Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW4120202_APPROVED PLANS_20120328
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 1 1121 02,0 2- DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE � I2 (D Z) Z `7 YYYYMMDD .�t I.i Oho 0 S 1 TE Gth NtJ EAST AVI= O Cj O E MAIN NC 70,5 o� m Jv1 A, ,�$0,ti9nnrrs" ,` { ♦ �C O ♦ 5a 4 w ` AL 6447 rrrrurrirIt cu,':/ 4 te .5, ummey ng-rumem fLL C Con5ulting LngIncenng Landl lannIn P0Box96s Asheboro, NC 2J203 ;' f hone. 336 328-0902 Fax: 336 328-0922 Lmad — mackoasheboro.com s f -r-� t.� 'N 7,-7`i.. 'i 7 ;r::•r''..j,s T� .vr: . •� :� �i' �Ir .�i `� v :I i� � I r � 1 �l � � � '.rt �� 1� 1f:' i 11it� f R�.i SHEET NO. SHEET INDEX DESCRIPTION 0 COVER SHEET 1 SITE & UTILITY PLAN 2 PHASE 1 - GRADING DRAINAGE &EROSION CONTROL PLAN 3 PHASE 2 - GRADING, DRAINAGE & EROSION CONTROL PLAN 4 SAND FILTER PLAN & DETAILS 5 LANDSCAPE PLAN 6 STANDARD & LANDSCAPE DETAILS 7 STANDARD DETAILS 8 EROSION CONTROL DETAILS 9 WASTE SITE PLAN p�V151ON5 2-29-12 : Changcd catch basln Inlet protection 3-14-12 Changes per NGP N� comments '5-22-I2 Chargc5 per Siam Water comments -5-22-I2 Added Curb & Gutter detail Apj jfavrdU Z�Ur;Y i44:i11�r € t' .i i sUYii tti� required by ,P w.c,rntrv�t�r rE„�., . r�, th �arotina . r4as ieqjircr that stcfT-nwaief system designer rnspect during conic,:mity wtt!L Ill,., plans any; specs, an;t cer'``4 corriphance with =lie rperm4w S%J.JJIPTo4 C4 P 2 6 W. -1 1Z 0 zo 4- REMOVE EXISTING ASPHALT AND GENERAL SITE NOTES: CLOSE EXISTING DRIVEWAY WHEN NEW CONNECTION .TO INSTALL GRASS VEGETATION ' FRESH CUTS GROCERY DRIVEWAY HAS BEEN COMPLETED 1. BOUNDARY SURVEY BY JERRY KING _ AND IS FUNCTIONAL: JOB # 5809 H 10 EXISTING POST OFFICE BLDG. PROPOSED RELOCATED PP DECEMBER 17, 2009 2. DEED REFERENCE: DB 2145 PG 1225 REMOVE EXISTING CURB & GUTTER 3. PIN: 7665733113, 7665738060 &TIE NEW ASPHALT INTO EXISTING STREET 150 LF EXIST. ASPHALT PROPOSED 6 4. TOTAL SITE AREA = 2.59 ACRES WATER LINE /t? PROPOSED SSMH 6 (BY OTHERS) 5. ALL BEARINGS ARE GRID BEARINGS. s # 6. IRON PIPES AT ALL CORNERS UNLESS PROPOSED TEMPORARY t PROPOSED NEW 30" CURB & GUTTER OTHERWISE NOTED. CONSTRUCTION EASEMENT _AIR 7. CURRENT ZONING: COMMERCIAL 8. EXISTING LAND USE: VACANT s LLC pPER���s EXIST SERVICE POLE 9. PROPOSED LAND USE: SHOPPING CENTER PRpPER��� F P�JIIL� 54 37 2 Ell P . ,�, f A p ! 10. UNDERGROUND UTILITIES, WHERE DISCERNABLE pp 6 L PROPOSED BY SURFACE APPURTENANCES (MANHOLES, LICK F P 1g5� pG 6 CAL Pg �CpM�ER�CP 35"23'- 8 R ` CP 6" X 6" TEE V S ETC ARE SHOWN B MER NEB \ a� a SITE EAST AVE �o E MAIN NC 705 � F �r c� e ti ti � ILI ti oms� N CATCH BASWS, ALVE ), P pM o t PER INFORMATION TIIO , UTILITY NOB AIINS TE PLANS EENGINEERING Rs. ZpNE� C Z EXISTING WELL - ; PROPOSED PLUG W OFF THEY SHOULD BE CONSIDERED APPROXIMATE. o EXIST PP TO BE RELOCAT STA:00 00 11. SHOULD EXISTING CONDITIONS DIFFER FROM ` BY PROGRESS ENERGY WHAT IS SHOWN ON THESE PLANS CONTACT i ♦ �' VICINITY MAP N TS ENGINEER IMMEDIATELY. ADDITIONAL WORK N \ ♦ ,\ \ PERFORMED WITHOUT OWNERS, ENGINEERS, & �� r �ti6 ♦ \� \ SERVI EEDLINE ARCHITECTS KNOWLEDGE & APPROVAL WILL BE �'" �j ,- _ems _'.� =' . TO BE BORED UNDER PARKING: 77 SPACES (2 HANDICAP) DEEMED INCIDENTAL WORK WITH NO EXTRA "�' '� *`' �; \� STREET \ PAYMENTS MADE. ! PROPOSED 6"SANITARY ♦.�8 (BY OTHERS) SEWER SERVICE PROPOSED PLUG \ 12. LANDSCAPE REQUIREMENTS PER TOWN OF 15.0�� (BY OTHERS) SEAGROVE STANDARDS. G U) L�f I-= � N On0O� Ala N LL Y L20.01---.-j COR S ! V' 0-0 plop HEAVY DUTY ASPHALT PAVEMENT 2" RPZowl \ \ OO #00 PROPOSED 27: WATER El / I e� _SERVICE \ � NEW SERVICE POLE \ \` BY PROGRESS ENERGY -30 f o ♦ s\ PROPOSED 8"SANITARY SEWER (BY OTHERS) 13 6"PROTECTION POST(TYP.) J \ ♦� \ �' O \, TRANSFORMER 22 \ Vol ! U 0 C T P P (70 ♦o�� \ \� \ 1 \� M ER S hr t _ 18 �� \ : �Q �j \\\ PROPOSED _ 16,205 S.F. ., EXISTING WELLAA w; GROCERY STORE � � �-. P TE 180 19 N5�`� NI ;- o \ a I \ lry r TaperCID \' p 24" CONCRETE N "P OTEC11ON POST(T) P.) CURB & GUTTER \ A \ c'piti Q 1 Y Taper BEFORE YOU DIG CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW I EAST A VE. REMOVE EXISTING CURB & GUTTER & TIE NEW ASPHALT INTO EXISTING STREET \ : .o_ \ C1 \ ' EXISTING ASPHALT ROAD •a_ \ (55 LF BORE AND JACK) . \\ (BY OTHERS) \ PROPOSED NEW 30" CURB & GUTTER \ o PRO SED SSMH # 5 \� P V E A HEAVY DUTY ASPHALT. PAVEMENT 24�� y 0 A 30, MBL PER 100') - UTILITY NOTES: — -- C TREES AND 20 SHRUBS P 5' LANDSCAPE BUFFER TREES 1. WATER & SEWER SERVICE LINES TO BE INSTALLED `�\\ IN ACCORDANCE TO THE NORTH CAROLINA PLUMBING CODE. ` 2. ALL UTILITY LOCATIONS TO BE COORDINATED WITH \ LOCAL UTILITY COMPANIES. 3, REFER TO BUILDING PLANS FOR EXACT GRAPHIC SCALE LOCATIONS OF WATER, SEWER, GAS, ELECTRIC, TELEPHONE, & CABLE SERVICES. zo o 10 zo = ao 80 4. IF FIELD CONDITIONS VARY FROM PLAN, CONTRACTOR TO CONTACT ( IN FEET) ENGINEER IMMEDIATELY. I inch = 20 ft. -7 Ln � C u � � •`� 0 O Do�� � I "N Q ` i 1 Q� L� vJ ca � U v e� V CIA 0 00-0 O W V L � z O CL _j L/] 0 w cC • a) +n Q o V Sheet No. of g y � � IY[. 'I .` ,� 4 'i � � •l5' ' � r � I , +, I o+•, �I..+f �[ r}' � •.'•��� �#,1 1: I- _ Si1 14 1I!i{ e ..} .. I ►, �,l,t ,r.„i, .�.0 .a..Fn .. .... �.., ... ,,. .. ., ., � .. �... �. .,.. .. ld .b l:.5 a�. u�{1.1 �.. � . . . • • 1 . 'e.,r .�.' -. .. - - � .- . ��. . i`�..6. 1:, V',T �;.,'1'J!r�•.tls�er'.- it :•2-ft}'..y: EROSION _CONTROL NOTES: 1 PROVIDE GROUND STABILIZATION COVER WITHIN 14 DAYS UNLESS OTHERWISE NOTED: 2. AFTER GROUND STABILIZATION AND COMPLETION OF PROJECT ALL TEMPORARY EROSION CONTROL MEASURES CAN BE REMOVED. ROCK CHECK DAM (Typ.� 1 , DITCH "B" \ PROVIDE GROUND COVER 1 WITHIN 7 DAYS OF GRADING 2:1 SLOPES PROVIDE GROUND COVER 1, R WITHIN 7 DAYS OF GRADING DISTURBED LIMITS ` w m 1 1 I J f I R I E~ 0. � Cl I OR I � DITCH 1 A" -- -- PROVIDE GROUN COVER WITHIN 7 DAYS 0 GRADING 303- -- REMOVE EXISTING ASPHALT AND INSTALL GRASS VEGETATION ;, CLOSE EXISTING DRIVEWAY WHEN NEW CONNECTION TO SEQUENCEFRESH CUTS GROCERY DRIVEWAY HAS BEEN COMPLETED OF CONSTRUCTION AND IS FUNCTIONAL. CURB INLET #7 PHASE 1 EXISTING POST OFFICE BLDG. TOP: 284.0 PROPOSEJ�RELOCATED PP INV. IN FROM INLET#6: 279.53 INV. IN FROM CMP OVERFLOW: 279.43 \ INV. OUT.279.33 REMOVE EXISTING CURB & GUTTER i . OBTAIN PLAN APPROVAL FROM NCDENR- LQ AND ALL u & TIE NEW ASPHALT INTO EXISTING STREET OTHER APPLICABLE PERMITS PRIOR TO STARTING PROJECT: EXIST. ASPHALT �....< � 2. INSTALL TEMPORARY CONSTRUCTION ENTRANCE &TEMP. EARTH BERMS CATCH BASIN YARD \ 3. INSTALL SILT FENCE ALONG EASTERN BOUNDARY OF PROJECT INLET PROTECTION GRATE INLET #6 TOP GRATE: 285.5 �p . S.0. 4. INSTALL 18" RCP FROM EXIST. C.B. TO CURB INLET#7. INV OUT. 280.5 + PROPOSED NEW 30" CURB & GUTTER 5, INSTALL 15 HDPE & CMP OVERFLOW STRUCTURE FROM CI#7• to AND INSTALL INLET PROTECTION STRUCTURE AROUND CI#7, „ „ DITCH G 1 ' 6, CONSTRUCT SEDIMENT TRAP "A" WITH COIR MESH FENCING (PHASE 1), � \ ` f CONNECT SKIMMER TO THE RISER AND INSTALL TEMP. DIVERSION DITCHES. PROVIDE GROUND COVER WITHIN 7 DAYS OF GRADING EXIST SERVICE POLE - ,5 00 R P ' 7. 8. INSTALL » RATE INLET#6. INSTALL 15 RCP FROM SEDIMENT RCP FROM CI#7 TO TRAP RAP TO GRATE INLET#5 EIP,a t8 NORTH AMERICAN GRJENX' AND INSTALL RIP -RAP PAD. DS75 MATTING GRATE INLETS TOP GRATE: 87.5 GR RCP �, a,. " G EXISTING CURB INLET #8 CONVERT TO GRATED INLET \ 9. INSTALL INLET PROTECTION STRUCTURES AROUND GRATE I �Ll_ INV OUT: 284.5 72'-i5 ® 35 4 (NCDOT STANDARD 840.35) INLET#5 AND #6. EXISTING / _ INV IN FROM CI#7: 279.10 1D, INSTALL 15' RCP FROM INLET 1 TO SEDIMENT TRAP. INSTALL # l _ \ + INV OUT 279.10 RIP -RAP PAD & RIP --RAP INLET PROTECTION STRUCTURE. _I / r , - ♦ \ EXIST PP� E_RELOCAT TEMPORARY SILT FENCE 11. CLEAR & GRUB SITE jj �` ♦ , , BY PROGRESS ENERGY \ 12. GRADE DITCH A FROM SOUTWEST CORNER OF LOT TO GRATE DITCH '7D" / /r ♦ ��� INLET#6 AND INSTALL REQUIRED DITCH LINER. AND P VIDE GROUND COVER «e« `� r'- - \ \ 13, GRADE SITE INSTALL REQUIRED DITCH LINERS IN 1MTH 7 HAYS OF`PRADING / �`1?$, - - - ` DITCHES B' & C'. 1 _ OUTLET \ 14. VEGETATE ALL DISTURBED AREAS OUTSIDE OF BUILDING PAD, INV. 283 5 ENTRANCE DRIVES AND PARKING AREAS. 1 , 15. INSTALL STONE ON DRIVES/PARKING AREAS AS SOON AS DESIGN GRADE IS OBTAINED. \ ` 16, CONSTRUCT BUILDING \ 17. WHEN ALL AREAS OUTSIDE OF BUILDING AND PARKING AREAS HAVE BEEN STABILIZED AND ALL INLET PROTECTION STRUCTURES HAVE BEEN INSTALLED, CONTACT DENR FOR APPROVAL TO ADJUST SEDIMENT TRAP TO SAND FILTER SIZE (PHASE 2) TO ACCOMMODATE FOR ` HEAVY DUTY ASPHALT PAD'EMEN \ �� FRONT PARKING LOT. • \ \ \ �p O ` (SEE SHEET #3 FOR PHASE 2 GRADING & EROSION CONTROL) Ilk UA F, ` \ ` ♦` NEW SERVICE POLE \ ♦� BY PROGRESS ENERGY \ 1 \ ♦�s\ \ LRIP-RAP PAD OTECTION PO T(TYP.) \ \ `� 1 -X ♦ ®\ \ DISTURBED LIMITS \ \ \ \ \ TEMPORARY SKIMMER BASIN TRA SFORMER i SEDIMENT TRAP "A" ° \ \ \ \ \ 1 \ % cS PROVIDE GROUND COVER WITHIN • P 7 DAYS ON SLOPES OF SEDIMENT PIT s M ER °° GRATE LET #9 2 0 5 8.F. \ \ \ � � � ♦\ ` c{`5 EROSION CONTROL LEGEND - ♦ �� �, TOP GRATE: 288.0 PROPOSED EXISTING WELL TEB = Temporary Earth Berm BOTTOM X: 285.0 f� °� 0 1 ` ♦ \ G� \ TSF = Temporary Silt fence GROCERY S T6 E \ 1 a, ' 1 '�%\♦ 15" CMP OVERFLOW INLET #9 \ , i g j OVERFLOW ELEV. 284.5 \ \ INVERT OUT ELEV. 280.04 \ \ 26• 1 v ELECTRIC SUMP P EAST A V DISCHARGE PIPE 1 \ aped. �� RIP --RAP PAD \ tD IL ` `. \ REMOVE EXISTING CURB & GUTTER \ ` 244 CON CR \ x - & TIE NEW ASPHALT INTO EXISTING STREET \ \ \ \ "P 0 TION POST ) CURB & G R E- I 282.5 �TOpSar i 14 � PROPOSE NEW 30" CURB &GUTTER \ 0. \ \ HEAVY. DUTY ASPHALT, PAVEMENT .� \ \ \ a� ��� INLET INV. �� .••�� ��� 60D.SET@BASE.5 Z�!EIR.UP10" '�� \ \ DITCHPRO7C'O'VER ° \ DITCH "E ` \ WITH NVIDEDAYSUN GRADING / \ \ \ PROVIDE GROUND COVER \ \ IN 7 DAYS OF GRADING ROCK CHECK DAM \ \ \ _ ~~ TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 2:1 SLOPES RIP .RAP INLET \ \ - -� \ PROVIDE GROYND COVER GRAPHIC SCALE DISTURBED LIMITS \ \ \ WITHIN 7 DAYS F GRADING PROTECTION STRUCTURE 20 0 10 20 40 00 BEFORE YOU DIG ! NORTH AMERICAN GREEN CALL 1-800-632-4949 DS75 MATTING IN FEET) N.c. ONE -CALL CENTER 1 inch = 20 it IT'S THE LAW ! t�t,tttttltir• iA - Ln ? �U N 2 ••r'••I��tltitt U N U � 4 o hI� HN o C N o x Uj 12 V 0 � � zz y S v v v N N N z W ton c3c 4 k w L z U 0 L7 O U o � O o � w co (� z w Q � 4 z z V oC C5 s z oq b 121 u Sheet No. 2 of 9 - - tTl�; ,I, �p� 3 ris" 1 + 1j1 _ - i'. uY _ }l r4- �{� REMOVE EXISTING ASPHALT AND ' INSTALL GRASS VEGETATION t CLOSE EXISTING DRIVEWAY WHEN NEW CONNECTION TO CONTROL �:. FRESH CUTS GROCERY DRIVEWAY HAS BEEN COMPLETEDEROSION SEQUENCE 0 F C O N ST R U CT I O N 1. PROVIDE.R: GROUND STABILIZATION COVER WITHIN 14 DAYS LET 7 AND 15 FUNCTIONAL. UNLESS OTHERWISE NOTED. IN ' EXISTING POST OFFICE BLDG. TOP: 284.0 t PROPOSEVRELOCATED PP 2. AFTER GROUND STABILIZATION AND COMPLETION OF PROJECT INV, IN FROM INLET#6: 279.53 27943 PHASE 2 ALL TEMPORARY EROSION CONTROL MEASURES CAN BE INV. IN FROM CMP INV. OUT:279.33 ` REMOVE EXISTING CURB & GUTTER 17. WHEN ALL AREAS OUTSIDE OF BUILDING . AND 'PARKING AREAS HAVE REMOVED. / & TIE NEW ASPHALT INTO EXISTING STREET BEEN STABILIZED AND ALL INLET PROTECTION STRUCTURES EXIST. ASPHALT HAVE BEEN INSTALLED,CONTACT DENR FOR APPROVAL TO ADJUST CATCH BASIN YARD SEDIMENT TRAP TO SAND FILTER SIZE (PHASE 2) TO ACCOMMODATE FOR GRATE INLET #6 'pS INLET PROTECTION ' GRATE: 285.5 40, 1 FRONT PARKING LOT. TOP INV OUT: 280.5 PROPOSED NEW 30" CURB & GUTTER 18. INSTALL ASPHALT & CONCRETE PAVEMENT AS SOON AS APPLICABLE to IN BUILDING PROCESS. DITCH „ C „ ♦ 19. WHEN ALL AREAS HAVE BEEN PAVED AND THE REMAINDER OF �.... — x ..... , PROVIDE GROUND COVER � � � THE SITE HAS BEEN STABILIZED, CONTRACTOR 15 TO REMOVE EXIST WITHIN 7 DAYS OF GRADING T SERVICE POLE _ `r - 1 `; f THE COIR MESH BAFFLES AND SKIMMER FROM SAND FILTER EIP a f � i8" �C4 \ (TEMP SED TRAP NORTH AMERICAN GREEN I "A"). REMOVE ANY SEDIMENT FROM THE Ex. CELL. INSTALL REMAINING 15" CMP & OVERFLOW STRUCTURE GRATE INLET �.55 EXISTING CURB INLET #8 AND CONSTUCT SAND FILTER AS PER PLANS. D S75 MATTING TOP GRATE: 287.5 — �� GR a G CONVERT TO GRATED INLET +� _ , �ELL INV OUT: 284.572 _15 . �P e 35+ '. -• (NCDOT STANDARD 840.35)20. WHEN SITE IS STABILIZED REMOVE ALL TEMPORARY EROSION AND EXISTING — / S INV IN FROM CI#7: 279.10 SEDIMENT CONTROL MEASURES AND RESEED THESE AREAS. INV OUT 279.10 yp. � � / � � 1 ` EXIST PP TEMPORARY SILT FENCE 21. PROVIDE TEMPORARY OR PERMINATE GROUND COVER STABILIZATION ROCK CHECK DAM T WITHIN 14 DAYS OF COMPLETION OF ANY PHSE OF GRADING / ) \ \ BY PROGRESS ENERG � DITCH '/D" n i _ � � � ` \ UNLESS OTHERWISE NOTED. P VIDE GROUN6 COVER / ♦,ems8g�1 N \ WITH 7 DAYS OF `PRADING / �? a NW - DITCH $'Bpl PROVIDE GROUND COVER--.ONE■■war.+— ■�■■W— WITHIN 7 1 •GRADING. "ems'■^a•■■��" _�/\M��� I-, SLOPES PROVIDE GROUND COVER WITHIN 7 DAYS OF • i� .,ilia .IP DISTURBED , 1%% �,r.I► �Lw' Il■I 41►':'- r ram•' �� � Aso I f I m a 4 OR I � I D i TC H A" ^— PROVIDE GROUNP COVER WITHIN 7 DAYS OF GRADING \ I \ DISTURBED LIMITS \ \ NORTH AMERICAN GREEN DS75 MATTING _ i \ HEAVY DUTY, ASPHALT PA MEN�0aa \ O '11ijoso Ilk NEW SERVICE POLE BY PROGRESS ENERGY \ RIP RAP PAD AV TION \ T TYP. ` � � \ � � -�^ ® \ DISTURBED LIMITS OTEc c ) \ --� TEMPORARY SKIMMER BASIN \ \ L SEDIMENT TRAP "A" 22 ° TRA SFORMER � � � � PROVIDE GROUND COVER WITHIN \ \ \ \ 7 DAYS ON SLOPES OF SEDIMENT PIT \ ti0,, 1 F`�, EROSION CONTROL LEGEND M R GRATE LET PROPOSED i 205 \S.F. -- TEB = Temporary Earth Berm TOP GRATE: 288.0 EXISTING WELL ' h0 � BOTTOM sX: 285.0 ? _ � \ G.� \ TSF = Temporary Silt fence GROCERY S T E \ 1$'Ox \ �� 15" CMP OVERFLOW INLET #9 \ \ 19 OVERFLOW ELEV. 284.5 \ MP TE 0 \ INV ERT OUT ELEV. 280.04 FF ELEV. 293.0 \ ELECTRIC SUMP PbIMP11\ \ \ \ x � ' EAST A 1/E. " DISCHARGE PIPE �� \ \ 1 , \ T p \, ��� — \ \ .� RIP RAP PAD \ D L ` \ REMOVE EXISTING CURB & GUTTER \ 24" CONCRETE I & TIE NEW ASPHALT INTO EXISTING STREET \ \ "P O TION POST ) CURB & GUTTER \ \ \ TLET #2 01 1 x R 14 � \ PROPOSED NEW 30" CURB &GUTTER \ `- C C T P V E \ \ �� \ \ \ HEAVY'bUTY ASPHALT PAVEMENT O 2 \ \ =mamr mmommon \ DITCH "E' \ \ PROVIDE GROUND COVER \;±TIN 7 DAYS OF GRADIN 2:1 SiOPES \PROVIDE GROQND COVER � � GRAPHIC SCALE WITHIN 7 DAYS `OF GRADING 20 0 10 20 40 { IN FEET ) 1 inch = 20 ft. INLET #1 \ INV. 286.0 \ 7 i� DITCH \ PROVIDE GROUND COVER � WITHIN 7 DAYS GRADING TEMPORARY GRAVEL CONSTRUCTION ENTRANCE BEFORE YOU DIG I CALL 1-800-632-4949 N.C. ONE —CALL CENTER IT'S THE LAW I Q P .+ �� • .Q N J�!'1 � w N U � q I � b u O @1 +,\ I~ C � t� �J U � CZ� S U U V v cv �► N, z. 0 N X O 4 4C w u z Z o � o � o o � u z V O 0 Q Ce z W p� 06 z W qg ' l7 Q z V fl N ON � N z 4 � m� m 'i a 0 V o Q Sheet Na of 9 M1 2, �71 1 f OPERATIONS -AND MAINTENANCE MANUAL C` rn WATERSHED PROTECTION SAND FILTER DEVICE -! , I-rl . OPERATION OF SAND FILTER Sand filters satisfy: the State's minimum requirements of 85% removal of Total Suspended Solids. / The sand filter design is comprised of two basiccomponents: the sediment. chamber and. the sand / chamber. Both are important parts of the design,, and.. neither can be omitted. The purpose of the ' •�� . sediment chamber is to reduce the amount` of sediment that reaches the sand chamber and to help ensure that:stormwater reaches the sand chamber as :sheet flow. The purpose of the sand f chamber is to trap the finer sediment along. with pollutants 'attached to the sediment, and to provide, a media for microbial removal of bacteria. Sand filters work by receiving the first flush of runoff and settling out the heavier sediment in the sediment chamber. Water then flows to the sand bed in sheet flow where pollutants are either trapped or strained out. Sand filters are to be used only for drainage areas that have been stabilized. Sediment from construction activity can quickly clog the sand filter, thereby reducing the required size of the filter. Drainage areas directed to each sand filter should be kept below 5 acres o in size. Larger drainage areas area less likely to be entirely impervious, and it is more difficult to �� distribute the flow of runoff across the sand bed. �SJ.7J Sand filter drain pipes should always be operable so that. the 'water can be drawn down in the event �.RCp K J X of severe rain or for repairs or maintenance. ' © V. S MAINTENANCE OF SAND FILTER '. C.O. INV.'e. The installation of a sand filter can required substantial routine . and non -routine maintenance. .280.53 V Debris and sediment can effectively plug a sand filter and prevent it from completing its intended ' s° C.O. INV , function. Weekly policing of teh filter chambers adn the drainage area contributing to the basin must Q 280•60 � 00 G be done to prevent premature clogging. Careful attention must be paid to eliminating or preventing ( PV sources of sediment (i.e. unstable bare earth areas, sanding parking areas during winter, etc.) ENTATION CHAMBER 6® Q5�� � f 0 • Maintenance operations must be performed when storms of approximately one inch are not passing + %�� ���ba%1'?`IG� '�' �( .6`' .C.O. INV through the filter within 24 hours. The filter material surface must be inspected regularly to ensure �5 ► 280.53 that the ��moterial has not become clogged with debris (or pollutants) and has not been compacted or Cr � become crusted over so as to prevent the free flow of water. Maintenance for sand filters consists SAN C.Q. INv of removing the first two or three inches of discolored sand and the replacing this with new sand. At \ 280.60 E the some time that maintenance is performed on the sand . chamber, the sediment chamber should be a a pumped and cleared. 1 P 0 R OW W . SH ., GU,, RD Spillway structures and pipes including the filter drain must be inspected regularly (at least once a vE F W EL 4:0 °. P Y P P I T 80.31 y year) to ensure there is no blockage or structural damage. / Filter basin repairs and maintenance will require a professional engineer to prepare a plan or detail and certify the completion of the repairs, \ % SAND FILTER SPECIFICATIONS Sand used in the sand filter chamber must be either NCDOT Standard Size 2S or ASTM C-33. �! .R Compaction must be 95% standard proctor for fill areas. All slopes for sedimentation chamber and sand filter chamber must be 3:!. ' Drain pipes in bottom of sand filter chamber should have screen covered with filter fabric on�) J { exposed ends to prevent pipe from becoming clogged. / SEQUENCE OF CONSTRUCTION - SAND FILTER # 1 1. WHEN ALL AREAS HAVE BEEN PAVED AND THE REMAINDER OF THE SITE HAS BEEN STABILIZE, CONTRACTOR IS TO REMOVE THE COIR MESH BAFFLES AND SKIMMER FROM SAND FILTER(TEMP. SEDIMENT TRAP "A") AND REMOVE ANY SEDIMENT FROM THE CELL. 2. INSTALL REMAINING 15" CMP AND OVERFLOW STRUCTURE. 3. EXCAVATE SAND FILTER TO DESIGNED GRADES. 4. INSTALL UNDER DRAIN SYSTEM. 5. SHAPE SAND FILTER EMBANKMENTS AS PER PLAN. 6. ONCE FINAL GRADE IS OBTAINED, CONTRACTOR TO OBTAIN AS -BUILT OF SAND FILTER FOR ENGINEER TO CERTIFY THATTHE DESIRED SURFACE AREA, VOLUME AND ELEVATIONS OF ALL STRUCTURES HAVE BEEN OBTAINED PRIORTO SEEDING AND MULCHING EMBANKMENTS. 7. INSTALL FILTER FOREBAY. 8. SEED AND STABILIZE SLOPES WITHIN ONE WEEK OF COMPLETION OF POND. . 9. CONTRACTOR TO CLEAN OUT ANY SEDIMENT THAT MAY ACCUMULATE AFTER A STORM EVENT DURING POND CONSTRUCTION. ALL SEDIMENT IS TO BE REMOVED PRIOR TO PLACING POND INTO OPERATION. ` 10. NOTIFY ENGINEER FOR FINAL INSPECTION. 11. ONCE SAND FILTER AND ALL DISTURBED AREAS ARE STABILIZED, EROSION CONTROL MEASURES MAY BE REMOVED. 12. ANY DEVIATION FROM THE APPROVED PLANS ARE TO BE APPROVED BY THE ENGINEER AND NCDENR-WETLANDS UNIT PRIOR TO THE WORK BEING PERFORMED. 1 1 NOTES: BRICK MASONRY CAN BE COMMON CLAY BRICK, JUMBO BRICK, OR 3000 PSI CONC. LID ua QAD a a" n r CONCRETE BRICK. ALL MORTAR JOINTS ARE TO BE 1 /2" & 1 /8". 3000 PSI CONC. BASE SECTION A -A 3'X3' BRICK JUNCTION BOX N TS I _ SAND FILTER RESPONSIBILITY NOTES I The p ro ert owner is responsible for maintainingthe completed filter asdirect d ermanent sand by the governmental office having jurisdiction for watershed protection. The permanent sand falter shall have full design volume available prior to any issuance of certificates of occupancy for the site and/or prior to any plat recordation for the site. This moy require the cleanout and disposal of sediment from the device. The government office having jurisdiction for watershed protection and their assigns have right of access to the permanent sand filter for inspections and maintenance enforcement. Final approval of installed runoff control structures will be required at finalization of the grading permit or at issuance of the final building certificate of occupancy (compliance), whichever comes later. If neither a building permit nor a grading permit is required for a site, then any required runoff control structure shall be substantially completed prior to installation SEDIMENT CH MBER `� of any built -upon area an the site. Engineering certification of completion shall be required �C►ev prior to final approval by the Enforcement Officer. I�284,5 _ SAND CHAMEIER O7 5 NSEDIMENT CHAMBER 34.8' 39.8': ' 94.8 t: TOP BERM TRASH GUARD EL 286.00 CMP OVERFLOW w/TRASH GUARD CMP OVERFLOW W / OVERFLOW ELEV. 284.50 OVERFLOW ELEV. 284,50 INV OUT 280.31 TOP SAND INV OUT 280.04 5.0' z EL. 282.50 � PVC CLEAN OUT c o 3.0 _ R w 3.0, o cv 3 TOP -RIP RAP N x. N y:1 W.L. 284.50 EL 284.50 ' W.L. 284.50 W.L. 284.50 r ANTI -FLOTATION BLOCK ' .., 2 CF. CONCRETE SECURED ` MAINTENANCE NOTE: TO CORRIGATED TEE BOTTOM SEDIMENTATION ANTI -FLOTATION BLOCK 1. ANY DEBRIS MUST BE REMOVED FROM THE FACE OF THE RIP -RAP GRAVEL BERM CHAMBER EL. 782.00 �6- SCH 40 PVC (SLOTTED) � 2 CF. CONCRETE SECURED MONTHLY. REMOVE ANY DEBRIS FROM THE SURROUNDING AREAS THAT COULD ENTER N to BRICK JUNCTION BOX INV. 280.17 TO CORRIGATED TEE EITHER CHAMBER OF THE SAND FILTER. KEY TRENCH TO BE MINIMUM N v BOTTOM SAND FILTER cn 2. GRASS MUST BE MOWED REGULARLY TO MAINTAIN A GRASS HEIGHT BETWEEN 3"-6". OF 1' BELOW EXISTING GRADE _ CHAMBER EL. 280.50 ANTI -FLOTATION BLOCK GRASS CLIPPINGS MUST BE BAGGED AND NOT BE ALLOWED TO COLLECT ON THE SAND < ONE LAYER , TEXTILE FABRIC, GEOTEX 117F-WOVEN MONOFILAMENT 4.5 CF. CONCRETE SECURED NOTE: COMPACTION MUST BE N ~ a FILTER. o W. �GEO TE"XT1LE .OR APPROVED EQUIVALENT BETWEEN GRAVEL AND SAND TO CORRIGATED PIPE AT EQUAL SPACING 95% STANDARD PROCTOR FOR FILL U o AND GRAVEL AND `EARTHEN BOTTOM OF FILTER CHAMBER ALONG PIPE. 3. ANY ERODED AREAS AROUND THE FILTER ARE: TO BE REPAIRED IMMEDIATELY TO PREVENT ANY SILT FROM ENTERING THE FILTER. 8" GRAVEL _BED, UNDERDRAIN AROUND PIPE, 47$ WASHED STONE 4. AS PART OF MONTHLY MAINTENANCE, REMOVE ANY DEBRIS AROUND ANY CATCH BASIN OR PIPE INLET TO PREVENT ENTRANCE INTO THE DRAINAGE NETWORK. REMOVE ANY DEBRIS FROM PERMANENT EROSION MEASURES SUCH AS THE ROCK CHECK FILTER DAM AT THE SAND FILTER SECTION DETAIL PIPE INLET. NOT TO SCALE BEFORE YOU DIG ! CALL 1-800-632-4949 N.C. ONE -CALL CENTER . IT'S THE LAW I TOP BERM EL 286.00 r 5.0' UNDISTURBED EARTH OR-/ COMPACTED TO 95% PROCTOR tcG`I v ° s Q z � 3 a � Z Sheet No. of 9 .a 100' MIN. OR 4X CIRCUMFERENCE OF LARGEST TIRE (WHICHEVER IS GREATER) 4" MIN. EXISTING 4" MIN. PAVEMENT EXISTING FlLTER CLOTH GROUND SIDE ELEVATION F 100' MIN, OR 4X CIRCUMFERENCE OF LARGEST TIRE (WHICHEVER IS GREATER) 10' MIN. OR EXISTING 25' RADIUS GROUND A- i 25' JIN. EXISTING PAVEMENT 2•-3' CLEAN STONE J 10' MIN. OR 25' RADIUS PLAN VIEW CONSTRUCTION SPECIFICATIONS I 1. STONE - USE COARSE AGGREGATE (2-3 INCH STONE) 2, LENGTH - AS EFFECTIVE, BUT NOT LESS THAN 100 FEET 3. THICKNESS - NOT LESS THAN EIGHT(8) INCHES 4. WIDTH - NOT LESS THAN FULL WIDTH OF ALL POINTS OF INGRESS OR EGRESS 5. WASHING - WHEN NECESSARY, WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH, OR WATERCOURSE. THROUGH USE OF SAND BAGS, GRAVEL, BOARDS OR OTHER APPROVED METHODS. 6. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHT-OF-WAY, THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. STABILIZED CONSTRUCTION ENTRANCE NTS COMPACTED SOIL � 2' MIN, + FLOW • •:'.:.,,•;._;.., 18' MIN. 1_ 6' TYP CONSTRUCTION SPECIFICATIONS 1, REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONAL MATERIAL. 2: ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS, 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT, 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT, 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSION ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL END APPROPRIATELY STABILIZE IT, TEMPORARY EARTH BERM N.T.S. METAL POSTS 1.5' INTO GROUND ilk .VANIZED HARDWARE EXTENDS TO TOP Rnx #57 WASHE STONE AL AL AL STANDARD CATCH BASIN YARD INLET PROTECTION NTS 12 GAUGE 4"x4" OR 2"x2" WELDED WIRE HOOKED ONTO PREFORMED CHANNELS ON METAL POSTS ULTRAVIOLET RESISTANT GEOTEXTILE FABRIC OR EQUIVILENT SECURED TO WIRE WITH METAL CLIPS OR WIRE AT 8" ON CENTER. MAX SEDIMENT STORAGE LEVEL IS 1/2 HEIGHT. REMOVE SEDIMENT WHEN THIS LEVEL HAS BEEN REACHED OR AS DIRECTED BY THE CONSERVATION ENGINEER NATURAL GRADE I CARRY 6 TO 12 INCHES OF FABRIC as INTO TRENCH. COVER WITH SOIL, TAMP AND BACKFILL CARRY 6 INCHES OF WIRE INTO TRENCH 00 METAL POSTS AT 8' O.C. MAX POSTS MUST BE 2' DEEP MIN. NOTE: SILT FENCES SHOULD NOT BE USED AT PIPE OUTLETS OR IN AREAS OF CONCENTRATED FLOW (CREEKS, DITCHES, SWALES, ETC.) TEMPORARY SILT FENCE N.T.S, PIPE OUTLET TO WELL—DEFINED CHANNEL NOTES 1. La IS THE LENGTH OF RIPRAP APRON 2. d=1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP ON THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TALLWATER DEPTH OR TO TOP PF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP -RAP AND SOIL FOUNDATION. SECTION A -A BLANKET RIP -RAP INLET/OUTLET PROTECTION N.T.S. 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING APPLICA 77ON OF LIME, FERTILIZER, AND SEED. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET /N A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. J. ROLL CENTER BLANKET /N DIRECTION OF. WATER FLOW ON BOTTOM OF CHANNEL. 4. PLACE BLANKETS END OVER END (SHINGLE STYLE) WI TH A 6 " 011 AP. USE A DOUBLE ROW OF STAGGERED STAPLES 4" APART TO SECURE BLANKETS: 5. FULL LENGTH EDGE OF BLANKETS A T TOP OF SIDE SLOPES MUST BE ANCHORED IN 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING, 6. BLANKETS ON SIDE SLOPES MUST BE OVERLAPPED 4 " 0 VER THE CENTER BLANKET AND STAPLED (2" FOR C350 MA TT/NG). 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT /S RECOMMENDED AT 30 TO 40 FOOT INTERVALS USE A ROW OF STAPLES 4" APART OVER ENTIRE WIDTH OF THE CHANNEL. PLACE A SECOND ROW 4" BELOW THE FIRST ROW IN A STAGGERED PA TTERN. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED IN A 6" DEEP X 6" WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NORTH AMERICAN GREEN TEMPORARY DITCH LINING INSTALLATION GUIDE N. T.S. FIRST CHAMBER SECOND CHAMBER OUTLET ZONE INLET ZONE 25% OF SURFACE 25% OF SURFACE 15% OF SURFACE 35% OF SURFACE AREA AREA AREA AREA -- ill Tip 1111 illl I [ill EIII flll Jill 11111 IIII I Jill 011111 iri • Ill! Illi� J U r y ►VATAYA ,LAVA' A ���'•�� r•�'•��1 F�`I�'I�� ►�I►���I ►���I� �'����� il����`I I���r►�'101 kvjMA AVAI ILr�rl•r�� STEEL POST MIN, 24" IN---,-" '� COIR MESH OR SIMILAR, GROUND BELOW BOTTOM STAPLED OR TRENCHED OF SED. TRAP SECTION INTO BOTTOM OR SIDE, TYP. BAFFLES MADE OF 700 G/M COIR EROSION BLANKET SIMILAR TO AND INSTALLED AS SEDIMENT FENCE. TYP OF 3 EA, BASIN, (2 1F BASIN IS 20' OR LESS IN LENGTH, TEMPORARY SEDIMENT TRAP "All N.T.S. TOP ELEVATION OF STORMWATER 1 MAX LLJ �11 11� 11 DESIGN OF SPILLWAYS . EXISTING SLOPE 0 DRAINAGE AREA WEIR LENGTH (ACRES) (FT) CLASS I RIP -RAP 1 4 VARIES FILTER FABRIC 2 6 3 1 SIDE VIEW 5 12 i DIMENSIONS SHOWN ARE MINIMAL EX►5 i)NG SLOPE -RAP STEP SEQUENCE � FRONT VIEW " """""" a'"'"` TEMPORARY CHECK D AN NTS MAXIMUM PLACEMENT OF POST USING HOGWIRE WITH APPROVED EROSION CONTROL FABRICS TO. BE 10 FEET. VARIES (SEE PLAN) MAXIMUM PLACEMENT OF POST WITHOUT HOG WIRE USING }�-2' MIN. _ APPROVED EROSION CONTROL FABRICS TO BE I� 6 FEET. TO 8 FEET APART. POST POST METAL T-POST 5 FEET OR 6 FEET IN HEIGHT SILT -FENCE SILT -FENCE DEPENDING ON FiLL SLOPE. OVER HOG WIRE OVER HOG WIRE FABRIC 36 INCHES IN WIDTH (MUST MEET_ ENGINEERS SPECIFICATIONS FOR EROSION CONTROL) STONE #4 WASHED STONE TO BE PLACED 12 INCHES DEEP AT SILT FENCE HOG WIRE METAL FENCE POST SILT -FENCE_ SILT -FENCE 1,5 FT. MIN, 2 ?< PLOW 1.0 FT 1 M SEDIMENT nj STRUCTURAL STONE CONTROL STONE 1 t4N CROSS SECTION TEMPORARY STONE OUTLET N.T.S. VENT INLET SCREEN/DOOR' ORIFICE INSIDE %11111111a��BARREL PIPE OR "ARM" NOT INCLUDED WITH SKIMMER NOTE; INLET SCREEN SUPPLIED BY USER SCH 40 PIPE VARIES ON LARGER SKIMMERS' USE 2.75"0 ORIFICE NTH 2" HEAD & 120-1/4-0 HOLES SKIMMERS TO BE FAIRCLOTH SKIMMERS OR APPROVED EQUAL. SKIMMER DETAIL NTS NOTE• 57RUC7LARAL 57LWE SHALL BE a SEDIMENT CaNTROL STONE SHALL OR NO. 57 STONE. TOP OF BERM SHALL BE A MINIM FOOT BELOW THE .SHOULDER U4 DI PER-90N PANT A rO rAL SEDIMENT FRAP VOLUML CUBIC FEET PER ACRE OF DiSTURCCD AREA SEDIMENT -WOULD BE PROVIDED. SOME 0r PC RCOUIRED CONTROL STONE PLAN VIEW PMUME MAY BE PROVIDED BY UP 04 DO►W57REAM CONTROLS RIP -RAP HEADWALL, 1 ' MIN HEIGHT FROM ROAD SHOULDER SEDIMENT STORAGE 3' MIN. STRUCTURAL 1 � 3.5' MIN TOP VIEW METAL FENCE POST MIN. FRONT VIEW SILT -FENCE ^1 IVM uM ,.nor NOTE: STRUCTURAL STONE SHALL BE (CLASS "B" STONE FOR EROSION CONTROL PURPOSES. SEDIMENT CONTROL STONE RIP -RAP WITH ST N.T.S. NA 7ZIRAL GROUND ROTECTION PERMANENT SEEDING DEF/NI T/ON Seeding disturbed areas with perennial grasses and (or) legumes to provide a permanent vegetative cover to lessen runoff and soil erosion. PURPOSE To lessen soil erosion and permanently stabilize disturbed areas created by grading of construction sites CONDITIONS WHERE PRACTICE APPLIES All bare soil areas on construction sites which are not covered by structures or other erosion control devices. PREPARA TION Prepare seedbed by ripping, chiseling, harrowing or plowing to depth of six inches so as to produce a loose, friable surface. Remove a// stones, boulders, stumps or debris from the surface which would prohibit germination or plant growth. Spread topsoil in a layer 3" - 6" depth. Incorporate into the soil 800 to 7,000 pounds of 10-10-10 fertilizer plus 500 pounds of twenty percent (209) superphosphate per acre and two tons of dolomitic lime per acre unless soil tests indicate that a lower rate of lime can be used. Mulch after seeding with 1.5 tons of grain straw per acre and either crimp straw into soil or tack with liquid asphalt at 400 gallons per acre or emulsified asphalt at 300 gallons per acre. PLANTS &_MIXTURE PLAN77NG RA TE/ACRE PLANTING DA 7ES Tall Fescue 100-150 lbs. Aug. 15 - Oct. 15 (Low Maintenance) Feb. 15 - May 1 Tall fescue 200-250 lbs. Aug. 15 - Oct. 15 Waterways and Lawns (High Maint.) Feb. 75 - May 1 Blend of two turf- 200-25C lbs. Aug. 15 - Oct. 15 type tall Fescues (909) and two or Feb. 15 -Moy 1 more improved Ken tucky bluegrass vorie ties (70,9 ) (high maintenance Toll Fescue 100 lbs. Feb. 15 -May 1 and and Aug. 15 -- Oct. 15 Kobe or Korean 20-25 /bs, Lespedeza Tall Fescue 50 lbs./acre Nov. 1 - Feb. 1 (Unscarified) Tall Fescue and 60 /bs, July and August German Millet or and Sudangrass 2 30 lbs. Tall Fescue 70 lbs. Nov. 1 - Jan. 30 and and RYegroi17 2 25 lbs. Common Sermudogross 8 lbs. (hulled) April 15 - June 30 15-20 lbs. (unhulled) Feb. 1 - March 30 1 For spring seedings, use Scarified Lespedeza seed For late fall and win ter seedings, use unscorified seed. 2 Annuals such as Millet, Sudangrass and Ryegrain must be kept at 10- 12" maximum .height. TEMPORARY SEEDING SPECIFICATIONS PIEDMONT REGION Application Rates lb/ac Recommended Seeding Dates Species Seed 10-10-10 Agriculurai Straw Fertilizer Limestone Winter Wheat 120 Jan. 1 May 1 Annual Lespedeza 50 750 2,000 4,000 (Kobe) May I - Aug 15 German Millet 40 750 2,Q00 4,000 Aug 15 - Dec 30 Ryegrain 120 1,000 2,000 4,000 GENERAL EROSION CONTROL NOTES THE CONTRACTOR SHALL TAKE ALL REASONABLE PRECAUTIONS TO AVOID THE SILTING OF STREAMS, LAKES OR OTHER WATER COURSES DUE TO THE CONSTRUCTION OF THIS PROJECT, EFFECTIVE EROSION CONTROL MEASURES SHALL BE INITIATED PRIOR TO THE COMMENCEMENT OF CLEARING, GRADING, EXCAVATION, OR OTHER OPERATIONS THAT WLL DISTURB THE NATURAL PROTECTION. THE EROSION CONTROL DETAILS SHOWN HEREIN ARE FOR THE CONTRACTOR'S REFERENCE. THE DETERMINATION OF WHICH DETAIL IS APPLICABLE AS THE WORK PROGRESSES SHALL BE AS SHOWN ON THE PLANS OR MADE BY THE ENGINEER. ALL DITCHES SHALL BE STABILIZED AS SOON AS IS PRACTICABLE TO MINIMIZE EROSION. THE CONTRACTOR IS REFERRED TO THE DETAILED SPECIFICATIONS FOR A DESCRIPTION OF ADDITIONAL. EROSION CONTROL REQUIREMENTS. THE CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES IN A GOOD, WORKING STATE OF REPAIR UNTIL THEIR USE IS NO LONGER WARRANTED. AT THAT TIME, THE EROSION CONTROL DEVICES SHALL BE REMOVED AND DISPOSED OF SO AS TO CAUSE NO STREAM SILTATION, WHERE CULVERT PIPES ARE TO BE INSTALLED UNDER ROADWAYS, THE CONTRACTOR SHALL INSTALL THE CULVERTS AS RAPIDLY AS IS PRACTICAL, BACK FILL IMMEDIATELY AND RIP RAP THE UPSTREAM AND DOWNSTREAM SIDES OF THE STREAM CHANNEL. NORTH AMERICAN GREEN S-75 OR EQUAL FOR TEMPORARY LINING CHANNELS A---F NTS V y U �j q 0 1 C O � It V hh� U�� M LZ q� u Z .� lu r Qj C� O w Q Qc CVO >L � � � a 15 a u Sheet No. 8 OF