Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6080201_CURRENT PERMIT_20090612
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW k�D/ DOC TYPE F CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE YYYYMMDD {•9 A7 s�� NCDENW North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Rhett Bailey Area Facilities Resource Manager 201 South Taraboro Street Wilson, North Carolina 27893 Division of Water Quality Coleen H. Sullins Director May 6, 2009 Subject: Stormwater Permit No. SWC4)8024l,- G4=)7 e �f o BB&T, Erwin North Carolina I-ligh Density Commercial Wet Pond Project Harnett County Dear Mr. Bailey: Dee Freeman Secretary The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for BB&T in Erwin North Carolina on May 1, 2009. Staff review of the plans andspecifications has determined that the project, as proposed, will comply with the Stormwater Regulations set �aforth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No. �cto SW608ftMI, dated May 6, 2009, for the construction, operation and maintenance of the subject project and the stornnvater BMPs. This permit shall be effective from the date of issuance until May 5, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. Ifany parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. 'Phis request must be in the form of a written petition, conforming -to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 11.0. Drawer 27447, Raleigh, NC 2761 1-7447. Unless such demands are made this permit shall be final and binding. This project wi11 be kept on file at the Fayetteville Regional Office. Iryou have any questions, or need additional information concerning this matter, please contact Mike Randall at (919) 807- 6374; or mike.randall I@iicdeiir.gov. Sincerely, DENR-FRO for Coleen H. Sullins cc: Fayetteville Regional Office �q�p' Central Files DWQ SPU Files Wetlands and Stormwater Branch One 1 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Nord L, l Ci: rfna Location: 512 N, 5aiisbury St, Raleigh, North Carolina 27604 Naturally Phone: 919.807-63001 FAX: 919-807.6494 l Customer Service:1-877-623-6748 NaK L Internet: www.rrcwatergzjality.org An Equal Opportunity 4 Af6rmalive Action Employer � • ..'1 a State Stormwater Permit Permit No.SW6090401 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr. Rhett Bailey, Area Facilities Resource Manager BB&T in Erwin, North Carolina Harnett County FOR THE construction, operation and maintenance of.a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and S.L. 2006-246 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance,until May 5, 2019,'and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on'page 2 of this -permit, The stormwater control has been designed to handle the runoff from 43,200 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. . 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 6 State Stormwater Permit Permit No.SW60k40t C. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area - Onsite, ft2: 52,400 Drainage Area - Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 43,200 Buildings ft2: 6,500 Roads/Parking, ft2: 28,400 Sidewalks, ft : 1,125 Other, ft2. 1,000 Offsite, ft�: 61175 c. Pond Depth, feet: 5.5 d. TSS remo.val efficiency: 90% e. Design Storm: 1.0 inch f. Permanent Pool Elevation, FMSL: 179.00 g. Temporary Pool Elevation, FMSL: 179.90 h. Permitted Surface Area @PP, ft2: 2,951 i. Permanent Pool Volume, ft3: 10,785 j. Temporary Pool Volume, ft3: 3,470 k. Forebay Volume, ft3: 2,046 I. - Controlling Orifice: 1.0" 0 pipe m. Receiving.Stream/River Basin: Black River n. Stream Index Number: 18-68-12-1 o. Classification of Water Body: C; Sw II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months)'. b. Sediment removal. c: Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure,. orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 2 of 6 State Stormwater Permit Permit No.SW6090401 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. Page 3 of 6 State Stormwater Permit Permit No.SW6090401 2. The permittee is responsible for compliance with all ,permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10.The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking -and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in -Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11.The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. . 12.The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 61h day of May, 2009. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Jor G01een H. Sullins, Uirector Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit . Permit No.SW6090401 Stormwater Permit No. SW6080201 BB&T in Erwin, North Carolina Harnett County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, BB&T in Erwin, North Carolina (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit Permit No.SW6090401 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13.. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building, Suite 714 Fayetteville, NC 28301-5043 Page 6 of 6 Application Completeness Review ❑ First Submittal taRe-submittal Date �eceived: Date Reviewed: Oq Development/Project Name: Receiving stream name ;3LA C e Il i VET _ classification: ( By l) 1 Lv(�U 1 1� For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-111, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. High Density Projects that require a 401 /404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): Latitude and Longitude: 0" 3 o 3 S`'z o 0 " Jurisdiction Project Address: U S H �.I �-Z l��i,f� s r .:e r- or 1&'( N r 7:0 L n L/ Engineer name and firm: G o Ad ol- ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets UrAigh Density ❑ Other ❑ 401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or addinfo letter) 5&- BUA z 00 r,1 Check for $505.00 included riginal signature (not photocopy) on application Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage,aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed restriction statement ❑ Sealed, signed & dated calculations ❑ Correct supplement and 0&M provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ $tormwater Wetland GAVet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road ❑ Two sets of sealed, signed & dated layout & finish grading plans with appropriate details ❑ Narrative Description of stormwater management provided ❑ Soils report provided ❑ Wetlands delineated or a note on the plans that none exist on site and/or adjacent property ❑ Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; ❑ Dimensions & slopes provided ❑ Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density ❑ Inspection and maintenance agreements provided W"_ Application complete ❑ Application Incomplete Returned: (Date) Comments S L- - 2-1/ 8/0 February 9, 2009 Revision SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low -density projects ` ❑ No more than two dwelling units per acre or 24% built -upon area; ❑ Vegetated conveyances to the maximum extent practicable; ❑ Built -upon areas at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. High density projects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. ❑ Achieve.85%average annual removal of total suspended solids. , ❑ For BMPs that require a separation from the seasonal high-water,table, (SHWT), the separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffer Requirements ❑ Undisturbed riparian buffers within 200 feet of water bodies within the 100-Year Floodplain and within 100 feet of water bodies that are not within the 100-Year Floodplain. Exceptions to the undisturbed buffer requirements are set forth in 15A NCAC 02B .0607 Stormwater Controls as required by 15A NCAC 02B .0602 ❑ Control and treat the difference between the pre -development and post -development conditions for the one- year, 24-hour storm with structural controls. ❑ Development and redevelopment shall implement stormwater management measures that promote infiltration of flows and ground water recharge for the purpose of maintaining stream base flow. Cl 85% average annual removal of total suspended solids. ❑ Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours, for detention ponds. ❑ Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one- year, 24-hour storm. ❑ Meet design or stormwater management measures set forth in 15A NCAC 2H .1008. High Density Projects that require a 401/404 within an NSW ❑ 85% TSS ❑ 30% TN ❑ 30% TP February 9, 2009 Revision A RA MOUNT P E F_ N G I N E E= f-' I N G, I N C. April 29, 2009 Mike Randall Stormwater Permitting Unit NCDENR - DWQ 1617 Mail Service Center Raleigh, NC 27699-1617 RE: BB&T — Erwin Stormwater Permit No. SW6080201 PEI Project No. 08124.PE Mike: On behalf of BB&T Bank, we are submitting the above project for a permit modification. We have been asked to show a road stub -out to future development on the northwest side of the project. We are increasing the permitted impervious area by 1,575 sf. The drainage area of the pond also has increased. However, the current pond is large enough to handle the additional impervious area and no changes are needed in the pond. The following is provided for your review: • Two sets of revised plan sheets (C-2, C-3, C-3. l ) • Two copies of revised stormwater calculations • Original and copy of revised Stormwater Permit • Two copies of Wet Pond Supplement • Check in the amount of $505 for review fee U"r.. If you have any questions regarding any of this information please feel free to your attention to this matter. Sincerely, PARAMOUNTE ENGINEERING, INC. A�t)'4LJA� Mark N. Hargrove, PE Enclosures: as noted 5 9 1 1 ❑ L E AN D E R D R I V E S U I T E ❑ 1, W I L M I N G T❑ N N ❑ 2 B 40 3 P F-I : f 9 1 0 1 7 9 1 - 6 7 a 7 r A X: 19 1 0 1 '7 9 1- 6 7 6 M r DWQ USE ONLY Date Receiv d Fee Paid Permit Number S :06 J State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This fornr inay he photocopied for rise as air original I. GENERAL INFORMATION 1. Applicants name'(specify the name of the corporation, individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Rhett Bailey - Area Facilities Resource Manager 3. Mailing Address for person listed in item 2 above: 201 South Tarboro CitTwilson Phone: (252 ) 714-2693 Email: rbaiiey®BBandT.com State:NC Zip:27893 Fax: ((252) 246-5719 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): BB&T - Erwin, NC 5. Location of Project (street address): US HWY 421, west side of entrance road to Lowes Home Improvement Store City:Erwin County:Harnett Zip:28339 6. Directions to project (from nearest major intersection): Site is on US HWY 421 +/- 3.5 west of the intersection of US HWY 421 & I-95. 7. Latitude:780 38' 0" N Longitude:35° 20' 0" W of project 8. Contact person who can answer questions about the project: Name:Mark Hargrove, PE Telephone Number: (910 ) 791-6707 Email:mhargrove©paramounte-eng.com II. PERMIT INFORMATION. 1. Specify whether project is (check one) []New ❑Renewal ®Modification Form SWU-101 Version 09.25.08 Page I of 2., If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number SW6080201 and its issue date (if known)February 18, 2009 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ®Sedimentation/Erosion Control 0404/401 Permit ❑NPDES Industrial Stormwater Ill. PROJECT INFORMATION 1. In the space provided below, summarize how Stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater_ will be treated by the use of a wet pond sized for 90% removal of TSS___ 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Property Area: 1.65 acres 4. Total Coastal Wetlands Area: 0 acres 5. Total Property Area (3) - Total Coastal Wetlands Area (4) = Total Project Area**:1.65 acres 6. (Total Impervious Area / Total Project Area) X 100 = Project Built Upon Area (BUA):57.8 % 7. How many drainage areas does the project have?1 8. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, complete the table with one drainage area for each engineered stormwater device. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Black River Stream Class & Index No. C; Sw-18-68-12-1 Total Drainage Area (sf) 52,400 On -site Drainage Area (so 52,400 Off -site Drainage Area (so Existing Impervious* Area (so 0 Proposed Impervious*Area (so 43,200 % Impervious* Area (total) 82.4 Impervious* Surface Area ., Drainage Area 1 d r Draina g e Area 2� On -site Buildings (so 6,500 On -site Streets (so On -site Parking (so 28,400 On -site Sidewalks (so 1,125 Other on -site (so 1,000 Off -site (sf) 6,175 Total (so: 43,200 ' Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated to exclude Coastal Wetlands froin use when calculating the built upon area percentage calculation. This is the area used to calculate overall percent project built upon area (BUA). Form SWU-101 Version 09.25.08 Page 2 of 4 9.• How was the off -site impervious area listed above derived7Offsite area is rear access road draining to pond _ Projects in Union County: Contact the DWQ Central Office staff to check to see if you project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stornavater requirements. 1V. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following property restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If Iot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from httl2:/lh2o.enr.state.nc.us/su/bm12 forms.htm - deed restrictions. Form DRI'C-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded property restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater Permitting Unit at (919) 807-6300 for the status and availability of these forms. Forms can be downloaded from http:l/h2o.enr.state.nc.us/su/bmp forms.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401 -Wetlan d Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Form SW401-Cistern Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Cistern Supplement Form SWU-101 Version 09.25.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at littp://Ii2o.enr.state.nc.us/su/in.si ma s.htm) Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form /Ij/yAL • Original and one copy of the Deed Restrictions & Protective Covenants Form (if--_ required as per Part IV above) • OriginaI of the applicable Supplement Form(s) and O&M agreement(s) for each BMP +'+r O- • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR M-001�- • Calculations & detailed narrative description of stormwater treatment/management Mib1♦ • Copy of any applicable soils report M ra A- • Two copies of plans and specifications (sealed, signed & dated), including: pw - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/ project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and Stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf (such as additional information requests), please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm):Paramounte Engineering, Inc. - Mark Hargrove, PE Mailing Address:5911 Oleander Drive, Suite 20"1 City; Wilmington State:NC Zip:28403 Phone: (910 791-6707 Fax: (910 1 791-6760 Email:mhargrove®paramou nte-eng.com VIII. APPLICANT'S CERTIFICATION I, (print or type nanie of person listed in General Information, itenr 2) Rhett Baile}1 certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1009— ` Signature: Form SWL Date: U Permit N (to be provided by DWO) N WtA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT, INFORMATION. v: ` Project name BB & T - Erwin, NC Contact person Mark Hargrove, PE Phone number 910-791-6707 Date 20-1 Drainage area number 1 Il. DESIGN INFORMATION Site Characteristics Drainage area 52,400 ft2 Impervious area, post -development 43,200 ftZ impervious 82.44 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runcff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr. 24•hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1 yr 241 storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity; 1-yr, 24-hrStorm Pre -development 1-yr. 24•hr peak flow Post -development 1-yr, 24•hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx, at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume Stored above the state -required temp. pool? Elevation of the lop of the additional volume 3,459 ft3 OK 3,410 ft3 OK, volume provided is equal to or in excess of volume required. I ff3 ft3 0 ft3 ft3 Y (Y or N) 3.1 in 0,20 (unitless) 0.81 (unitless) 0.13 inlhr OK 1.38 ft3lsec 1.00 ft3lsec -0.38 ft3lsec 179.90 fmsl 179.00 fmsl 179.00 fmsl 179.50 fmsi 178.50 fmsl 172.00 fmsl 171.00 fmsl 1.00 it N (Y or N) fmSl Form SW401-Wei Detention Basin-F2ev.5 Parts I. & 1h. Design Summary. Page 1 of 2 Permit No. (to be provded by DWO) 11. DESIGN INFORMATION Surface Areas Area, temporary pool 4,431 ft' Area REQUIRED, permanent pool 2,798 ft, SAIDA ratio 5.32 (unitless) Area PROVIDED, permanent pool, Ap m P,i 2,951 ft` OK Area, bottom of 1 Oft vegetated shelf, Awl µ6, 1,998 ft` Area, sediment cleanout, top elevation (bottom of pond). Ab„ p,,, 1,218 ft` Volumes Volume, temporary pool 3,470 ft' OK Volume, permanent pool, Vp l 10,785 ft' Volume, fcrebay (sum of forebays if more than one forebay) 2,046 ft3 Forebay % of permanent pool volume 19.0% % OK SAIDA Table Data Design TSS removal 90 % Coastal SA)DA Table Used? Y (Y or N) MountainlPiedmont SA1DA Table Used? N (Y or N) SAIDA ratio 5.34 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vim,, ,w ft' Area provided, permanent pool, Ate,,,-P,,, ft` Average depth calculated ft Average depth used in SAIDA, d_ (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, A,� ,w 2,951 ft` OK Area, bottom of iOft vegetated shelf, A.-,,, 1,998 ft` OK Area, sediment cleanout, top elevation (bottom of pond), A,.,,, 1,218 hl OK "Depth" (distance b/w bottom of 10ft shelf and top of sediment) 6.50 ft OK Average depth calculated 5,65 ft OK Average depth used in SAIDA, dN, (Round to nearest 0.5ft) 5.5 ft OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (H,) Drawdown through weir? Weir type Coefficient of discharge (C,V) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak Flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or welf) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of Flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies Y (Y or N) 1.00 in in 0.60 (unitless) 0.42 N (Y or N) _(unitless) (unitless) —ft —ft 1.38 ft3lsec 1.00 ft"lsec 0.01 fttlsec 2,78 days OK Insufficient post -development peak Flaw. OK, draws down in 2-5 days. OK, drawdown time is correct. 3 :1 OK TO_:1 OK 10.0 ft OK 4 :1 0K 4.0 :1 OK Y (Y or N) OK 1.5 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pond will be pumped down by mechanical means if required Form SW401-Wel Oelenimn Basin-Rev,5 Parts I, & II. Design Summary, Page 2 012 Permit N lit. REQUIRED ITEMS CHECKLIST (to be provided by DWQ) Piease indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met, It the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. my#- C- 3 1. Plans (1" - 50' or larger) of the entire site showing: C -3+ I Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. C ` a 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. /t7N9 C -- 6 ' 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. C_ 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. cG C_a f e 5. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, to verify volume provided. 1/ 1 IV# C ` ] 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. all_ S r L5 7. The supporting calculations. — IA2_ L rJ✓; S. A copy of the signed and notarized operation and maintenance (0&M) agreement. /II NIL 9. A copy of the deed restrictions (if required). n14 Ag9d;da 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SWapt-Wet Detention Basin-Rev.5 Part III. Required Items Checklist, Page t of ? 3111 i s \ ► ERWIN, NC Revised Stormwater Calculations Prepared for: BB&T SANK 2101 South Tarboro St. WILSON, NC 27893 Prepared by: PARAMOUNTE F N G I N F G R I " G. 1 N C. 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 Project #08124.PE c aQ SEAL 7r 19742 April 2009'f -��� ����P Q4 PARAN40-UNTE F= N G-: 1 N F- FY F2 I N C� . 1 N C BB&T Bank -- Wet Pond Total Area Draining to Infiltration Area = 52,400 SF = 1.20 AC Total Proposed impervious Surface Area Draining to Pond: Roofs = 6,500 sf Pavement = 34,575 sf Future Pavement = 1,000 sf Sidewalk = 1,125 sf 43,200 sf % Impervious = 43,200/52,400 = 82.4% Rewired Storage for 1.0-Inch of Runoff For Pond: (use Schueler Method) = 0.05 + 0.009 (1) = 0.05 + 0.009(82.4) = 0.792 = (1.0")(0.792)(1/12)(52,400) = 3,459 CF (3,470 cf provided) BBBT BANK - ERWIN, NC NC DENR Retention Requirements Objective: design a wet detention basin with the following characteristics: a permanent water pool depth between 3- and 6-feet, a surface area that meets TSS removal requirements (values set by NC DENR and included here), a forebay that is approximately 20% of the total pond volume, a temporary water pool sized to detain the initial 1.0 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2.5 days, and a length -to -width ratio of approximately 3:1. Step is Determine the surface area required for 90% TSS removal Post -Development Conditions Total Drainage Area 1,2D ACRE Value from CAD Impervious Drainage Area 0.99 ACRE Value from CAD impervious Cover 82 4% Impervious Cover-- (impervious Drainage Area)/(Total Drainage Area)'100 k Elevation of Permanent Pool Surface 179.00 FT Value selected by designer Average Depth of Permanent Pool 5.50 FT Calculated by designer (Bottom Elevation)=(Permanent Pool Surface Elevation of Wet Detention Pond Bottom 172.0 FT Elevation) -(Depth of Permanent Pool) Approximate Pond Length 125 FT Value from CAD Approximate Pond Width 30 FT Value from CAD Len th:Width Ratio 4:1 Ratio= Len th / Width :1 Required SA1DA Ratio for 90% TSS Removal 5.340 value from chart. Reference: "90% TSS Removal Required Permanent Pool Surface Area 2,798 SF Required Surface Area=(Required SA/DARatio)'(Total Drainage Area) Provided Permanent Pool Surface Area 2,951 SF Interpolated value from stage -storage calculations Step 2: Determine the 1_.5-inch runoff_ elevation within the wet detention pond. Runoff Coefficient, Rv 0.792 INIIN Rv=0,05+0.009'(% Impervious) Required 1,0" Runoff Volume (Volume of 3,458 CF 1.0"Runoff Volume=l inch `Rv'I foot/12 Temporary Pool) inch *(Total Drainage Area) Required 1yr 24-hour Runoff Volume (Volume of 0 CF Value taken from Hydraflow Model Temporary Pool) Value from stage -storage calculations Volume Below Permanent Pool 0 CF (cumulative pond volume at permanent pool elevation) Tot=i VNuunn to be Rnmr0ed a 458 CF Total Volume to be Controlfed={Volume Below - Permanent Pool)+(f yr, 24hr. Runoff Volume) Storage Elevation at Required Volume 179,90 FT Value is interpolation based upon stage - storage values. See stage -storage calculations Sten 3. Calculate the required forebav volume (18.22% of total oond volume) and comoare to the forebav volume provided Total Pond Volume 10,785 CF Value from stage -storage calculations Required Foreba Volume 2,157 CF Forebay Volume= Total Pond Volume '20% Provided Fo rebay Volume 2,046 CF Value from stage -storage calculations Provided Forebay Volume:Total Pond Volume 19.0% (Provided Forebay Volume)/(Total Pond Volume)' 100 % Sten 4: Venfv, that time required to drawdown the 1.5-inch runoff volume is within 2 to 5 days Diameter of Proposed Low -flow Orifice 1,00 IN Value chosen by designer Riser Elevation of Outlet Structure 179.90 FT Value chosen by designer (Total Elevation Head Above Orifice)=(Riser Total Elevation Head Above Orifice 0.90 FT Elevation) -(Elevation of Permanent Pool Surface) (Average Elevation Head Above Orifice)=[(Storage Elevation at Required Average Elevation Head Above Orifice 0.30 FT Volume)+(Elevation of Permanent Pool Surface)1/2-(Storage Elevation at Required Volume) Cd, Coefficient of Discharge 0,60 Value chosen by designer D, Flowrate Through Low -flow Orifice 0.014 CFS 4=Cd*(Pi)*[(Diameter of Orifice)'(1 W12 in)1^2/472'32.2'0verge Head)1^1/2 iDrawdown Time for 1.5"Runoff 2,78 DAYS (Drawdown Time)=(1,5" Runoff Volume)/0'(i P.SProjeclstLamben Arch itecture108124_PE Dunn -Erwin 13138-T1Documenls0esign CalculationsgiydrolStormwaterlrevisions)Wet Detention Pondmnh#1 BB&T BANK - ERWIN, NC Stage -Storage Calculations for Proposed Wet Detention Pond determine the storage capacity and characteristics of the proposed wet detention pond. Pond side slope above Permanent Pool 3 Veg. shelf 6" above/below Perm. Pool 5 FT Side Slope below planted shelf 0 Vertical wall incremental and cumulative storage of the wet detention pond oer contour interval. Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 179.00 3,035 0 0 Permanent Pool 179.50 4,056 1,773 1,773 179.90 4,431 1,697 3,470 180.00 4,525 448 3,918 181.00 5.510 5,018 8,935 182.00 6,557 6,034 14,969 Stage/Storage Total Pond Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 172.00 1218 0 0 Pond Bottom 178.50 1218 7,917 7,917 179.00 2,070 822 8,739 ~Permanent Pool Forebay Only (20% of Total Pond) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 175.00 186 0 0 --Bottom Elev. 176.00 324 255 255 177.00 504 414 669 178.00 686 595 1.264 178,50 780 367 1.631 179.00 881 415 2,046 --Forebay Volume P \ProjectslLambert Architecture108124.PE Dunn -Erwin BB&T\Documents\Design Calculations\Hydro\Stormwater\revisions\vvet Detention Pondmnh#1 Hydrograph Report 1 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 1 Pre Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.200 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.05 in Storm duration = 24 hrs Hydrograph Discharge Table Time -- Outflow (min cfs) 721 0.976 722 1.128 723 1.260 724 1.348 725 1.380 << 726 1.359 727 1.292 728 1.196 729 1.087 730 0.982 End Monday, Apr 27, 2009 Peak discharge = 1.380 cfs Time to peak = 725 min Hyd. volume = 4,464 cuft Curve number = 75 Hydraulic length = 0 ft Time of conc. (Tc) = 5.0 min Distribution = Type III Shape factor = 484 Printed values — 65.00% of Op.) Hydrograph Report PA Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.200 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.05 in Storm duration = 24 hrs Composite (Area/CN) _ [(0.990 x 98) + (0.210 x 61)111.200 Hydrograph Discharge Table Time -- Outflow (min cfs) 720 2.174 721 2.489 722 2.786 723 3.020 724 3.144 << 725 3.138 726 3.016 727 2.807 728 2.545 729 2.267 End Monday, Apr 27, 2009 Peak discharge = 3.144 cfs Time to peak = 724 min Hyd. volume = 9,920 cuft Curve number = 92* Hydraulic length = 0 ft Time of conc. (Tc) = 5.0 min Distribution = Type III Shape factor = 484 ( Printed values — 65.00%of Qp.) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 Post Development Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.200 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 3.05 in Storm duration = 24 hrs Composite (Area1CN) = ((0.990 x 98) + (0,210 x 61)11 1.200 Hydrograph Discharge Table Time -- Outflow (min cfs) 720 2.174 721 2.489 722 2.786 723 3.020 724 3.144 << 725 3.138 726 3.016 727 2.807 728 2.545 729 2.267 End Monday, Apr 27, 2009 Peak discharge = 3.144 cfs Time to peak = 724 min Hyd. volume = 9,920 cuft Curve number = 92* Hydraulic length = 0 ft Time of conc. (Tc) = 5.0 min Distribution = Type III Shape factor = 484 ( Printed values >= 65M of Op.) Hydrograph Report 3 Hydraflow Hydrographs by Intelisoive v9.22 Hyd. No. 3 Detention Area Hydrograph type = Reservoir Peak discharge Storm frequency = 1 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 2 - Post Development Reservoir name Max. Elevation = 180.14 ft Max. Storage Storage Indication method used. Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A (min) cfs ft cfs cfs cfs cfs cfs Monday, Apr 27, 2009 = 0.997 cfs = 743 min = 8,169 cuft _ <New Pond> = 4,708 cuft ( Primed values - 65.00%of Qp,) Wr B Wr C Wr D Exfil Outflow cfs cfs cfs cfs cfs 731 1.803 180.09 10.85 0.027 0.652 ----- ----- ----- ----- ----- ----- 0.679 732 1.643 180.10 10.85 0.027 0.707 ----- ----- ----- ----- ----- ----- 0.734 733 1.523 180.11 10.85 0.027 0.764 ----- ----- ----- ----- ----- ----- 0.791 734 1.435 180.12 10.85 0.027 0.811 ----- ----- ----- ----- ----- ----- 0.838 735 1.370 180.12 10.85 0.027 0.849 ----- ----- ----- ----- ----- ----- 0.876 736 1,318 180.13 10.85 0.027 0,881 ----- ----- ----- ----- ----- ----- 0.908 737 1.271 180.13 10.85 0.027 0.907 ----- ----- ----- ----- --_-- ----- 0.934 738 1.224 180.14 10.85 0.027 0.928 ----- ----- ----- _---- --_-- ----- 0.955 739 1.176 180.14 10.85 0.028 0.945 ----- ----- ----- ----- ----- ----- 0.972 740 1.128 180.14 10.85 0.028 0.957 ----- ----- ----- ----- -_--- -_--- 0.984 741 1.079 180.14 10.85 0.028 0.965 ----- ----- ----- ----- ----- ----- 0.992 742 1.031 180.14 10.85 0.028 0.969 ----- ----- ----- ----- ----- ----- 0.997 743 0.982 180.14 << 10.85 0.028 0.970 ----- ----- ----- ----- ----- ----- 0.997 << 744 0.933 180.14 10.85 0.028 0.967 ----- ----- ----- ----- ----- ----- 0.995 745 0.884 180.14 10.85 0.028 0.961 ----- ----- ----- ----- ----- ----- 0.989 746 0.835 180.14 10.85 0.028 0.953 ----- ----- ----- ----- ----- ----- 0.980 747 0.785 180.14 10.85 0.027 0.941 ----- ----- ----- ----- ----- ----- 0.968 748 0.736 180.14 10.85 0.027 0,927 ----- ----- ----- ----- ----- ----- 0.954 749 0.686 180.13 10.85 0,027 0.910 ----- ----- ----- ----- ----- ----- 0.938 750 0.636 180.13 10.85 0.027 0.892 ----- ----- ----- ----- ----- ----- 0.919 751 0,587 180.13 10.85 0.027 0.871 ----- ----- -_--- ----- ----- ----- 0.898 752 0.541 180.12 10.85 0.027 0.848 ----- ----- ----- ----- ----- ----- 0.875 753 0.500 180.12 10.85 0.027 0.824 ----- ----- - ----- ----- ----- ----- 0.851 754 0,466 180.11 10.85 0.027 0.799 ----- ----- ----- ----- --_-- ----- 0.826 755 0.440 180.11 10.85 0.027 0.774 ----- ----- ----- ----- ----- ----- 0.801 756 0.420 180.11 10.85 0.027 0.749 ----- ----- ----- ----- ----- ----- 0.776 757 0.406 180.10 10.85 0.027 0.724 ----- ----- ----- ----- ----- ----- 0.751 758 0.395 180.10 10.85 0.027 0.703 ----- ----- ----- ----- ----- ----- 0.730 759 0.388 180.09 10.85 0.027 0.685 ----- ----- ----- ----- ----- ----- 0.712 760 0.382 180.09 10.85 0.027 0.668 ----- ----- ----- ----- ----- ----- 0.694 761 0.377 180.09 10.85 0.027 0.651 ----- ----- ----- ----- ----- ----- 0.678 762 0.372 180.08 10.85 0.027 0.635 ----- ----- ----- ----- ----- ----- 0,662 End Pond' Report 4 Hydraflow Hydrographs by intelisolve v9.22 Monday, Apr 27, 2009 Pond No. 1 - <New Pond> Pond Data Contours - User -defined contour areas. Average end area method used for volume calculation. Begining Elevation = 179.00 It Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuff) Total storage (cuft) 0.00 179.00 3,035 0 0 0.50 179.50 4,136 1,793 1,793 1.00 180.00 4,603 2,185 3,978 2.00 181.00 5,574 5,089 9,066 3.00 182.00 6.600 6,087 15,153 Culvert ! Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 15.00 1.00 8.40 0.00 Crest Len (ft) = 10,00 16,00 0.00 0.00 Span (in) = 15.00 1.00 14.00 0.00 Crest El. (ft) = 180.60 181,00 0.00 0.00 No. Barrels = 1 1 2 0 Weir Coeff. = 3.00 3.00 3.33 3.33 Invert El. (ft) = 175.00 179.00 179.90 0.00 Weir Type = Broad Broad --- --- Length (ft) = 54.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 4.60 0.00 0.00 n/a N-Value = .013 .013 .013 nla Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(inlhr) = 0.000 (by Wet area) Multi -Stage = n!a Yes Yes No TW EIev. (ft) = 0.00 Stage (ft) 3.00 2.00 1.00 0.00 1 0.00 6.00 Total Q Note: Culven/Orifice outflows are analyzed under inlet 00 and outlet (cc) control, Weir risers checked for orifice condilions (ic) and submergence (s), Stage / Discharge 12.00 18.00 24.00 30.00 36.00 42.00 48.00 54.00 Elev (ft) 182.00 181.00 180.00 - j- 179.00 MOO Discharge (cfs) W W, PARAMOUNTE F IV G I N E 1= FZ I N G 1 N C. 5 9 1 1 O L E A N D E R D R I V E S U I T E 2 0 1 W I L M I N G T O N N C 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F) L E T T E R O F T R A N S M I T T A L To: NCDWQ Date 9/14/09 Surface Water Protection 225 Green Street, Suite 714 Re: BB&T —Erwin, NC xv ,a etteville, NC 28301-5094 Attn: Project No. 08124.PE e are sen f ❑ Originals ❑ Prints ❑ Shop Drawings ❑ Calculations he follovh iterns:1 ❑ Cnrrespondenee ® Mans ❑ Specificalions ® Other as listed below Qua'ty Datr Dwg. No. Description 1 l ngincer's Certification for storm water pond 4 Issue Status:j ❑ For Approval ❑ As Requested ❑ Construction ❑ Bid ® For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks pion Taken: ❑ No Exceptions Taken ❑ iMakc Corrections Noted ❑ Amend & Resubmit ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Remarks: Cc: (� ```` V Ell\' i4 I' 1;�;u, ; Signed:A,,�=W, Mark N. Hargrove, .E. State Stormwater Permit Permit No.SW6090401 (o?0`161 Stormwater Permit No. SW6e862f)I- 14'� BB&T in Erwin, North Carolina Harnett Count Designer's Certification I, v , as a duly registered FXq I in the State of North Car rna, having been authorized to observe 4erio ica y eeklyl full time) the construction of the project, BB&T in Erwin, North Carolina (Project) for ,6 A 4, 1 A&4 (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature /'�G,li(�J1%. `�. Ititiuuurur � O Registration Number 9 7 -- ap sss 'ti Date ti of. o 2 SEAL L r _ 19742 y �'A 4-,INrea O4 1- 'i ����� Page 5 of 6 16 State Stormwater Permit Permit No.SW6090401 Certification Requirements: _1. The drainage area to the system contains approximately the permitted acreage. /Kri g2. The drainage area to the system contains no more than the permitted amount of built -upon area. mph3. All the built -upon area associated with the project is graded such that the runoff drains to the system. ANj_4. All roof drains are located such that the runoff is directed into the system. mtj 6 5. The outlet/bypass structure elevations are per the approved plan. mN 6. The outlet structure is located per the approved plans. +�1P7. Trash rack is provided on the outlet/bypass structure. /,%)V� 8. All slopes are grassed with permanent vegetation. N1N# 9. Vegetated slopes are no steeper than 3:1. ►�4 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. �11. The permitted amounts of surface area and/or volume have been provided. M,yg 12. Required drawdown devices are correctly sized per the approved plans. ►AIyg 13. All required design depths are provided. y► 14. All required parts of the system are provided, such as a vegetated shelf, anda forebay. mpg 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building, Suite 714 Fayetteville, NC 28301-5043 Page 6 of 6 00 Q Permit Number: (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application, Vegetation is too short or too Maintain vegetation at a height of lon approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Pernut Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged, Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth, Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Re air or re lace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 7.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 4.0 feet in the forebay, the sediment shall be removed. Sediment Removal E�. 175 Bottom Elevatio�174 FOREBAY BASIN DIAGRAM (fill in the blanks) 1 Volume' ft Min. Sediment Storage Permanent Pool Elevation 179.0 Pool -Sediment Removal Elevation-172.0- Volume Bottom Elevation 171 MAIN POND 1 ft n. Sediment Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project frame:BB&T - Erwin, NC BMP drainage area number:#1 Print name:Rhett Bailey Title:Area Facilities Resource Manager Address:2101 South Tarboro Street, Wilson, NC 27893 Phone:(252) 714-2693 Signature: Date: Im1oz _I I Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, E11e vi P5 . ,J .'nr- So V , a Notary Public for the State of N of ((lyo!l r1Cj , County of W vv V1Q c ✓ , do hereby certify that If personally appeared before me this J �� day of �, J Gi p� �_)Giy_Y....... ... _, , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires % 1 � 420 S i Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4