Loading...
HomeMy WebLinkAboutSW4091201_401 Certification Application_20100216Permit Number: (to be provided by DWQ) tA A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. . The Required Items Checklist (Part Ill) must be printed, filled out and submittod along with all of the required information. I:}PROJECT INFORMATION. `` ' _.: i' ` �.. Project name Goodw9l Mocksvilie Contact name Bill Haymore Phone number 336-724-3625 Date December 11, 2009 Drainage area number 2 I! DESIGN:INF,ORMATION i. ..:.` •pia... Site Characteristics Drainage area 38,768 ft2 Impervious area 28,749 ftz Percent impervious 74.2% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? 1-yr. 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr. 24-hr peak control Storage Volume: Non -SA Waters Minimum volume required Volume provided - Storage Volume: SA Waters N (Y or N) In 2.98 in/hr fl'lsec ft'/sec ft'Isec 2,328.0 ft' 2,360.0 ft' OK 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft' Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water Ponding depth of water Surface area of the top of the bioretention cell Length: Width: -or- Radius Media and Soils Summary Drawdown time, ponded volume Drawdown time, to 24 inches below surface Drawdown time, total: In -situ soil., Soil permeability Planting media soil: Soil permeability Soil composition % Sand (by weight) % Fines (by weight) % Organic (by weight) Phosphorus Index (P-Index) of media Form SW401-Bioretention-Rev.3 July 30. 2009 12 inches OK 1.00 ft 2,328.0 ft' OK 140 ft OK 23 ft OK ft 6 hr OK 18 hr OK 24 hr 0.13 inlhr Insufficient. Increase infiltration rate. 2.00 in/hr OK 85% OK 10% OK 5% OK Total: 100% 30 (unitless) OK Parts I and II. Design Summary, Page 1 of 2 Permit Number: (ro be provided by QWQ) Basin Elavations Temporary pool elevation Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface . Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP located at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater,than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8inches gravel followed by 3-5 ft of grass) Grassed swale Forebay Other 828.00 fmsl Y (Y or N) OK Y (Y or N) OK media depth 827 fmsl 0 inches Insufficient mulch depth, unless installing grassed cell. 824 fmsl 3ft 0.33 ft Y (Y or N) 4 OK 10 OK 1 ft 822.67 fmsl 818 fmsl 4.67 ft OK N (Y or N) fmsl 827 ft 2 4 4 OK N (Y or N) Excess volume must bypass cell. N (Y or N) Excess volume must pass through filter. ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 0.5 ft/sec: OK N (Y or N) OK N (Y or N) OK Y (Y or N) OK X OK Form SW401-Bioretention-Rev.8 July 30, 2009 Paris I and 11. Design Summary, Page 2 of 2 Permit Number: (to be provided by DWQ) o�'0E wpT �94G h F kv RA r ti HCDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be titled out, printed and submitted. The Required Items Checklist (Part Itt) must be printed, filled out and submitted along with all of the required information. I:, -PROJECT. INF0RMATI0N':r5:�. F��R_r _ W;•� Project name Goodwill Mocksville Contact name Bill Haymore Phone number 336-724-3625 Date December 11, 2009 Drainage area number 1 II'DESIGN INFORMATION:%TL«r°.x_ 4`ti w s'�y_` .'"`.. + `y- iu _'� " r `�'� ":.:_ Awl ' i Site Characteristics Drainage area 71,874 ft2 Impervious area 40,946 tt2 Percent impervious 57.0% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? N (Y or N) 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity 2.98 in/hr Pre -development 1-yr, 24-hr peak flow ft'/sec Post -development 1-yr, 24-hr peak flow f Isec Pre/Post 1-yr, 24-hr peak control ft3lsec Storage Volume: Non -SA Waters Minimum volume required 3,383.0 ft3 Volume provided 3,795.0 ft3 OK Storage Volume., SA Waters 1,5' runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft, Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 3,795.0 ft2 OK Length: 120 ft OK Width: 35 ft OK -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface 18 hr OK Drawdown time, total: 24 hr In -situ soil.• Soil permeability 0.13 in/hr Insufficient. Increase infiltration rate. Planting media soil., Soil permeability 2.00 in/hr OK Soil composition % Sand (by weight) 85% OK % Fines (by weight) 10% OK % Organic (by weight) 5% OK Total: 100% Phosphorus Index (P-Index) of media 30 (unitless) OK Form $W401-Bioretention-Rev.8 July 30, 2009 Parts I and II. Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Basin Elevations Temporary pool elevation Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safely is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom'of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP located at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X' in the shaded cell) Gravel and grass (8inches gravel followed by 3-5 ft of grass) Grassed swale Forebay Other 824.00 fmsl Y (Y or N) OK Y (Y or N) OK media depth 823 fmsl 0 inches Insufficient mulch depth, unless installing grassed cell, 820 fmsl 3 ft 0,33 ft Y (Y or N) 6 OK 10 OK 1ft 818.67 fmsl 813 fmsl 5.67 ft OK N (YorN) fmsl 823 ft 2 4 4 OK N (Y or N) Excess volume must bypass cell. N (Y or N) Excess volume must pass through filter. ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 0.25 fVsec OK N (Y or N) OK N (Y or N) OK Y (Y or N) OK X OK Form SW401-Sioretention-Rev.8 July 30, 2009 Parts ! and N. Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) fI IREQUIRED'rrEMS CHECKLIST.. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Pfan Initials Sheet No. /'("�r C — 3 5 1. Plans (1" 50' or larger) of the entire site showing: Cht1LMIML>) Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW),•• Clean out pipe locations, Overflow device, and Boundaries of drainage easement,. C-3 C 2. Plan details (1" = 30' or larger) for the bioretention cell showing: StJ�fnl7t'$D� Dell dimensions Pretreatment system, High flow bypass system, Maintenance access, s Recorded drainage easement and public right of way (ROW), Design at ultimate build -out. Off -site drainage (if applicable), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. Indicate the P-Index between 10 and 304� __ C ~ 3 G 3. Section view of the bioretention cell (t" = 20' or larger) showing: C6ki5rAl rpD)- Side slopes, 3:1 or lower Underdrain system (if applicable), and Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, fitter fabric (or choking stone if applicable), #57 stone, underdrain_s (if applicable), SHWT level(s), and overflow structure] t;EPaRT 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The STor—tAWATfIZ results of the soils report must be verified in the field by DWO, by completing & submitting the soils MA NA(q. investigation request form. County soil maps are not an acceptable source of soils information. All PLA 4 . elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in C5J8tM1RiD)situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and - P index. C- 3D 5. A detailed planting plan (1" = 24' or larger) prepared by a qualified individual showing: C'5V60I1TfVb) - Avarietyofsuitablespecies, Sizes, spacing and locations of plantings. Total quantity of each type of plant specified, -A planting detail, The source nursery for the plants, and Fertilizer and watering requirements to establish vegetation. SW 0-I01 6. An assurance that the installed system will meet design specifications upon initial operation once the C-SI aM I TUD) project is complete and the entire drainage area is stabilized. C —3 C 7, A construction sequence that shows how the bioretention cell will be protected from sediment Lntll the entire drainage area is stabilized. 8, The supporting calculations (including underdrain calculations, if applicable). � tI'fTED> SV5MI Sy>�iTTEp 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. �EPo�T 10. A copy of the deed restriction, Form SW401-Bioretention-Rev.7 Part III, Page 1 of 1