Loading...
HomeMy WebLinkAboutSW5120203_Supplement_20120207AS'lAr' HCDENR n STORMWATER MANAGEMENT PERMIT APPLICATI 401 CERTIFICATION APPLICATION EORN E C E� U E 2of w a rF,�p MAY 2 4 2012 .MRM NC OENR Raleigh Regional Office WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name State Employees' Credit Union - Siler City Contact name Jon Aldridge Phone number 919-361-5000 Date February 7, 2011 Drainage area number 1A - To SWMF II. DESIGN INFORMATION Site Characteristics Drainage area 97,359,00 ftZ Impervious area 67,935.00 ftZ Percent impervious 69.8% % Design rainfall depth 1.00 inch C R Peak Flow Calculations �0 4� Vrk1-yr, 24-hr rainfall depth 2.99 in�y 1-yr, 24-hr intensity 0.12 inlhr Q SFAi. �r Pre -development 1-yr, 24-hr runoff 0.37 ft3lsec 9— Post -development 1-yr, 24-hr runoff 0.32 ft Isec y _ 44 Pre/Post 1 •yr, 24-hr peak control 0.05 ft3lsec 4,N �4 Storage Volume: Non -SA Waters �N A. Minimum required volume 5,503.00 ft3 Volume provided (temporary pool volume) 5,563.00 ft3 OK of fe$ ZP17- Storage Volume: SA Waters Parameters 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff volume ft3 Post -development 1-yr, 24-hr runoff volume ft3 Minimum volume required ft3 Volume provided ft3 Outlet Design Depth of temporary poollponding depth (DPIa,t,) 12.00 in OK Drawdown time 2.32 days OK Diameter of orifice 1.25 in OK Coefficient of discharge (Ca) used in orifice diameter 0.60 (uniiless) calculation Driving head (Ho) used in the orifice diameter calculation 0.44 ft OK Form SW401-Wetland-Rev.6-11116109 Parts I and 11, Project Design Summary, Page 1 or 3 Surface Areas of Wetland Zones Surface Area of Entire Welland 5,563,00 ft' OK Shallow Land 2,247.00 ft' Insufficient shallow land area. The shallow land percentage is: 40% % 40 J ID Shallow Water 2,187.00 ft2 OK The shallow water percentage is: 39% % Deep Pool Forebay portion of deep pool (pretreatment) 541.00 ft' Insufficient forebay area. The forebay surface area percentage is: 10% % Non-forebay portion of deep pool 588.00 ft2 OK The non-forebay deep pool surface area percentage is: 11% % Total of wetland zone areas 5,563.00 ft' OK Add or subtract the following area from the zones 0,00 ftZ Topographic Zone Elevations Temporary Pool Elevation (TPE) Shallow Land (top) 680.00 ft amsl Permanent Pool Elevation (PPE) Shallow Water/Deep Pool (top) 680,00 ft amsl Shallow Water bottom 679.50 ft amsl Most shallow point of deep pool's bottom 678.00 ft amsl Deepest point of deep pool's bottom 677.00 ft amsl Design must meet one of the following two options: This design meets Option #1, (Y or N) Top of PPE is within 6" of SHWT, If yes: SHWT (Seasonally High Water Table) it amsl OK This design meets Option #2, Y' - (Y or N) Wetland has liner with permeability < 0.01 in/hr, If yes: Depth of topsoil above impermeable liner 12,00 in OK Topographic Zone Depths Temporary Pool Shallow Land 0.00 in Permanent Pool Shallow Water 6.00 in OK Deep Pool (shallowest) 24.00 in OK Deep Pool (deepest) 36.00 in OK Planting Plan Are cattails included in the planting plan? N (Y or N) OK Number of Plants recommended in Shallow Water Area: Herbaceous (Ccubiinch container) 550 Number of Plants recommended in Shallow Land Area: Herbaceous Wcubic-inch container), OR 600 Shrubs (1 gallon or larger), OR 96 Trees (3 gallon or larger) and Herbaceous (4+ cubic -inch) 12 and 480 Number of Plants provided in Shallow Water Area: Herbaceous (4'cubic-inch container) 622 OK Number of Plants provided in Shallow Land Area: Herbaceous (4'cubic-inch container) 171 More required if not planting shrubs or trees. Shrubs (1 gallon or larger) 61 More required if not planting herb. and/or trees. Trees (3 gallon or larger) and 6 More required if not planting herb. and/or shrubs. Grass -like Herbaceous (4+ cubic -inch) Form SW401-Wetland-Rev.6-11116/09 Parts I and II. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Y (Y or N) OK Does project drain to SA waters? If yes, N (Y or N) Excess volume must pass through filter. What is the length of the vegetated filter? ft Are calculations for supporting the design volume provided in the Y (Y or N) OK application? Is BMP sized to handle all runoff from ultimate build -out? Y (Y or N) OK Is the BMP located in a recorded drainage easement with a Y (Y or N) OK recorded access easement to a public Right of Way (ROW)? The length to width ratio is: 1.58 :1 OK Approximate wetland length 95,00 ft Approximate wetland width 60.00 ft Approximate surface area using length and width provided 5,700.00 ft' This approx. surface area is within this number of square feet of the entire wetland surface area reported above: Will the wetland be stabilized within 14 days of construction? Y (Y or N) OK Form SW401-Wetland-Rev.6-11116109 Parts I and II. Project Design Summary, Page 3 of 3