Loading...
HomeMy WebLinkAboutSW6100701_Plan Sheet (Set)_20120802may#� ill ■'-At l—■ 1f_r•.�.a��^:i :rr-5_±�� ��� �i7±.a s' E-4, s'- .� ='v:S =U a7 7-211*UL39 rr+ .swr:r: VICINITY MAP / NOT TO SCALE LEGEND >NIr O R/W or C.L. C-' 0 IT- 0—i---- SS W UGT GAS E 1•I•MM�� WATER VALVE WATER METER FIRE HYDRANT SANITARY SEWER MANHOLE SANITARY SEWER CLEAN OUT (C.O.) RIGHT OF WAY CENTERLINE UTILITY POLE & GUY UTILITY POLE PROPERTY CORNER PROPERTY LINE (SURVEYED) PROPERTY LINE (UNSURVEYED) PROPERTY LINE (PROPOSED) SANITARY SEWER LINE WATER MAIN UNDERGROUND TELEPHONEICABLE GAS MAIN OVERHEAD ELECTRIC UTILITY LINES STORM DRAINAGE PIPE CENTERLINE ROAD (ALIGNMENT) RIGHT OF WAY EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR DIVERSION DITCH W/ STORAGE DISTURBED AREA BOUNDARY LINE SILT FENCE CHECK DAM CATCH BASIN (CURB INLET) CATCH BASIN (YARD INLET) SURVEY NOTATION CID COMPUTED POINT EPK EXISTING PK NAIL EIP EXISTING IRON PIPE ECIP EXISTING CRIMPED IRON PIPE EIA EXISTING IRON AXLE EIS EXISTING IRON STAKE ECM EXISTING CONCRETE MONUMENT ECS EXISTING COTTON SPINDLE ERRS EXISTING RAIL ROAD SPIKE PIGS PK NAIL SET ISS IRON STAKE SET RIW RIGHT-OF-WAY WC WITNESS CORNER N.C.G.S. NORTH CAROLINA GEODETIC SURVEY PP POWER POWER SSMH SANITARY SEWER MANHOLE NCNG NORTH CAROLINA NATURAL GAS TBM TEMPORARY BENCH MARK NIF NO IRON FOUND EXISTING PROPERTY LINE EXISTING PROPERTY LINE TO BE REMOVED PROPOSED PROPERTY LINE GENERAL SITE NOTES: 1. STOP SIGNS SHALL MEET THE CRITERIA OF THE NC DEPARTMENT OF TRANSPORTATION. 2. PERIMETERS OF EXISTING WOODED AREAS ARE APPROXIMATE. 3. STORM DRAINAGE, STREET CONSTRUCTION AND PAVING SHALL BE IN ACCORDANCE WITH NCDOT. 4. ACCESS TO SITES SHALL BE BY PUBLIC RIGHT-OF-WAYS AND EASEMENTS. OTHER ACCESS LOCATIONS REQUIRED SHALL BE SECURED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. 5. COMPLIANCE WITH ALL OSHA REGULATIONS, AND JOB SITE SAFETY IS THE EXCLUSIVE AND SOLE RESPONSIBILITY OF THE CONTRACTOR. SITE DATA: OWNER: HCC INVESTMENTS, LLC CONTACT PERSON: JACKIE HAiRR ADDRESS: 3077 N. MAIN ST. HOPE MILLS, NC 28348 TELEPHONE: 910-426-0867 SITE LOCATION: LATITUDE: 34.9831°N LONGITUDE: 79.0121°W AREA FOR MIXED SITE: 47.00 AC. AREA FOR HARRIS TEETER SITE: 13.02 AC. AREA FOR CVS SITE: 2.31 AC. TOTAL DEVELOPMENT AREA: 62.33 TOTAL DISTURBED AREA: 48.00 AC. PIN NO.: 9494-68-2619 DEED REFERENCE: D.B. 7458, PG. 610 FLOOD ZONE: X FIRM PANEL: 3710949400J DATED: 01-05-2007 DUPLEX UNITS: 22 BUILDINGS, 44 UNITS CONDOMINIUM UNITS: 300 COMMERCIAL SF: 159829 SF PARKING NEEDED FOR COMM: 800 PARKING NEEDED FOR RES: 558 TOTAL REQUIRED PARKING: 1358 TOTAL PROVIDED PARKING: 2278 ZONE CLASS: MXD SETBACKS: DUE TO MXD (MIXED) ZONING, SETBACKS VARY. SETBACKS TO BE APPROVED WiTi BUILDING DESIGN BY PLANNING. DIVERSION DITCHES MUST BE STABILIZED WITH VEGETATION TO PREVENT ERC';:ION. CATCH BASINS WILL BE CONSTRUCTED WITH DROP INLET GRATES UNTIL CONSTRUTION OF CURB AND GUTTER. RA MOOR VILLAGE HCC INVESTMENTS. RETAIL COMMERCIAL AND RESIDENTIAL DEVELOPMENT OWNER/DEVELOPER: HCC INVESTMENTS, LLC 3077 N. MAIN STREET SUITE 201 HOPE MILLS, NC 28348 TELEPHONE: (910) 426-0567 SHEET INDEX S-1 ' SITE PLAN S-2 UTILITY PLAN S-3a EROSION CONTROL PLAN 100 SCALE S-3b EROSION CONTROL PLAN 60 SCALE S-3c EROSION CONTROL PLAN 60 SCALE S-3d EROSION CONTROL PLAN - SOILS S-3e EROSION CONTROL PLAN - CLEARING S-4a STORM AND GRADING PLAN 100 SCALE S-4b STORM AND GRADING PLAN 60 SCALE S-4c STORM AND GRADING PLAN 60 SCALE S-4d STORM AND GRADING PLAN -PLANTING S-5 PROFILE - STORM S-6 PROFILE - STORM S-7 PROFILE - STORM D-1 DETAILS - EROSION D-2 DETAILS - EROSION D-3 DETAILS - EROSION D-4 DETAILS - DRAINAGE D-5 DETAILS - SITE ***CAUTION*** UNDERGROUND UTILITIES 3 DAYS BEFORE DIGGING CALL 'Qra 7.fgff TOLL FREE 1-800-632-4949 A ONE CALL SYSTEM FOR COMMUNITY AND ,JOB SAFETY. *** CAUTION *.* THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE ENGINEER MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED. ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE ENGINEER HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. NOTE TO CONTRACTOR CONTRACTOR TO CONTACT NORTH CAROLINA ONE CALL CENTER AT LEAST 48 HOURS PRIOR TO SITE EXCAVATION, GRADING OR DIGGING. Approved 5toanwa,.dr P2rfnit Documents (.onstructiort in accordance with; iese documents i€ required by the stormwater permit. North 'Carolina rules require that the st•:rmwal.. !-ysae;n deci¢ter Inspect during construe lion; certify conformity with thr plans and spa• dnrl certify ocn+pliance with the s4ormwater rules. (15 : N�AC 2H .1008 Wat2w Permit # S W6100 01 Dateby-L�� NC G.rlson o]Wlity DESIGNED BY: PLANS PREPARED BY: DATE: PROJECT NO.: REVISED: Revisit % Date �Ia�1Fl��T110 PETER E. 0`1, z5. ZO/z- Hoch ngineers � P.A. CONSULTING ENGINEERS & SURVEYORS 1403 NC Highway 50 South - Benson, NC 27504 Phone: (919) 894-7765 Fax: (919) 894-8190 E-mail: enochengineers@eanhlink.net May 12, 2010 3554 July 25, 2012 D�a�� JUL � 6 "L1�12 DENR - WATER 1']t.JALITY Weu&nft & grAp Maim t3mneh C r SITE DATA: OWNER: HCC INVESTMENTS, LLC CONTACT PERSON: JACKIE HAIRR ADDRESS: 3077 N. MAIN ST. HOPE MILLS, NC 28348 TELEPHONE: 910-426-0867 / SITE LOCATION: LATITUDE: 34.9831°N LONGITUDE: 79.0121°W ACREAGE FOR COMMERCIAURETAIL 15.31 ACRES ACREAGE FOR MULTIFAMILY 21.37 ACRES SOT VICINITY MAP •;.�� ' NOT TO SCALE OPEN/GREEN SPACE REQUIREMENT 9.77 ACRES /,'' .� �-�,� A ACREAGE FOR OPEN/GREEN SPACE 22.04 ACRES TRACT, IIA'I (GRASS ISLANDS/POND AREA) ' �, , /�✓ - f,�r / � /n ,O�/AC cJ PIN NO.: 9494-68-2619 /' ,� / s u DEED REFERENCE: D.B. 7458 PG. 610 /' rr ' %� / 'A FLOOD ZONE: X LOT FIRM PANEL: 3710949400J ,/ ,% DATED: 01-05-2007 LAKEWOOD �35� J�,, ,' LOT TRAEMOOR ACCESS ,/ tia ' LAKEWOOD ROAD o SECTION ONE MB 108, PG. 89 mp 011 I ka %mo. I W". 'L, #K IM V71p, 1 � a� •`\ `�` ,�• � �� � RIB 110 ' ► LOT 115 ' / t / t / / LOTI 1141 I / 1� /s / t LOT g 11341 ***CAUTION*** N.C. UNDERGROUND UTILITIES +`krr [r�4 3 DAY5 BEFORE DIGGING CALL TOLL FREE 1-800--632-4949 A ONE CALL SYSTEM FOR COMMUNITY AND JOB SAFETY. ss• CAUTION sss THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE ENGINEER MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTLITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE ENGINEER HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. TRAEMOOR @ LAKEWOOD 5ECTfON ONE -A MS 108, PG. 173 f f / LEGEND w m WATER VALVE WATER METER FIRE HYDRANT ® SANITARY SEWER MANHOLE o SANITARY SEWER CLEAN OUT (C.O.) R/W RIGHT OF WAY or C. L. CENTERLINE �-� UTILITY POLE & GUY 69 UTILITY POLE 0 PROPERTY CORNER PROPERTY LINE (SURVEYED) G----- •--- — PROPERTY LINE (UNSURVEYED) a--�.— — — PROPERTY LINE (PROPOSED) SS SANITARY SEWER LINE W WATER MAIN UGT UNDERGROUND TELEPHONEICABLE GAS GAS MAIN E OVERHEAD ELECTRIC UTILITY LINES m m m m m m STORM DRAINAGE PIPE - - CENTERLINE ROAD (ALIGNMENT) RIGHT OF WAY - — --- EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR DIVERSION DITCH WI STORAGE --(]--Cl— DISTURBED AREA BOUNDARY LINE -----x x :-- SILT FENCE CHECK DAM ® CATCH BASIN (CURB INLET) ® CATCH BASIN (YARD INLET) p .. N �-+ a+ 5zg i !1 �00 zQn G in o C)«� W m°°jo 00 z W rr� ° o� U I:G �QLLI �Q O_ 0 N I • ¢ 2 II U N O W a w ¢ `" n 0 O o 0 ma mOf z� " �N o o LD I � � Ul cD } ? n W LLI acnr� 2 `Q• 6b� �/ / \/�� \ `°� t ��•��/ _ Y so / LOT r i TRAEMOOR %' / / �0 I , . // �s�, /@ LAKEWOOD / 1 ! SECTION THREE � � / LOT r ! f a `\ f / 108 / ! ! M6 I T8` PG. 29 NW a1 r r , / / / �sy //I `b� f � 4 / / �B rBF I% 1/ LOT � 1 f to in TSM, STEPFiFlI G Ac Y�FE / PARCEL TWO ati as exr / + w \ ,`y'' \ ' -P�\�P! _ / / , , i 07 / LOT L— (1 \\ 1 + 1 , I1 u 5 O.5 3 ACRES /'' ,t'In � ' -1A y �� HARR15 p . �� / A \ / ?° ! `\ LO Y 1 �� 1 -PA CT 105 1 �� 1 \ d ACRES a TEETER -287- - - \ 1 / i �� /'� \ ��`g� ! 1 II ! ` \ ��\. \ �\ ` tV --T87- ---- �-'IN / // R @ G { ! ! 1 1 1 \\ \ \ O / / ,�c� i \ \ \ \ N LO f .d aG 5 I /�� J� \ sFcn §',8 I y,a °S \ \ \t \ . \ 1 N zap � � ...M'. \ resae• ` 1 � 1 1 � o WAY. `� / / / ' /1 �/ / \ + u: �I / STORWATER PARCEL 4 1 , RED 9 ' f' �`` / C.55: a'•t•. a 1 1 Ar It ` BUILDING C o�'G ' `. POOL 4 B ` I e ae d`�\\S ! syB, f, f CD �l � �Cj 1 i O N 33 52 ACRES . I ! `� O [? w P 1 1 ` r• N i+f � � ti.a 4 •�, F E O C r 4B' b > \ �\\7Daz+i��. ,iSt IyNJ Q f 1 r �� a._ _ _.. _ _ d + +■ \ \ \ ♦ V� J➢( 7! r•'•r ~-- \ �6 \ \ 1 1 CCZ1E3fi0 ! t 1 t Z 1cp IF �ir t9 Rern,t f / / / / /�/// /i/� �`' V zV)o # � j I / / ! / ! / l 2 _ li.l W z c� ! 1 1 ,1- /// nod U1�� W z o cx.> 5� 0 � z; Y t0 ? LrJ or, % ! . / •o. j _ '' _ { 1 r { i t ! U Q Q O 0 O O I f { �< LL O :C r) a Fr 8� J !{ UTPARCEL t ` _--� DUP a t 1• , 'TUP�ifY CI r r BUILDING: B N� O TPA EL BUILDING A • _ PARCEL ONE � rj,� ', "- ,1 �..�;. ti� ' ® u - - -- _ i j 7� I `` j �'► _ OUTPAR&L I � Fs$ e1.on ( r /' 1 ! Ir / t Lu - f . GG ACRES -- KING RO %`� ` ``' ^, / = � - z - r S.F.T ARCI=L I i { 1.74 AC V RES EkS N LE F T - i ,/ r/ J/ f� f/ r !/ rr RR 4����'� 5,800 8 \�` j 4. "56 u I L82.o0 1 .00 ,'� i 1 t -_ - �, _ � _ PC) N 4, �'xr cu s ! ! Y I 1 D }} co I I ! r ff f z +•..Di7P �4729'Yr — FPd: IMOO ! �i_ + 1 1 2.00 ( dp E7= 1 1 , r f r.. '"-t i J. — i r � ..-. _. , ...' 3 '� �.t seo 42'2g�- ti �—w � '� ` 1 ! ! � o / - - - � - - ... • � � / , r ' 1 I � 1� f I � 1 i 1\ ♦ /'� n 1—.—_..._ ..��'/ . _......—.\\ If! �,..h �, �.t__ _ _ - _ � f � � `� • /r - -- `, 1 j 1 � 1 �, \ f.L s r _ 94.57' 1 '--� - f ._f •. r-,�� ucrrr ,S'NCD rmo `"`^ .�_.-�... ~ �� I `� / s !< • D IBS.00 t l •�itc" or om,caTl "�--•= - �-�_ -,_. - �szs.00• � � � � f - .._ I - � / I I � ` If 'Jf L ti N� ROPE 7 Y L �FFB 189. Dur I / rJ f ` W 0�1CF1Sj� pEls r � -� ...-•,"-.,...--s.,..._ ^- ` �— 1 � �� FFS: 1$2.0 ! � _-ti `` J. CIAD (SR GRAPHIC SCALE - I�IL— r _--� _..,:;.:=�-•=,J__ -___- I/ /, 100 0 50 100 200 400 IN FEET) I ix �"' �- '�= EE PROJECT. 3554 1 inch = 100 #t u ` _ -- r FOOD LION ENTRY 1 j IV I 4 ,3 �Ix IIII I lr�� -ter J 10 ti C Er w z z u, U 0 z U1 0 0 T. m F c a z c L- Z�bV� M SITE DATA: OWNER: HCC INVESTMENTS, LLC CONTACT PERSON: JACKIE HAIRR ADDRESS. 3077 N. MAIN ST. HOPE MILLS, NC 28348 TELEPHONE: 910-42"867 SITE LOCATION: LATITUDE: 34.9831 •N LONGITUDE: 79.0121 °W PIN NO.: 9494-68-2619 DEED REFERENCE: D.B. 7458. PG. 610 DIVERSION DITCHES MUST BE STABILIZED WITH VEGETATION TO PREVENT EROSION. CATCH BASI"' WILL BE CONSTRUCTED WITH DROP INLET GRATES UNTIL CONSTRUTION OF CURB AND GUTTER. NO WETLANDS WERE DELINEATED ON THIS SITE ALL ROOF DRAINS WILL DIRECT RUNOFF TO THE POND I" DESIGN STORM CALCUL+377ONS SUPPORTING DATA AND VARIABLES: IMPERVIOUS: 59.2% DRAINAGE AREA (DA): 65 acres Rv: RUNOFF COEFFICIENT Vt: TREATMENT VOLUME (FIRST INCH) Vp: PROVIDED VOLUME FOR TREATMENT MEASURED FROM PPE TO TOP OF RISER TREATMENT VOLUME CALCULATIONS (3.3.1.): Rv = 0.05 + 0.9(0.592) Rv = 0,583 Vt = (3630)(1.0)(0.592)(65) Vt=137,559 mt Vp is 510,482 cuff DRAWDOWN TIME: 1 yr = 3.2 days 4k �/ J Q QCO� X"OQV Ail 01 k. 1!, �,, � �� J1�� !� I � ,q,26•E',ra n, � r �'k/ ✓�13Q'_J0IN,_ w ***CAUTION*** LEGEND W WATER VALVE WATER METER FIRE HYDRANT Q SANITARY SEWER MANHOLE O SANITARY SEWER CLEAN OUT (C.O.) R/W RIGHT OF WAY C C L CENTERLINE W J f / s«e CAUTION •ss _ UTILITY POLE 8 GUY THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM rd UTILITY POLE / \ FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE ENGINEER MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN 0 PROPERTY CORNER COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE PROPERTY LINE (SURVEYED} UNDERGROUND UTLIIIES SHOWN ARE IN THE EXACT LOCATION !COT \\ INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED o-- - - - - --0 PROPERTY LINE (UNSURVEYED) /-; A5 ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE PR LINE PROPERTY ENGINEER HAS NOT PHYSICALLY LOCATED THE UNDERGROUND PR ' - (PROPOSED) I�' p� UTILITIES. SS SANITARY SEWER LINE TRACE �� A / W WATER MAIN UGT UNDERGROUND TELEPHONE/CABLE GAS GAS MAIN E OVERHEAD ELECTRIC UTILITY LINES STORM DRAINAGE PIPE LOT!' - - CENTERLINE ROAD (ALIGNMENT) RIGHT OF WAY EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR LAKEWOOD , ' ` �, a3y� .' j LOT TRAEMOOR ACCESS I I G ,�� @ LAKEWOOD ROAD a °�r �� �// 5E:CTION ONE �/ I MB 108. PG. 85 LOT 1 15 LOT 00 LOT 113 e LAKEWOOD �, w • 10 �� \5ECTION • PROPOSED MAJOR CONTOUR DIVERSION DITCH W/ STORAGE --0--0- DISTURBED AREA BOUNDARY LINE -•- x x X- SILT FENCE 0 h i >pira � nZ_ 00 . t , d23 o a c o V. . z � 0 �i �WUoO° � ,� a o W �Z o,� U CHECK DAM ® CATCH BASIN (CURB INLET) ® CATCH BASIN (YARD INLET) LLI ,;; Ld CD CO 0 ¢ co 11J N OUTLET SCALE _ Channel Calculator Given Input Data: Shape Trapezoidal Solve for Depth of Flow Flowrate 71.6400 cfe Slope O.:0 0 ft/ft llanaing's a 0.1130 Heigbt 48.0000 fa 0 all T 0 S U W `! EQ � Q U-) 8ottoit Width 84,0000 is Loft Slope - 8.3333 ft/Ft (V/H) 0 Right Slope 0.3333 Ft/Ft (V/H) Computed Results: H } �, � � Oeptb 19.0356 in Velocity 3.840S fps � W U 4 t� X 0 Full rlawrate 406.0389 efe Z V) 2 Area 76.0048 ft2 0 0 LL Perimetas 310.6060 in Z 13 W C7 Pier Arae 10.6539 ft2 LU fl� ULLJ � � Flow Perimeter 204.4027 in � Hydraulic Radius 13.141S is Tap Width 198.2251 is �• fJ0 2 Percaat 39.6575 X Critical Information; - Critical Depth 14.7976 is Critical slope 0.0026 ft/ft Critical velocity 5.4296 Fps I I Q / / Critical area 13.1943 ft2 i 4�' �/ _ •�F,S I/ _ / J 1 f Critical perimeter 177.5967 is LOT 1 ! Critical hydraulic radius 10.6982 in N r CCritical top width 172.71146 in I Pe •�/ QQ �, IHYi �b t ,Sk / 1 O9 / ! ! CSpeci Fic energy 1.8155 ft P: N CL S'.'Sp• / ! f .-Minimum energy 1.0497 ft a10 - LOT ! ! Fude number 0.6371 C +y � Mrrolow Condition Subcritical 00 0) V) �. i !1 LOT 1! r ! J o L 107 !! LOT ! J \ '> a w IOG r !\ \e 1\, , \ , II H (D u�i z = \ / 9 \ �� r +►zog ! 1 ! \ LOT t► Y , \ 1 ��` A, CT 8 0- a HARKS p Ix' / r !ro ■ - ` R 1 1 \ 105 I \ 1 V \1 AQ;E5 cn m `mil TEETf=R 1, _ y Q QW. N1. N, rsi ,7a \\`�\,\� \� r: oll , A a01 / \ STORhA%AIA E FARCE _- .. 1 IN N r G.: 5 5 .ACRES / -- - Elm \ j � �� WFrwrlareRaw - 1 I ! 1 t r r 1 yl BEEMIgNr FOND. ti$ �� YIAiOR OPoFICEINv:t l j � i r / ��� f \ • 1 YY AsvYiiiw�r°s7L16 / �3j S I1�, 00 -' ��` . PARCEL .4. l P�1v1 BUILDING C l f. `oar' f- �� f / �'. �. �� -+ram! i i o m y 33..G2 NN �.J=lk�aJ14L.dc.�y�V1�11"aR... � .ram �/! �J �t�'j��GV' ` � F ! •_ _ _-' _ �~�_��'�= � C I j� • ` � � i�� � � �4 SPLLWAY arm sLav:,rseo / / ! {) f � j ► � .I i U a 'a+ / / 11 1 11 ,a, ra �s E ��� �` `�`roaO°E"so `�` - r / ! Csi/ C fZ Ll U , 0 - L3 ` \a / at- j ,` / t]Y5Q p V) •® (� I d i f 424 3 iE. B 1 f � � sc• _ / / / / � � � ¢ y �\ N a a / / / , , ` _ j \/ F FF6: B2.OD $P$ 181' I 1 ~ ' ! !1 / / // ! J / � 0 O W J 1 1 1! 0 3� w a� ;* c��w a a z¢� p c� b a J -¢LiU a 2M= r ! 1 /� 9 e[I t '�'��y�1..� I f r y}(]�/ - / TJ D a .� rZT 0TP,0CILLlW, 5UI LD1NG B , Q PARCEL ONE .GG ACRES -- K1NI Ro e /'y` `` a°r C4 rL42 r t / 1 1 � �i GRAPHIC SCALE 100 0 50 100 20D ( IN FEET ) 1 inch = 100 ft. 4W j • A DUP UTPARCEL ' 1 O Tt'A L -` - / l.00 n ,/ r I I!► 1 tI W QUTPAfV-'EL I 1 .74 A IES TYPICAL iI'3i i I / T ARCEL 11 '� � 516W Sy. , -- 1 (S NIGLE F T!A) / • 1 1 163.00 1 i 1 !33 1\ my .sa �e TYPICAL TYPICAL U O % 4,50 B.P. 18 \ 18>;.00 T10 N 41 e ` TYPICAL USB .. "•y .t 1 : �1 .O0 I DUP J : Cn 1i tG i I ` jf ff ! /J •, 1 2.00 D 1 f c0 -1 6) I I Q ' 4Y�9'W FFf 182.00 = � •a 1 2.00 ! j -10 Co S i _ �1... _ �` Far. - -- . '�-=-:..-�'�94.5�1SS ^� � - , � • f -- .. 4�� r/- `. law SIGN MCaQi -". �-�... `,� i 1 \ jj / TS° '�." `�+,'...����, -...- �~SS ��­ it OERrGfj iIDH s . , 2E6. / i \ D07 DEDICATION... '� •Lwr � ~ 4�� r3ra�a 0 R TY ,.�pD� il6s. 1 I Lim // / J ��. ~�'" LU tw.w:`^ � ...�:` r ` ~ �42y; ±+1F � � G _ - DUP i $pg• •B1.OQ � .� � LG� .00 ! "` �� r - _ r r t ` ant4�'2x• Ar eor.; r D L6X j j \ Rog1CFrSh R'ogD / '-� ..`�_. _ C FFB* fez. \ " r 0 vAtc SS two 1 / t ' 1 1 ^-- w'�p �" �_ SS xa nfs]-�s+.n I �`` `► / tr EE PROJECT: 3554 4a l FOOD LION ENTRY (L P m 'o U C m `o C 4) E in i= 0 z - a _ . _.-5 .. . tea. ...■ �a • LL� L:'_ ,J. _ . _ _ _ • .;l '.-a '.-..- iz�aa-�ri - _- YnaD�Cv VICINITY MAP / NOT TO 5CALf= LEGEND W WATER VALVE WATER METER FIRE HYDRANT SANITARY SEWER MANHOLE o SANITARY SEWER CLEAN OUT (C.O.) RIW RIGHT OF WAY or C.L. CENTERLINE �--� UTILITY POLE R GUY fd UTILITY POLE o PROPERTY CORNER PROPERTY LINE (SURVEYED) Q-� — -- ---0 PROPERTY LINE (UNSURVEYED) o-- --- — — --a PROPERTY LINE (PROPOSED) SS SANITARY SEWER LINE W WATER MAIN UNDERGROUND TELEPHONElCABLE GAS GAS MAIN E OVERHEAD ELECTRIC UTILITY LINES m 1111111 STORM DRAINAGE PIPE CENTERLINE ROAD (ALIGNMENT) RIGHT OF WAY - -' -- — - EXISTING MINOR CONTOUR — - EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR -- �= DIVERSION DITCH WI STORAGE _0 DISTURBED AREA BOUNDARY LINE x x SILT FENCE CHECK DAM ® CATCH BASIN (CURB INLET) ® CATCH BASIN (YARD INLET) IR Q, SITE DATA:IN OWNER: HCC INVESTMENTS, LLC G- �`" CONTACT PERSON: JACKIE HAIRR �\ ADDRESS: 3077 N. MAIN ST. MILLS, NC 28348 TELEPHONE: 910-426-0867 SITE LOCATION: LATITUDE: 34.9831'N LONGITUDE: 79.0121'W TOTAL DEVELOPMENT AREA: 62.33 TOTAL DISTURBED AREA: 48.00 AC. PIN NO.: .9494-68-2619 DEED REFERENCE: D.B. 7458, PG.:610 DIVERSION DITCHES MUST BE STABILIZED WITH . . VEGETATION TO PREVENT EROSION. CATCH BASINS WILL BE CONSTRUCTED WITH DROP:INLET GRATES UNTIL / \ CONSTRUTION OF CURB AND GUTTER. \ NO WETLANDS. HAVE BEEN DELINEATED ON THIS SITE. �( 40 � 0) Specifications for stormwater wet detention basin All herbaceous plants within the shallow water zones shall be installed between April 1 andjuly 31 of 2011. Installation of herbaceous shallow water plants after this date entails an increased risk of failure and may only be performed upon mutual agreement between the installation contractor and owner or owner's representative. The installer must take great care to ensure that plants awaiting installation are kept moist and shaded at all times. Under no circumstances shall plant toots be allowed to dry out during transport, storage or installation. Each planting area (shallow land and shallow water) shall be clearly identified and marked prior to installing plants. Vertical distance from normal pool (permanent pool) shall be the primary means of locating the planting areas. All plants within the basin (shallow water and shallow land zones) shall be installed as large drifts of a single plant species, unless otherwise specified. Planting holes or slits of herbaceous species shall be deep enough to allow the down of the plant to be at grade level, while roots extend vertically into the substrate without kinking. Soil should not be loosened more than necessary. Once plants are set in place, soil most be pressed gently but firmly against the entire root mass, working in a deep to shallow direction, so that water can move via capillary action from the soil to the plant roots. Approximately 5 grains of a balanced slow release fertilizer shall be installed next to each herbaceous large plug within the wetland. Fertilizer may be omitted if 6 inches of fertile topsoil has been applied throughout the wetland. It is the responsibility of the contractor to ensure that the soil in each planting area is [Hoist or wet when plants are installed and for 45 days after installation. It is the responsibility of land owner to ensure that the wet detention basin draw down orifice does not clog, causing water levels to remain high and killing the plants. Planting densities and sizes shall be as fallow: At least 50 herbaceous plants of at least 4 cubic -inch containers shall be installed pet 200 ft2 of shallow water area_ At least 50 herbaceous plants of at least 4 cubic -inch container OR 8 shrubs of at least 1-gallon container OR 1 tree of at least 3 gallon container and 40 grass like herbaceous plants of at least 4 cubic -inch containers shall be installed per 200 square feet of shallow land area. At least 5 species shall be utilized in the shallow water zones, and 5 for shallow land, with no more than 300/6 of a single species. The genetic origin C `provenance") of the plants shall be as dose as feasible to the wetland site. Except for provenance, genetic diversity is encouraged and cultsvars should not be utilized. NOTE% • The landscape contractor shall abide by the "CONSTRUCTION SEQUENCE" and install the plants as specified on the LANDSCAPING PLAN. • After the first year and again at the end of the two-year warranty period, all plants that do not survive must be replaced. • No planting within 10' of inflow or outflow pipes or riprop. CONMUCEON $EQUEN 1. Form the stormwater BMP facility by soil excavation and/or fill. 2. Install fountain(s). 3. Remove any construction debris. 4. Till the top 6 to 8 inches of soil surrounding the stormwater BMP facility. 5. Place topsoil or the specified soil mix surrounding the BMP facility in horizontal layers not to exceed 12 inches per lift. 6. Install plant materials and mulch; minimize or eliminate the use of pesticides and fertilizers. 7. Plant grass by hydro seeding. 8. Immediately water the newly installed plans: materials. WAW AMEA .ow---� WET DETENTION PLANTING TABLE TABLE 1. SHALLOW LAND HERBACEOUS PLANTS COMMON NAME SCIENTIFIC NAME SPACING DELIVERED AS QUANTITY JOE PYE WEED EUPATORIUM FISTULOSUM BARE ROOT 805 SWAMP MILKWEED ASCLEPIAS INCARNATE BARE ROOT 805 SOFTRUSH JUNCUS EFFLISUS BARE ROOT 805 BULLTONGUE SAGIITARIA LANCIFOLIA BARE ROOT 805 TABLE 2. SHALLOW WATER EMERGENT PLANTS COMMON NAME SCIENTIFIC NAME SPACING DELIVERED AS QUANTITY SOFTRIISH JUNCUS EFFUSUS BARE ROOT 1083 COMMON PLAINTAIN PLANTAGO MAJOR BARE ROOT 1083 BULLTONGUE SAG117ARIA LANCIFOLIA BARE ROOT 1083 WATER MILLET ZIZNEOPSIS MILIACEA BARE ROOT 10$3 TABLE 3. SEED MIX COMMON NAME ISCIENTIFIC NAME SPACING IDELIVEREDAS 1QUANTITY CENTIPEDE _ EREMOCHLOA SPP. NIA - SEED VARIES S6_,63 z / `, ,) Al, 1 176.3g �t�V SIS SEDIMENT OOLLEC11ON 169.50 LO1 109 LEVEL OF POOL IN FOREBAY 173.50 FOREBAY .0 / t 0 2.75' 175.00 5.67, MAIN POOL LEVEL OF PERMANENT POOL 173,50 �77 SHALLOW WATER ;\ SECTION A A WET DETENTION BASIN CROSS SECTION SHOWING SHALLOW LAND AND SHALLOW WATER AREAS •- NTS LOT �07 '22'46"E S78 STORMWATER POND 8, OPEN SPACE O 04 s~ 06 1^�,4 0,6, a\ V� W � V• p t- zC:�n a bows � E� g � �U 0 zow Orra" U� ***CAUTION*** j� OOU 1\ N.C. UNDERGROUND UTILITIES y m =TDAYFSRBEFORE l]LGGING CALLEE 1--800-632--'4949 Q � Z � 2 m A ONE CL CALL SYSTEM FOR COMMUNITY AND JOB SAFETY, o o qI H � m ••' CAUTION r #•� o p T ,E UNDERGR&D UTIlkIES SHOWN HA�}'E SEEN LOCATED FROM f FIELD SURVE`�\ 1NIF RMATION AND E*JS-nNG DRAWINGS. THE ENGINEERMPRd, I � MAKES, NO GUARANTEE THAN[ THE IRVDERC*OUND U11LI- iES SHOWN A ANDOINEA THE �NGEN LL SUCH UR F�lfI7 iER OAESA. EiTHERiIN SERVIC R 11pp NOT fiNDERGROUND UTWARARTHE LOLLTi SH0N ARE1N TtE EXAC�CAON \ INDICATED, ALTHOUGH HE DOES CERTIF THAT THEY AI���EEEEEE LOCATED AS ACCURATELY AS POSSINEFLROM QNF�MATON AVAILA� TH moENGINEER HAGS NOT'RHYTIES.\AD�E 1J�IDERGROl1IVD r � ` r \ N CV OG WZ 05 5 _j _j WZ 164.79� \ �• o � zz� S78'17'43"E 578°22'19"E Q W °� LL -r, 0_ C] i Q- Una - - � � 0t0� .7 . . / SHALL, WATER AREA GRAPHIC SCALE 40 0 20 40 so ( IN FEET } 1 inch = 40 ft. AREA W zg a J z O � O Z � � W CL Q H EE PROJECT: 3554 S - 4d 8 a Im ��r _- -. � I.. .,. �- .:ia .Iti�l�.�: f.�_.,.1. .. .�if, _!t���t: �,f �r..Ir.•.i !'L1 i ...-.-�.'r.i..[�i ��f �± �i���..�i ,..f :i._ CONSTRUCTION SEQUENCE 1) INSTALL CONSTRUCTION ENTRANCES PRIOR TO ANY LAND DISTURBANCE ACTIVITY. 2) INSTALL PERIMETER EROSION CONTROL MEASURES PRIOR TO GRADING. 3) INSTALL EROSION CONTROL MEASURES AT EXISTING DRAINAGE WAYS. 4) COMPLETE INSTALLATION OF SITE DRAINAGE NETWORKS AND SITE SWALES WITH ASSOCIATED EROSION CONTROL PROTECTION BEFORE BEGINNING SITE GRADING. 5) GRADE SI TE. 6) GRASS AREAS THAT WILL NOT BE DISTURBED. 7) INSTALL UTILITIES. 8) PLACE BASE -COURSE IN DRIVES. 9) THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETIONS OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVISES OR STRUCTURE SUFFICIENT TO RESTRAIN EROSION. PERMANENT GROUND COVER WILL BE PROVIDED FOR ALL DISTURBED AREAS WITH 15 WORKING DAYS OR NO MORE THAN 90 CALENDAR DAYS. (PER GENERAL STATUTE 113A-57 PARAGRAPH (2) 7 (3)), SEEDING SPECIFICATIONS SEEDBED PREPARATION THOROUGHLY CULTIVATE LAWN AREAS BY DISCING TO A DEPTH OF 6" AND RAKING THE SURFACE SMOOTH TO REQUIRED GRADES. APPLY 4,000 LBS. OF AGRICULTURAL LIME PER ACRE AND 1,000 LBS. OF 10-10-10 OR EQUIVALENT FERTILIZER PER ACRE. TEMPORARY SEEDING WHERE TEMPORARY SEEDING IS REQUIRED PRIOR TO SEEDING OF PERMANENT LAWNS OR FILL SLOPES, PROCEED AS FOLLOWS: AUG. 15TH-MAR. 1ST SOW RYE GRAIN AT THE RATE OF 120 LBS. PER ACRE, MAR. 1ST-AUG. 15TH SOW GRAIN MILLET AT THE RATE OF 40 LBS. PER ACRE. PERMANENT SEEDING �RATE(LBS /ACRE) AUG 115- NOV IST KOREASPEDEZA 50 Q$ KOBE LESPEDEZA 50 Eta TALL FESCUE 60 NOV 15 - MARCH 1ST TALL FESCUE 120 AID. ABRUZZI RYE 25 MARCH 1 - APRIL 15 TALL FESCUE 120 APRIL 15 -- JUNE 30 HULLED COMMON BERMUDA 12 JUNE 30 - AUG 15 TALL FESCUE 60 AM BROWNTOP MILLET 25 MULCHING IMMEDIATELY AFTER SEED AREA SOWN, MULCH THE ENTIRE AREA EVENLY WITH A LAYER OF WHEAT STRAW TO PROTECT AREA FROM EROSION. MULCH TO BE APPLIED AT A RATE OF 75-100 LBS. PER 1000 SQUARE FEET. SECURING MULCH: THE MULCH SHALL BE HELD IN PLACE BY EMULSIFIED ASPHALT BINDER ON SLOPES 2 TO 1 OR STEEPER, OR AS REQUIRED. APPLY ASPHALT AT 0.10 GALLON PER SQUARE YARD. IN HEAVY TRAFFIC AREAS, USE TYPE "RS" OR "CRS" TO MINIMIZE REMOVAL OF TACK COAT. SYNTHETIC BINDERS MAY BE USED AS RECOMMENDED BY THE MANUFACTURER TO ANCHOR THE MULCH, TEMPORARY CHANNEL LININGS IF REQUIRED SHALL BE INSTALLED IN AREAS AS SHOWN ON PLANS, OR AS REQUIRED TO PREVENT EROSION. LININGS AREA TO BE LEFT IN PLACE THROUGHOUT PERMANENT SEEDING PROCEDURE. PRACTICE NTANA4 RA3 AND SPECIFIC 1 TTONS r4A1 STMU to Sw4m m rmw wm we rMM MAX STMOM 817FNM rmw 1dm m UK WM FMVCE CR M ON MW Fkwe aria Inca godon dwaoja aNn,arf tee Rev. sae SILT FENCE DETAIL (NOT TO SCALE) UWAUN t Ki t t:KTA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE. DIMENSIONS OF GRAVEL PAD: THICKNESS: B INCHES MINIMUM WIDTH: 12-FEET MINIMUM OR FULL WIDTH AT ALL POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER LENGTH: WEETMINIMUM LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES, AND ENTRANCES AT CURVES IN PUBLIC ROADS. WASHING - IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA, A WASH RACK MAY ALSO BE USED TO MAKE WASHING MORE CONVENIENT AND EFFECTNE. ENG PAVEMwSTIENT 1r SLOPE FOR VEHICULAR TRAFFIC EDGE MAINTAIN BERM dt VALLEY /TO PRMT SI [ IMENT LAMr CONSTRUCTION SPECIFICATIONS_ . WATER RPM LAVING S TE 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, FILTER FABRIC AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO SEDIMENT TRAP OR OTHER SUITABLE e rt OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 24NCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCUTRE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY CONSTRUCTION ENTRANCE (NOT To SCALE) Filter Cloth 12' of NCDOT #5 or #57 washed stone Class B Riprap 9" min Plan View 1.5' 4' to 6' Cross --Section View ROCK CHECK DAM (NOT TO SCALE) 1.5min. I'liTer Gioin CONSTRUCTION 1. PLACE STRUCTURAL STONE (CLASS B) TO THE LINES AND DIMENSIONS SHOWN ON THE PLAN ON A FILTER FABRIC FOUNDATION. THE CREST WIDTH OF THE DAM SHOULD BE A MINIMUM OF 2 FEET. 2-KEEP THE CENTER STONE SECTION AT LEAST 91NCHES BELOW THE END WHERE THE DAM ABUTS THE CHANNEL BANKS. &PLACE SEDIMENT CONTROL STONE (#5 OR #57) ON THE UPSTREAM SIDE OF THE DAM THAT IS A MINIMUM OF 1 FOOT THICK. 4.PROVIDE AN APRON THAT IS 3 TIMES THE HEIGHT OF THE DAM. THE APRON WIDTH IS AT LEAST 4 FEET LONG. UNDERCUT THE APRON SO THAT THE TOP OF THE APRON IS FLUSH WITH THE SURROUNDING GRADE. S.EXTEND THE STONE AT LEAST 1.5 FEET BEYOND THE DITCH BANK TO KEEP WATER FROM CUTTING AROUND THE ENDS OF THE CHECK DAM. . 6.EXCAVATE SEDIMENT STORAGE AREA TO THE DIMENSIONS SHOWN ON THE PLAN. MAINTENANCE 2' max• at INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH center SIGNIFICANT d INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. hk CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. IF ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL, REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAM AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. 6."S Compacted soil t I 2' 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.) 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST, 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THT BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5, WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOE NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND B INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER (FIGURE 6.62a). S. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. 11. NO MEASURES ARE TO BE REMOVED UNTIL DENR APPROVAL. INSTALLATION SPECIFICATIONS 1. THE BASE OF BOTH END POSTS SHOULD BE AT LEAST ONE FOOT HIGHER THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STANDARD APPLICATIONS. 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. 4, INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED WITHIN THE TOP 8 INCHES OF FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE: FABRIC, WITH EACH PUNCTURE AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. 6, WRAP APPROXIMATELY 8 INCHES OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES. 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY DEVIATIONS BEFORE COMPACTION. 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEASY 60 POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. MAINTENANCE INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CONSTRUCTION SPECIFICATIONS 1. Omda the bssln so thotthe bottom Is level 4vn9 •n Tack wA side to". 2. Install posts orsaw hones across the width of ins sediment brp (Proake 6.82, Sediment Fence). 31 Steel posts should be driven spaced to a depth 4124 Inches, a ma>dmtan of 4 fast apart, sM Inetel d up the skba oi8m basin st wet. TM top of the tat��eshould be8 Indies hVior thin the kwort of the 01". Tope d the baffles should be 2 Inchea kmw 0w he top of the bean. 4, install al leant three revue of baMas between the Intel and the Dupe! Aecharpe "L 8ashs Jose than 28 feet in length may use 2 baT*L 11. 1Ahen asW posts, add a support vAre or rope woos the top of the measure to pm-ni sagphg. 8. V*W poroue matelot, Ake Jute backed by cot matertal, over ■ sawhorse or lies lop win. Hamner reborinto the arAorsa legs for aadmdng. The fabric should have fireto ten parent operdegs le the vwaw. Attach rebric to s tope and eulpport structure wMr alp ties, win or staples. 7. The bottom and sites of the fabric stwuid be anchored Ina trends orphnad va 84nch erosion control Fria" staples. 8. Do not optics the fsbrlc, but we a continuous peloo aaoas the basin. MAINTENANCE Inspect battles at least once a wask and molar fakir rainfall. Make sM required repairs hanedlmtoV, Its sure to mNntairt access to Via banes. Shouldthe fabric of a bank c48apse, leer, dereopoes, at become heffadtve, replica it prwnpW. Remove sedinnnt deposits when it parses half full to provide adequate storage vofume for the nmd min and to reduce prosaure on the banes. Take csre m mvokl demaghgiM banksckr ing deanouL Sediment depth should never axiAw heir the designed satomp depth, Mar the mrit buting dnMmga area has been prop**/ stabbed, remove a1 bd k attends and unstable ttsdlrrlent depoth, bhy thr area to grade, and dab8ae k. BAFFLE DETAIL NOT TO SCALE 4' BOTTOM CONSTRUCTION SPECIFICATIONS 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. - 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL, IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GOUND LEVEL AND APPROPRIATELY STABILIZE IT. DITCH/BERM DETAIL (NOT TO SCALE) USE D.O.T. #57 WASHED STOP er.. �. CONSTRUCTION SPECIFICATIONS 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SPOIL. 2, INSTALL THE CLASS B OR CLASS 1 RIPRAP IN A SEMI -CIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM CREST WIDTH OF THE RWRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN THE SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3. A I FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4, THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18 INCHES BELOW NATURAL GRADE. S. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. MAINTENANCE INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (112 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. ROCK PIPE INLET PROTECTION (NOT TO SCALE) ENING TO BE WE a GRAVEL TO BE NO CLOSER THAN 1/2' MESH WIRE 3' FROM TOP OF BLOCK PLACE AT LEAST ONE BLOCK ON ITS SIDE r IN EACH BOTTOM ROW FOR DRAINAGE. PLACE TWO COURSES OF BLOCK AROUND INLET. f, t; TEMPORARY BLOCK AND GRAVEL DROP INLET PROTECTION _"! f 1 g a S 17 a LU z QINCt4�W iD Paul Paul 0 O0A 01 r. 5 C4 1-4 U " 00 0 V, � n z�� U.� o 0 a� zg4 U� 0 zi�t0 N _ a � C> N ¢ Ins n `ta 3 0 I s S a E o } �¢ � mix C3 ma W o zLu V �((n U_ z 2 a z 0 us CO a: � � LLUU CD r E' Z rn a a t» q � 0 Q ;V ^ �9 y C 8 LU m Cm O r y ti a 8 Wat a _QUj q s � � c rx o it N o z p �^ N O cm STORM PIPE 000 C4 CV BEGIN FIL TER FABRIC �a z END OF PIPE/FES U' RIP RAP APRO o U I-, < � W Q THICKNESS AS CONTINUE FILTER FABRIC PER PLAN o c> � �`' z 65 P F5 � (nix BEYOND RIP RAP APRON v a z z W zz RIP RAP GRAVEL�P7 Qczn 0 o cn M En o a SIZED &PL zd a o e>* AS PER oCL cz-i n W STORM PIPE W2 a.� (1.25*Wl) W, (3*Do) uU w �� RR t:J C) La (Apron Length) C) RIP RAP APRON DETAIL f)l NOT TO SCALE Z oa U 2 Z l.0 0 0 ILL W EE PROJECT: 3554 D-� K; c c m E w 0 z v :I 171 TOP OF DAM M.0o TOP OF MM WM 3 3 MINOR ORIFICE CALCULATIONS TOP OF RISER: 177.00 PPE: 173.50 TOTAL VOL: 510,482 tuft APPROX. VOL a Hof3: 136,615 cu.ft. MIN. DEWATERING TIME: 2 days or 1728M sec. MAX. DEWATERING TIME: 5 days or 432000 sea MAX. 'Q" = 136,615 cu.ft.1172800 sea MAX. 'Q": 0.79 cis MIN. 'Cr = 136.615 cu.n. / 4320DO sec. MIN. "Q': 0.32 cis Cd: 0.60 g: 32.2 fils' ASSUMING AN INSTANTANEOUS VOLUME OF 136,615 cu.fL AND USING A 5" (r = 2.5") MINOR ORIFICE, "a"is AS FOLLOWS: Ho/3 =1175.15 - (173.50 + (2.5112))113 Ho/3: OAV Q = Cd' A" (2' g' Hof3)10.5 Q = (0.6X0.14)(35.4)A0.5 Q: 0.5 cis 136,615 cf = 0.5 cfs (t) ACTUAL DEWATERING TIME: t=273,230 sec = 3.2 days RISER BUOYANCY CALCULATIONS INSIDE DIAMETER,. 72" = 6 R WALL THICKNESS: 6" = 0.5 R TOP ELEVATION: 177.00 INVERT ELEVATION: 173.50 Yconcrete: 150 Iblcu.tt Ywater. 62.4 lblcu.ft. DISPLACEMENT (d) VOLUME AND WEIGHT Vd = (3.14159) (3.5)A2 (h) + (3.14159) (3.5r2 (3.5) Vd = (38.5h + 134.7) cu-fL Wd = 62A(38.5h + 134.7) Wd = (2402h + 8405) lb CONCRETE (2) VOLUME AND WEIGHT_ Ve = (3.14159) (3.5)A2 (3.5) - (3.14159) (3.0)A2 (3.5) + (3.14159) (3.5)A2 (h) Vc = (38.5h + 35.74) cuff Wc=150(36.5h + 35.74) We = (5775h + 5361) lb REQUIRED BUOYANCY PREVENTION FACTOR =1.1 We =1.1Wd (5776h + 5361)=1.1(2402h + 8405) h=1.25fL 1 104 1 2 SECTION A -A WET DETENTION BASIN CROSS SECTION 1trS GROUND LEV & Moo SKIMMER SEDIMENT BASIN CONSTRUCTION SPECIFICATIONS 1. Clear,grub, and strip the area under the embankment of a vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of It properly. Haul all objectionable material to the designated disposal area. Place temporary sediment control measures below basin as needed. 2. Ensure that fill material for the embankment Is free of roots, woody vegetation, organic matter, and other objectionable material. Place the All In lifts not to exceed 9 inches, and machine compact tL Overfill the embankment 6 Inches to allow for settlement. 3. Shape the basin to the specified dimensions. Prevent the skimming device from in Into the mud b excavating a shallow h under the skimmer settling y 9 P or providing a tow support under the skimmer of stone or timber. 4. Place the barrel (typically flinch Schedule 40 PVC pipe) on a fine, smooth foundation of impervious soft. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe. Place the fill material around the pipe spillway in 44nch layers and compact it under and around the pipe to at least the same density as the adjacent embankment Care must be taken not to raise the pipe from the firth oontactwith Its foundation when compacting under the pipe haunches. TEMPORARY SKIMMER SEDIMENT BASIN AND WET DETENTION BASIN CROSS-SECTION & SPILLWAY DETAIL NTS 3 3 J GRnssY SLOPE 141 GRASSY SIAI+E 3 10' BOTTOM V00TH 3W alWREL 417t1.tf 1T3.11Q GR,LSSY SLOPE 3 r fI ` SECTION C-C WET DETENTION BASIN OUTLET SWALE CROSS SECTION Mrs 5. Place a minimum depth of 2 feet of compacted bacldlti overthe pipe spillway before crossing 0 with construction equipment. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 6. Assemble the skimmer followingthe manufactures inshuctioons . or as designed. 7. Lay the assembled skimmer on the bottom of the basin with the Wbia joint at the Inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support Be sure to attach a rope to the skimmer and anchor R to the side of the basin. This will be used to pull the skimmer to the side for maintenance. 8. Earthen spiflwayS-Install the spillway in undisturbed sail to f m greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. The spillway should be Wind with laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to cover the bottom and sides and extend onto the bop of the dam for anchoring in a trench. The edges may be secured with 841nch staples or pins. The fabric must be tong enough to extend down the slope and exit onto the stable ground. The width of the fabric must be one piece, not Joined or spliced; otherwise water can get under the fabric. if the length of the fabrk: Is insufficient for the entire length of the spillway, multiple sections, spanning the complete width, may be used. The uppersecdon(s) should overlap the lower sectlon(s) so that water cannot flow under the fabric. Secure the upparedge and side of the fabric in a trench with staples or pins. (Adapted from 'A Manual for Deslgning.instali'rng and Maintaining Skimmer Sediment Basins." February,1999. J.W. Fafrcioth & Son). 9. Erosion control -Construct the structure so that the disturbed area Is minlmtzed. Divert surface water away from the bare areas. Complete the embankment before the area Is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after constructlon(References: Surface StabillzaUon). 10. Install porous baffles as specified In Practice 6.65, Porous Bafifes. 11. After all the sediment produdng areas have been permanently stabilized, remove all sediment deposited during construction, repair all erosion features, restore the vegetative shelf, remove 4" skimmer and barrel assembly, remove the Interior embankment, ensure the V dia. riser and 24' barrel are clearof any sediment and debris, and excavate the permanent pool to the prescribed depth. Smooth the area to blend with the adjoining areas and stabilize properly. (References: Surface SfabHization, NCDENR StormwalerBMP Manua! ). MAINTENANCE INSPECT SKIMMER SEDIMENT BASINS At LEAST WEEKLY AND AFTER EACH SIGNIFICANT (ONE-K4 LF INCH OR GREATER) RAINFALL EVENT P LY M AND REPAIR IMMEDIATE . REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DNIENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED, EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE VEGETATION GROWING N THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT,SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS, FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. GRouMn LEVEL 1W.W CJ co z�¢z O ii O 2 U t-_ LLU 7 UJ "- ¢ to O_ O } a O �t3. z0( O LL- (D t.t.i [A tit tUtl G7 ? } z LO a a Z O 42 a �? m tsr cn ac co O b. 4 m t Q w+ fi q 3 Lo O t O tO Q cV IF to r t7 O✓0 N LV Q Z J O y. UHQ QF- Z _JGU OrJO _ iA (F5F- �z0 U zin LU LLazO L] z 0Z 5 o0��.1w z 0 crW 3 � zz� ti a Zrp7Y Q iQ¢U Q J W o� g z � W OOOp:E 0 tt� w ILI w � EE PROJECT: 3554 D 2 T w W Z t;a Z w Z to if c a? O C m Z c _. _ - ,� r.l 1 1 r ., .- �� _ .? -T _7 • j j F" r};'rr 4 - r.�T r _ f a �t lr l r } rr r• r >fj� �,} ; r y� � J 3koqa r7l 0 sop or pronnpot spanway cmvus wn • Dewaterini —Allow the maximum reasonable detention period before the basin is completely dewatered (at least 24 hours). • Inflow rate —Reduce the inflow velocity and divert all sediment -free runoff. Fmhankmoxst aeu,menr Cross -Section storage zone view Figure 6.64c Example of a sediment basin with a skimmer outlet and emergency spillway. From Pennsylvania Erosion and Sediment Pollution Control Manual, March, 2000, 6.64.6 SKIMMER SEDIMENT BASIN_ (NOT .oSCALE) Iter. 6106 CONSTRUCTION SPECIFICATIONS 1. Clear,grub, and strip the area under the embankment of all vegetation and root mat. .Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. Place temporary sedimenfcontrol measures below basin as needed. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the tall in lifts not to exceed 9 inches, and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling. into the mud by excavating a shallow pit under the skimmer or providing a low. support under the skimmer of stone or timber. 9. Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from the bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction(References: Surface Stabilization). 10. Install porous baffles as specified in Practice 6.65, Porous Baffles. 11. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly, (References: Surface Stabilization). MAINTENANCE 4. Place the barrel (typically 4-Inch Schedule 40 PVC pipe) on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as INSPECT SKIMMER SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH backfill around the pipe. Place the fill material around the pipe spillway in 4-Inch layers SIGNIFICANT (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR and compact it under and around the pipe to at least the same density as the adjacent IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL embankment. Care must be taken not to raise the pipe from the firm contact with its DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE foundation when compacting under the pipe haunches. FIRST BAFFLE. PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED, EXCAVATE THE SEDIMENT FROM THE r Place a minimum depth of 2 feet of compacted backfll over the pipe spillway before ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR THE FIRST CELL. MAKE SURE crossing it with construction equipment. In no case should the pipe conduit be installed VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE by cutting a trench through the dam after the embankment is complete. SKIMMER. 5. Assemble the skimmer following the manufactures instructions, or as designed. 6. Lay the assembled skimmer on the bottom of the basin with the flexible joint at the inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach a rope to the skimmer and anchor it to the side of the basin. This will be used to pull the skimmer to the side for maintenance. 7. Earthen spillways -Install the spillway in undisturbed soil to the greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. The spillway should be lined with laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8-inch staples or pins. The fabric must be long enough to extend down the slope and exit onto the stable ground. The width of the fabric must be one piece, not joined or spliced; otherwise water can get under the fabric. If the length of the fabric is insufficient for the entire length of the spillway, multiple sections, spanning the complete width, may be used. The upper section(s) should overlap the lower section(s) so that water cannot flow under the fabric. Secure the upper edge and side of the fabric in a trench with staples or pins. (Adapted from "A Manual for Designing, Installing and Maintaining Skimmer Sediment Basins." February, 1999. J.W. Faircloth & Son). NOTL. HORIZONTAL STAPLE SPACING SHOULD BE ALTERED • IF NECESSARY TO ALLOW STAPLES. TO SECURE THE CRITICAL POINTS ALONG THE CHANNEL SURFACE. REFER TO GENERAL STAPLE PATTERN GUIDE FOR CORRECT STAPLE RECOMMENDATIONS FOR CHANNELS. Q ° 6- T,q�'�'E' SWALE BOTTOM WIDTH ze - I 11-1 M I I EI 11_=1 11EE1 I-- =111=111=I- - _ _fI�II►�III=III=III=� - I- �1 I f=111-1I1�1 11�1 I!^I l =�.�=1 11�11 I�1 11=iI1�1 11=1 11�1 11=1 � 1=1 11�1 f ICI 11=1 11=TI�I 11=1 11=1(I�I INSTALLA TION 1. PREPARE SOIL BEFORE INSTALLING LINING, INCLUDING APPLICATION OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. J. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW ON BOTTOM OF CHANNEL. 4. PLACE LINING END OVER END (SHINGLE STYLE) WITH A 6" OVERLAP. USE A DOUBLE ROW OF STAGGERED STAPLES 4" APART TO SECURE STRAW w/ NET. 5. FULL LENGTH EDGE OF LINING AT TOP OF SIDE SLOPES MUST BE ANCHORED IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. EXTEND LINING UP SLOPE 3 FEET. 7. LINING ON SIDE SLOPES MUST BE OVERLAPPED 4" OVER THE CENTER BLANKET AND STAPLED. 8. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT INTERVALS. USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PATTERN. 9. THE TERMINAL END OF THE LINING MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. SWALE LINING DETAIL_ NOT TO scare REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE AND REPLACE THE ORIFICE BEFORE REPOSITIONING THE SKIMMER. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT,SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. B C CRI TI CAL POINTS eta A. OVERLAPS AND SEAMS v j `' �:• `i' B. PROJECTED WA TER LINE C. SIDE SLOPE VERTICES NCDOT #5 or #! washed stone ware cloth enings) r#5ORA ED STON �o L CONSTRUCTION 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE OUTLET. 2.DRIVE 5-FOOT POSTS 2 FEET INTO THE GROUND SURROUNDING THE OUTLET. SPACE POSTS EVENLY AROUND. THE PERIMETER OF THE OUTLET, A MAXIMUM OF 4 FEET APART. &SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4.PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5.ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. &COMPACT THE AREA PROPERLY AND STABILIZE IT WITH GROUND COVER. MAINTENANCE INSPECT OUTLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT 6 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS, TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. HARDWARE CLOTH & GRAVEL OUTLET (NOT TO SCALE) rIa % �4 a LLJ LLI �v 17 1 0 z �IN0ui 77-j�E O .•. 00 U a 00 as C V A0,0 O to W" wag 0 U J 2 O O z N Z ? a U N r O 0 a } ar m a WM m0 o Z L W� z a Q ULLJ a c'ia 2 n o y y 4 h .s o n � C' N / e0 ow LV tit Ha NLLJ o V aZ Z J W Zip ��z0 y � x�U a� Wz JZ Z� o g� w (D zZ� aaYawm 00 J<L.0 ZM= a Q W uu 0 D Q J za r0 p V z uU o_ ( ) a rV W EE PROJECT: 3554 D = 3 C U 0 z H E v vm i--F u w• Z c O D r-c) -q H Z A _ © o m z D 2 (D 0 0 zH-0r--n O D Cn O C Z � c� z f0` Z H -L n 1\p Z M --1 . �M Co> 0 v _p m Z z O HEET 1 OF 1 840 m 14 3 I Y- PLAN WITH GRATE & FRAME REMOVED SEE NOTE A SECTION X-X ^." WEEP HOLES BRICK COPING(INCIDENTAL) TOP ELEVATION STD. 840.16 FRAME — & GRATE � M DOWEL(SEE NOTE) GENERAL NOTES: USE CLASS "B" CONCRETE THROUGHOUT. PROVIDE ALL DROP INLETS OVER 3'-6" IN DEPTH WITH STEPS 12" ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. OPTIONAL CONSTRUCTION - MONOLITHIC POUR 2" KEYWAY OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB AS SHOWN ON STD. NO. 840.00. CONSTRUCT WITH PIPE CROWNS MATCHING. INSTALL 2" WEEPHOLES AS DIRECTED BY THE ENGINEER. INSTALL STONE DRAINS, OF A MINIMUM OF 1 CUBIC FOOT OF NO. 78M STONE IN A POROUS FABRIC BAG OR WRAP, AT EACH WEEP HOLE OR AS DIRECTED BY THE ENGINEER. CHAMFER ALL EXPOSED CORNERS 1". DRAWING NOT TO SCALE. MAX. PIPE THIS SIDE - 18" SECTION Y-Y DIMENSIONS AND QUANTITIES FOR DROP INLET(BASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE- CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE PIPE SPAN WIDTH MIN. HEIGHT D A B H BOTTOM SLAB WALL PER FT. HT. OTAL OTAL CONCREETE FOR VINIMM HEIGHT, H C.M. R.C. 12" 31- 0" 2' - O" 2' - 0" 0.222 0.222 0.592 0.015 0.026 15" 2'-3'r 0.648 0.023 0.036 18" 2r-6" 0.703 0.033 0.049 24" 3' - 0 r` 0.814 0.059 0.085 30" 3' - O" 2' - 0" 31- 6" 0.222 0.222 1 0.925 0.092 0.127 m v� H � c • o O " DEPRESSION Rr'i O --I _-q mZ2 r - rr t - r. Ir 7§/$ 178 =-n>>m cn zN©OO CV 0ME z 17 • ADD EZZZ= N Cla - © C Z � SECTION G-G O �7 C CD m p m �z 2, _ 31/ 11 _~ H Z Cl,r= 0 � co v z • � :0 fl) m v 16 OD v .pan Z SECTION H - H v H p Z > o 0 .4 c m 0 1 �12 n 1 %2 11 �cm H ri7\� 11-41/2 rr 1'-41/21, .1 r - 7%1r 1 1- 75/8rr PLAN OF GRATING CAST IRON 1/8r► �$r► 1rr 1n 31-33/4►` 1/8 f7 1/$„ / „ 3 3/4 rr ( 3 -2 11 21/8 31-13/4rl N N 3`-611 #4 BAR N 6'r . DOWEL r F� I 1 PLAN OF FRAME CAST IRON 2, - 33/ rr 3/ rr 3� rr r -' r, 2%$ rr 21-13/ 11 21-srr E z oU) Q Q Q � R H � X V EL -j OO�Z � z j=0C.D w�~ow 0 n F-- > CL H r 0 0 0 LL. W C3' J F Z Lu H op� ©�� Q W = �+ F- �W_ _ co (, CV r- H "f O {� z V W SHEET 1 OF 1 840 m 14 z ocn ¢Q • " 0 C="3 . LJ- —J co Q 0<00 -- H U)F-V,-0J OOcoQ Z •jam �.".' H � 0 r N [j' W co oaz Q C3 � d- " a ¢ate 0 � n W cn rac o 1 z U. 4 Q 'W� _J cl) H � _ CD LU p w cc a O L- SECTION E-E SECTION F-F HEFT 1 OF 1 SHEET 1 OF 1 840 A 6 840,16 p kn U. " zkn4 U o `¢2 zt ON o a x GbU waa. Q !Ni! V xw O U- g a mt 4 O Iz to rz w F a 's Qom' m o v- ti o N W d, o o"o N N �z N0 O }} Q 0�za U w wzo 44tt 444...�����IIrrr11I z 4 3a w =z2 w U�CJ '� c� azam o .,al�0 Uoa xvnx a a EE PROJECT- 3554 D 4 0 z E 0 -a C s o� w z 1 (1e1 i , s 1 . iJ ., 1�. f, 3 -. L ��•;! i�' _ ,. .. -- .. _ . i� ..i r ��. �.. --� 1 wl.. _ i _. _ .. w. 60, to W To 8417LTtf CF sm R7—A (OR R7—Na) TYPE R7-Ba PARKIIIG SIGN APPROVED FOR USE IESERVED mm MCRAL STATUTE 20-37.0 PARKING LEGEND Am BORDER - cREEN SYMBOL ON BLUE BACKGROUND BACKGROUND — wIa11: IlAtK TYPE R7—W PARKWO SON APPROVED FOR USE UNDER GENERAL STATUTE 20-37.0 MiUOm LEGEND AND SOFM — GREEN PENALTY BACKGROUND — IHN issc R7—eD PENALTY SIGNS ARE REOUM TO ACCGMPANY ALL R7—B OR R7—Ba PARKING SOBS ERECTED AFTER DECEMM 31. IM WHM NECESSARY 'VAN ACCES90W vAN SIGNS SHALL SE GAC:GF6918LE USED. 9UMwKIsT NJFOW9 POSTIE aF 10 2BE4' S�CufEO IIttR O7NpiElE olrnl � T�51fD CRilOE RESERVED PARKING SIGN DETAIL Not to Scale ,70" TYPICAL (24' AM.—W MAX) W.aaf LL ui Dc S E W z LU VARIABLE SLOPE VARIABLE SLOP£`...` NOT TO NOT 1 w -1 2-1XCEED s 15'-4' 15-4 3'4' MIN. I B'-o' 4` 13ACK OF 6`-O" I 3'4" MIN. j 6`-0' sIKlFwux Ir TYPE R1-1 STOP SION 30" r �' w/ A9T11 D49SA—oI "TYPE In' (2 Affm[) ® (Nlgi NITENSTY) SNEERNG l ON TER BAa OMMI) 7-0' R7 BOTMW of SN,W RI —I CROSS—SECTION DETAIL 6'--5" Thick Turned Down Sidewalk NTS VF'I UJ a cV O co r Ca CV CV Cn 3 s U N Y O O d a LO LK7 B9 LLJ a_ 0 U U S u7 L0 U GALvAN2ED V $UPPORT Post m of SECURED WIN COYCREW IH i2' DIAACM Past # a x of 36' DEPTH Affiv TIDY). A7Af9iED aRADIE STOP SIGN DETAIL Not to Scale ATTnm.n e-xv rnr,ifYv fv I -AV f 11n1nti W/ 2 3/4" SCREWS (3 PL EACH BOARD) GATE PLAN STANDARD �vRo STANDARD JOINT CURB CURB DOUBLE ACCESS RAMP SIDEWALK VAR SLOPES NOT:j�� 1 EXCEED 12:1 +ne+o• .a+ro • • +o. 8. p s r a o.+ q p ar FACE TO FACE (NOT TO SCALE) 2.25` 3.00* 2.2! ALL JOINTS? TrA WELDED TO I SOLID FRA POST TOP TREATED WOOD FULCRUM LA FACADE Ir �W�TSTRIKE 0 I co I L 81 /2" ---DROP BAR t- 1EZ MIN DEPTH 1/2" SO 48" INTERIOR UPRIGHT (TYP 2 PLCS) B• CONCRETE FOOTING 3000 PSI GATE ELEVATION NTS E STANDARD CURB 4" GATE POST SIDEWALK ACCESS RAMP a NaT To EXCEED 1/Y' iSSED CURB SO GATE FRAME (TYP 4 SIDES) 2xra TR. WOOD HORIZ. FRAME BOLTED TO STEEL FRAME W/ 1 /4" GALV. CARRIAGE BOLTS AS SHOWN TRUSS ROD (TYP 2 SIDES) TREATED WOOD FACADE NOT SHOWN FOR CLARITY DUMPSTER ENCLOSURE DETAIL NTS '\ TOP OF CURB UTTER LINE BACK OF SIDEWALK --TOP OF CURB OUTTER LINE SIDEWALK ACCESS RAMPS DROP BAR NO SCALE ROUND POST HINGE DOUBLE GATE LATCH MISC. HARDWARE NTS SIDEWALK GRASS ISOMETRIC VIEW BOLLARD DETAIL NTS Are ''RD & SONOTUBE FILLED W/ CONCRETE CHEDULE 80 PIPE GRADE 370 SONOTUBE Z ZO N O 2 � 4 t U � � s O N Q ttZ � p¢ clgap mLL U. ZVN �w °� UlCD Tr a vi 2 a � ti r; CO CC co a a � c r � N C4 Wa z 5�a a OF.Q JWO OVA t �2 I!:jE wo�zU � In F Q W QQrx� O9C�1 J 002 30'��JW � ?ZEE Q YaZmwx a. UnW CL W J J W CLI C) 0 WO �w EE PROJECT. 3554 D:5 P s It c T r r �S ��y.l 3lti f �1 .�.�r _ �• �I_. 1- Im ILLJ 2 IL k� F� la C0V to C9 Z a O N v 2 1 U- LO rn G`� U tt a� TOP OPOAM,s,.ao 2 TOP OF GSM 181An 3 3 MINOR ORIFICE CALCULATIONS RISER BUOYANCY CALCULATIONS TOP OF RISER: 177.00 INSIDE DIAMETER: 72" = 6 ft PPE: 173,50 WALL THICKNESS: 8" = 0.5 ft TOTAL VOL: 510,482 cu.fL TOP ELEVATION: 177.00 APPROX. VOL C 1­1013: 150,000 cu.fL INVERT ELEVATION: 173.50 MIN. DEWATERING TIME: 2 days or 172800 see. . Yooncrete: 150 Iblcuft MAX. DEWATERING TIME: 5 days or 432000 sec. Ywater. 82.4 Iblcu.ft - MAX. "Q" - 1 soaoo cu.ft. ! 17z800 sec. DISPLACEMENT d VOLUME AND WEIGHT S MAX.'Q": 0.868 cfs Vd a (3.14159) (3.S)A2 (h) + (3.14159) (3.5)A2 (3.5) MIN. "0' . 150000 cu.ft.1432000 sec. Vd . (38.5h + 134.7) cu.ft. MIN. "Q": 0.347 ds Wd . 62.4(38.Sh + 134.7) Cd: 0.60 Wd = (2402h + 8405) lb g: 32.2 ftls' CONCRETE (c) VOLUME AND WEIGH_ T_ ASSUMING AN INSTANTANEOUS VOLUME OF 150,000 cu.fL AND USING A 5" (r - 2.5') MINOR ORIFICE, "Q" IS AS FOLLOWS: Vc - (3.14159) (3.5)A2 (3.5) (3.14159) (3.0)A2 (3.5) + (3,14159) (3.5)12 (h) Vc = (38,5h + 35.74) cu.fL Hof3 - [177.00 - (173.50 + (2.5112))j 13 We - 150(38.5h + 35.74) Ho/3: 1.09T We = (5775h + 5381) lb Q = Cd * A " (2 " g " Hol3)+'0.5 REQUIRED BUOYANCY PREVENTION FACTOR =1.1 Q (0.8)(0.136)(70.66)A0.5 We = 1.1 Wd Q: 0,686 cfa (5775h + 5381) 1.1(2402h + 8405) h ■ 1.25 ft ACTUAL DEWATERING TIME`. 2,53 days SECTION A -A WET DETENTION BASIN CROSS SECTION NTa GROUND LEVEL MOM 51 11 GRABBY SLOPE y GRASSY OLM GRASSY SLOPE - 7 ` a W BOTTOM WOTH \♦%\ \ 1, - W SARREL OUTLET 178.00 PRELIMINARY NOT FOR CONSTRUCTION PRELIMINAR FOR REVIEW PURPOSES ONL NOT FOR SALES, CONVEYANCES, OR RECORDATI GROLM LEVEL 190,00 X. �y��/. / fir♦ ♦ ., 'Yz a �,�;x , x�y/ �/ ♦/♦ ' / /%�i /j /'���\/�♦♦//\�� Ott �t�tr'ti��.'\�//// X. SECTION C-C WET DETENTION BASIN OUTLET SWALE CROSS SECTION=l{/, NTa .. Z ) / • O SKIMMER SEDIMENT BASIN CONSTRUCTION SPECIFICATIONS MAINTENANCE S. lace e 1. Clear,grub, and strip the area under the embankment of all vegetation and P a minimum depth of 2 feat of compacted backfiil over the pipe 9. Erosion control -Construct the structure so that the disturbed area is INSPECT SKIMMER SEGTdENT BASINS AT LEAST WEEKLY AND AFTER spillway before crossing It with construction e EAC O root mat, Remove all surface soil containing high amounts ofaganlc p Y 9 equipment In no case should minimized. Divert surface water away from the bale areas. Complete the H SIGNIFICANT (OR -HALF INCH OR GREATER) RAINFALL EVENT matter and stockpile or dispose of it properly. Haul all objatGylable thepipe conduit be Installed by cutting a trench through the dam after the embankment before the area Is cleared. Stabilize the emergency apilMray AND REPAIR iMMEDIAT?LY. REMOVE SEDIMENT AND RESTORE THE material to the designated disposal area. Place temporary stdiment embankment is complete. embankment and all other disturbed areas above the crest of the principal BASIN TO ITS ORIGINALDIMENSIONS WHEN SEDIMENT ACCUMULATES control measures below basin as needed. 6. Assemble the skimmer following the manufactures instructions, or as spillway immediately after construction(Referenoss: Surface Stabilization). TO ONE-HALF THE HEIOIT OF THE FIRST BAFFLE. PULL THE SKIMMER designed. T s I anal for the embankment Is free o is TO ONE SIDE SO THA iE SE 2. Ensure that fit mat f too 9 SEDIMENT . woody UNDERNEATH ET CAN BE vegetation, organic matter, and other objectionable materia€.Place the fill 7. Lay the assembled skimmer on the bottom of the basin with the flexible 10, Install porous baffles as specified In Practice 6.85, Porous Baffles. EXCAVATED, EXCAVAT; THE SEDIMENT FROM THE ENTIRE BASIN, NOT In lifts not to exceed 9 Inches, and machine compact it. Overlll the joint at the Inlet of the barrel pipe. Attach the flexible joint to the barrel pipe JUST AROUND THE SK$MER OR THE FIRST CELL. MAKE SURE embankment 6 Inches to allow for settlement and position the skimmer over the excavated pit or support Be sure to 11. After all the sediment -producing areas have been permanently stabilized, VEGETATION GROWINC.IN THE BOTTOM OF THE BASIN DOES NOT HOLD 3. Shape the basin to the specified dimensions. Prevent the skmming device attach a rope to the skimmer and anchor it to the side of the basin. This remove all sediment deposited during construction, repair all erosion features, DOWN THE SKIMMER. from settling Into the mud by excavating a shallow pit under m Skimmer will be used to pull the skimmer to the side for maintenance, restore the vegetative shelf, remove 4" skimmer and barrel assembly, remove 8 he s s or providing a low support under the skimmer of stone or tirxer. Earthen pillway Install the spillway In undisturbed soil to the greatest the interior embankment, ensure the e' die, riser and 24" betel are dear of any REPAIR THE BAFFLES fl THEY ARE DAMAGED. RE -ANCHOR THE 4. Place the barrel (typically 4-Inch Schedule 40 PVC pipe) on+flrm, smooth extent possible, The achievement of planned elevations, grade, design sediment and debris, and excavate the permanent pool to the prescribed depth. BAFFLES IF WATER IS F OWING UNDERNEATH OR AROUND THEM, foundation of impervious soft. Do not use pervious material Inch as sand, width, and entrance and exit channel slopes are critical to the successful Smooth the area to blend with the adjoining areas and aWbilize properly. gravel, or crushed stone as backfill around the pipe. Place th fill material operation of the spillway. The spillway should be lined with laminated (References: Surface Stabilization; NCOENR StormwaterBMP Manua! ). IF THE SKIMMER ARM fl BARREL PIPE [5 CLOGGED, THE ORIFICE CAN around the pipe spillway In 4-Inch layers and compact it und,r and around plastic or Impermeable geotextile fabric. The fabric must be wide and long BE REMOVED AND THE)BSTRUCTION CLEARED WITH A PLUMBER'S the pipe to at least the same density as the adjacent embanWent. Care enough to cover the bottom and sides and extend onto the top of the dam SNAKE OR BY FLUSHII4t WITH WATER. BE SURE AND REPLACE THE must be taken not to raise the pipe from the firm contact wfthb for anchoring in a trench. The edges may be secured with a -Inch staples ORIFICE BEFORE REPQITIONING THE SKIMMER. foundation when compacting under the pipe haunches. or pins. The fabric must be long enough to extend down the slope and exit onto the stable ground. The width of the fabric must be une piece, not CHECK THE FABRIC Uhl) SPILLWAY FOR DAMAGE AND MAKE ANY joined or spliced; otherwise water can get under the fabric. It the length of REQUIRED REPAIRS WMH FABRIC THAT SPANS THE FULL WIDTH OF THE the fabric Is insufficient for the entire length of the spillway, multiple SPILLWAY. CHECK THF. MSANKMENT,SPILLWAYS, AND OUTLET FOR sections, spanning the complete width, may be used. The.upper serction(s) EROSION DAMAGE, AN INSPECT THE EMBANKMENT FOR PIPING AND should overlap the lower section(s) so that water cannot flow under the SETTLEMENT. MAKE AL NECESSARY REPAIRS IMMEDIATELY. REMOVE fabric. Secure the upper edge and side of the fabric In a trench with ALL TRASH AND OTHEFpEBRIS FROM THE SKIMMER AND POOL AREAS. staples or pins, (Adapted from "A Manual for Designing,lnatalling and Maintaining Skimmer Sediment Basins.' February, 1990. J.W. Fairdoth & FREEZING WEATHER CN RESULT IN ICE FORMING IN THE BASIN. SOME Son), SPECIAL PRECAUTION:SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PUGGING WITH ICE. TEMPORARY SKIMMER SEDIMENT BASIN AND WET DETENTION BASIN CROSS-SECTION & SPILLWAY DETAIL W LU Z c� LU z ta.r �0: Z N O 2 CO U 0 a U cV Q L0 a O and a' qQ Z�U q}pp �N Lt_ Y LL Z Wt LVIf0 y U } p a t� Q O^ t O � C ti C ^ N r E O � � � a O r N Fi f: r r� O OD N N - �Z _z p W U L a Z ''' W LLJ Z Q L 2az i W zz l J 3� a -- CL (.)I-. W zr�ii a o a�� 2 _..� o� ltl 0 W w 1 _J u c U CLI m z oL �- w o 00 O n, � � w 0 c 0 w � r 06 c m EE PROJECT: 3554 a D 2 H z I +tt fi F Y � h '1 n L x t 'i T ! t..t h. ..' 7 •' ri �,t t r� tl, i�t Ji� t -i t , Lkkyl- I - a LLI a 6 0 v v N LO c 0 0 ar c c 0 c.� L 0 0 E LO LO w U C.9 z v cn C) U I U) LO GENERAL SITE NOTES: TRA MOOR VILLA 1. STOP SIGNS SHALL MEET THE CRITERIA OF THE NC DEPARTMENT OF TRANSPORTATION. 51TE 2. PERIMETERS OF EXISTING WOODED AREAS ARE APPROXIMATE. 3. STORM DRAINAGE, STREET CONSTRUCTION AND PAVING SHALL BE IN ACCORDANCE WITH NCDOT. HCC INV STM NTS KING ROAp NCSR I I 12 ROCICFISF► R M csR. r I rz 4. ACCESS TO SITES SHALL BE BY PUBLIC RIGHT-OF-WAYS AND EASEMENTS. OTHER ACCESS LOCATIONS REQUIRED SHALL BE SECURED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. 0� 5. COMPLIANCE WITH ALL OSHA REGULATIONS, AND JOB SITE SAFETY IS THE R TAIL COMM RCIA AN "I t ( A ^ NOT EXCLUSIVE AND SOLE RESPONSIBILITY OF THE CONTRACTOR. V OT TO SCAt�VI!-�R S1 NTIA V LE END 511E DATA; OWN ERIDEVE LOPER. OWNER: HCC INVESTMENTS, LLC WATER VALVE HCC INVESTMENTS LLC o WATER METER CONTACT PERSON: JACKIE HA1RR FIRE HYDRANT ' SANITARY SEWER MANHOLE ADDRESS: 3077 N. MAIN ST. 3077 N. MAIN STREET O SANITARY SEWER CLEAN OUT (C.O.) HOPE MILLS, NC 28348 SUITE 201 R/IV or C.L. RIGHT OF WAY CENTERLINE TELEPHONE: 910-426-0867 HOPE MILLS, NC 28348 -----� UTILITY POLE & GUY UTILITY POLE SITE LOCATION: LATITUDE: 34.9831ON TELEPHONE: (910) 426-0567 U PROPERTY CORNER LONGITUDE: 79.0121 *W. PROPERTY LINE (SURVEYED) AREA FOR MIXED SITE: 47.00 AC. — — --- --o PROPERTY LINE (UNSURVEYED) �-�-- — -- - - a PROPERTY LINE (PROPOSED) AREA FOR HARRIS TEETER SITE: 13.02 AC. SS SANITARY SEWER LINE w WATER MAIN AREA FOR CVS SITE: 2.31 AC. UGT UNDERGROUND TELEPHONh1CABLE TOTAL DEVELOPMENT AREA: 62.33 GAS GAS MAIN E OVERHEAD ELECTRIC UTILITY LINES TOTAL DISTURBED AREA: 48.00 AC. = M M M M = STORM DRAINAGE PIPE -. - CENTERLINE ROAD (ALIGNMENT) PIN NO.: 9494-68-2619 RIGHT OF WAY DEED REFERENCE: D.B. 7458, PG. 610 — — — —. — — EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR FLOOD ZONE: X PROPOSED MINOR CONTOUR FIRM PANEL: 3710949400J PROPOSED MAJOR CONTOUR DATED: 01-05-2007 DIVERSION DITCH WI STORAGE DUPLEX UNITS: 22 BUILDINGS, 44 UNITS ---- ---- 0——0— - DISTURBED AREA BOUNDARY LINE CONDOMINIUM UNITS: 300 —Xx x— SILT FENCE COMMERCIAL SF: 159829 SF CHECK DAM PARKING NEEDED FOR COMM: 800 ® CATCH BASIN (CURB INLET). PARKING NEEDED FOR RES: 558 CATCH BASIN (YARD INLET) TOTAL REQUIRED PARKING: 1358 TOTAL PROVIDED PARKING: 2278 SURVEY NOTATION ZONE CLASS: MXD SETBACKS: DUE TO MXD (MIXED) ZONING, SETBACKS VARY. CP COMPUTED POINT SETBACKS TO BE APPROVED WITH BUILDING EPK EXISTING PK NAIL DESIGN BY PLANNING. EIP EXISTING IRON PIPE ECIP EXISTING CRIMPED IRON PIPE DIVERSION DITCHES MUST BE STABILIZED WITH EIA EXISTING IRON AXLE VEGETATION TO PREVENT EROSION. EIS EXISTING IRON STAKE ECM EXISTING CONCRETE MONUMENT CATCH BASINS WILL BE CONSTRUCTED ECS EXISTING COTTON SPINDLE WITH DROP INLET GRATES UNTIL ERRS EXISTING RAIL ROAD SPIKE PKS PK NAIL SET CONSTRUTION OF CURB AND GUTTER. ISS IRON STAKE SET RNV RIGHT-OF-WAY WC WITNESS CORNER N.C.G.S. NORTH CAROLINA GEODETIC SURVEY PP POWER POWER SSMH SANITARY SEWER MANHOLE NCNG NORTH CAROLINA NATURAL GAS TBM TEMPORARY BENCH MARK NIF NO IRON FOUND EXISTING PROPERTY LINE EXISTING PROPERTY LINE TO BE REMOVED PROPOSED PROPERTY LINE OPMENT SHEET INDEX -S-1 SITE PLAN S-2 UTILITY PLAN S-3a EROSION CONTROL PLAN 100 SCALE S-3b EROSION CONTROL PLAN 60 SCALE S-3c . EROSION CONTROL PLAN 60 SCALE S-3d EROSION CONTROL PLAN - SOILS S-3e EROSION CONTROL PLAN - CLEARING S-4a STORM AND GRADING PLAN 100 SCALE S-4b STORM AND GRADING PLAN 60 SCALE S-4c STORM AND GRADING PLAN 60 SCALE S-4d STORM AND GRADING PLAN -PLANTING S-5 PROFILE - STORM S-6 PROFILE - STORM S-7 PROFILE M STORM D-1 DETAILS -EROSION D-2 DETAILS - EROSION D-3 DETAILS - EROSION D-4 DETAILS - DRAINAGE D-5 DETAILS - SITE ***CAUT!ON*** UNDERGROUND UTILITIES 3 DAYS BEFORE DIGGING CALL TOLL FREE 1-800-632-4949 A ONE CALL SYSTEM FOR COMMUNITY AND JOB SAFETY. ««« CAUTION ««« THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWANGS. THE ENGINEER MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTLITIES SHOWN ARE IN THE EXACT LOCATION , INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE ENGINEER HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. NOTE TO CONTRACTOR CONTRACTOR TO CONTACT NORTH CAROLINA ONE CALL CENTER AT LEAST 48 HOURS PRIOR TO SITE EXCAVATION, GRADING OR DIGGING. DESIGNED BY: FLANS PREPARED BY: n h oc Engineers, P.A. CONSULTING ENGINEERS & SURVEYORS 1403 NC Highway 50 South - Benson, NC 27504 Phone: (919) 894-7765 Fax: (919) 894-8190 E-mail: enochengineers@carthlink.net PRELIMINARY DATE. May 12,2010 NOT FOR CONSTRUCTION PROJECT NO.: 3554 PRELIMINARY. REVISED. FOR REVIEW PURPOSES ONLY NOT FOR SALES, CONVEYANCES, OR RECORDATION JUN 16 2011 6 2010 1" DESIGN STORM CALCULA71ONS SUPPORTING DATA AND VARIABLES: IMPERVIOUS: 50.9% DRAINAGE AREA (DA): 65 acres Rv: RUNOFF COEFFICIENT Vt TREATMENT VOLUME (FIRST INCH) Vp. PROVIDED VOLUME FOR TREATMENT MEASURED FROM PPE TO TOP OF MISER KING r2oAp rsri TREATMENT VOLUME CALCULATIONS (3.3.1.): NCR r 11, ROa,p HCSR r r r z Rv - 0.05 + 0.9(0.509) Rv w 0.508 NGg1� �Op3 Vt - (3630)(1.0)(0.508)(65) � Vt - 119886 cu,R.-120000 cu.R. G�QirN Vp - 264820 cu.R / ^ j j T� n /� e y ICI`r 1 r 1 � v E, `P NOT TO 5CALE DRAWDOWN TIME IN HOURS (hrs) FOR EACH STORM: 1 yr - 92.35 hrs 2 yr-108.52 hrs SITE DATA: 10 yr - 110.52 hra 25 yr - 118.85 hro OWNER: HCC INVESTMENTS, LLC 100 yr - 113.27 bra 500 yr-115.85 hrs CONTACT PERSON: JACKIE HAIRR ADDRESS: 3077 N. MAIN ST. HOPE MILLS, NC 28348 TELEPHONE: 910-426-0887 SITE LOCATION: LATITUDE: 34,9831'N LONGITUDE: 79.0121'W AREA FOR MIXED SITE: 47.00 AC. AREA FOR HARRIS TEETER SITE: 13.02 AC. AREA FOR CVS SITE: 2,31 AC. TOTAL DEVELOPMENT AREA 62.33 TOTAL DISTURBED AREA: 48.00 AC. PIN NO,: 9494-68-2619 DEED REFERENCE: D.B. 7458, PG. 610 FLOOD ZONE: X FIRM PANEL: 3710949400J DATED: 01-05-2DO7 DUPLEX UNITS: 22 BUILDINGS, 44 UNITS CONDOMINIUM UNITS: 300 COMMERCIAL SF: 159829 SF PARKING NEEDED FOR COMM: 800 AC= DM E►4AF1lLL -4 / El LOT,"' OMCE / FFR: 190.00 1 , LOT TRAEMOOR I ONE-sTORY - II 116 l �, / @ LAKEWOOD 12325 25S.F. �. ► �/ SECTION ONCE FFE: 190.00 / I M15 108, PG. 89 � � titi°• - j �tiy. �� � i' �� ' d+ /' I LOT 14 \ itJ,r 1 189�\, _-7 I /� ONE-STORY , / l \'\ _ - LOT I 0NR-STORY / \ N OFFICE r r 1/ tiry5 \K 1" r 4 ? , �'b 'i' 4 0 12a26 S.F. \ ,' , LOT , [ iMI ILL OFFICIS / ' \ ONE-STORY \ / �' PARKING NEEDED FOR RES: 558 i FFE: 199.OPD - - \\ OFFICE ,11 \ , r l \ �; 12,325 s. / 12s26 B.F. �. TOTAL REQUIRED PARKING: 1358 ` _ r r , 1/ _ EFEa lMIS- TOTAL PROVIDED PARKING: 2278 1 12 r AP a IF ZONE CLAS . S: MXD / 0' ;' 1 I '* SETBACKS: DUE TO MXD (MIXED) ZONING, SETBACKS VARY.fp - FFE: iaT.oO / s / g / ) T \ / \ LOB` SETBACKS TO BE APPROVED WITH BUILDING / DESIGN BY PLANNING. y' / / OFFICE I2a25 S.F. cam: / //' /. / I 1I/ / ' 1 ti`\. /:• / , / ) J � 11 "Et 1a7.60 r ba. �. DIVERSION DITCHES MUST BE STABILIZED WITH / , '/ / ` $�; v SJLL VEGETATION TO PREVENT EROSION. AOCM PROPO�DMVIMYr tik/' / ��� \ /C \ / '� l APART \ 1 'J LOl 200 / o i . M: 184.50 "�°° �tr r / I I c CATCH BASINS WILL BE CONSTRUCTED / r \ \ ONE-STORY / WITH DROP MLET GRATES UNTIL // _ / \��' \\ . \} 'h'\ I 1 OFF1cE / /� / A,4A TURN CONSTRUTION OF CURB AND GUTTER. ,yy� lFFa2'12 is FFE: I57,06-/- NO WETLANDS WERE DELINEATED ON THIS SITE ALL ROOF DRAINS WILL DIRECT RUNOFF TO THE POND � ' % APAKIVNEN7s \ ! 7� , ,, - 20.400 3.F: .� - .,�°. 13.200 S.F. AVAY y' _ �iC l I� \ p / i •• J� �� o t / /- / . �� / '\ FFE: lIS4.00 ' .'' / /,yam FPE: 189.75 �` / 9 / O ! ti / - li 2a,400 $.F. // ,/ /� B ;E • \\-,1$7-_ 1- --- \ \ FFE: 19a.a0 / /" /,9'�.\ y µf u ` ♦ •\\ \ TEMR IXED 5 F \. / ,' "lea .,e/ '� � \ ( , ✓ _ \ APAIrrr<ENTs \ ,{ ooKEs 25.400 S.F. APARTMENTS �' /" / SAPARTMENTS 26.400 B.F. / ! 28.4" S.F. `. \ \ e� 1 154.9 ,' FFE:I 15$.7 �Oa�iLrD�f irr�ir, ' ' \\ ���yr �\�:,�\-186- -- __ � . ;u.o:r�\ rh,, \{ \ �rlAKRI� ITE \ \ '.� -- - �' i ��7��� •Fal la$.5u /, � :s`�" •, / � ' r � (y,��` l ♦ ` ` .I�Iv`wae•ao r ^ � A r''[, __ -- f', / /� ` �, '�X, \ \ \\�• �', ` � `�v\���� \ f allies a�, 4j too .�.� _ •43'26° f I \ j \ \ \.%' \ • �� a'nloe 'Sell owl -Ele!w'Se rar,eaca ApAR'I'i?! a' OU'rl ti 25,40.0 S.F. 1 5 1 r �, ,{war' R� \ C'•;- �- $ �-/ I \��.� \\ r/ � ` �,�_.'-\\ ` '��\ �{ `-' � �� � h "�I a;r7°�oo � �FPi: lti$.76_ l � \ - - � / '\ I \ a / '\(t�\\ J r� f�W /� `\ �- t: \ �• '�/ •" \ I IN Top 184w, / / \ / _ J ii - APARTMENT$ 0- f �► ~ \\> �'<<•'\ \ \ O 'y ' � ce w 13;200 S.F. #( APART1�TS I I ! \ r / _ w / _ !/ t @ u \.� \ } - - �� / _ �� j'�\ /' G 2 I w ra FIE: 158.00 25.400 B.F.: •. �` 1 ! '' i i.� U7 Ta "� �_-csi V�` [ j oba 1� n r� i art1 / - 1 C.s �5r'. 41 ,re.m ror,euo j� 1 1� r ` • FFEi 192. a .t l / r �: r$3 ' LP� 25 400 B.F. f �-3 eace Fit 182.00 (`�( O 1. Ln C7 r r r '- � "' � �- T -- * � j� �. -- �, � 1 `f S_Op • � � ,_ - _ _ II , 1 t) r � APARI[ifffi'iT8 I c � tV r - r / 1 - � . r * � f•' Iltni - -- s.Me a,,f'. I � ! J I � Els - _ I - ! /" I8,200 $.F. j lr r � jrr r - 'ram'- ,,r--1q� �o�r. i9.a �_ - ' 1.iMxl. I.�6, ■ - -_ _, f f I�i°Kiriraw_ a -_r •^;*-^-,�1Q�� - -- ���,`.� --r--'--- ! 1 / - _�. - -� I j _.._ l OUT>�A a=` � � I ,^yq�.� i '-..'"._ IS 1. � . - r 1 _. orw,el. ,,o �-.. -. _ ..: _�� _.. � _ � ! 1� l_,_1 - - _ _ -- ... ?f~---?•251-+ _ - `'' � - _- ,.�----- 1 I - jJ1 � /� '•• .� 3 8k �,r ,� �� a'' �c _-+ _' _ - , �.� ' _�15� .k - - �Ij - � j I--.._ - - • ; d �-' l �r _ _ \ �{�y !+ f I � � ` ~ �_ _ :'�-� T I r STC DO1rN • r � �. uia- ,,�• - + r Jj _ -c.. I \4 �S--F.-aT \ �� i ^ � �' "�-__- nr i!IifJdP7�,�• y� !' i _- \ r 1 i t i � ���` � �-/ -- --- �- -• 1 V. rar,sico 1"�"l^-1 I ra, ,! lfc. ( Mgr. I 81T 1J"E : o ,rrvw,ro� FFS: 8.1:0 7 I , moo Ilrvgrr,re�e rar,r r 1 �}. i I! 7�� ry]� R j AURANT / r ,e 1 _ g-__ .. t` h - -- , �� � � � 1 �., r r - - p 7 pROPab�- � or6vEwArr. `'-___ ...� -. -_, ;.:- El -- ae�,.� �„'--» _ "', - - � �z AOCGSS _ s . " �,,,, • la . . . . .�..'ti ..-... � _ -.. �.��.-99:;5--- +�, � 1' ,etao � I ;j _ - il`y gql.. I , '+ Jrivw,rr.es}'_�F, i f13 ^ h.'r l + 31T DO } r; jjJ,! i r X 4.55a S.F. 1 -- --• -- ___. 4r � . _ _ -- � _ � ,. ,� _ �. a�-� � �� ;;; sTAURANT ;-���� r l - ie2.o0 I / . J- _'. •. "`� ..... ._ 1 ' f` _ - :h n[{�._ • ,, i-.. „e I J, I INY a111 IT! 7 � � f r.;�+ I E / =0'4 2 �_ - i-ai - L g"t - S / -�i /C fyr _ j :., E _Z'ili:' 102.00 '����; 1 1 O t r .,' U"g af-'"r + �r 1 It Lll tt7 I ��// f Y \ , PRFLIMINA>� � o NOT FOR CONSTRUCTION I PNOPOSEO FIK.I / A0Cf5S D810440Y PRELIMINARY _ z FOR REVIEW PURPOSES ONLY NOT FOR SALES, CONVEYANCES, OR RECORDATION U GRAPHIC SCALE Ln ***CAUTION*** N.C. UNDERGROUND UTILITIES A3 DAYS BEFORE DIGGING CALL TOLL FREE 1-800-632--4949 A ONE CALL SYSTEM FOR COMMUNITY AND JOB SAFETY. ••• CAUTION •_' THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE ENGINEER MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTUTIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE ENGINEER HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. OUTLET PROTECTION #2 DA_= 1Q10 31.66 ACRES = 121.00 CFS V10 = 8.15 FPS Q FULL -. 142.65 CFS V FULL = 7.27 FPS Slope - 0.-10% Do (pipe d1a)= - - _----_-_ La = D50 (stone dim)= W1= W2-�a 5.00 FT ZONE 3, CLASS 1 RIP 8 X D0 = 6" - DEPTH 18" wl LINING 3xDO = _ 15.00 FT 1.25xW1 = 18.75 FT - - - RAP 40.00 FT _ � to � 11 N ,r P L 19' 0i ( IN FEET ) 1 inch = 100 ft TRAEMOOR @ LAKEWOOD SECTION ONE -A MB 108, PG. 173 I LEGEND w WATER VALVE 0 WATER METER �[ FIRE HYDRANT SANITARY SEWER MANHOLE o SANITARY SEWER CLEAN OUT (C.O.) R/W RIGHT OF WAY `2 or C.L. CENTERLINE 07 '- UTILITY POLE & GUY 69 UTILITY POLE G PROPERTY CORNER vA -o PROPERTY LINE (SURVEYED) a--�- - - -- --o PROPERTY LINE (UNSURVEYED) --- - -- -- --a PROPERTY LINE (PROPOSED) SS SANITARY SEWER LINE w WATER MAIN UGT UNDERGROUND TELEPHONE/CABLE GAS GAS MAIN E OVERHEAD ELECTRIC UTILITY LINES 1• M w 1• w 1• STORM DRAINAGE PIPE - CENTERLINE ROAD (ALIGNMENT) RIGHT OF WAY - -- - EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR PROPOSED MINOR CONTOUR PROPOSED MAJOR CONTOUR DIVERSION DITCH WI STORAGE - _ a - -- a - DISTURBED AREA BOUNDARY LINE ----x R k- SILT FENCE CHECK DAM ® CATCH BASIN (CURB INLET) ® CATCH BASIN (YARD INLET) OUTLET PROTECTION #1 DA = ^165.00 ACRES- -- - Q10 141.23 CFS V10 - Q FULL =� {9.52 FPS 41.02 CFS V FULL_- >8.36 FPS Slope =- D0 (pipe die) = -ZONE 0.00% 2.50 FT 2, CLASS B RIP RAP La = DSO (atone dta)= `6 X D,, 115.00 FT 6" DEPTH 1 B" wl LINING W1= I3xDO = 7.60 FT W2= I1.25xW1 = 9.38 FT OJMET WALE Channel Calculator G von Input Dal a: Shape Trapazel dal Sol vs f or Depth of FI aw FI ow at a 71. 0400 cf a Shape 0.0010 ftlft Mini ny' s n 0.0130 Hsi qht 48. D000 I n Cr I i II a r IX Z a F U LLI Fa - d Bol I am Vf dt h 84. DODO I n Lef 1 31 ape 0.3333 f t r f t (Vi l l R ght Slope 0.3333 f tlft (W4 Conput ad Rssul t s: toe Depth 19.0356 i n Q In Q � Vat ocl t y 3,0405 T pe Ful I F1 0389 W n. l] w Q' V7 W ow at s 486. of s Arse t 2 0060 z U Z 87. Per I not or 318. 8539 C n 1 U. Z LOU W Fl ow k ea 19.6539 f t 2 � � FI ow ParI net er 204.4027 In Fydr sul 1 e Radl us 13.105 in Top Vf dt h 198. 2251 In C Z Percent 30.8579 % a i t t cal I of or rral I on: Cr I t i cal Depth 14,7976 In Cr I t 1 eel slope 0.0026 f 11 f t I t ea{ vet 0c t y 5. 4296 f ps OrItIeel area 13.1943 ft2 Cri t I eel per I met Or 177. 9067 1 n / LOT / 1 ar t I eel hydraulic radl us 10.6862 i n A / I O9 / I 1 Cr i t I eel top W dt h 172. 7946 In ^ a / , 1 r Specl f I c energy 1, also f t LOT 1 1 1 M ni num *nor lly 1.8407 f t J Froude nunber 0.6371 1 1 FI ow Con. 1 t I on Subcr I t I cal V) / 108 1 J ! c LDT £ ' 1 107 1 LOT 1 1 x s�g•,r��. 1 ! I OG ;1 \\ LOT \V �\ \\ \� �� `� ti o 0 NN El II 1 ro CL ��_ 'uwa�saerrca,av ,mm ��.ee r,, k'Z 1 I11�1ti11`11 MaY ,ram 77 COI f1��1! �I1 t7 jwu la w ( FFE: a2.00 FFE O tY = p! I_ 1 td1 D / i j j I I �! 1 f I "� $ ii 1a1. ifl J 5 �� a rt"P1.00 D /' ,� 1i�►�r1111 �W ,00 1 1 / f I 1 1 I is i _ 1• / / { n •1 V \ QD , o � rFE 1aa. D 'at. _ � _ ■�A�y� 3.004 4: NN Ss EE PROJE..T: 3554 S w 4a NOT FOR CONSTRUCTION. w WATER VALVE SS SANITARY SEWER LINE O �• a 0 WATER METER W WATER MAIN S AL Lu P I I �� FIRE HYDRANT -- - UGT UNDERGROUND TELEPHONEIC LLu SANITARY SEWER MANHOLE — GAS GAS MAIN A. FOR REVIEW PURPOSES ONLY 0 SANITARY SEWER CLEAN OUT (C.O.) .E OVERHEAD ELECTRIC UTILITY LI �QI1a NOT FOR SALES, CONVEYANCES, OR RECORDATION R/W RIGHT OF WAY IIIIIIII IIIIIIII M M STORM DRAINAGE PIPE �`M' Z / •+• cAUTTON «•« or C. L. CENTERLINE — CENTERLINE ROAD (ALIGNMEN THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM UTILITY POLE & GUY RIGHT OF WAY �' / 1� �N� FIELD SURVEY yGFORMATION AND EXISTING DRAWINGS. THE ENGINEER @ �,` ��,� P UTILITY POLE -- — -- ---- EXISTING MINOR CONTOUR yR� _�� % // MAKES NOG ARANTEE THAT THE UNDERGROUND UTILITIES SHOWN rtnl 1 U VICINITY MAP NOT TO SCALE ' SITE.DATA: fr' \ f r j / f J OWNER: HCC INVESTMENTS, LLC / ` 0� CONTACT PERSON: JACKIE HAIRR ADDRESS: 3077 N. MAIN ST.� HOPE MILLS, NC 28348 pypp S.F • / 13, pp TELEPHONE: 910-426-0867 SITE LOCATION: f LATITUDE: 34.9831'N LONGITUDE: 79.0121 °W — AREA FOR MIXED SITE: 47.00 AC, AREA FOR HARRIS TEETER SITE: 13.02 AC. / . AP AgTME�TS ' yNV iT4I�3 AREA FOR CVS SITE: 2.31 AC. - TOTAL DEVELOPMENT AREA: 62.33 / d 3.D0 T 4 T A. TOTAL DISTURBED AREA: 48.00 AC. T PIN NO.:. 9494-68-2619 DEED REFERENCE: D.B. 7458, PG. 610 FLOOD ZO . X FIRM Fl1k1\iL371 9400J DATED: 01-05- . 7 Y D FLEX UNIT i ' 2 BUILDIN 44 UNITS / / •� APAg 2p0 S F, ONDOMIN UNITS: 3�./ ! i ! �! FFE: 18`�•75 T, • OMMER AL SF: 1598 SF .50 P KI NEEDED FOK COMM: 800f AR G NEEDED FOR RES: 558 % / TO, L REQUIRE PARKING:1368,AgT1�iE F• TAL PROVIgED PARKING-:227826+4008r %nn ZONE C S MXD , FFE• / SETBACKS: DUE TO MXD (MIXED) ZONI ; SETBACKS V SETBIIiCKS TO B,5 A0PFt9vv ITH BUILD D IGN BY PLANNINGIT fp IVERSION D�TCHES BE STABiL"iZED WITH / 51TE- --- 1st KING ROAD NC5R I 112 ROWISH ROAb N�,eR III2 1 1 4 COMPRISE ALL/SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR 5r-G 1 7 3 O PROPERTY. CORNER EXISTING MAJOR CONTOUR / ABANDONED. E ENGINEER FURTHER DOES NOT WARRANT THAT THE G . UNDERG OUND UTLITIES SHOWN ARE IN THE EXACT LOCATION O PROPERTY LINE (SURVEYED) PROPOSED MINOR CONTOUR INDICATE, / INDICAALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED — — — -p U AS ACCURATELY AS POSSIBLE INFO RMATION AVAILABLE. THE PROPERTY LINE (UNS �-. RVEYED) PROPOSED MAJOR CONTOUR / E G EER HAS NOT PHYSICALLY LOCATED E UNDERGROUND �%�/ UTILITIES. PROPERTY LINE (PROPOSED) DIVERSION DITCH W/ STORAGE — 0 — -- — DISTURBED AREA BOUNDARY LINE GRAPHIC SCALE —x x x--- SILT FENCE � �'` \ , � � , � so o ao ao 120 240 CHECK DAM 41 CATCH BASIN (CURB INLET) S - i \ ® CATCH BASIN (YARD INLET) �JIN FEET o .� 1 irn so ,' 09 I J 2 f f � 08 S6S f 1 o �3•,� , , 107 ` 06 \ 105 S f I \ \ fg s.9' z ., 1 I 1 \ N7 R22 W\ „ti. . ' . ■ — T x ' Y ZZ 5� iT8.6I3 / C6 / iB2• t VEGETATION TOP &ANT EROSI EATCV4 / . / S o ! BASINS L liIIEI ($ED j irrvi'o" 5 o j / / % j / WITH DROP IN - GO 5p J GONSTRUTIOi F CIB►ND NO WETLANDS WER . ELINEA IS SI ALL ROOF DRAINS WELL . T li/ OFF TO E NDJ / / 182• / / / / �� FFE•I ApAg,TMENT f �\ / ' I �—/ / . 0 26,4p0 50 I I 1 I I Ap o s•F • f rf / ��� ' 1 �, � P D 10 26+ " 1 D .0 81.0 1 / FE : 1g�k f/ 1\\-' / h _ _ 1 D I,EX FFE' 181 j FF 1 1 • FFE' 1 1 1 I i f \ / ` , � � - _ . / / : \i r ,. FFE• . I ! f14 - --- -- — _- --- - _ - --- I �op}�tiei57.78 /i` - ' % / / Q`q F . ¢O� � iMTl O 175.80 `eAP • 18 •S \ o� l F�, 18 • i�.' 000 �400SF14 NN oo FEF z Ix 1 ao LF 54" 18� oo t UP O }} Rl f 0 P f D ur"fOFtM j n / ouT- 2,0 I DUP 1,00 � DUP// � Z z � x ,0 _ I - - — - FE� FFE l 1 / �/ / �x �' w w o L.. 11 �-' � T �� G Z I : 11• f/ #.` `9 /� v��z o a �z-j ! 1'� W Z % ENTS I 1 AgTMENTS TMENTS z CL u o CL m TS APAR'TM F, 1 4nn 5•F• ; a 0 � z z r `- Ag,TI4E� g,400 5' 1 26+ 00, ! 13,20 1 1$3•n \ 1 o Ap 0 S.F. 2 18 ;5� FFE 1S2• t I FE: 182'00 3;21 5 ,QO FFE I �) F GO i9 I I 1 1 FFE• 1 c%j� � / p i82.g0 0 I I I ! 1 t 0 I I � � � cQ .' �g 1 --- X ` .00 jai_,.-3, i_IV UPE: le 3.0u1 2.0 1 1 1 # a' -. -. _... �, MCP IS -` f _ — — — — — i ei S8Q42.29_..E--- — — — _— -- - -- v --O-70--�__ - r i 2 5.AfJ -� } _ s 25 1 — -' i,LST i ----- _.._ _--.-_. -- - -- .J AS iT 0v� ' - - ov-P i q 4,E5s •� o 45'3ry g I 1iyi7 g.90 - ,' -� i /• :;• 'a L`. .., - `- _ - ------ - -- _.._ _- r..- 7wf - V LO F - - - v I I I ��.:. I. w �rl DIJ 0 STA a '01W SIT D . t sTA T1)0 -- - --I'� i � OT IF � FF 183 }. I �.� - I _- 5 �- ! t _ t - 'a 5,6 0 ,S�J _ - - --• g00'F' - - `� Np `" I ;: T� ii�•F • ` - 9• 182 — r — 5, .00 I _ d m N X UP X DU 5 g FFE — �182 _ o _- -, pyE D p 2,0 I La 1 ! 3.0 E;Lj E: � I � - s -- - - - - ----- - Eli I __ ffi\ _ � f�2 I } iLP I - C � r r 1 � 20D `.` _ � �l q,•4a' W ¢" ! It' Uj 1sTF5� 4"� 3 ' sm �'_ I'� {�C } : g Y - Lr t ..., �;Q O 35 .... r - � '—`— 1 f�— - ' -�•; 3 i � _a •-....I�. i3 C' ci: . Ag,TMENT5 26�400 S•F• FE: 182.50 5i LF 24" RCIr 1ti= I �` * f �-- I:__ t L _J " I I _ - - - ._ U '29"E 596.98 �- —__ —.���— 27.94 151 �L15�— — — — — -54 - f,-1 O _'. likINAGE AREA; 65.0 AC. O c 4G c CD z s aa.. w w z 0 Z w 0 O Z w 0 Ae a it w W z c0 z w U 0 w p L E VICINITY MAP NOT TO 5CALE SITE DATA: OWNER: HCC INVESTMENTS, LLC CONTACT PERSON: JACKIE HAIRR ADDRESS: 3077 N. MAIN ST, HOPE MILLS, NC 28348 TELEPHONE: 910.428-0887 SITE LOCATION: LATITUDE: 34.9831'N LONGITUDE: 79.0121'W AREA FOR MIXED SITE: 47.00 AC. AREA FOR HARRIS TEETER SITE: 13.02 AC. AREA FOR CVS SITE: 2.31 AC. TOTAL DEVELOPMENT AREA: 62.33 TOTAL DISTURBED AREA: 48.00 AC. PIN NO.: 9494-88-2819 DEED REFERENCE: D.B. 7458, PG. 610 FLOOD ZONE: X FIRM PANEL: 3710949400J DATED: 01-05-2007 DUPLEX UNITS: 22 BUILDINGS, 44 UNITS CONDOMINIUM UNITS: 300 COMMERCIAL SF:159829 SF PARKING NEEDED FOR COMM: 8W PARKING NEEDED FOR RES, 558 TOTAL REQUIRED PARKING:1358 TOTAL PROVIDED PARKING: 2278 ZONE CLASS: MXD SETBACKS: DUE TO MXD (MIXED) ZONING, SETBACKS VARY. SETBACKS TO BE APPROVED WITH BUILDING DESIGN BY PLANNING. DIVERSION DITCHES MUST BE STABILIZED WITH VEGETATION TO PREVENT EROSION. CATCH BASINS WILL BE CONSTRUCTED ' WITH DROP INLET GRATES UNTIL SEI + UU, 4944 CONSTRUTION OF CURB AND j�pFtIVEWAY CES NO WETLANDS WERE DELINEATED ON THIS 5 ALL ROOF DRAINS WILL DIRECT RUNOFF T E r fJ \ \ .� \ oAo***CAUTION*** IS 4LEGEND .Pv / 1 8 1 NOT FOR CONSTRUCTION f� / / ` ` ��s PRELIMI NARY : F FOR REVIEW PURPOSES ONLY NOT FOR SALES, CONVEYANCES, OR RECORDATION 0 try as WATER VALVE WATER METER FIRE HYDRANT SANITARY SEWER MANHOLE �. o SANITARY SEWER CLEAN OUT (C.O.) R/W RIGHT OF WAY C , C L CENTERLINE �I ji. / r} ,/ / •*+ CAUTION +•« �--e UTILITY POLE & GUY THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM UTILITY POLE FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE ENGINEER MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN 0 PROPERTY CORNER / / COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR !r I /r' ` I �, / ABANDONED. THE ENGINEER FURTHER DOES NOT WARRANT THAT THE PROPERTY LINE (SURVEYED) 1;1 UNDERGROUND U OWN ARE IN THE EXACT LOCATION 0 / INDICA L BLUE FRORTIFY THAT INFORMATIONAVAILABLE.— - — PROPERTY LINE {UNSURVEYED} n ' $ —o PROPERTY LINE ^ r AS NO J�Fi��LY LOCATED THE UNDERGROUND ��— � — ----' (PROPOSED} /� uTIEs. SANITARY SEWER LINE z / Y ,/ ONE�F�CE W �� WATER MAIN GTI UGT UNDERGROUND TELEPHONEICABLE Ell MID 105, GAS GAS MAIN Q� 1V+ E OVERHEAD ELECTRIC UTILITY LINES r� v v; m m m STORM DRAINAGE PIPE V " 5 h / �. / -- - CENTERLINE ROAD (ALIGNMENT) �^ w �, �QT / / RIGHT OF WAY 0 to , o O _�9�� /� 1 1 5 EXISTING MINOR CONTOUR �j �j Z ih a / EXISTING MAJOR CONTOUR z oFT / PROPOSED MINOR CONTOUR j' ON _. A / PROPOSED MAJOR CONTOUR t 1 00 \ 1 / / DIVERSION DITCH W S O 1 T RAGE `', r° / \� !'` ,' \ FFE• ,'' ,f PC, 1-o / / --a--a— DISTURBED AREA BOUNDARY LINE j' � / —_ x— SILT FENCE \y r i / \ ( r �,s, ` \ \_ l ���✓ 1 / CHECK DAM CATCH BASIN (CURB INLET) CATCH BASIN (YARD INLET) CD p,F-M o F . V cV ,�'' \ \ \ / •.\ a.• QN O Ol G. E STOlRy OF�'ICE . , / FE; ig8.00 - - / . � , / // / 1 08, P Y. / F _ M cl �/ �QL \ U x1 _ �• %\; �4j�z �'o +t ` . ,::�, �, �� \ NE_STOR� / �' / \ J��� 0 FICE,fib / - J I ,325 S.F . r ; � `T p Ag`TMEN c�- b / r -• 1�. LQ� j m / 13 200 S7.0U // �' / / Q 1 yam', ` r , FFE• \ i i 1 Q� ! ST�FFICE \ I %` ' \ �"` 0 , ^ ` �` / 1 1 ti Q9 1 IS �MED12,325 S'pp .��= �r ,• / � / ' .J _. `.\--' - 4�0��� -/ I I � ( N � sz FFE: iga• :, \ i f' / \ S' o1 1 -o � •\�� ..� / .:���T! a , %'� % � ,./` / i TMEL,TS ```� TO 58 7�i5 g./ 1 ` '- `' 11 `� � � . .:, ; �; / � BAR S.F • ,! � ►'� 0 73.E cu +� � •; -- _ \;: ." . ,:.••:•�.,\ ' ; ' / Cp 1 � -� �, � � � 13,2p0 1g4.50 ''`,' / ` � •4 »E j OC Q o f- / a�° ONE-STORY �' / / i" ° 6 ICE �,- •� ~} .� S .F • /, , � / T �74 as �' � -s ` ` -' "ti, �x, � \ FFE ig7 �'•�" � r " Pat -L `\ ,. F, \ �9� _STORY - i 13,200 000 ON FFICE %%g FFE \NN XL� 11 E: 187.50 / /06TMEpTS / F'" / / AO a ? / W La LL FFE ! i 9 ! ` O 6 I^ c0 ir � Z U W W Z Z w ►- // %�\�y / / 1 / j 4� 26+ 00 182.50 \ s ._ W ` 5 ` \ jC� `� \�`\ �� s tee. ,15/ I a ``I c >- � `u c�i O� a r ` ,� % r / - ` r ARTMENTs ! / Pam, - +,NV'OUT 5• y�r . o o , Z 6r / y:. \� ` \`7 / . / AP 400 S,F • / / / + n. -' / \ \ ` / •� \\ 1 FFE. 2 + 82 5 r \ _ 87— gglS / 1 a6+ g•F i t \ _ f — 41/LO / 1 171 �1 Ld CD to LO -- . � � ;ram � � � �' � ( i' I -- - � ( --� •'�" � .•;' � � _ / / � B6- /' / --�► T APART S.F P: 0 -' CBS 2tiss.oa Q,a3o� 6,400 '\ \� �' � TOpIT117 � -- i '��` I RC4 lrN 1N 57175.80 '� 1S3 75� ('•; � �.\' ; �, ,-..` �-. / �sr� Ts. , ��► �- o+n FFE: � � { •, _ ; �" 7 ;� � I Iw ST01tM 7 176 � � jll Li L-j I 1 APAgTMENTS / ENTS ApAR S•F•r 40p S.F• I AFAR 0 S,F. APAg,TM S.F• 26,400 b 1 26' 182.00 { 13+20 Ol 1 183.00 ��2,s 1 FFE• `� FFE' ig2 1 FFE F } \ �r ! E, 183 •� EE PRWECP 3554 0/ I ' ` / Cg P9 82.9U '� �+ 1 1 O �. 5 ITN1� 78 / J' 1 IOUv876.20------- ----- —� ---- S m 4c r —1Nv J J� f._. -._ . -- - -- - - --- --- �— ----- --off / 1 � \ S. lSTO SITE ° KfNG ROAD NCSR 1 112 ROCK+ l5fi lZpgp NC5R 1 112 �G51z %0a vow � GN'1` VICINITY MAP NOT TO 5CALE Specifications for storinwater wet detention basin: D All herbaceous plants within the shallow water zones shall be instilled between April 1 and July 31 of LEGEN2011. Installation of herbaceous shallow water plants after this date entails an increased risk of failure and may only be performed upon mutual agreement between the installation contractor and owner or owne?s representative. The installer must take great care to ensure that plants awaiting installation axe kept moist INrepresentative. VALVE and shaded at all times. Lander no circumstances shall plant toots he allowed to dry out during transport, ea WATER METER storage or installation. Rach planting area (shallow land and shallow water) shall be clearly identified and FIRE HYDRANT marked prior to installing plants. Vertical distance from normal pool (permanent pool) shall be the. SANITARY SEWER MANHOLE primary means of locating the planting areas. All plants within the basin (shallow water and shallow land : zones) shall be installed as large drifts of a single plant species, unless otherwise specified Planting holes 0 SANITARY SEWER CLEAN OUT (C.O.) or slits of herbaceous species shall be deep enough to allow the crown of the plant to be at grade level, ,WE DE ENTION PLANTING TABLE 'TABLE 1. SHALLOW LAND HERBACEOUS PLANTS COMMON NAME SCIENTIFIC NAME SPACING DELIVERED AS QUANTITY JOE PYE WEED EUPATORIUM FISTULOSUM BARE ROOT 805 SWAMP MILKWEED ASCLEPIAS INCARNATE BARE ROOT 805 SOFTRUSH JUNCUS EFFUSUS BARE ROOT 805 BULLTONGUE SAGITTARIA LANCIFOLIA BARE ROOT 805 TABLE 2. SHALLOW WATER EMERGENT PLANTS COMMON NAME SCIENTIFIC NAME SPACING DELIVERED AS QUANTITY SOFTRUSH JUNCUS EFFUSUS BARE ROOT 1083 COMMON PLAINTAIN PLANTAGO MAJOR BARE ROOT 1083 BULLTONGUE SAGITTARIA LANCIFOLIA BARE ROOT 1083 WATER MILLET ZIZNEOPSIS MILIACEA IBARE ROOT 10B3 TABLE 3. SEED MIX I COMMON NAME SCIENTIFIC NAME SPACING IDELIVEREDAS QUANTITY CENTIPEDE EREMOCHLOA SPP. WA SITED VARIES R/W RIGHT OF WAY. while roots extend vertically into the substrate without ktnktng. Sod should not be loosened more than or C. L. CENTERLINE necessary. Once plants are set in place, soil must be pressed gently but firmly against the entire root UTILITY POLE & GUY mass, working in a deep to shallow direction, so that water can move via capillary action from the soil to UTILITY POLE the plant roots. Approximately 5 grams of a balanced slow release fertilizer shall be installed next to each herbaceous o PROPERTY CORNER large plug within the wetland. Fertilizer may be omitted if 6 inches of fertile topsoil has been applied PROPERTY LINE (SURVEYED) throughout the wetland. It is the responsibility of the contractor to ensure that the soil in each planting PROPERTY LINE (UNSURVEYED) area is moist or wet when plants are installed and for 45 days after installation. It is the responsibility of — —o PROPERTY LINE (PROPOSED) land owner to ensure that the wet detention basin draw down orifice does not clog, causing water levels to remain high and killing the plants. Planting densities and sizes shall be as follow. S5 SANITARY SEWER LINE At least 50 herbaceous plants of at least 4 cubic -inch containers shall be installed per 200 ft2 of shallow W WATER MAIN water area UNDERGROUND TELEPHONEICABLE At least 50 herbaceous plants of at least 4 cubic -inch container OR 8 shrubs of at least 1-gallon container GAS GAS MAIN OR 1 tree of at least 3 gallon container and 40 grass -like herbaceous plants of at least 4 cubic -inch E OVERHEAD ELECTRIC UTILITY LINES containers shall be installed per 200 square feet of shallow land area � STORM DRAINAGE PIPE At least 5 species shall be utilized in the shallow water zones, and 5 for shallow land, with no more than 30% of a single species. The genetic origin ("provenance') of the plants shall be as close as feasible to the CENTERLINE ROAD (ALIGNMENT) wetland site, Except for provenance, genetic diversity is encouraged and cultivars should not be utilized. RIGHT OF WAY EXISTING MINOR CONTOUR NOTES: ---- EXISTING MAJOR CONTOUR The landscape contractor shall abide by the "CONSTRUCTION SEQUENCE" PROPOSED MINOR CONTOUR and install the plants as specified on the LANDSCAPING PLAN. PROPOSED MAJOR CONTOUR After the first year and again at the end of the two—year warranty DIVERSION DITCH WI STORAGE period, all plants that do not survive must be replaced. ---'p DISTURBED AREA BOUNDARY LINE No planting within 10' of inflow or outflow pipes or riprop. K a SILT FENCE CHECK DAM CONSTRUCTION SEQUENCE: CATCH BASIN (CURB INLET) ® CATCH BASIN (YARD INLET) 1. Form the stormwater 8MP facility by soil excavation and/or fill. 2. Install fountain(s). 3. Remove any construction debris. 4. Till the top fi to 8 inches of soil surrounding the stormwater BMP facility. 5. Place topsoil or the specified soil mix surrounding the BMP facility In horizontal layers not to exceed 12 Inches per lift. fi. Install plant materials and mulch; minimize or eliminate the use of pesticides and fertilizers. 7. Plant grass by hydro seeding. 8. Immediately water the newly Installed plant materials. OQ` / LO S7,>AA Y S � \7 U0 l� SHAY 2 4g WA` S6,5.so 03'IE UoT 109 S 16,E S0-112 "E 1 I I 1 1 ! 1 1 I � 1 1 1 1 � L 1 U0 07.1 0G� � �05 f 1 1 � f 1 > S78°22'46"E S78°1 7'43"E �78°22'19" 0 a, P-1 O 00 z Go V� 6 le a. V0 4 0 = 04 t�A kn a 00 _ z z� U~. t3 °o .9 J�J p - N Co Z a" 0 CFJ O a°°06 w _ to c E 0 Z CL U W Ix ¢ Y Cn — Q 0 �LU W 8 J IL C � 2 }, ***CAUTION*** 4 ,.r� � � 8 w 4) to z 0 w 0 Z I ..• CAUTION ••• a \ � a4 z T 4E UNDERGRO�[2 UTIU41ES S40WN HA1gE BEEN L ATED FROM N 1 1 \ 1 FIELD tURVE11� INFbRMATION�(AND ETHE rSITINC DRAWINGS. THE ENGINEERMAK 1 �MPRIS NO ALL q H C LITIES IN THE AREA,►END U fiUITIES SHO � f \\\ Ili��11 EITHERtIN SERVI 1 ABANDON THE�NGINEER FURTHER S I�OT wAR�ANT TH THE m �IIDERGRRROUNDTLiITII SHOVINCEARE IN TIIE EXACT`I.00ATION 1 AS HEY INDICATED, URATYOAS pOSSIBHE E FRbMTINFMAFYTHATTTTHEYTIbAE AVAAAIFiiEELA��EE ATH pp iai — ENGINEER HAS NOT'�HY51U LLnESQCATED�THE NDERGRCil1 O M \ \ \ \ MONO ... \ 1 \ �a a \ \ �� \ U F U SL LOp� I �!o It /a ` \ a Z �WIr Z N78'17Z22 (n�o t Aa - Off` a zZ E ¢ YowM $ c)na \ _jga(.)00 \ 1 ` CL 1 w w z 1 1 W z w ' 1 W Z LU v � z 1 � C J / 1>1 _..I / SHk LOW CP J co —� Q-- WATER Q Z 0 E ,--- 0.. / z 117 1 SHALLOW LAND AREA w 0 E GRAPHIC SCALE r I I EE PROJECT: 3554 40 O 20 40 W ISO s 4d Z ( IN FEET ) 1 inch = 40 ft, s i — a•'-