Loading...
HomeMy WebLinkAboutSW6111205_HISTORICAL FILE_20120110STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS ISTORICAL FILE DOC DATE YYYYMMDD ft � NCD North Carolina Department of Environment and Natural Resources! Division of Water,Quality Beverly Eaves Perdue Coleen H' Shcliris Governor Director January 10, 2012 Mr, David Heins Environmental Division Chief (DPW) Fort Bragg DPW - WMB 2175 Reilly Road Stop A Fort`Bragg, NC 2831'0-5000 Subject: Request for Additional Information Stormwater Project No. SW6111205 3rd Brigade Phase 3 and Phase 4 "Cumberland County Dear Mr. Heins: Dee Freeman Secretary The Division of Water Quality Central'Office received a Stormwater Management Permit Application for the 3`a Brigade Phase 3 and Phase 4 project oil December 20, 2011. A preliminary review of that information has determined that the NC DENR Modified Design Supplement is not complete. Please resubmit Section: 1.1 NC DEN Modified Design Supplement for LID projects. 1. The supplement form must be stamped by a P.E. as it will be included as an attachment to the permit. 2. The Draw Down Time only indicates that that it is less than 48 hours. Ponded water must completely drain into the soil within 12 hours and to a level of 24 inches below the soil surface within 48 h0u1-S. �� l 3. Delete line item, under-Site`Hydrolb'gy for Basin 6. DWQ is primarily concerned with the Post - construction Runoff. 4. Under the Water Quality Volume Calculations, the value used for Impervious Area does not indicate whether or not it includes existing impervious'areaor only new impervious area. This is significant since the "volume to treat" for Basin 1 is 39;927 ft3. Where the provided storage is only 34,043.08 ft3. The runoff from the existing impervious area, i.e:, Grave Street, should not be included since it is not directed into Bioretention #7, otherwise the volume provided in bio- retention 97 is not adequate. 5. Under "Provided Storage".for cell #7 is 12,682.08 ft. Does the 12,682.08 ft3 include 15 forebays? The plans indicate only 10 going to cell #7, with 3 going to cell #2 and 2 going to cell #3. 6. Please revise the reference from forebays to bioswales and the correct the number going to each cell, i.e., 10 going to cell #7, with 3 going to cell 92 and 2 going to cell #3. 7. The plans shows a bioretention cell #22 in Basin 5, the supplement form does not. Bioretention cell #22 should be identified on the drawings and in the supplement form as either a bioretention cell or a bioswale. Wetlands and Stonm eater Branch 1617 Mail ServiceCenter, Raleigh, Noah Carolina 2769971617 One Location: M2 N.'Salisbury St. Ralef b. North Carolina 27604 NorihCar0-1iina Phone: 91 M07-63001 FAX: 91 M07-6494 t Customer Service: 1-877-623-6748 aturk[ aLi �/ Internet: wvuw.ncwaterquality.6r9 An Equal Opportunity 1 Affirmative Acton Employer 'The calculations do not iticlutfe l io"retention cell #22 Also, sheets CG 101; CG 102; CG 104, CG 105, CG 106, and CE701 reference bioretentioil cells #1.4 A through 4141, retention cel[s #13A through #13H and bioreten_tion cell 422. My understanding is that while these areas do provide additional treatment and act as a. forebay'they are not designed as bioretention basins, If they are not designed as bio-retention cells than they should be identified as bioswales. Please resubmit sheets WWI, CG ]02, CG 1'04, GG 105, CG 106, and CE701 identifying the areas as*bioswales. If they are designed and function as bioretention cells then the supplement form will need to'be revised. Please note -that this request: for additional information As in response to a. - preliminary review; The requested information should be received by this Office prior to February 24, 2012, or the application, will be returned as incomplete. The.return of a project will necessitate resubmittal of all required items, including the application fee. If you need,additional time to submit the information, please submit your request for a time extension to the Division. The request must indicate the date by which you expect to submit the required information The Division is allowed 90 days from the receipt of a completed application to issue _the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation,Eros ion Control Plan, is a violation of NCGS 143-215.1 and �is.subje.ct to enforcement action pursuant,to NCGS ,143,2,15.6A. Please reference the State assigned project number SW611.125 on all correspondence. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any quest ons.concerning:this matter please feel free to contact me at (91,4) $07-6374 or ►nike:randail@nc.denr.gov. . ,Sincerely, Mic eaI F.'Randall Environmental .Engineer Stofmwater Permitting Unit cc: Lee Ward, Frot Bragg, Water Management Branch P.'Bart Smith, P.E. USACE Stormwater Permitting Unit Files Page 2 of 2.. DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3640 ClSAS-DG Memorandum To: Mr. Micheal F. Randall Environmental Engineer, Stormwater Permitting Unit 1617 Mall Service Center Raleigh, NC 27604 From: P. Bart Smith, P.E. Civil Engineer Subject: Comment Resolution Memorandum Project: 3"1 Brigade Phase 3 and 4, Fort Bragg, NC NCDENR: SW6111205 NCDENR Comments and Government's Resolution: Date: 01-25-2011 1. The supplement form must be stamped by a PIE. as it will be included as an attachment to the permit. Ilodifled Design Supplement ivill be stumped by P. E 2. The Draw Down Time only indicates that that it is less than 48 hours. Ponded water must completely drain into the soil within 12 hours and to a level of 24 inches below the soil surface within 48 hours. Slcrlement added to reflecl the above requirements. 3. Delete line item under Site 'Hydrology for Basin 6. DWQ is primarily concerned with the Postconstruction Runoff. Line deleted. 4. Under the Water Quality Volume Calculations, the value used for Impervious Area does not indicate whether or not it includes existing impervious area or only new impervious area. This is significant since the "volume to treat" for Basin I is 39,927 sf.. Where the provided storage is only 34,043.08 Sf. The runoff from the existing impervious area, i.e:, Grave Street, should not CESAS-DG Date: 01-25-2011 be included since it is not directed into Bioretention #7, otherwise the volume provided in bioretention 97 is not adequate. Graves .Street drainage area was removed from the required storage calculations. The required storage requirement was reduced to 28892 Nf As designed, Basin I has 32903 sf of storage. 5. Under "Provided Storage;' for cell #7 is 12,682.08 sf. Does the 12,682.08 ft3 include 15 forebays? The plans indicate only 10 going to cell #7, with 3 going to cell 42 and 2 going to cell #3. Cell 97 grading ivas revised due to cover on pipe network reducing the number of 'Bioswales. Cell 47 has 9 Bioswales serving it. Storage calculations have been revised. 6. Please revise the reference from forebays to bioswales and the correct the number going to each cell, i.e., 10 going to cell 47, with 3 going to cell #2 and 2 going to cell #3. All forebays were renamed to Biosivales and number serving each cell vvas validated. 7. The plans shows a bioretention cell #22 in Basin 5, the supplement form does not. Bioretention cell 922 should be identified on the drawings and in the supplement form as either a bioretention cell or a bioswale. Bioretention cell922 was removed from project due to lack gI'volume. Grading plan was corrected. Please contact me if you have any questions, P. Bart Smith, P.E. Civil Engineer Site Designer r Martha Morgan response (UNCLASSIFIED) From: Morgan, Martha [martha.morgan@ncdenr.gov] Sent: Thursday, February 02, 2012 1:44 PM To: Smith, Paul B SAS Cc: Randall, Mike Subject: RE: Fort Bragg Project (UNCLASSIFIED) Hey there, Yes we have already looked at the location of this project and there are no known groundwater issues in this location. Thanks for checking with us, Marti Morgan -----Original Message ----- From: Smith, Paul B SAS(mailto:Paul.B.Smith@usace.army.mil] sent: Thursday, February 02, 2012 12:59 PM To: Morgan, Martha subject: Fort Bragg Project (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Ms Morgan, I was referred to by Mr. Mike Randall at your stormwater permitting section. He stated you needed to review the project location to ensure there are no hazardous underground plumes in or adjacent to our site. Please see the attached .kmz file for project outline. Please call if you have any questions, v/r, P.Bart Smith, P.E. Civil Engineer site Development USACE, Savannah District Phone: (912) 652-5521 Email: paul.b.smith@usace.army.mil Fax: (912) 652-5891 classification: UNCLASSIFIED Caveats: NONE Page 1 A'IF, .91 `fir MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chafles Wakild, P. E. Governor Director January 10, 2012 Mr. David Heins Environmental Division Chief=(DPW,) Fort Bragg DPW - WMBs=,�� 2175 Reilly Road Stop A Fort Bragg, NC 28310-5000 Subject: Request for Additional Information - Stormwater Project No. S W 61 1 1205 3`d Brigade Phase 3 and Phase 4 Cumberland County Dear Mr. Heins: Dee Freeman Secretary After further review of the P Brigade Phase 3 and Phase 4 project the Plans, sheet CG 102, and CG 103 show that stormwater runoff is not directed to Cell #9, Cell # 10, Cell # 1 1 and Cell # 12, although the supplement form indicates that they contribute to the overall storage provided. In the case of Cell # 10, Cell # l I and Cell # 12 the overall storage volume, without Cell # 10, Cell 911 and Cel l # 12, is still well above the required storage. However, in the case of Cell #9 the overall storage volume provided is reduced to 32,623 ft3 compared to the required storage of 39,623 ft'. Cell # 10, Cell #10, Cell # I I and Cell 412 could be converted to open space and still meet the requirements to control and treat the first inch. Also, please provide documentation that the project has been reviewed by Martha Morgan, with DENR, at martlna.mor an@ncdenr-.gov. Please note that this request for additional information is in response to a preliminary review. The requested information should he received by this Office prior to February24, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please submit your request for a time extension to the Division. The request must indicate the date by which you expect to submit the required information. The Division is'allowed 90 days from the receipt of a completed application to issue the permit. The cons6tiction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuantto NCGS 143-215.6A. Wetlands and Slonnwater.Branch one 1617 Mail Service Canter; Raleigh, North Carolina 27699.1617 Onr hCatolina Location: W N. Salisbury Si. R616" l , North Carolina 27604 n Phone: 819-807•63001 FAX: 919-807-64941 Customer Service; 1-877-623-6748 �ay�turQli // �J Internet`. wwa.ncwaierqualily.org i/ An Equal Opporlunily.l Afidmalive Aclion Employer Please reference the State assigned project number SW61 1 125 on all correspondence. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to contact me ai (919) 807-6374 or mike.randall@nc.denr.gov. Sincerely, Micheal F. Randall Environmental .Engineer Stormwater Permitting Unit cc: Lee Ward, Frot Bragg, Water Management Branch P. Bart Smith, P.E. USAGE Stormwater Permitting Unit Files ,f Page 2 of 2 DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3640 CESAS-DG Memorandum To: Mr. Micheal F. Randall Environmental Engineer, Stormwater Permitting Unit 1617 Mall Service Center Raleigh, NC 27604 From: P. Bart Smith, N.E. Date: 01-25-2011 Subject: Comment Resolution Memorandum for second letter dated 1-12-2012 Project: 3`d Brigade Phase 3 and 4, Fort Bragg, NC NCDENR: SW6111205 NCDENR Comments and Government's Resolution: 1. After further review of the 3rd Brigade Phase 3 and Phase 4 project the Plans, sheet CG 102, and CIS 103 show that storm water runoff is not directed to Cell #9, Cell # 10, Cell # 1 1 and Cell # 12, although the supplement form indicates that they contribute to the overall storage provided. In the case of Cell # 10, Cell # I I and Cell 912 the overall storage volume, without Cell #10, Cell 911 and Cell #12, is still well above the required storage. However, in the case of Cell 49 the overall storage volume provided is reduced to 32,623 113 compared to the required storage of 39,623 0. Cell 99,10, 11, and 12 are sumped to receive sheel floK, from the adjacent grassed and concrete areas, therefore, these cells do contribute to the treatment volume. Basin 41 which contains Cell 99 has had the contributing area adjusted per your previous comment letter and has more than adequate storage dare to the Grave's Street adjustment_ Cell 99, Cell # 10, Cell # 1 1 and Cell 412 could be converted to open space and still meet the requirements to control and treat the first inch. The installation prefers to maximize all urea for detention of stormnvater, all cells ►will remain as submitted. Please contact me if you have any questions, P. Bart Smith, P.F1. Civil Engineer U.S. Army Corps of Engineers Savannah District EMAIL TRANSMITTAL Date: 2-3-2012 To: NC DENR Attention: Mike Randall DWQ-Stormwater Permitting Unit 512 North Saulsbury Street Raleigh, NC 27604 From: P. Bart Smith, P.E. 100 W. Oglethorpe Ave Savannah, Ga 31402 912-652-5521 Phone 912-652-5891 Fax paul . b. smith@usace. army. mil SUBJECT: Request for Additional Information, SW6111205 PROJECT: 3rd Brigade Phase 3 and 4. LOCATION: Fort Bragg, NC Submittal Contents: 1- Grading Plan and Boring Plan Sheets CG-1011102,104,105,106. 1- Post Developed Hydro Exhibit, CE-701 1- Bio Retention Design Criteria, Modified Sec 1.1, Supplement Form, Signed 1- Copy of email from Ms. Morgan 2- Comment Resolution Letters from comments dated January 10, 2012 2- NCDENR Comments both date January 12, 2012 Remarks Mr. Randall, If you any questions please give me a call or email after 19 February. Vlr, P.Bart Smith BN _ ` o _ i All • 11/ri— _ l lIIl } rl •slid .:� —r 470r" I � I ' It 11 — y s i I l II 14' l}t t ` I• NR .]., t)r.re l` iliN ,• .• A t I OOtlf�^d'� ' IIV }I��C. ` - ^ I',T+ - ,ly• � ti .. �.. µk tl0 ! om � kit lxx} l y It g I lil o o ♦' EI A l I� I} L — mz + P Il�lIllll` c) Itt'll 1 Ji I I l 1 40 WO � i � 1'TTltl S,IIII}I`���H- 4}I— }�i s °' 4 1W, on APti ,_ Om � � m f•1 O � T� � n sa � ti � f•1 L2 On A �i oz - o I �' ' ertwc acowE CIVIL'I rrusE f �n«ra uo r,ox. r..Aoiiw, a GRADING AND DRAINAGE �s. 1�nt,EvwNEEAores xicl C9,1�N,�W dE•NCi Ev.. �. .a�icn,��e�� ..e., �, �,i�. �Qa�,' PLAN G vi � II F,� Al � -+ I I +11y i I I• 0 I I I I i I b _ II me �� I ��� • I _ - �L / J-`-� rmaa /� 1 I ! I III •\ NnaDo II IVIL i !Il I fl r I I � � —_ _-___�I/, -II as aooa end •;a I I !�� N tla ]003! 'Jnd rOF gU1L SING H 0 6 r Y75' 6 NG I III � m 111 � tt/re= � r• Nntl• �� CGvea[o rlaaosie. l� x }}' IF Sa.7.75' Q ± II VIII € r V •' rnvaa eo0 I}�, �b Nntla tl0 _ x 10 y o �z r66 urn 7AdI „e ° I I FA A 1 1 nm vN oN N a I e �5 O O rN'V NO Cr O p' A m m n p F N S P Z y n i7 �, .•, R auexee'xSfO.�lF. luOdu'eK.erW=,e. aNll IVIL Cnv�liw. GRADING AND DRAINAGE PLAN F µiv fiwrml[aPStvlcr COrtc6 a. trrGlnE£• s, swww,psrwcre iAV e• ^' C i� -} _ 1 i I y-��- �-� 1 - �tl Olid / fly 1ij Nitld x I � '� � 1 �/' II �+' II ❑ Ila 11 a �+�a E �I�ja i 1� Y n ' I • �I / / I 11 /' I � 4 5 0 = , � • j I �'I / III ,/e I'; z. Dlp w� I \—� - _• —�r�'— alvw ��- = I ola ra (— \ Iet FI �V y! o . &/ o ° �i ,warp r e o p /r' x a 4 •//' e- Y- q -',� ,�—vim 4� - ;� _-�• ; �'�'`�'I1p1T``I;'�__����"' Cl r" _---------- - - - GRAVES' ,�"€ z;^ a "oA •� ,'�� a � /� a —a"bg r Wr V 9 02. — � I� � �� / Ill '� j� ,� � ✓� ' ' all CC1Gr � nN In V m � vR rn A um O n� ✓. p O P %+v ti pa n m A A N A g n -01 i P y a _ C n { [din bin z in O ICY �I s 1 7, N 4 O o n`•' o 05 T NC O 1 A N O S. 000 0000,0""., I I I ^y'/I H uvu.wu.fu a Mill- - TYPICAL FOR•'S' _ � SR �,.o.,� ���F D ••N . �-:° � � � � � l4 y I , y y y y � I �,T ,� - • vC p4000+w � I re � ATEFS ! S 2.50 ADE H �DQUA RS ,I a I } EF 3 u NO tES I F F ` 383 _ SpECIA1 INL- -t _ — _ _ _ — — — Seim •II } 4' ••\ t TYP HI$ Poor' Y _ — — _ _ .� r SEE ?E AtE GI00: FOR LEGENDS. w — F 3t5 �` I �� I �' •'� .'�• 2. SEE PLATE G1001 FOR GENERAL -- , NOTES. 3a SSF �,i }l } u e:. PVC•ti 0 %�` _ --�$ ` �II'1 g,pgE,EMlId+ � } 1 I / l /� _ _ _ I I 11'. / J' 1 R�00r: II E 1.1//��II�E uTLEi 3 >< 5 /, 3, SEE PLATES CS501-SAi FoP SITE z DETAILS._ 4. SEE PLATES 10. 9 CUF I'—Dl , C-101C AND c-1011) Io10 'OR PHASING. �F = 382.25 €�a a LEGEND IF SOIL TEST BORING 0 + CRT SOUNDING a g A,—yVl�iaOPi . TESS -!T = �RDo* OR PREVIOUS PROJECT .IAnpsOLI-35361/5355a (w E'} e> > Cp\EKD t x• III s-2 y v , c ITI / I'yl'� \ rr sev2s. • PERCOLATION TEST Q Ii�p,. ROOF DRAIN I I Y' e„ t,•i DPwn k _ .. Llu.i': Of CONSIROCIIOM1' s Sesr I rs C,-, FES Ea -I l I , l .R Ijra". Pv RO�f oRal r g Quo 5\ Elc` 1 I l ' I--- 'El E�-, — __ _ — I 4 l N00% O \ fk 1. D Z 13 a t �' III I its— _ F q 1 �»ilis� _•— _ _ — — _ _ — CO /A� g J I ICAL FOR�2 yx�an— TYPI F`OR [El V �� ;Ir �, E E G Nm y PVC R BR> 1 rl .. 1 q `� a � I I I� }141 11 by I _ O J ey ° SCUEr•.JO' V •y,e`� V I II I>cll ` Vy,. !1t- TrPlcAL FOR C/ II II s •—_�--� i 8K7 0 mz ,n ❑ ma m z in as a an o 0 �O -T .77 O N � z n I i I II i o / I !V /// o� 1 i f -y❑� i _ //III V 1' o❑ � I �� �a I I � II �4 �U A - vW ¢6 f� a co _le � Xm Ix 40SUB ORUNc m IIIII �! 1 I I I111� f ° IIIIII 3 / aoR dp' �/z C ! i If I Illlllrz o ` �I1+ a r.��b �• a „ - 12 �. ___ ; F -_ ilit I I 1 6 a _yJ ��I} I R I - I i ! I �IIIl lllo❑ C "Y^eV�ll�� � V --I o-.e la -_� ,3 e.a-_ 1r-J o-v eio F Y I YI III m o IIII / .� II 3m I s� ^I I II 1 ! IIIIIII I / I � IItl / It I !! � ��� __ — — _ �Jil� �_ I /¢ � a,✓ / I III - I � � � I • / I I /IV II- / C tJ / c o cal U U ❑ I ., M I a Ao.... 4� NC®ENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. David Heins Environmental Division Chief (DPW) Fort Bragg DPW - WMB 2175 Reilly Road Stop A Fort Bragg, NC 28310-5000 Division of Water Quality Coleen H. Sullins Director January 10, 2012 Subject: Request for Additional Information Stormwater Project No. SW6111205 3`d Brigade Phase 3 and Phase 4 Cumberland County Dear Mr. Heins: Dee Freeman Secretary The Division of Water Quality Central Office received a Stormwater Management Permit Application for the 3rd Brigade Phase 3 and Phase 4 project on December 20, 2011. A preliminary review of that information has determined that the NC DENR Modified Design Supplement is not complete. Please resubmit Section: ] .I NC DENR Modified Design Supplement for LID projects. I . The supplement form must be stamped by a P.E. as it will be included as an attachment to the permit. 2. The Draw Down Time only indicates that that it is less than 48 hours. Ponded water must completely drain into the soil within 12 hours and to a level of 24 inches below the soil surface within 48 hours. 3. Delete line item under Site Hydrology for Basin 6. DWQ is primarily concerned with the Post - construction Runoff. 4. Under the Water Quality Volume Calculations, the value used for Impervious Area does not indicate whether or not it includes existing impervious area or only new impervious area. This is significant since the "volume to treat" for Basin 1 is 39,927 ft3. Where the provided storage is only 34,043.08 ft3. The runoff from the existing impervious area, i.e., Grave Street, should not be included since it is not directed into Bioretention #7, otherwise the volume provided in bio- retention #7 is not adequate. 5. Under "Provided Storage" for cell #7 is 12,682.08 W. Does the 12,682.08 ft3 include 15 forebays? The plans indicate only 10 going to cell #7, with 3 going to cell #2 and 2 going to cell #3. 6. Please revise the reference from forebays to bioswales and the correct the number going to each cell, i.e., 10 going to cell 47, with 3 going to cell 42 and 2 going to cell #3. 7. The plans shows a bioretention cell #22 in Basin 5, the supplement form does not. Bioretention cell #22 should be identified on the drawings and in the supplement form as either a bioretention cell or a bioswale. Wettands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919.807-63001 FAX 919.807-64941 Customer Service: 1-877-623-6748 Internet: www,nmaterquality.org An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Aaturally The calculations do not include bioretention cell #22. Also, sheets CG 101, CG 102, CG 104, CG 105, CG 106, and CE701 reference bioretention cells # 14 A through #14J, retention cells #13A through #13H and bioretention cell #22. My understanding is that while these areas do provide additional treatment and act as a forebay they are not designed as bioretention basins. If they are not designed as bio-retention cells than they should be identified as bioswales. Please resubmit sheets CG 101, CO 102, CG 104, CG 105, CG 106, and CE701 identifying the areas as bioswales. If they are designed and function as bioretention cells then the supplement form will need to be revised. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to February 24, 2012, or the application wil be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please submit your request for a time extension to the Division. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant.to NCGS 143-215.6A. Please reference the State assigned project number SW611125 on all correspondence. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to contact me at (919) 807-6374 or mike.randali@nc.denr.gov. Sincerely, Mi�eal Randall Environmental Engineer Stormwater Permitting Unit cc: Lee Ward, Frot Bragg, Water Management Branch P. Bart Smith, P.E. USACE Stormwater Permitting Unit Files Page 2 of 2 MCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. David Heins Environmental Division Chief (DPW) Fort Bragg DPW - WMB 2175 Reilly Road Stop A Fort Bragg, NC 28310-5000 Division of Water Quality Charles Wakild, P. E. Director January 10, 2012 Subject: Request for Additional Information Stormwater Project No. SW6111205 Yd Brigade Phase 3 and Phase 4 Cumberland County Dear Mr. Heins: Dee Freeman Secretary After further review of the 3rd Brigade Phase 3 and Phase 4 project the Plans, sheet CG 102, and CG 103 show that stormwater runoff is not directed to Cell #9, Cell # 10, Cell # 1 I and Cell # 12, although the supplement form indicates that they contribute to the overall storage provided. In the case of Cell # 10, Cell 41 1 and Cell #12 the overall storage volume, without Cell #10, Cell 411 and Cell #12, is still well above the required storage. However, in the case of Cell 49 the overall storage volume provided is reduced to 32,623 ft3 compared to the required storage of 39,623 ft3. Cell #10, Cell #10, Cell #1 I and Cell # 12 could be converted to open space and still meet the requirements to control and treat the first inch. Also, please provide documentation that the project has been reviewed by Martha Morgan, with DENR, at martha.morgan uiedenr. ov. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to February 24, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please submit your request for a time extension to the Division. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Wetlands and Stormwater Branch 1517 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807.6300 l FAX: 919-807-64941 Customer Service: 1-877-623-6748 Internet www.ncwaterqualit .org An Equal opportunity 4 Affirmative Action Employer Nne orthCarolina NaturallY Please reference the State assigned project number SW611125 on all correspondence. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to contact me at (919) 807-6374 or mike. randal I@nc.denr.gov. Sincerely, Micheal F. Randall Environmental Engineer Stormwater Permitting Unit cc: Lee Ward, Frot Bragg, Water Management Branch P. Bart Smith, P.E. USACE Stormwater Permitting Unit Files Page 2 of 2