Loading...
HomeMy WebLinkAboutSW6080201_HISTORICAL FILE_20090211STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW lD/%P622i`%l DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE _aq_O�ozz YYYYMMDD A� rty A NCDENR North Carolina Department of Environment and Natural Resources -Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 9, 2009 MYCPHYL, LLC 309 St. Matthews Road Erwin, NC 28339 Subject: Post -Construction Notification Project ID: Harnet_2009-2-1_3 ®ENR—FRO Project: BB&T - Erwin, NC Harnett County, North Carolina FEB 1 1 2009 Dear Sir or Madam, DWQ A review of the Financial Responsibility/Ownership (FRO) form required under the gq.•yyld d Sedimentation Pollution Control Act received on February 1, 2009 has determined that the BB&T - Erwin, NC project may be subject to a State Stormwater Permit for Post -construction. Unless excluded under the provisions of Session Law 2006-246, Section 8, you must submit within 30 days an application for a Post -Construction Stormwater Permit to: North Carolina Department of Environment and Natural Resources Division of Water Quality Stormwater Permitting Unit Post -Construction Application 1617 Mail Service Center Raleigh, NC 27699-1617 The Post -construction permit is in addition to a North Carolina General Permit (NCGO 10000) permit received for construction activity from the Division of Water Quality. For more information regarding MSI Post -Construction and Phase 11 Session Law 2006-246 please visit: http://l12o.enr.state.nc.us/su/NPDES_Pliase_II_Stormwater_Program.htm If you have any questions concerning this matter please feel free to call me at 919-807-6379 or e- mail me at Jennifcr.Jones@ncmail.net. incere'y, nnifer ones cc: Fayetteville Regional Office, Mike Lawyer Stormwater Permitting Unit Files BB&T, Rhett Bailey, 2101 S. Tarboro Street, Wilson, NC 27893 Wetlands and Stormwater Branch One 1 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 No hCa�rof ina Location-, 512 N, Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 atura!!tf Internet: www.ncwaterquality.org U An Euual 6poodunity 1 Affirmative Action Empiover - I Affl`i` u NC®EN R North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Rhett Bailer Area Facilities Resource Manager 201 South Tarabo_ro Street Wilson, North Carolina 27893 Division of Water Quality C61een K Sullins Director February 18, 2009 Subject: Stormwater Permit No. SW6080201 BB&T, Erwin North Carolina High Density Commercial Wet Pond Project Harnett County Dear Mr. Bailer: Dee Freeman Secretary DENR—F O AJAR 2 7 200g ®WQ The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for BB&T in Erwin North Carolina on January 15, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No..SW6080201, dated February 18, 2008, for the construction, operation and maintenance of the subject project and the stormwater BMPs. This permit shall be effective from the date of issuance until February 17, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit..This request must be in the form of a -written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27.611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information coheerning this matter, please contact Mike Randall at (919) 807-6374; or mike.randail@ncmail.net. Sincerely, for Coleen H. Sullins' cc: 1Fay� ettevilkRegionai_Office� Central Files SPU Files Wetlands and Stormwater Branch One 1617 Mail Service Center, Raleigh, North Carolina 27699.1617 NorthCarolina Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 �atura!!� Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity 1 Alfirmative Action Employer PARAMOUNTE N G I N E E R I N G, I N C. February 11, 2009 Mike Randall Stormwater Permitting Unit NCDENR - DWQ 1617 Mail Service Center Raleigh, NC 2769�-1617 RE: BB&T - Erwin PEI Project No. 08124.PE Mike: r r On behalf of BB&T Bank, we are submitting a response to your e-mail, dated February 6, 2009, for further review and approval for the above referenced project. The comments of your e-mail are listed below with our response provided in bold. 1.) I noted one error on drawing C6.1 (the drawing indicates 1.0 inches of storage... although the elevation is 179.0 to 179.9 (really 10.8 inches). Response: The note on the sheet has been revised to say that elevation 179.90 is the 1.0 inch runoff volume elevation. 2.) The $505 check was not included. Response: I am sure the check was enclosed, however we are providing you with another check for $505.00 Two copies of the revised plan sheet C-6.1 and another check are closed. If you have any questions regarding any of this information pleas;, feel free to contact us. 'Thank you for your attention to this matter. Sincerely, PARAMOUNTE ENGINEERING, INC. Mark N. Hargrove, PE Enclosures: as noted 5 cJ 1 1 ❑ L E AN ❑ E R ❑ R i V E, 5 U I T E 2 ;] E V1 1 L M I N G T❑ N N C 2 8 4 ❑ 3 P H : (9 1 Ell 7 9 1 - 6 7❑ 7 r X 1 f 9 1 ❑ 1 9 1- 6 7 6❑ State Stormwater Permit Permit No.SW6080201 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr. Rhett Bailer, Area Facilities Resource Manager BB&T in Erwin, North Carolina Harnett County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and S.L. 2006-246 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until February 17, 2019, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 41,625 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for, the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 6 State Stormwater Permit Permit No.SW6084201 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 1.175 Onsite, ft2: 51,170 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 41,625 Buildings ft2: 6,500 Roads/Parking, ft2: 28,400 Other (sidewalks), ft2: 1,125 Offsite, ft : 5,600 c. Pond Depth, feet: 5.5 d. TSS removal efficiency: 90% e. Design Storm: 1.0 inch f. Permanent Pool Elevation, FMSL: 179.00 g. Temporary Pool Elevation, FMSL: 179.90 h. Permitted Surface Area @PP, ft2: 2,951 i. Permanent Pool Volume, ft3: 10,785 j. Temporary Pool Vo]ume, ft3: 3,470 k. Forebay Volume, ft : 2,046 I. Controlling Orifice: 1.0" fd pipe m. Receiving Stream/River Basin: Black River n. Stream Index Number: - 18-68-12-1 o. Classification of Water Body: C; SW II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. .4. Records of'maintenance activities` must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. .5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidableunless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 2 of 6 State Stormwater Permit Permit No.SW6080201 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to -the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved, plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Page 3 of 6 State Stormwater Permit Permit No.SW6080201 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of.the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10.The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11.The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 181h day of February, 2009. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No.SW6080201 Stormwater Permit No. -SW6080201 BB&T in Erwin, North Carolina Harnett Count Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project,' BB&T in Erwin, North Carolina (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit_ Permit No.SW6080201 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. _10. The inlets are located per the approved plans and do not cause short- circuiting of the system. _11. The permitted amounts of surface area and/or volume have been provided. _12. Required drawdown devices are correctly sized per the approved plans. _13. All required design depths are provided. _14. All required parts -of the system are provided, such as a vegetated shelf, and a forebay. .15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building, Suite 714 Fayetteville, NC 28301-5043 Page 6 of 6 ;,,,-, DEN© A OU � V T MAR 7 E N G I� N E- E S-"! N 'CDF N : G. MAR 2 1 2009 5 9 1 1. O LE AND I. It .. ; D R I V I, S U I 'I' E. 2'() 1 W I .1,N1 I N G. T O N, N" C. 2 8 4 0 3 .DWQ 9 1 0 7 9 1 - 6 7 0 7( O) 9 1 0 - 7 9 1 - 6 7 6 0 ( F) rain 1. I '. T T F. R f l F T R A N S M I T T A L 19 1 NCDENR — DWQ stDatc;k 1113109 Stormwater Permitting Unit G! 1617 Mail Service Center ,(Re BB&T —Erwin, NC Raleigh, NC 27699-1617 Attn:1 Mike Randall `1?r9'c'N49' IVj 08124.PE e. arc seriiiiiig: ❑ Originals ® Prints h '0147g7iri' items: ❑ Correspondence ® Plans ❑ Shop Drawings ® Calculations ❑ Specifications ❑ Other as listed below ' - } $;Qtianti t '].. � - .�� r 1 ;ii - Datc .{ , 'l. f �•.-A1 - 1 . i't Div .'"No' ' i . a, i.� 7 1 �I ]J' ire, ie....n •. }" !' 1a f.54i � � [ (1 ! '1 .. ' DcscriPUon;. er i - fit{ 7'l.�r+� [� ti4:1 2 - —' Sets of Plans (Cover, SV-1, C-1, C-2, C-3, C-3.1, C-6.0, C-6.1, C- 6.2, C-8)- 2 Stormwater Calculauoils & Narrative 2 Original and Copy of Stormwater Management Permit Application I -orm & Wet Detention Basin Supplement 1 Operation & Maintenance Agreement 1 Check for 5505 for applicatioli fee lssit'e'Status: ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks Ac6PTakciii ❑ No 1'_'.xceptions Taken ❑ NfAc Corrections Noted ❑ Amend & Rcsubmil ❑ Rejected - See Remarks ❑ Approved as Submittcd ❑ Other Remark"s: Mikc, tlic'enclosed plans arc for your review and approvad. Please let me know if ou haveany qucstious. Mark N. Harcyove, P.E. J DWQ USE ONLY Date P.c'eivcLcc Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may lie photocolried for Ilse as all onfilm! I. GENERAL INFORMATION 1. Applicants name (specify the narne of the corporation, individual, etc. who owns the project): BB&T Bank 2, Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Rhett Bailer - Area Facilities Resource Manager 3. Mailing Address for person listed in item 2 above 201 South Tarboro Street City:Wilson State:NC Zip:27893 Phone: (336 ) 692-1413 Fax: ((252) 714-2693 Email:LCockrell@BBandT.com 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): BB&T - Erwin, NC 5. Location of Project (street address): US HVVY 421, west side of entrance road to Lowes Horne Improvement Store City:Erwin County:Harnett Zip:28339 6. Directions to project (from nearest major intersection): Site is on US HWY 421 + - 3.5 west of the intersection of US HWY 421 & 1-95. 7. Latitude:780 38' 0" N L0ngitude:35° 20' 0" W of project S. Contact person who can answer questions about the project: Name:Mark Hargrove PE _ Telephone Number: (910 ) 791-6707 EmaiLmharryrove<> >ararnounte-en g.com It, PERMIT INFORMATION: .r 1. Specify whether project is (check one): ®New ❑Renewal ❑Modification Form SWU-101 Version 09.25.08 Paue I of-4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. AdditionaI Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPDES Industrial Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing Stormwater management for the project. Stormwater will be treated by the use of a wet pond sized for 90% removal of TSS 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Property Area: 1.65 acres 4. 'Total Coastal Wetlands Area: 0 acres 5. Total Property Area (3) - Total Coastal Wetlands Area (4) = Total Project Area**:1.65 acres 6. (Total Impervious Area / Total Project Area) X 100 = Project Built Upon Area (BUA):57.8 % 7. How many drainage areas does the project have?] 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For hivh density nroiects, com►alete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Black River Stream Class & Index No. C; Sw-18-68-12-1 Total Drainage Area (so 51,170 On -site Drainage Area (so 51,170 Off -site Drainage Area (so Existing Impervious* Area (so 0 Proposed Impervious*Area (so 41,625 % Impervious* Area (total) 81.3% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (so 6,500 On -site Streets (so On -site Parking (so 28,400 On -site Sidewalks (so 1,125 Other on -site (so Off -site (sf) 5,600 Total (sf). 41,625 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **TotaI project area shall be calculated to exclude Coastal Wetlands from use when calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area (BUA). Form SWU-101 Version 09.25.08 Page 2 of *'`Total project area shall be calculated to exclude Coastal Wellflnds front 11se whorl calculaling the built upolr area percentage calculation. This is the area to i-rrlrrrlale Overall pen'errt project Inidt upon area (BLIA). 9. How was the off -site impervious area listed above derived?Offsite area is rear access roan draining to pond Projects in Union County: Contact the Dll'Q Central OfJicc stcrJf tv check try .ree iJ:vnrr project is Inccrtccl tvithirr cr Threatener! c£ L'inlangered Species ivutershecl that inoi, be subject to more stringent stormitwier• req a rre ni ews. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot, if lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at (919) 807-6300 for the status and availability of these forms. Forms can be downloaded from http://li2o.em-.statC.nc.tts/su/bmp forrns.htm. Form SW401-Low Density Form SW401-Curti Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Form SW401-Cistern Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Leve] Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Cistern Supplement Form SWU-1O1 Vcrsion 09.25.09 Page 3 of•4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form Initial • Original and one copy of the Deed Restrictions & Protective Covenants Form (if required as per Part IV above) • Original of the applicable Supplement Forn1(s) and O&M agreement(s) for each BMP �s'J rl7 • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) ,,JJ M /V payable to NCDENR • Calculations & detailed narrative description of stormwater treatinent/management In • Copy of any applicable soils report _ I" N • Two copies of plans and specifications (sealed, signed & dated), including: &P - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated - Vegetated buffers (where required) V1I. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf (such as additional information requests), please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):Paramounte En ineerin Cnc. - Mark Hargrove, PE Mailing Address:5911 Oleander Drive, Suite 201 City: Wilmington � - State:NC Zip:28403 Phone: (910 ) 791-6707 Fax: (910 ) 791-6760 Email: mhargroveQparamounte-eng.com„ _ VIII. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, itenz 2) Rhett Bailer certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 21-I.1CLO, .. Signature: Date: Ym Form SWU-101 Version 09.25.08 — Page 4 of 4 Permit fro ue piowdad 5v DVVO) NCDENR ` STORMWATER MANAGEMENT PERMIT APPLICATION FORM "'•` 401 CERTIFICATION APPLICA T ION FORM WET DETENTION BASIN SUPPLEMENT This form must be fitted out, printed and submitted. The Required Items Checklist (Part 111) must be printed. frilled out and submitted along with all of the required information. I. PROJECT INFORMATION v ,"'' ,', 1ae'„° ' !' a p„ • a.' Project name BB & T - Erwin, NC Contact person Mark Hargrove, PE Phone number 910-791-6707 Date 13-Jan-09 Drainage area number 1 II, DESIGN INFORMATION ,,,, Site Characteristics Orainage area 51,170 ft' Impervious area, past -development 41,625 ft' % impervious 61.35 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters fvlinimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr. 24-hr runoff Post -developments -yr, 24-hrrunoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, ore -development Rational C, past -development Rainfall intensity 1-yr. 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr. 24-hr peak flow PrelPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SNWT elevation (approx at the perm. pool elevation) Top of 10tt vegetated shelf elevation Bottom of 1 Oft vegetaled shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout. bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume Forin Sw401-VUei t1elention BasirnRfev.5 3.336 ft' OK 3,470 ft., OK, volume provided is equal to or in excess of volume required. Y (Y or N) 3.1 in 0.20 (unilless) 0.81 (unilless) 0.13 inthr OK 1.35 I'Isec 2.96 ft Isec 1.el ft'isec 1 f y.90 frost 179.00 fmsl 179.00 fmsl 179.50 fmsl 178.50 frost 172.00 fmsi 171.00 fmsi 1.00 ft N (Y or N) fmsi Parts I- & II. Design Summary. Page I or 2 Permit No flo be provided by Owgl II. DESIGN INFORMATION Surface Areas Area. temporary pool 4,431 ff Area REQUIRED. permanent pool 2.697 12 SAIDA ratio 5-27 (uniuess) Area PROVIDED, permanent pool, A;,,,,,,, , 2.951 fla OK Area, bottom of 10ft vegetated shelf, A,,, ,,,�,; 1,998 ft' Area, sediment cleanout, top elevation (bottom of pond), A,, ,,„„ 1,218 11 Volumes Volume, temporary pool Volume, permanent pool, V,,,,r, p Volume, iorebay (sum of forebays if more than one lorebay) Forebay %of permanent pool volume SAIDA Table Data Design —1 SS removal Coastal SAIDA Table Used? IvloumainlPiedmonl SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-21b) Volume, permanent pool, V,­ P, A Area provided, permanent pool. A,w �,, Average depth caiculated Average depin used in SAID:,, d,_ (Round to nearest 0 5ft) Calculation option 2 used? (See Figure 10.2b) Area provided, permanent pool, Ar,,,,,; p.. Area bottom of 1 Oft vegetated shelf, Aw s,i,„ Area. sediment cleanout, top elevation (bottom of pond), Awl ,h l 'Depin" (distance blw bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Cr,) Driving head jH„) Drawdown through weir? Weir type Coefficient of discharge (C,) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of fiowpaih to width ratio Lengin to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? DramrmftGV �de{�ele �lona�asinpRemrsrgencies 3,470 ft' OK 10.785 ft; 2,046 ft' 19.00/0 % OK 90 % Y (Y or N) N (Y or N) 5.27 (unitless) N (Y or N) h' ftz ft It Y (Y or N) 2,951It OK 1,998 ft'' OK 1,218 fC OK 5.50 ft OK 565 ft OK 5.5 ft OK Y N (Y or N) 1.00 in _ in 0.50 (unitless) 0.42 ft (Y or N) _ (unitless) (unitless) —ft ft 1.35 Wises 2.96 fl'fsec 0.01 ft3Isec �l1o�Y r USQ-r� �r�ro�/off OK f ram— nsufficlent post -development peak flow. r j C i C 2.68 days OK, draws down in 2-5 days. OK, drawdown time is correct. 3 :1 OK 10 :1 OK 10.0 ft OK 4 :1 OK 4.0 :1 OK Y (Y or N) OK 1,51t OK N (Y or N) OK (Y or N) Y (Y or N) OK Pond will be pumped down by mechanical means it required