to CHAVIS' INC. ® Letter of Transmittal reVVE ' INC. V JqN2o D ?012 kQev-WA R SlowMrry ?a%o Date Copies No. Descri tion 1-19-2012 2 Renovate Towle Stadium Track & Field Erosion Control Calculations 1-19-2012 2 Renovate Towle Stadium Track & Field Storm Water Calculations 1-19-2012 1 StormWater Management Permit Application Form 1-19-2012 2 Renovate Towle Stadium Track & Field Drawings Sheets 1-22 REMARKS: Copy To: file Received By: Erosion Control and Sediment Control Plan Renovate Towle Stadium Track and Field Fort BLga,, NC VICINITY MAP �F Si F �� �� ♦Q _ tipl t t �� t- �� • %� fit?)> 'Lit x }} ! � ' � .• � ,i � ? S al =Cg r` ssagr� Or NU y' •a� 5 t raa fl rj t x P?rye 2a0 m �i26i0 Gaogle ITap dais �10 Goagle,-'jjm6 f iJM Repart a problem _ F.,L_.�—_ r)nnP ZAPATAENGINEERTNGofNorth Carolina, Inc. Contract: PV912HN-07-D-0003 July 2010 Page 9 Task Order: 0013 Erosion Control and Sediment Control Plan Renovate Towle Stadium Track and Field Fort BraQjz, NC M 67916 Ss'a'12. 8 F 3f, 71 Sa' SOIL MAP Soil Map —Cumberland County. North Carolina (Towle Stadium) ly e 579fio9 87Ge50 6i9 09 679750 n « r` 4Z u � yid.. - .. vi .•,�, � � ' Mao Sc6e17.1500unNed o asac la s r 111 ShW N hhl— �- 0 d1 40 90 170 nt 0 50 l00 200 300 USDA Natural Resources Web Sal Survey am Cbnservatbn Service National Cooperative Soil Survey ZAPATAENGINEERING of North Carolina, Inc. July 2010 Page 6 ti79850 Vu9u0 6 5J1412010 Page 1 of 3 Contract: W912HN-07-D-0003 Task Order: 0013 Erosion Control and Sediment Control Plan Renovate Towle Stadium Track and Field Fort Bragg, NC Sal Map —Cumberland County, North Carorina Map Unit Legend Towle Stadium Cumberland County, North Carolina [NC1151) Map Unit Symbol Map Unit Name Acrss In AOI Percent of A01 BdU Blaney -Urban land complex, 8 to 15 percent slopes 9.7 91.6% WgB Wagram-Urban land complex, 0 to 9 percent slopes 0.9 8.4% Totals for Area of Interest 10.6 100.0% IANatural Resources Web Sal Survey 6114/2010 ® Conservation Seryice National Co operative Soif Survey Page 3 of 3 ZAPA7,4FNGINEERING of North Carolina, Inc. Contract: W912HN-07-D-0003 July 2010 Page 8 Task Order: 0013 / Application Completeness Review [� First Submittal ❑ Re -submittal Date Received: 12 Z Date Reviewed: I Z� Development/Project Name: Receiving stream name R a_C4_ 1 Classification: ziver Basin: CA-o.v iz.By Bill Diuguid For post-construcfion requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-Ill, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): 6 Latitude and Longitude:35 B 9 AJ _ — 79 I 36 v Juris�on ror-f .13 C Project Address: deAWd 84-1to .P1t-1 V-C Engineer name and firm: C C Phone:20*-358-82SoM-- Email.- Rowdom,ioe JQ__Ela co is the project confirmed to be in the State MSI Stormwater Permit jurisdic ion? YYes or ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets t gh Density ❑ Other N� -tr— 401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) &K BLIA 77 U [R heck for $505.00 included rd/Original signature (not photocopy) on application Y Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ �p r subdivided projects, a signed and notarized deed restriction statement we -'Sealed, signed & dated calculations L✓ Correct supplement and 0&M provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ["Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road i�Two sets of sealed, signed & dated layout & finish grading plans with appropriate details arrative Description of stormwater management provided Soils report provided V_?'&r-a 70CH-WLc,1,L p/D,uf— ❑ Wetlands delineated or a note on the plans or in the accompanying documents that none exist on site and/or 4rPM=�� adjacent property Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; Dimensions & slopes provided r� Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density t� MP operation and maintenance agreements provided Ue, Application complete ❑ Application Incomplete Returned: (Date) Comments May 5, 2011 Revision, Bill Diuguid f� fy �. �, kr.. � ,...._ ..f h. i �. .e �