Loading...
HomeMy WebLinkAboutSW5120101_O&M Agreement_20120402SlN.SI Ze t o 1 Permit Number: P1 (!o be provided by DWQ) Drainage Area Number: 1 g Z _ Bioretention Operation and Maintenance Agreement 4 I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be `a corrected, repaired or replaced immediately. These deficiencies can affect the integrit�l��,`� . 7 SRO, of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures:�E — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present, Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device. pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to Swale (if applicable), smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid futureroblems with erosion. Stone verge is clogged or Remove sediment and clogged I covered in sediment (if stone and replace with clean stone. applicable). �^ �E4 . 11 �u11 E- APR - 2 2012 Form SW401-Bioretention O&M-Rev.3-----Pa e 1 o 4 NC DEiN;R Raleigh �r ai «ai Office BMP element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. allies have formed. Restabilize the area after grading, Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/ wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum de th of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that -Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 5 W '5-I 2�010 Pen -nit Number: ,tf)ip (to be provided b), DIVQ) acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Camp Butner Cantonment Trailer Relocations BMP drainage area number:l&2 Print name: LTC Toni Coats Title: Construction Facilities Management Officer (CFMO), North Carolina National and Address:4105 Reedy Creek Road, Raleigh, NC 27607 Phone:919-664-6000 pp Signature: Date: 9 1, Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. e I iUr`E'�I�e/~ , a Notary Public for the State of County of �ot �� , do hereby certify that C Q personally appeared before me this day of 3,2 pp -�6ep , 20 t ( , and acknowledge the due execution of the forgoing bioretention maintenance requiremepts. Witness ,hand and official seal, RUSSELL B NiEMYER NOTARY PUBLIC WAKE COUNTY, NC My Commission FrxpWw 3-%2015 S IAA 1- My commission expires Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4 n 2"_ � ts} �_• .. _.. t , 5ti%S 1Z.ol o / Permit Number: (to be providecl by DbvQJ Drainage Area Number: "Z Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set Iocation. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant \ removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. n �� - Once a year, the soil will be aerated if necessary. ° s - Once a year, soil pH will be tested and lime will be added if necessary. �� After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal: County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU40I-Level Spreader, Filter Strip, Restored Riparian Buffer 0&M-Rev.3 Page l ol'4 BMP element: The Swale and the level lip The bypass channel The filter strip The receiving water Potential problem: The swale is clogged with sediment. The level lip is cracked, settled, undercut, eroded or otherwise damaged. There is erosion around the end of the level spreader that shows stormwater has bypassed it. Trees or shrubs have begun to grow on the swale or just downslope of the level lip. Areas of bare soil and/or erosive gullies have formed Turf reinforcement is damaged or ripap is rolling downhill, Grass is too short or too long (if applicable). Areas of bare soil and/or erosive gullies have formed. Sediment is building up on the filter strip. Plants are desiccated Plants are dead, diseased or dying. Nuisance vegetation is choking out desirable species. Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Remove the sediment and dispose of it off -site. Repair or replace lip. Regrade the soil to create a berm that is higher than the level lip, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. _ Remove them. Regrade the soil if necessary to remove the gully, and then reestablish proper erosion control, Study the site to see if a larger bypass channel is needed (enlarge if necessary). After this, reestablish the erosion control material. Maintain grass at a height of approximately three to six inches. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Remove the sediment and restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Provide additional irrigation and fertilizer as needed. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Remove vegetation by hand if possible. If pesticide is used, do not allow it to get into the receiving water. Contact the NC Division of Water Quality local Regional Office, or the 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 4 Permit Number: S �V_5__l Z tI O/ (to be provided by DIVQ) I acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Camp Butner Cantonment Trailer Relocations BMP clrainage area number:2 Print name: LTC Toni Coats Title: Construction Facilities Management Officer (CFMO), North Carolina National Guard Address:4105 Reedy Creek Road, Raleigh, NC 27607 Phone:919-664-6000 A z_It Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of G C��6��, , County of ke , do hereby certify that 1-17 T t Z C,--"a� personally appeared before me this day of _S e, 2 p , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal; RUSSELL B NIEMYER NOTARY RMI.IC WAKE COUNTY, NC W Canmbalon Explms 34"15 SEAL My commission expires 3 — t16 — Z 0 ( 5- Form SWU40I-Level Spreader, Filter Strip, Restored Riparian Buffer 0&M-Rev.3 Page') of'4 Permit Number: (to be provided by UINQ) Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 4 of`4