Loading...
HomeMy WebLinkAboutSW1100301_HISTORICAL FILE_20120601STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW%�fa,3Dl DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE YYYYMMDD �4 % �-` MODE ®®�� ® R North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Jess Maggard, Plant President Flowers Baking Company of Morristown 1725 West I" North Street Morristown, TN 37816 Division of Water Quality Charles Wakild, P.E. Director .tune 1, 2012 Subject: Stormwater Pcrinit No. S �+' 1100301 Flowers Baking Company of Morristown Hendersonville Distribution facility at Blue Rock Commerce Center High Density Commercial Bio-Retention Project Henderson County Dear Mr. Maggard: Dee Freeman Secretary The Asheville Regional Office of the Division of Water Quality (ARO/DWQ) received your request for a name and ownership change for the post -construction stormwater permit at Hendersonville Distribution Facility at Blue Rock Commerce Center (SW l 100301). Attached is the modified permit for Flowers Baking of Morristown — Hendersonville Distribution facility at Blue Rock Commerce Center. This permit complies with the Stormwater Regulations set forth in Title 15A NCAC 2I-1. 1000 and Session Law 2006- 246. This permit shall be effective from the date of issuance until May 10, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 15013 of -the North Carolina General Statutes. and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 2761 1-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the ARO/DWQ. If you have any questions, or need additional information concerning this matter, please contact Susan A. Wilson, in the ARO/DWQ al (828) 296-4665.1 or sLisaii.a.wilsoii@ncdeiir.gov. Sincerely, ?2� harks Wakild, P.1. cc: Asheville Regional Office Central files Jim Johnson, Environmental Manager, blowers Foods 2900 Rolling Pin Lane, Suite C, Suwanee, GA 30024 Wellands and Stormwater Branch ORe 1617 Mail Service Cenler, Raleigh, North Carolina 27699-1617 North Carol i rt a Location: 512 N. Sarshuzy SI, Raleigh, North Carolina 27604 Ir Phone: 919-807.6300 4 FAX: 919-807-6494 Aaturallly Internet: www.Rcwaterqualily.org An Equal Opporturuly 1 Affirmative Action Empbyer ,0 4� State Stormwater Permit Permit No. SW1100301 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules; and Regulations PERMISSION IS HEREBY GRANTED TO Flowers Baking Company of Morristown Hendersonville Distribution Facility at Blue Rock Commerce Center McMurray Road, Flat Rock & Henderson County 7r7:i0:11 construction, operation and maintenance of two bioretention cell(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater'rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 10, 2020, and shall be subject to the following specified conditions and limitations: Sol 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting -data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 48,963 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area as indicated in Section 1.7 of this permit, and per the application documents and as shown on the approved plans. The built -upon area for the future development is limited to 46,363 square feet. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such: required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 4 State Stormwater Permit Permit No. SVd 1100301 7. The following design criteria have been provided in the bioretention cell and must be maintained at design condition: a. Drainage Area, ftacres: Onsite, 2: Oftsite, ft`: b. Total Impervious Surfaces, ft�: Qnsite, ft Offsite, ft2: c. Design Storm, inches: d. Max. Ponded Depth, feet: e. Seasonal High Water Table, fmsl: f. Planting Media Depth, feet: g. Cell Dimensions, feet- h. Bottom Elevatio�p, fmsi: i. Surface Area, ft j. Permitted Storage Volume, ft3: k. Bypass / Storage Elevation, fmsi: I. Predevelopment 1 year 24 hour: M. Post development 1 year 24 hour: n. Drawdown Time, hours: o. Underdrain Diameter, inches: P. Receiving Stream/River Basin: q. Stream Index Number: r. Classification of Water Body: 11. SCHEDULE OF COMPLIANCE 1.58 30,544 31,468 1,848 8;798 24,498 24,465 24,498 24,465 0 0 1" 12" 12" 2161 2' (grass} 41 ' by 54', 102' by 40' 2162 2164 2,004 2,060 2,004 2,060 2,166 2,168 2.64 2.94 1.08 1.32 W/sec 24 24 4" 4" UT to Bat Fork I French Broad 6-55-8-1 loC„ 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch basins and piping. g. Access to the cell and outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The facilities shall be constructed as shown on the approved plans. This permit Page 2 of 4 State Stormwater Permit Permit No. SW110030 i shall become void unless the facilities are constructed in accordance with the } conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, I and prior to operation of this permitted facility; a certitication must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with'this permit, the approved plans and � specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. i 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership, d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is' defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such Page 3 of 4 State Stormwater Permit Permit No. SW1100301 time as the Division approves a request to transfer the permit. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances; which may he imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12, The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 1st day of June, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION '-;� 4 2-� -�� -- --- - -- fv, CHarles a iDirector Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 4 Permit Number: (lobe )roridedbiDWO) Drainage Area Number: Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. Heavy equipment will NEVER be driven over the bioretention cell. Special care will be taken to prevent sediment from entering the bioretention cell. Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will rernediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have Formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if:. • ;: stone and replace,with clean stone. applicable), Form SW401-Bioretention O&M-Rev.3 JUN 0 • �_—.----._._ j1 of I WATEH t} 'f i BMP element: Potentialproblems: How 1 will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. 4 possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and ' replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present Remove tree stake/wires (which six months after planting. can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed, Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recor unended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 2 BMP element: Potentialproblems: How I will remediate the roblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if a licable The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- ou tle t. 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 3 Permit Number: (to be provided by DIVO) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Projecl name:Hendersonville Distribution Facility at Blue Rock Commerce Center BMP drainage area number:DA-I 8 7- Print name: Mat I,II a-� .V Title: U P r1i -beli-tOpIWA ' Address: �O f !" LA Phone: (I ZO, 9 3 1-- a5oc x M Signature: Date: 3 z. 10 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, �1i`� i l'1 '�G _ , a Notary Public for the State of County of -C)f- S,,l , do hereby certify that . - 3qjt]; � 1�(1i'l personally appeared before me this ! day of t��`�k ( �'\ V and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, %AN FEB • 8 's 22012 �q�AYIIIII �pVO'���`� S My commission expires � r Form SW40I-$ioretention I&M-Rev. 2 Paae 4 of 4 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 30, 2011 Corporation Service Co., Registered Agent Flowers Baking Co. of Morristown, LLC 327 Hillsborough St. Raleigh, NC 27603 Member/Principal Flowers Bakeries, LLC 1919 Flowers Circle Thomasville, GA 31757 SUBJECT: NPDES Stormwater Permit Compliance Inspection Hendersonville Distribution Facility at Blue Rock Permit No: SWl 100301 Henderson County Dear Sirs: On September 20, 2011, Susan A. Wilson, from the Asheville Regional Office of the Division of Water Quality (DWQ), and Tim Fox, Henderson County Erosion Control, conducted a site inspection for the stormwater controls at the Hendersonville Distribution Facility at Blue Rock, located at 129 Reeds Way in Henderson County, NC. The facility has two bioretention cells which serve as post -construction stormwater BMPs. Good vegetation was present in each cell and no erosive problems were noted at the inlets or outlets. No adverse impacts to surface waters were noted from the BMPs. The inspection report is attached for your review. A copy of an operation and maintenance agreement for Bioretention BMPs is also attached for your review. DWQ reminds you that the stormwater controls (both BMPs) are to be inspected, at minimum, once a month and within 24 hours after every storm event greater than 1.0 inch. Records for inspection and maintenance should be kept in a knownlset location and must be available upon request. Location: 2090 U.S. Hghway 70, Swannanoa, North Carolina 28778 Phone: 828-296.45001 FAX: 828-299-70431 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org One NorthCarolina Aaturall# An Equal Opportunity 1 Affirmative Action Employer Flowers Baking Co. of Morristown, LLC September 30, 2011 Page 2 of 2 A copy of a name and ownership change form has been attached with this report. DWQ recommends that you document the appropriate legal entity for the permit (as well as the party responsible for inspection). Your original design engineer has been copied with this letter and report. Please contact me, or have a designee contact me, at (828) 296-4665 or Susan.A. Wilson@ncdenr.gov after receipt of this inspection report. Sincerely, Susan A. Wilson, P.E., Environmental Engineer Surface Water Protection Section Asheville Regional Office Enclosure: Inspection Report, Name/Owner Change Form, O&M Agreement cc: ARO Files Tim Fox, Henderson County Planning (w/Inspection), e-copy Jesse Gardner, P.E. (w/Inspection), 1210 S. Main St., Waynesville, NC 28786 SASWPNenderson\Stormwaterl5-State Stormwater\Hville Dist at Blue Rock\CFI.Hville Distri Blue Rock.9 2011 Am Compliance Inspection Report Permit: SW1100301 Effective: 02/28/11 Expiration: 05/10/20 Owner: Butler Development Group Project: Hendersonville Distribution Facility at Blue County: Henderson Rock Commerce Center McMurray Rd Region: Asheville Flat Rock NC 28731 Contact Person: Matt Wilson Title: Phone; 770-733-9500 Ext.19 Directions to Project: Type of Project: State Stormwater - HD - Other Drain Areas. 001 - (Bat Fork) (04-03-02) ( C) 002 - (Bat Fork) (04-03-02) ( C) On -Site Representative(s): Related Permits: Inspection Date: 0912012011 Entry Time: 04:05 PM Primary Inspector: Susan A Wilson Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: E State Stormwater (See attachment summary) Exit Time: 04:25 PM Phone: 828-294-4500 Inspection Type: Compliance Evaluation Page: 1 Permit: SWI100301 Owner - Project: Butler Development Group Inspection Date: 09/20/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Susan Wilson (DWQIARO) and Tim Fox (Henderson Co. Erosion Control) conducted an inspection at the newly built site on September 20, 2011. The 2 bioretention cells (BNMPs) had good vegetation and appeared to be working properly. Visually, it appears that the parking lot may divert most of the stormwater runoff to BMP#2 (southwest corner). This should be observed in the future to ensure that BMP#2 is not eroding and is properly treating the stormwater. The ownership of the permit appears to have been changed and needs to be modified. Also - the O&M Agreement needs to be updated if Matt Wilson (Butler Development Group) is no longer responsible. The owner may wish to consider removing some of the invasive vegetation. Page: 2 Permit: SW1100301 Owner - Project: Butler Development Group Inspection Date: 0912012011 Inspection Type: Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE Is the permit active? 00011 Signed copy of the Engineer's certification is in the file? ❑ ■ ❑ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ■ ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ ■ Comment: ARO was unable to locate the Engineer's Certification in our files. The original O&M Agreement was signed by Matt Wilson of the Butler Development Group. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ■ ❑ ❑ ❑ Comment: The site appears to be built as designed. However, from visual inspection of the site - it appears that the parking lot may be graded so that the majority of the runoff diverts to BMP#2 (southwest corner). SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑ Are the inlets located per the approved plans? ■ ❑ ❑ ❑ Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ❑ ■ upon request? Comment: The site appears to be very newly constructed. Maintenance does not seem to be an issue at this time. Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ■ ❑ ❑ ❑ Comment: Other WO Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ' ■ ❑ ❑ ❑ Comment: There does not appear to be any adverse impacts to surface waters from the outlet of the BMPs. Page: 3 North Carolina Secretary of State Page I of 1 °L"IA 4,�., North Carolina r' ti DEPARTMENT of= THE Elaine F. Marshal! Y, Secretary SECRETARYOF STATE PO Box 29622 Raleigh. NC 27626-0622 t919>807-2000 Date: 9/30/2011 Click here to: View Document Filings I Sign Up for E-Notifications i J Pre -populated Annual Report Fillable PDF Form I File an Annual Report Corporation Names Name Name Type NC FLOWERS BAKING CO. LEGAL OF MORRISTOWN, LLC Limited Liability Company Information SOSI D: 0583852 Status: Current -Active Effective Date: 3/9/2001 Dissolution Date: Annual Report Due Date: Citizenship: FOREIGN State of Inc.: TN Duration: PERPETUAL Annual Report Status: CURRENT Registered Agent Agent Name: CORPORATION SERVICE COMPANY Office Address: 327 HILLSBOROUGH STREET RALEIGH NC 27603 Mailing Address: 327 HILLSBOROUGH STREET RALEIGH NC 27603 Principal Office Office Address: 1919 FLOWERS CIRCLE THOMASVILLE GA 31757 Mailing Address: 1919 FLOWERS CIRCLE THOMASVILLE GA 31757 Officers Title: MEMBER Name: FLOWERS BAKERIES, LLC Business Address: 1919 FLOWERS CIRCLE THOMASVILLE GA 31757 This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 1024 http://www.secretary. state.nc.us/corporations/Corp.aspx?PitemId=5315112 9/30/2011 Henderson County, NC Detailed Parcel Polygons Report Friday, September 30, 2011 i rarcef inrormaeron . PIN: 9588248120 Parcel Number: 1012815 Listed To: FLOWERS BAKING CO OF MORRISTOWN LLC Physical Address: 129 REEDS WAY Deed: 1441/455 Date Recorded: 09/29/2010 Mailing Address: 1919 FLOWERS CIR Mailing City, State, Zip THOMASVILLE, GA 31757 Code: Property Description: Lot # 4 BLUE ROCK COMMERCE CENTER Map Sheet: 9588.03 Neighborhood: BLUE ROCK COMMERCE CENTER Township: Blue Ridge Assessed Acreage: 1.5800 Building Value: $327,000.00 Land Value: $137,600.00 Total Value: $464,600.00 Jurisdiction: Fire District: BLUE RIDGE FIRE County Zoning: I Elementary School UPWARD District: Middle School District: FLAT ROCK MIDDLE High School Distrcit: EAST HIGH Soils: Hayesville loam, 2 to 7 percent slopes Voting Precinct: Blue Ridge South Commissioner District: 4 Revenue Stamps: 380 Agricultural District: Blue Ridge caoc':4'44 CIVIL DESIGN CONCEPTS, PA Transmittal Letter Date: February 18, 2011 Project Name: Hendersonville Distribution Facility at Blue Rock Commerce Center CDC Project: 10971 To: Mr, Brian Lowther NC DENR — Division of Water Quality Wetlands and Stormwater Branch Stormwater Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 cc: Via Mail Overnight Hand Delivered Pick up @ CDC Office 17ER 2 4 2011 ---- Copies---- Date --------- Description---------------------------------------- ------------------- ---------------------------- 2 5-5-10 Stormwater Permit Application (Revised) I Check for $505 REMARKS: Please find attached applications and review fee to complete the package that was previously submitted to your office. Please let me know if you need any additional information in order to complete your review. By: Jesse Gardner, P.E. ---------------------------------- File: Plan Water Sewer S:IAC A DI 109711DK)&G R- EC-S D\B15 May 10-trans.doc r MAR 2 9 2011 , EMA CA PAY Accord Mailing Address: P.Q. Box 5432, Asheville, NC 28813 200 Swannanoa River Rd Asheville, NC 28805 1210 S. Main Street, Waynesville,NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455 State Stormwater Inspection Report General Project Name: � y ��,y fi tx �I G I. Permit No: SW [ 10030 t Expiration Date: Contact Person: ' Phone Number: Inspection Type: C Inspection bate: pt tt Time In: : O >6 Time Out: 7- Current Weather: l�W!_l Recent Rain (Date)? 9 t1 Rain in Lo.s�, Location Facility Address / Location: City: Zip: County: Lat: "N Long: - ° "W Permit InformationI� s� Rule Subject to (circle one): 1988 Coastal Rule 1995 Coastal Rule 2008 Coastal Rule csst ba2Il4b24� Goose Creek High Quality Waters Outstanding Resource Waters Density (circle one): Qgh (I-ID� Low (LD) U i aA4 ;- i Stormwater Best Management Practices (BMPs) (insert number of each). - Wet Ponds Infiltration Basins Infiltration Trenches LD Swales Stormwater Wetlands Dry Ponds ✓ Bioretention Permeable Pavement Sand filters (circle one) Open Closed Cistern Level Spread erlFilter Strip Other (sped): File Review Yes No NIA NIE 1. Is the permit active? 2. Signed Engineer's Certification on file? ✓ 3. Si fined Operation and Maintenance agreement on file? DoeSAsr 5 d P-S v 4. Recorded heed Restrictions on file? Site Visit- Built Unnn Area (RUAl Yes No NIA NIE 5. BUA is constructed and consistent with the permit requirements? v 6. BUA aspermitted) is graded such that the runoff drains to the system? (high density only) 7. Drainage area is consistent withpermit? i.e. no un ermitted drainage to the SW BMI's ✓ 8. Drainage area is stabilized? to reduce risk of sedimentation to the SW BMPs Site Visit: Stormwater BMPs Yes No NIA NIE 9. Stormwater BMPs are located per the apErovedplans? 10. Stormwater BMPs have dimensions (e . length, width, area) matching the upprovedplans? 11. Stormwater BMPs are constructed per the approvedplans? ✓ Sits Visit• nnpratinn and Maintpnanrp Yes No NIA NIE 12. Access points to the site are clear and well maintained? 13. Trash has been removed as needed? V 14, Excessive landscape debris (grass clippings, leaves, etc) is controlled? 15. Stormwater BMPs being operated and maintained as per the permit requirements? ✓ 16. Inspection and Maintenance records are available for inspection? (high density only, 1995 - present only) ✓ Other Permit Conditions Yes No NIA NIE e compliant with other conditions of thepermit? Other Water Quality Issues Yes No NIA NIE `,,)m lliiant with other water uali[ issues as noted durinr, the inspection? !/ .on Report, Version 3.0 Pagc 1 of 2 State Stormwater Inspection Report Comments V-446T-Ar—r0IV. .. QjU I L,-r ft-5 Ue-sr4,~► t�. �,�5���; 5 ►�/-! b35►� . V6R- 1W # 9. -� N o r sup-" .. TA -I s P-444LoN 4 t..ai �& i �z T i oFp�AkPVq & -IV 5-024rj 2uti00FG r,C, �01.A4' "[b Inspection Pictures (some of the pictures taken during the site visit) Compliance Status Compliant ❑ Non -Compliant Letter Sent (circle one): Yes No Letter type: CEI NOV NOVRE r Date Sent: o Reference Number: Inspector Name and Signature: 7zie 77 Air �w> CF Q � �ju'R-t a Other Date: State Storaiwater Inspection Report, Version 3.0 Page OMACTEC engineering and constructing a better tomorrow ' } JUN i 2010 1 ju WATEF' QLiA1-lT't S'-CT�UN April 29, 2010 Mr. Matthew Wilson Butler Development Group 2727 Paces Ferry Road, Suite 1-255 Atlanta, Georgia 30339 Subject: Recommended Seasonal High Groundwater Table (SHWT) Elevation at Bioretention Cells Flowers Bakery Distribution Facility Flat Rock, North Carolina MACTEC Project No. 6685-09-1850.01 Dear Mr. Wilson: As requested by Mr. Jesse Gardner of Civil Design Concepts, PA and authorized by you via email on April 22, 2010 , we installed two temporary groundwater elevation monitoring points (piezometers P- 1 and P-2) at/near the locations identified on the undated site plan provided via email by Mr. Gardner. Tile purpose of the installation of these piezometers was to provide a recommended Seasonal High Water Table (Sl-]WT) elevation for two stormwater bio-retention cells. 3liese piezometers were installed on April 23, 2010 and consisted of 1-inch diameter PVC pipe with the bottom 2,54eet of the pipe slotted and installed in nominal 2-inch diameter holes augered by hand to depths of 9.4 and 9.8 feet. A plan showing the approximate locations for these two piezometers, along with the hand auger boring records are attached. Seasonal High Water Table (SHWT) Recommendation We understand that a SFIWT elevation is required for design of two stormwater bioretention cells to be located south of the proposed building. Groundwater elevation measurements were obtained at the two piezometers installed at the locations of the bioretenntion cells and compared with groundwater elevation measurements obtained in January 2010 to evaluate the anticipated SF]WT elevation at the proposed bioretention cells. Additionally, the soil that was encountered during hand augering to install these piezometers was visually examined by a geotechnical engineer for signs of iron staining, which may be indicative of soils that are at the depth of the historic SI-1WT. No MACTEC Engineering and Consulting, Inc. (NC Engineering License No. F-0653) 1308 Pallor Avenue • Asheville, NC 28806 • Phone: 828.252.8130 • Fax: 828,251.9690 www.mactec.com Flowers Bakery Distribution Facility, Flat Rock, North Carolina April 29, 2010 MACTEC Proiect 6685-09-1850.01 obvious signs of iron staining were able to be discerned from the visual examination of the soil cuttings. Depths to groundwater were measured in the two piezometers after installation and on two subsequent days, as noted in the table below. Additionally, soil test boring B-7 (located approximately 50 feet north of the P-1 piezometer location) was reopened and the groundwater level was measured at a depth/elevation of 8.7/2159.3 feet on April 28, 2010, 2.2 feet lower than the depth/elevation of 6.5/2161.5 feet recorded on January 28, 2010. Groundwater levels in the site area are typically higher during late winter and early spring (including the date of our previous site exploration) and can be impacted locally by topography and surface drainage features. The exploration at the site in January was performed following an extended period of wet weather and can be expected to conservatively represent a period of seasonal high groundwater. The following table summarizes the piezometer installation and subsequent ground -water elevation measurements at the piezometers. Approximate Depth to Bottom of Piezometer ground -surface Piezometer below ground Depth/Elevation of Ground -Water I.D. elevation (ft.) surface (ft.) (ft.) 4/23/10 4/26/10 4/28/10 P-1 2165 9.8 7.012158 6.912158.1 7.1/2157.9 P-2 2167 9.4 6.4/2160.6 6.112160.9 6.3/2160.7 Based on the results of the groundwater levels measured at the recently installed piezometers and the groundwater levels measured during late January 2010 in our soil test borings we recommend a SHWT elevation of 2160 feet for the stormwater biorentention cell at piezometer P-1 and a SHWT elevation of 2162 feet for the cell at P-2. 2 Flowers Bakery Distribution Facility, Flat Rock, North Carolina AIACTEC Project 6685-09-1850.01 April 29, 2010 If you have any questions concerning our piezometer installation and recommendations described in this letter and the attachments, please do not hesitate to contact us. Sincerely, MACTEC ENGINEERING AND CONSULTING, INC. Timothy P. Quigley, P.E. Project Engineer Registered, North Carolina 034969 TPQISEB:tpq •%%'tk$%11111f11I. ••.• �� CARP '•.. :4 O�'FESSIp'• �' '•� i w � • r � . r 2 7 I Step n E. Blevins, E.:�•� Q,•; Senior Principal N�•.;��rN��..�� •� E. 11111111110 Attachments: Piezometer Location Plan Hand Auger Boring and Piezometer Records (P-I and P-2) cc: Mr. Jesse Gardner, P.E.0gardner@civiIdes igneoncepts.com) _ss E R EID Sw WAY,- ---------------- , ss .. . ....... vrt 2173.5 f We need a boring/hand auger to determine the Seasonal High Water Table �:IWT). These are required opprovd for the bioretention cello. &P-1 .&P-2 2111 00 L LM F..ft M &APPROXIMATE PIEZOMETER LOCATION MAIACTEC ENGINEERING AND CONSULTING, INC. PIEZOMETER LOCATION PLAN FLOWERS BAKERY DISTRIBUTION FACILITY FLAT ROCK, NORTH CAROLINA I REFERENCE: SITE PLAN PROVIDED ELECTRONICALLY BY CIVIL DESIGN CONCEPTS, PA ON APRIL 19, 2010. MACTEC MACTEC ENGINEERNG AND CONSULTING, INC. ASHEVILLE, NORTH CAROLINA Project Name: _ _! Project No.: Boring No.: P" Date: V.P3 1D Soil -Stratigraphy Soil Description and Remarks Fro T }- U D.oZS /} f Itis sl f�cc�rrw�.} . � s 3 pQ `� ]] t f ) f1 L 45 Co.,.1 r> f Re.c�� i s �} i�Cewl.�l !"� � C �C.e ovs � 14n� y �l+°k51`rC. S, l f-� M a i z• j' S Antic. As 3 r�� 1 q _! �•�� y grRrw� ��}�,� rl}oFntn�5 ��cJ(un) � h Crrn�/��� �row� �. t�c�! w f �� ` �� ��c�� r1o' kv er Acrir\ 1L MC rt� Cry ��l f 4` W� ef\('W,r lY4 �} 7� eeA kG[D1 1%S G 1l grcvJ 7- 0 TC Gfr fox rr^? Performed By: y r �� ' Date: I a e Checked By: Date: . U $MACT C MACTEC ENGINEERNG AND CONSULTING, INC. ASHEVILLE, NORTH CAROLINA HAND AUGER BORING RECORD / Project Name: pWLcS Qfr ./ j�'� vTZon � C 7 _ Project No.: Boring No.: P� �- Date: Soil Stratigraphy Soil Description and Remarks From To I( 2,J Si Mlr 'FroM 2-�a3 �-1R`�Gy siiT��S4�� i �r t'i �GaWs I f �' } I AEI /� d�1 l S� N co,.�n � w h i CG j`r k CnAr5G S r 14,1 s JA^/Tco�d�s iJrc,••� MICACe-00s Sr�TJ� (1,ell- 1 S4J crin leIMlAIU g. `I ��p r�tr�� U CJ rov�o� u3tr e n coffin crc� 4' -7. S'-Te-J �, auk C Ktis tt �1� rcun� � f I' J s 1Ar4r Performed By:/1 Date: Checked By: Date: b S `I NODE R North Carolina Department of Environment and Natural Resources Division of Water Quality , y,. Beverly Eaves Perdue Coleen H. Sullins Dee -Freeman, - Governor Mr. Matt Wilson Butler Development Group 2727 Paces Ferry Road ; Suite 1-255 Atlanta, GA 30339 Director May 11, 2010 Subject: Stormwater Permit No. SW1100301 _Secretary_ L J JUN 1 5 2010 J ' ViNTER CI AUTY SECTION A _,_,", I r_' n; {;ONi! L CFI ICE Hendersonville Distribution Facility at Blue Rock Commerce. Center High Density Commercial Bio-Retention Project Henderson County Dear Mr. Wilson: The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Hendersonville Distribution Facility at Blue Rock Commerce Center on May 11, 2010. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No. SW 1100301, dated May 10, 2010, for the construction, operation and maintenance of the t act project and the stormwater BMPs. This permit shall be effective from the date of issuance until May 10, 2020, and shall be subject to the _conditions and limitations as specified therein. Please pay special attention to the Operation and . Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Asheville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Brian Lowther at (919) 807-6368-, or t-'.an.lowther@ncdenr.gov. Sincerely, fb,. Coieen H. Sullins cc: Asheville Regional Office Central Files SPU Files Jesse Gardner, PE Civil Design Concepts, PA Wetlands and Stormwater Branch 1617 ftService Center, Raleigh, North Carolina 27699.1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919.807-64941 Customer Service: 1-877-623-6740 Internet: www.newaterqualo,org An Equal Opparlunity 1 Alfirmalive Action Employer One NorthCarolina naturally a State Stormwater Permit Permit No. SW1100301 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESO DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT �I J UN 5 2010 JJ VVATE'r-, OUA_I"Y SECTION APOF VILL` !" 3760NAL OFFICE In accordance with the provisions of Article 21 of Chapter 143, General"Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Butler Development, LLC Hendersonville Distribution Facility at Blue Rock Commerce Center McMurray Road, Flat Rock. & Henderson County FOR -THE construction, operation and maintenance of two bioretention cell(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until May 10, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 46,363 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area as indicated in Section 1.7 of this permit, and per the application documents and as shown on the approved plans. The built -upon area for the future development is limited to 46,363 square feet. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 6 State Stormwater Permit Permit No. SW1100301 7 The following design criteria have been provided in the bioretention cell and must be maintained at design condition: 0 (01 C. d, e. f. 9. h. J� k. 1. M. n. o. P. q• r. Drainage Area, acres: Onsite, ft : Offsite, ft2: Total Imperviou Surfaces, ft2: Onsite, W: Offsite, ft2: Design Storm, inches: Max. Ponded Depth, feet: Seasonal High Water Table, fmsl: Planting Media Depth, feet: Cell Dimensions, feet: Bottom Elevationp, fmsl: Surface Area, ft Permitted Storage Volume, ft3: Bypass 1 Storage Elevation, fmsl: Predevelopment 1 year 24 hour: Post development 1 year 24 hour: Drawdown Time, hours: Underdrain Diameter, inches: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE 1.58 28,231 31,468 1,848 8,798 21,898 24,465 21,898 24,465 0 0 1H 12" 12" 2162 2' (grass) 41' by 50', 102' by 40' 2162 2164 1,770 2,060 1,770. 2,060 2,166 2,168 2.64. 2.94 1.08 1.32 ft3lsec 24 24 4" 4" UT to Bat Fork 1 French Broad 6-55-8-1, 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum, and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The . approved Operation and Maintenance Plan must be foilowed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. I . . e. Maintenance of all slopes in accordance witWapproved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch -basins and piping. g. Access to the cell and outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. The facilities shall be constructed as shown on the approved plans. This permit Page 2 of 6 State Stormwater Permit Permit No. SW 1100301 shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate recorded easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion: Control Plan approvalor a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative coriveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. . 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such Page 3 of 6 State Stormwater Permit Permit No. SW 1100301 time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding .requirements for the stormwater control, must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated -by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 1T80 days prior to the expiration date of this permit. Permit issued this the 11th day of May 2010. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No. SW 1100301 Henderson Distribution Facility at Blue Rock Commerce Center Stormwater Permit No. SW1100301 Henderson Countv Designer's Certification as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAT_ Page 5 of 6 State Stormwater Permit ti Permit No. SW 1100301 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation, per the vegetation plan. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. ' The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parks of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 6 of 6 Permit Number: (to be provided by D WO) �F W A 7FR PIMA %� }� NCDENR T STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information, i.A�-PROJECT,,INFORMATIONk l!:.. .rv- -_� 1.,.�.�i`A Project name Henders6nville Distribution Facility at Blue Rock Commerce Center Contact name Jesse Gardner, P.E. Phone number 828-252.5388 Date Drainage area number DA-1 Lj'd 1++'R4' �i'' +� k k�iS rcr :Kt �. r. - +a?, " "" -x 5. k >a - -r, ^, s.t us a v` C�•' <; iI;DESIGNI�IFORMATION'�t�:rs,t•_�,� �.�°�. ,b....�,Z��,���;�r.�2�5.?� .*.`?�. , .,��.�'�' .�� :�``���,.���,� 1+ .-g�,.:."'�,������ ! ?���+r�• tsr�'A���r Site Characteristics Drainage area 30,089 ft2 Impervious area 21,866 it' Percent impervious 72,8% % Design rainfall depth V inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow PrelPosl 1-yr, 24-hr peak control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Cell Dimensions Ponding depth of water Ponding depth of water Surface area of the top of the bioretention cell Length: Width: -or- Radius Media and Soils Summary Drawdown lime, ponded volume Drawdown time, to 24 inches below surface Drawdown time, total: In -situ soil, Soil permeability Planting media soil. Soil permeability Soil composition Sand (by weight) Fines (by weight) Y , (Y or N) '3.4 in 0.14 inthr 2.640 it3lsec 1.080 ft3lsec -1.560 tt3lsec 1,769.0 ft3 1,770.0 it OK it it ft3 0 it, it 12 inches 1.00 it 1,770.0 f!' .. 41 1t 50 it 1t M OK OK OK .6 hr OK 18 hr OK 24 hr 2,00 in/hr OK 2.00 in/hr OK 87% OK 8% OK J i JUI i 5 2010 LD�,i tiV.",1.7P QUALITY SECTION lt�F-. REC-10NAI 0 F F I C E I Form SW401-Bioretention-Rev.8 July 30, 2009 Parts I and 11. Design Summary, Page 1 or 3 Permit Number: (to be provided by DWO) % Organic (by weighty 5% OK Total: 100% Phosphorus Index (P-Index) of media 10'(unitless) OK Form SW404-Bioretention-Rev.8 July 30, 2009 Parts I and II. [Design Summary, Page 2 of 3 Permit Number: (to be provided by DWQ) Basin Elevations Temporary pool elevation 2166,00 fmsl Type of bioretention cell (answer 'Y' to only one of the two following questions): Is this a grassed cell? Y (Y or N) OK Is this a cell with trees/shrubs? N (Y or N) Planting elevation (top of the mulch or grass sod layer) 2165 fmsl Depth of mulch 0 inches Insufficient mulch depth, unless installing grassed cell. Bottom of the planting media soil 2163 fmsl Planting media depth 2 It Depth of washed sand below planting media soil 0 It Are underdrains being installed? Y (Y or N) How many clean out pipes are being installed? 4 OK What factor of safety is used for sizing the underdrains? (See 10 OK BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 1 It the bottom of the cell to account for underdrains Bottom of the cell required 2162 fmsl SHWT elevation 2161 fmsl 2 r r.O 4 r-". ; ;l, Distance from bottom to SHWT 1 It Insufficieril distance to SHWT. Internal Water Storage Zone (IWS) Does the design include IWS N (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 2165 ft Planting Plan Number of tree species 0 Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed Y (Y or N) OK through a vegetated filter? What is the length of the vegetated lister? It Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed, Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Y (Y or N) OK Is the BMP located at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal 10 or less than 3:1? Y (Y or N) OK Is the BMP totaled in a proposed drainage easement with access Y (Y or N) OK* to a public Right of Way (ROW)? Insufficient inlet velocity unless energy dissipating devices are being Intel velocity (from treatment system) 2.33/2.77 fUsec used. Is the area surrounding the cell likely to undergo development in the N (Y or N) OK . future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y. (Y or N) OK Pretreatment Used (Indicate Type Used with an 'X' in the shaded cell) Gravel and grass X (B`inches gravel followed by 3-5 It of grass) Grassed swale Forebay Other Form SW401-Bioretention-Rev.8 July 30, 2009 Parts I and It. Design Summary, Page 3 of 3 Permit Number: (to be provided by OWQ) ®��/ems C, W AT fi9QG i1 y 9 '���444AAA y r NCDENR n Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION.' Project name Hendersonville Distribution Facility at Blue Rock Commerce Center Contact name Jesse Gardner, P.E. Phone number 828-252-5388 Date Drainage area number DA-2 II. DESIGN INFORMATION r Site Characteristics Drainage area 40,266 ft' Impervious area 24,465 It2 Percent impervious 60.8% % Design rainfall depth 1" inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr runoff depth 3.4 in 1-yr. 24-hr intensity -0.114 in/hr Pre -development 1-yr, 24-hr peak flow 2.940 fl31sec Post -development 1-yr, 24-hr peak flow - 1.320 ft3lsec Pre/Post 1-yr, 24-hr peak control -1.620 ft3lsec Storage Volume: Nan -SA Waters Minimum volume required 1,997.0 ft' Volume provided 2,060.0 ft' OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft 3 Post -development 1-yr, 24-hr runoff ft 3 Minimum volume required 0 ft3 Volume provided ft' Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bio retention cell 2,060.0 It OK Length: 102 fl OK Width: - 40 ft OK -or- Radius fi Media and Soils Summary Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface 18 hr OK Drawdown time, total: 24 hr In -situ soil. Soil permeability 2.00 infhr OK Planting media soil: Soil permeability 2.00 in/hr OK Soil composition % Sand (by weight) 87% OK % Fines (by weight) 8% OK % Organic (by weight) 5% OK Total: 100% Phosphorus Index (P-Index) of media 10 (unitless) OK Form SW401-Bioretention-Rev.8 July 30, 2009 Pasts I and II. Design Summary, Page 1 of 2 Permit Number: (to be provided by D WO? Basin Elevations Temporary pool elevation Type of bioretention cell (answer 'Y' to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? _ What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) _ Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains _ Bottom of the cell required SHWT elevation _ Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow _ Separation of IWS and Surface Planting Plan Number of tree species _ Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? _ Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP located a1 least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? _ Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (flinches gravel followed by 3-5 f1 of grass) _ Grassed Swale _ Forebay _ Other 2168.00 fmsl Y (Y or N) OK N (Y or N) 2167 fmsl 0 inches Insufficient mulch depth, unless installing grassed cell. 2165 fmsl 2 ft Oft Y (Y or N) 5 OK 10 OK 1 f1 2164 fmsl 2162 fmsl 2ft OK N (Y or N) fmsl 2167 ft 0 Y (Y or N) OK Y (Y or N) OK ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 2.4612.77 fllsec Insufficient inlet velocity unless energy dissipating devices are being used. N (Y or N) OK N (Y or N) OK Y (Y or N) OK X Form SW401-Bioretention-Rev.B July 30, 2009 Parts I and 11. Design Summary, Page 2 of 2 DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph 1I -.Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwate_r__Management Plan...,. ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources' 1 Division of Water Quality JUN 15 M STORMWATER MANAGEMENT PERMIT APPLICAT ON FORM This form ntay be photocopied for use as an original WATER QUALITY SECTION + ASHEV LLE REGIONAL OFFICE I. GENERAL INFORMATION Project Name (subdivision, facility, or establishment name - should be consistewt-, RIVproject name on plans, specifications, letters, operation and maintenance agreements, etc.): Hendersonville Distribution Facility at Blue Rock Commerce Center _ 2. Location of Project (street address): McMurray Road_ _ City:Flat Rock County:Henderson Zip: 3. Directions to project (from nearest major intersection): The project is located on lot 4 of Blue Rock Commerce Park, which is approximately 3,000 LF south of the intersection of Tracy Grove Road and McMurray Road in central Henderson Coun . 4, Latitude:35° 18' 26.02" N Longitude:82° 24' 39" W of the main entrance to the project. IL PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System []Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-l0l Version 07July2009 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: Signing Official & Title: b. Contact information for't)erson listed in item 1a above: H Street Address: pants FtfrA VkA '5v:� 1-9,155 City: 44a6Os State: Zip: 347�^I Mailing Address (if applicable): City: Phone: c !� Emaih fVlW hcl -%40 State: Zip: Fax: g '? —017lo c. Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is Iocated on): Property Owner/Orgar Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: % 1 0 t! r .! 7W i?LV O City: �49 A e!nI State: -A)G Zip: AS 70�1_ Mailing Address (if applicable): City: State: Zip: D Phone: ( D GQ � ) 7 % 7 556,9 Fax: ( � Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: Phone: Email: 4. Local jurisdiction for building permits: Point of Contact: State: Fax: Phone #: Zip: Form SWU-101 Version 07July2009 Page 2 of IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The projects stormwater will be conveyed primarily through hrough vegetated dictches and directed into one of the 2 planned biorention cells for quantity and quality control_ _ 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.ldentify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ® Ph 1I - Post Construction 3. Stormwater runoff from this project drains to the French Broad River basin. 4. Total Property Area: 1.58 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area':1.58 acres Total project area shall be calculated to exclude the following the nonnal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NNW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHV) line. The resultant project area is used to calculate overall percent built upon area (BETA). Non -coastal wetlands landward of the NHW (or MHW) line tuay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 65.9 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Draina k e Area 2 Drainage Area Drainage Area Receiving Stream Name UT to Bat Fork UT to Bat Fork Stream Class * C C Stream Index Number * 6-55-8-1 6-55-8-1 Total Drainage Area (so 30,089 40,266 On -site Drainage Area (sf) 28,231 31,468 Off -site Drainage Area (so 1,858 8,798 Proposed Impervious Area** (so 21,898 24,465 % Impervious Area** total 72.90 60.87 Impervious— Surface Area Drainage Area Drainage Area _ Drainage Area Drainage Area _ On -site Buildings/Lots (sf) 3,480 3,480 On -site Streets (so 12,923 18,184 On -site Parking (so 5,342 2,633 On -site Sidewalks (so 153 168 Other on -site (so 0 0 Future (so 0 0 Off -site (sf) 0 0 Existing BUA*** (so 0 0 Total (so: 21,833 24,465 * Stream Class and Index Number can be determined at: htt : 12o.etir.state.nc.us ims re orts re ortsWB.htniI Form SWU-101 Version 073uly2009 Page 3 of 3 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Field survey Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCRC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from hU://h2o.enr.state.nc.us/su/bmp_forms.htm. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from hM.//h2o.enr.state.nc.us/su/bmp--forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.ussu msi ma s.htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hU://h2o.enr.state.nc.us/su/bmp forms.htm. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VIl below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to ht!pl/www.envhelp.org/pages/onestopexl2ress.htmi for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished Floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. Form SWU-101 Version 07July2009 Page 4 of 6 o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to de ths) as well as a ma of the borin locations with the existin p P g g elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verrfij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 3to7 Page No: Zb 1. 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htip:// www.secretary.state.nc.us/Corporations/CSearch,aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httpl/h2o.enr.state.nc.us/su�m�forms.htm#deed restrictions. restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall iinclude all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tesse Gardner, P.EGardner, P.E. Consulting Firm: Civil Design Design Concepts, PA����PAA Mailing Address:P.O. Box 5432 City:Asheville State:NC Zip:28813 Phone: (828}252-5388 Email: jjardner®civiIdesignconce�ts.com®civiIdesignconce�ts.com Fax: 828 252-5365 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) _ n' I, (print or type name of person listed in Contact Information, item 2a) R R Ert) ')e.l�L&e 7 -certify that 1 own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1 a) with (print or hfpe name of organization listed in Contact Information, item 1 b) / UJtZ;W�PT LLoC svelop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. P?6v 114e koe- o Form SWU-101 Version 07July2009 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civgeties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: G Date: AZWuo 3 ,2-OlO I, a Notary Public for the State of County of do hereby certify that e • X-0� Z-* eAt.-�TCi personaIIy appeared before me this„ALday of _P%vtz4_. .2-010, and acknowledge the due exe ution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires 0 - / /-VV o l 0 X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 2) W# 01s�ln certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rles under 15A NCAC 2H .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature:%�" Date: 3 0 i rr 1, Kt -I -101A �'1 .5� a Notary Public for the State of County of U� do hereby certify that personally appeared before me this day of 1� ' i t 2CA L-_, and acknowledge the due execution of the application for �1► aU�1J11JI� `�> . a stormwater permit. Witness my hand and official seal, Al N VQ C •'' FEB f SEAL 2012 0 My commission expf e��„� yC1 �r�0 i7, Form SWU-101 Version 07July2009 Page 6 of C a4 C CIVIL DESIGN CONCEPTS, PA Transmittal Letter U N 1 5 2010i WATER CUALITY SECTION AE` I�cV1LLC= REGIONAL OF-lUE Date: May 5, 2010 Project Name: Hendersonville Distribution Facility at Blue'Rock'Coinmerce Center CDC Project: 10971 To: Mr. Brian Lowther NC DENR — Division of Water Quality Wetlands and Stormwater Branch Stormwater Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 cc Via Mail Overnight Hand Delivered MAY 1 0 2010 -7v PENR . h�n��-w Pick up @ CDC Office ------ Copies Date Description --------------------------------- -------------------------------- 2 5-5-10 Stormwater Permit Package (Revised) --------------------------------------------------------------------------------------------------------------------------------------- REMARKS: Brian, Please find revised plans and supplement form for revised Bioretention Cell #l. The cell has been revised to provide the minimum 27 separation from the SHWT. Please let me know if you have any questions or need any additional information in order to approve this project. Thanks, File�Jlan Water Sewer EC/Stor NCDOT USACE FEMA CA PAY Accord S:IACAD1104711Docs5G R-EC-S DsB15May ] 0-trans.doc Mailing Address: P.O. Box 5432, Asheville, NC 28813 200 Swannanoa River Rd Asheville, NC 28805 1210 S. Main Street, Waynesville,NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Pax: 828-456-5455 EP' ' ^l lry .. .. iVPti REPORT OF GEOTECHNICAL EXPLORATION Flowers Bakery Distribution Facility Flat Rock, North Carolina Prepared For: BUTLER DEVELOPMENT GROUP ' Atlanta, Georgia 1 February 12, 2010 JJN 1 5 A)iu 1 REPORT OF GEOTECHNICAL EXPLORATION Flowers Bakery Distribution Facility Flat Rock, North Carolina Prepared For: BUTLER DEVELOPMENT GROUP Prepared By: MACTEC ENGINEERING AND CONSULTING, INC. 1308 Patton Avenue Asheville, North Carolina 28806 MACTEC Project 6685091850 February 12, 2010 MACTEC engineering and constructing a better tomorrow February 12, 2010 ' Mr. Matthew Wilson Butler Development Group 2727 Paces Ferry Road, Suite 1-255 ' Atlanta, Georgia 30339 Subject: Report of Geotechnical Exploration Flowers Bakery Distribution Facility Flat Rock, North Carolina MACTEC Project No. 6685-09-1850.01 Dear Mr. Wilson: MACTEC Engineering and Consulting, Inc. (North Carolina Engineering License No. F-0653) is pleased to provide this Report of Geotechnical Exploration for the proposed Flowers Bakery Distribution Facility in Flat Rock, North Carolina. Our services were provided in general accordance with our Proposal ' PROP09ASHE-112 authorized by you on December 3, 2009. The purpose of this exploration was to determine general subsurface conditions within the area of the proposed construction and evaluate these conditions relative to site earthwork and pavement construction and design and construction of the foundations for the proposed building. This report presents a review of information provided -to- us, a discussion of the site and subsurface conditions encountered, and our ' geotechnical recommendations. Site and boring location plans and the results of the field testing are included with the report. 1 We thank you for the opportunity to provide our professional geotechnical services during this phase of your project and would be pleased to discuss our recommendations with you. We would also welcome the opportunity to provide the necessary quality assurance monitoring and testing services during construction of this project. Sincerely, MACTEC ENGINEERING AND CONSULTING, INC. Timothy P. Quigley, P. Project Engineer Registered, North Carolina 034969 ITPQ/SEB:tp 'I�VIJ'0 9 / p • SEAL -9r 41 �= r Step n E. Blevins P. Se for Principal � Registered, North Carolina ffP,O'NCl`+ E. cc. Mr. Jesse Gardner, P.E.(j;�ardnerncivildesignconcepts.com) Mr. Ted Harris, P.E. Freeland Harris Consulting Engineers (tharris cufhce.com) 1 MACTEC Engineering and Consulting, Inc. 1308 Patton Avenue 0 Asheville, NC 28806 • Phone: 828.252.8130 • Fax: 828.251.9690 www.mactec.com TABLE OF CONTENTS 1.0 SITE AND PROJECT DESCRIPTION.................................................................................. 1 2.0 SITE GEOLOGY...................................................................................................................... l 3.0 FIELD EXPLORATION..........................................................................................................2 4.0 LABORATORY TESTING..................................................................................................... 2 5.0 SUBSURFACE CONDITIONS............................................................................................... 3 5.1 Groundwater Conditions...................................................................................... 3 5.2 Seismic Site Classification....................................................................................4 6.0 BUILDING DESIGN AND CONSTRUCTION RECOMMENDATIONS ......................... 4 6.1 Building Foundations............................................................................................ 4 6.2 Grade Slab ......................................................................................................... 6 6.3 Loading -Dock Walls............................................................................................. 7 7.0 EARTHWORK AND PAVEMENT CONSTRUCTION RECOMMENDATIONS........... 8 7.1 Site Preparation..........................................................................................8 7.2 Compacted Structural Fill..........................................................................9 7.3 Pavement Recommendations.....................................................................10 8.0 QUALIFICATION OF REPORT........................................................................................... l 1 ATTACHMENTS Figure 1 -- Site Location Plan Figure 2 — Boring Location Plan Key To Symbols and Descriptions Soil Test Boring Records (6) Atterberg Limits Test Results (2) Flowers Bakery Distribution Center, Flat Rock, NC — Report of Geotechnical Exploration February 12, 2010 MACTCC Project 11'o. 6685091850,01 1.0 SITE AND PROJECT DESCRIPTION The project site is located to the southwest of the intersection of McMurray Road and Windy Hill Lane and east of Interstate 26 in Fiat Rock, North Carolina (Figure 1). The site is currently -,grass covered and was previously an apple orchard. The ground surface in the area of the proposed building and parkin-, areas gently slopes to the south and ranges in elevation from about 2172 in the northern portion to 2163 along the southern portion of the proposed construction. Project information was provided through telephone conversations between MACTEC representatives, Mr. Jesse Gardner of Civil Design Concepts, PA (CDC) and you. Additionally electronic copies of the proposed site plan were provided. We understand that a distribution facility consisting of a single story building with a footprint of up to 15,000 square feet is proposed for construction at the site at finish floor elevation (FFE) 2173.5 feet. In order to achieve this FFE up to 3 feet of fill; contained by loading dock walls along three sides of the building, will be required to achieve subgrade elevation. The building will have both 39-inch and 50-inch high loading docks. Maximum column and wall loads are expected to be 50 kips and 2 kips per linear foot, respectively. We understand that one fully loaded tractor trailer with total axle loads of 50.000 pounds will access the distribution facility each day along with 10 to 12 local bread delivery trucks, 23 feel. in length with two single axles. 2.0 SITE GEOLOGY The project site is located in the Chauga Belt underlain by gneiss bedrock. The bedrock in this region is a complex crystalline formation that has been faulted and contorted by past tectonic movements. The rock has weathered to residual soils, which form the mantle for the hillsides and hilltops. The typical residual soil profile in areas not disturbed by erosion or human activities consists of silty or clayey soils near the surface where weathering is more advanced, underlain by sandy silt and silty sand. Flowers Bakery Distrihution Facility, Flat Rock, NC — Report of Geolechnical Exploration Fehrrraiy 12, 2010 MAC7E'C Project No. 6685091850 1 3.0 FIELD EXPLORATION 1 Six soil test borings were drilled at the approximate locations shown on the attached Boring ' Location Plan (Figure 2) to depths of between 10 and 50 feet below the existing ground surface. Borings B-1 through B-3 were drilled within the proposed footprint of the building and borings B- ' 5, B-7 and B-8 were drilled in proposed parking and drive areas. Two additional soil test borings, B-4 and B-6, were proposed at locations shown on Figure 2 but were unable to be performed at the time of driiiing due to ponded water and very soft surface soils in the area of these planned test borings. Additionally boring B-2 was terminated at 50 feet, prior to encountering auger refusal or ' 100 feet as proposed, due to excessive amounts of sand filling the hollow stem auger. The boring locations were located at the site by referencing the building corners that had been staked by others ' (CDC Surveyors). The borings were drilled by mechanicaliy twisting hollow -stem augers into the soil. Soil sampling and penetration testing were performed in general accordance with ASTM D 1586. At assigned intervals, soil samples were obtained with a standard 1.4-inch I.D., 2-inch O.D. split -spoon sampler. The sampler was first seated 6 inches to penetrate any loose cuttings, and then driven an additional 12 inches with blows of a 140-pound hammer falling 30 inches. The number of hammer blows required to drive the sampler the final 12 inches was recorded and is designated the "N- Value" or "Penetration resistance". The N-Value, when properly evaluated, is an index to the soil's strength and foundation supporting capability. Representative portions of split spoon samples were sealed in glass jars and returned to our laboratory where they were -visually classified by a geotechnical engineer. The boreholes were sounded for the presence and depth of groundwater as noted on the test boring records and then backfilled with auger cuttings 4.0 LABORATORY TESTING Laboratory testing (Atterberg Limits — ASTM D 4318) was performed on two soil samples collected during split -spoon sampling to quantify the plasticity of the surface soil for pavement subgrade evaluation. The results of the iaboratory tests are shown below: 2 Flowers Bakery Distrihution Facith , Flat Rock, A'C— Report Qf Geotechnical Exploration AlACTEC Project No. 6685091850 Fehruaq 12, 2010 Table 1. Atterberg Limits Test Results Sample Liquid Limit Plastic Limit Plasticity Boring No. Soil Type Depth, ft (LL) (PL) Index (PI) Sandy Fat B-7 1 — 2.5 55 24 31 Clay Sandy Elastic B-8 1 — 2.5 y - 76 41 34 Silt 5.0 SUBSURFACE CONDITIONS The following descriptions provide a general summary of the subsurface conditions encountered. The attached Test Boring Records represent our interpretation of the field drilling logs based on engineering examination of the field samples. The lines designating the interfaces between various strata represent approximate boundaries and the transition between strata may be gradual. It should be noted that subsurface conditions will vary between the boring locations. The gTound surface at the boring locations was covered with grasslrootmat, approximately 3 inches thick. Topsoil was encountered below the grass/rootmat in boring B-5 (approximately 6 inches). Below this ground cover laver, fill or disturbed residual soil was encountered to a depth of between 3 and 5.5 feet in the six soil test borings. The fill or disturbed residual soil was sampled as firm micaceous sandy elastic silt, sand, fat clay, and fat clay with sand. Undisturbed residual soil was encountered below the fill or disturbed residual soil. The residual soil was generally sampled as very loose and loose, micaceous, silt}, sand or clavey sand and very soft to stiff micaccous sandy silt and sandy elastic silt. Each of the six borings performed were terminated in residual soil. 5.1 Groundwater Conditions The borehoies were sounded for the presence groundwater. Where encountered, the depth to groundwater was recorded and is shown on the attached Test Boring Records. Groundwater was encountered at the time of drilling or after a period of at least 24 hours in five of the six soil test 3 tFlowers Baken, Distribution FacilitK Flat Rock, NC- Deport of Geolechnical Exploration I ehruary 12. 010 AIACTEC Project No. 6685091850 borings at depths below ground surface ranging from 6.5 to 10.8 feet (elevations ranging between ' approximately 2161 and 2162 feet). At this depth below the 6gound surface, groundwater is not expected to be encountered during site grading or excavation to the proposed foundation elevations. 1 5.2 Seismic Site Classification Based on the subsurface conditions encountered by the soil test borings, visual classification, experience based assumptions for the deeper soils between 50 and 100 feet, (unable to be explored at ' this time), and the average N-value method described in section 16 of the 2009 North 'Carolina Building Code, the seismic site classification for the proposed building area is Site Class "E". It is likely that a more accurate method for determining the seismic site classification, employing direct measurement of the average shear -wave velocity (instead of N-value correlation) within the upper 100 feet of the subsurface profile would result in a Seismic Site Class "D" for the site. The ' cost of MACTEC performing a survey to determine the shear wave velocity profile at the site and the corresponding site class would be $2500. 6.0 BUILDING DESIGN AND CONSTRUCTION RECOMMENDATIONS 6.1 Building Foundations The proposed Flowers Bakery Distribution Facility may be supported on a shallow foundation system consisting of spread and strip footings. Based on the site topography, we have assumed that fills up to approximately 3 feet will be needed to establish the slab subgrade elevation. Preparation of areas to receive structural fill and the piacementicompaction of the structural fill should be performed as recommended in Section 7 of this report. 1 We recommend that the shallow. strip and spread footings be designed for a maximum allowable bearing pressure of 2000 psf. This recommended allowable bearing pressure is based on correlations ' between standard penetration test resistances and laboratory strength tests for similar soils and observed performance of foundations supported by soils similar to those at this site. 4 Flowers Bakeq Distribution Facility, Flat Rock, NC — Report of Geotechnical Exploration Febrarari, 12, 2010 AV CTEC Project No. 6685091850 The minimum column and continuous wall footing widths should be 24 inches. The minimum widths are considered advisable to provide a margin of safety against a local or punching shear failure of the bearing soils. Exterior footings should bear at least 24 inches below final exterior grade to provide frost protection and protective embedment. interior footings should bear at least 18 inches -below the surface of the grade slab. Total settlement within the building area due to the area load of the fill required to achieve the floor slab subgrade elevation of up to approximately one inch is expected. Much of this settlement is expected to occur during construction as the fill and building loads are applied. Differential settlements will depend on differential foundation loading and subsurface conditions and are anticipated to be less than '/ inch. We recommend that masonry walls be provided with periodically spaced movement joints to accommodate differential settlements, particularly those settlements that may occur across transitions from fill -supported footings to footings bearing on residual soil. Exposure to the environment will weaken the plastic soils present at the footing bearing level if the foundation excavations remain open for a prolonged period of time. Therefore, foundation concrete should be placed as soon as possible after the excavations are dug, preferably on the same day excavated. If the bearing soils are softened by surface water intrusion or exposure, the softened soils must be removed from the foundation excavation bottom immediately prior to placement of concrete. Care should be exercised during winter months to prevent freezing of foundation bearing soils by backfilling adjacent to the foundations promptly after placement of concrete. Foundation concrete 'should not be placed on frozen or saturated soil. If foundation excavations must remain open overnight when rainfall is imminent, we recommend that a 2- to 3-inch thick "mud -mat" of "lean" (2000 psi) concrete be placed on the excavated surface to protect the bearing surface from exposure until the foundation can be constructed. An engineering technician working under the supervision of the geotechnical engineer should observe the foundation excavations immediately prior to concrete placement and document that the soil foundation bearing conditions are as indicated by this exploration. The engineering technician should perform hand -auger borings with dynamic cone penetrometer testing within the foundation excavations as part of this documentation. The foundation bearing areas should be level or suitably benched and be free of loose soil, ponded water, and debris prior to the observation and testing. 5 ' Flowers Bake Distribution Facility, Flat Rock, NC— Report o Geotechnical Exploration Februan, 12, 2010 r5 P .f P MACTEC Project No. 6685091850 Significant differences between the actual bearing conditions and those indicated by this exploration ' should be brought to the attention of the owner's representative along with appropriate recommendations for correction of the observed differences (such as excavation and replacement of unsuitable bearing material, lowering the foundation bearing elevation, or increasing the foundation bearing area). 6.2 Grade Slab A modulus of subgrade reaction of 50 pounds per cubic inch (pci) may be used for design of the grade slab supported on compacted fill constructed from excavation of the surface silty clay/clayey silt soils present within the upper 3 to 5.5 feet of the soil profile in cut areas at this site. A higher modulus of subgTade reaction of 100 to 150 pci could be used for design of the floor slab if imported silty sand soil or aggregate were used as structural fill within the top 2 feet of the slab subgrade. The grade slab should be jointed around columns and along footing -supported walls so that the slab and foundations can settle differentially without damage. Joints containing smooth dowels or keys may ' be used in the slab to permit rotational movement between parts of the slab without sharp vertical displacements or cracking. ' We recommend placement of a G to 6 inches thick layer of aggregate base course (ABC) , on the prepared subgrade to protect the soil subgrade during slab construction and to provide a level bearing surface and additional subgrade support for the slab. We recommend that the engineering technician observe the proposed slab subgrade prior to slab construction or immediately prior to placement of the gravel layer and document the conditions ' observed. The slab subgrade should be free of loose soil, ponded water, and debris prior to the observation. Any significant differences from the specified subgradc condition should be brought to ' the attention of the owner's representative along with appropriate recommendations for correction of the observed discrepancies. ' Exposure to the environment and construction traffic may disturb the subgrade soils at the slab bearing level. If the subgrade soils are softened by water intrusion, exposure or construction traffic; ' the softened soils must be removed or scarified, allowed to dry, and recompacted prior to placement of the crushed stone leveling course or construction of the grade slab. 6 Flowers Bakery Distribution Facility, Flat Rock, NC — Report of Geolechnical Exploration AIACTEC Project No. 6685091850 February 12, 2010 6.3 Loading -Dock Walls The loading -dock walls must be capable of resisting the lateral earth pressures that will be imposed on them by the structural fill supporting the floor slab. The onsite sandy elastic silt and sandy fat clay are marginally suitable for use as compacted fill to support the floor slab (see discussion of earthwork construction in section 7). Granular fill such as 957 stone placed within a wedge behind the wall defined by a 45 degree angle from the wall foundation could be used to expedite construction of the wall backfill (as during periods of wet weather) and to reduce lateral loading on these walls. Based on previously developed correlations for the onsite near -surface soils, imported silty sands and uncompacted washed stone drainage aggregate, the following soil properties and earth pressure coefficients for a horizontal backfill condition are recommended: Table 2. Recommended Soil Properties and Lateral Earth Pressure Coefficients Recommended Soil Properties and Lateral Earth Pressure Coefficients Effective Stress Properties Lateral Earth Pressure Coefficients(") Materials,,.. Total Unit Cohesion Internal Angle Description Weight (pcf) (Psi of Friction Ko Ka Kp (degrees) On -site Silty Clay/Clayey 125 500 0 1.00 1.00 1.0 Silt Imported 120 0 28 0.53 0.36 2.8 Silty Sand Clean washed 100 0 40 0.36 0.22 4.6 stone (#57) Note: Ko = At -Rest earth pressure coefficient Ka = Active earth pressure coefficient Kp = Passive earth pressure coefficient (divide by SF=2, use with active opposite case) (a� for horizontal backfill A coefficient of 0.30 could be reasonably assumed for evaluating ultimate frictional resistance to sliding at the soil to foundation contact. Walls which will be prevented from rotating such as below grade walls braced against the upper floor level should be designed to resist the "at -rest" lateral earth pressure. Walls such as exterior retaining 7 ' Flowers Bakery Distribution Facility, Flat Rock, NC — Report of Geotechnica! Fxploralion February 12, 2010 AIACTEC Project No. 6685091850 walls which are permitted to rotate at the top may be designed to resist "active" lateral earth pressure. Typically, a top rotation of about 1 inch per 10 feet height of wall is sufficient to develop active pressure conditions in soils similar to those encountered at the site. Less deflection would be ' required to develop active conditions in the crushed stone backfill. ' The total unit weight of the backfill soil should be used with the above earth pressure coefficients to calculate lateral earth pressures and a drainage system should be provided to prevent hydrostatic ' pressures from building up behind the wall. Lateral pressure arising from surcharge loading, earthquake loading, and ground water, should be added to the above soil earth pressures to determine ' the total lateral pressures which the walls must resist. I In addition, transient loads imposed on the walls by construction equipment during backfilling should be taken into consideration during design and construction. Excessively heavy grading equipment (that could impose temporary excessive pressures or long term excessive residual pressures against the constructed walls) should not be allowed within about 5 feet (horizontally) of the walls. 7.0 EARTHWORK AND PAVEMENT CONSTRUCTION RECOMMENDATIONS 7.1 Site Preparation At the start of construction, topsoil, vegetation, debris, and surface soils containing organic material should be stripped from the construction area. The total grass/rootmat and topsoil thicknesses ranged from 3 to 8 inches at the boring locations but could be greater in other areas of the site. ' During construction, positive surface drainage should be maintained to prevent the accumulation of surface water, if the exposed subgrade becomes excessively wet, or if conditions are encountered different from those described previously in this report, the geotechnical engineer should be contacted. After stripping of the site, we recommend that the construction area be proofrolled to detect unsuitable soil support conditions. Proofrolling should be performed with a heavily loaded dump truck or with similar approved construction equipment. The proofroller should make at least four 1 8 ' Flowers Baken, Distrihulion facility, Mai Rock, NC — Report of Geolechnical Erploralion Fubruar>> 12, 010 "AIACTGC Projecl No. 6685091850 passes over each location, with the last two passes perpendicular to the first two. Any areas that ' wave, rut, or deflect excessively and continue to do so after several passes of the proofroller should be excavated and replaced with suitable structural fill material (placed and compacted as ' recommended in this report). Proofrolling should be performed after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. The proofrolling should be monitored by an engineering technician working under the supervision of the geotechnical engineer. 7.2 Compacted Structural Fill Fill used for raising the site grade or as backfilI should be uniformly compacted in 8 to 10-inch lifts to 1 at least 95 percent of the standard Proctor maximum dry density (ASTM D 698). In addition, at least the upper 18 inches of subgrade fill beneath pavements and floor slabs should be compacted to 100 ' percent of the same specification. In general, soils containing more than 5 percent (by weight) fibrous organic materials or having a Plasticity Index (PI) greater than 30 (less than 15 is preferable) should not be used for fill. Laboratory testing on soil samples collected within the surficial 3 to 5.5 foot thick layer of plastic soil present at the site indicated Pi's of 31 and 34. These upper plastic soils are marginally suitable for use in compacted fill due to their sensitivity to compaction moisture content and difficulty in drying these soils to optimum compaction moisture contents should they become too wet for compaction. Lime stabilization of the plastic soil used as fill material may be required if the earthwork construction schedule becomes critical during wet periods. Alternatively, imported material that is less plastic and moisture sensitive could be used for the compacted structural fill at the site. Before filling operations begin, representative samples of each proposed fill material should be collected and tested to determine the compaction and classification characteristics. The maximum dry density and optimum moisture content should be determined. Once compaction begins, a sufficient number of density tests should be performed by an experienced engineering technician working under the direct supervision of the geotechnical engineer to measure the degree of compaction being obtained. The surface of compacted subgrade soils can deteriorate and lose its support capabilities when exposed to environmental changes and construction activity. Deterioration can occur in the form of freezing, formation of erosion gullies, extreme drying, exposure for a long period of time or rutting by construction traffic. We recommend that the surfaces of floor slab and pavement subgrades that 9 Flowers Raken, Distribution Facility, Flat Kock, NC — Report of Geotechnical Exploration FehruarY 12. 2010 AfACTEC Project No. 6685091850 have deteriorated or softened be proofrolled, scarified and recompacted (and additional fill placed, if necessary) immediately prior to construction of the floor slab or pavement. Additionally, excavations through the subgrade soils (such as utility trenches) should be properly backfilled in compacted lifts. Recompaction of subgrade surfaces and compaction of backfill should be checked with a sufficient number of density tests to determine if adequate compaction is being achieved. Once compaction begins, a sufficient number of density tests should be performed by the engineering technician to measure the degree of compaction being obtained. Typically, one test for each 2,500 square feet and each l-foot vertical accumulation of fill with a minimum of three tests per 1-foot lift accumulation is recommended. Areas that do not meet the compaction specifications should be recompacted to achieve compliance. 7.3 Pavement Recommendations The pavement subgrade surface should be proofrolled and structural fill should be placed and compacted as described in previous sections of this report. The plastic subgrade soils indicated to be present within areas to be paved are moisture sensitive and have a moderate potential for volume rying or wetting. Careful scheduling of subgrade preparation and pavement change during d construction to avoid periods of dry weather will be required. Based on the provided site grading plan we understand that the pavement will be constructed on both cut and fill subgrades of up to approximately 2 feet. We understand that the Flowers Bakery Distribution Facility typically receive deliveries once a day from an 18-wheel tractor trailer with maximum total axle loads of 50,000 lbs. Additionally 10 to 12 local delivery trucks having two S1111"1e axles will be accessing the site daily. For the near -surface plastic soil encountered in our soil test borings, a CBR value of 2 was assigned based on our experience with similar soils and published values. Based on the amount of truck and automobile traffic expected for the drive/parking/loading areas and AASHTO pavement design guidelines we recommend the follow pavement sections: ID] Floirers Bakery Distrihulion Facility, Flat Rock, NC — Rehorl of Geotechnical Exploration A-1ACTEC Project No. 6685091850 Fehruan, 12, 2010 Table 3. Recommended Minimum Flexible (Asphalt) Pavement Thicknesses Standard Duty Pavement �'� Heavv Duty Pavement (2) Asphalt Surface Course 3 inches 3 inches Aggregate Base Course 8 inches 10 inches "} Pavement areas in which only passenger car and local delivery trucks will be traveling. (2) Pavement areas in which passenger cars, 18-wheel tractor trailers and local delivery trucks will be traveling. Table 4. Recommended Minimum Rigid (Concrete) Pavement Thicknesses Standard Duty Pavement t'} Heavy Duty Pavement (2) Concrete Slab Thickness 5 inches 6 inches Pavement areas in which only passenger car and local delivery trucks will be traveling. (Z� Pavement areas in which passenger cars. i 8-wheel tractor trailers and local delivery trucks will be traveling. Asphalt and concrete pavements and bases should be constructed in accordance with the guidelines of the latest applicable North Carolina Department of Transportation standard specifications. Materials, weather limitations; placement and compaction are specified under appropriate sections of this publication. 8.0 QUALIFICATION OF REPORT ' The recommendations provided in this report are based in part on project information provided to us and they only apply to the specific project and site discussed in this report. If the project information section in this report contains incorrect information or if additional information is available, you should convey the correct or additional information to us and retain us to review our recommendations. We can then modify our recommendations, as necessary, for the proposed project. ' Regardless of the thoroughness of a geotechnical exploration, there is always a possibility that conditions between borings will be different from those at specific locations and that conditions will ' not be as anticipated by the designers or contractors. In addition, the construction process may itself alter subsurface conditions. Therefore, experienced geotechnical personnel should observe and document the construction procedures used and the conditions encountered. Unanticipated 11 1 Flowers Bakery Distribution facility Flat Rock, NC — Report of Georechnical Exploration February 12, 010 MACTEC Project No. 6685091850 conditions and inadequate procedures should be reported to the design team along with timely recommendations for addressing the unanticipated conditions or inadequate procedures. We recommend that MACTEC be retained to provide this service based upon our familiarity with the project, the subsurface conditions, and the intent of the recommendations and design. We recommend that this complete report be provided to the various design team members, contractors, and the project owner. Potential contractors should be informed of this report in the "Instructions to Bidders" section of the bid documents. The assessment of site environmental conditions for the presence of pollutants in the soil, rock, or ground water of the site is beyond the scope of this exploration. Additionally, evaluation of the potential for seismic induced liquefaction and settlement were bevond the scope of services for this geotechnical exploration. 12 1 HENDERSONVILLE, N.C. QUADRANGLE 35082-C4-TF-024 ' N.C. DMA 4554 IV SW - SERIES V842 PRINTED 1965 QUADRANGLE LOCATION PHOTOREVISED 1990 NOTE: SITE LOCATION IS APPROXIMATE. CONTOUR INTERVAL 20 FEET GRAPHIC SCALE FEET MACTEC $ ENGINEERING AND CONSULTING, INC. 1,000 500 0 1,000 2,000 ASHEVILLE, NORTH CAROLINA SITE LOCATION PLAN FLOWERS BAKERY DISTRIBUTION FACILITY FLAT ROCK, NORTH CAROLINA DRAWN: P�X DATE: FEB 2010 DFT CHECK: SCALE: 1" = 1,000' ENG CHECK: JOB: 6685-09-1850 APPROVAL: 'S� FIG: 1 w - ---------- W, x- T 211713-S' 2168 167, --:E 02166N N 88'05'23' W 30. 0' `813-06'23-W 483.00, MACTEC ENGINEERING AND CONSULTING, INC. DRAWN: DATE FEB 2010 DFT CHECK: SCALE: 1 50' ENG CHECK: JOB: 6685091850 LAPPROVAL:,j -�F I G: 2 REFERENCE: SITE PLAN BY CIVIL DESIGN CONCEPTS, PA DATED DECEMBER 21, 2009. .. .. .. .. .. MAJOR DIVISIONS GROUP -TYPICAL NAMES SYMBOL BVI B'. G W Well graded gravels, gravel - sand - CLEAN mixtures, little or no tines. GRAVELS GRAVELS {Little or no tines) r Q° G I Poorly Graded gravels or grave! -sand (!Vlore than 50-0 of mixtures. little or no fines. coarse friction is LARGER ihan(lie GRAVELS ° GM Silty gravels: gravel -sand -silt mixtures. COARSE . No4 sieve size) WITH FINES GRAINED (Appreciable GC Clayey gravels, grovel - sand - clay SOILS amount of rtnes) mixtures. (More Ihtm 50"J of is S Well graded sands, well graded sands with ' In111Critd LARGER than No. CLEAN YY r grovel. 200 sieve size) SANDS (mme than 50"'. of SANDS (Little or nn fines) SP Poorly graded sands, poorly graded sands ' cnnrse fraclion is with gravel. SMALLER than the No. 4 Sieve SANDS SM Silly sands. Size) WITH FINES (Appreciable amount of, fines) SC _ Claye) sands. tv1L lnargalic sills, sandy or clayey silts with 1.11,ptasticily. . 511.,TS AND CLAYS CL Innrganic days of low plasticity. FINE (Liquid limit LESS than 50) GRAINED — OL Organic silts and organic silty clays of low SOILS — plasticity. (More Than 50% of m3terinl is Mil Inorganic silts, elastic sills. SMALLER than No. 200 sieve size) SI LTS AND CLAYS (Liquid fimil GREATER than 50) CI I Inorganic clays of high plasticity, fat clays OH clays ofhigh plasticity, organic sills. silts. CORED ROCK RK Rock BOUNDARY CLASSIFICATIONS: Soils possessing characteristics of two groups are designated by combinations of group symbols. SI LT OR CLAY SAND � GRAVEL Cobbles Boulder Fine Medium Coarse Fine_ Coarse No.200 No.40 ' No.10 NoA - 3/4" 3" 12" U.S. STANDARD SIEVE SIZE Reference: "Classification of Soils for Engineering Purposes" (Unified Soii Classification System) ASTM D 2487, and/or "Description and Identification of Soils" (Visual -Manual Procedure), ASTM D 2498. Undisturbed Sample Split Spool) Sample Rock Core Dilatoineler Packer Water Table at time of drifli Caved Depth Auger C►tltings Bulk Sample Crandall Sampler Pressure Meter No Recovery Water Table arter 24 Itours Correlation of Penetration Resistance with Relative Density and Consislency SAND & GRAVEL SILT & CLAY No. of Blows Relative Density No. ol' 131ows Consistenc' 0 - —Very Loose 0 - 1 Very Soft 5 - 10 Loose 2-4 Soft 11 - 20 Firm 5 - 8 Firm 21 - 30 Very Firm 9 - 15 Stif? 31 -50 Dense 16 - 30 Very Stiff Over 50 Very Dense Over 31 1lard 1-EY TO SYMBOLS AND DESCRIPTIONS MACTEC Engineering and. Consulting, Inc. Depth SOIL CLASSIFICATION AND REMARKS 01) SEE KEY SHEET FOR EXPLANATION OF 0 SYMBOLS AND ABBREVATIONS USED 0.25 GrasslRootmat 3 8 12 17 A R DRILLER: Techdrill EQUIPMENT: CME 45 - Auto Hammer METHOD: 2 114" Hollow Stem Auger u HOLE DIA.: 6" L REMARKS; Ground water ecounlered at 11.4 feet at time of boring and at 10.8 feet after 24 hours C7 O THIS RECORD IS A REASONABLE INTERPRETATION OF SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER > TIMES MAY DIFFER, INTERFACES BETWEEN STRATA ARE i APPROXIMATE, TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. Elevation STANDARD PENETRATION TEST 00 BLOWSIFT N; ;'61 0 10 20 30 41) 50 60 711 80 90100 l '. , FILL/DISTURBED RESIDUUM: Firm, reddish -brown, micaceous, sandy elastic SILT, trace clay and fine roots, moist (N=6) RESIDUUM: Loose, reddish -brown, tan, micaceous, silty, fine to medium, SAND, trace fine roots, moist 2-3-4 2167 40 (N=7) 1-2-3 (N=5 ) Soft, reddish -brown, tan, micaceous, sandy SILT trace clay, moist to wet WOH-I-k 2162 (N=2) Firm, reddish -brown, black, micaceous, sandy SILT, trace fine gravel, moist to wet 1-2-3 2157 (N=5) Loose, white, gray, brown, micaceous, silty, line to course, SAND, wet 2152 2-2.3 (N=5) Boring terminated at 20 feet. 0 14 TEST BORING RECORD Boring: B-1 Date Drilled: January 27, 2010 Project: Flowers Bakery Distribution Facility Project No.: 6685091850 Prepared By: —f-P� Checked By:Page 1 Of 1 VMACTEC Engineering & Consulting, Inc. Depth SOIL CLASSIFICATION AND REMARKS (rt) SEE KEY SHEET FOIL EXPLANATION OF 0 SYMBOLS AND ABBREVATIONS USED 0.25 Grass/Rootmat 3 5.5 12 17 27 a ii DRILLER: Techdrill 6 FQUI]'MI-NT: CME 45 - Auto Hammer - METHOD: 2 114" Hollow Stem Auger HOLE D1A.:. 6" REMARKS: Ground water ecountered at 10.5 feet at time of boring c� 0 THIS RECORD IS A REASONABLE INTERPRETATION OF w SUBSURFACE CONDITIONS Al THE EXPLORATION LOCATION. _ SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER j TIMES MAY DIFFER. INTERFACES BETWI:I:N STRATA ARE w APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL, Flevatiou • STANDARD PENETRATION TEST (n) BLOWS/FT ";s 6"' ll 10 20 30 411 5o 60 70 941 94100 2nd 6" FILLIDISTURBED RESIDUUM: Firm, reddish -brown, micaceous, FAT CLAY WITH SAND, moist 2-3-4 (N=7) Firm, brown, tan, micaceous, sandy elastic SILT, trace quartz and Fine gravel, moist 2107 2-3-5 RESIDUUM: Soft, yellowish -brown, pinkish -brown, micaceous, sandy SILT, little clay, trace Fine gravel/quartz, moist to wet 1 2 (1-1-2 2162 1-4-� (N=3) Loose, brown, gray, pinkish -brown, micaceous, silty, fine to coarse, SAND, moist to wet 4. 2157 1-3-3 (N=6) Loose, tan, gray, brown, micaceous, silty, Fine to coarse, SAND, moist 2152 2-2-4 (N=6) 2147 3-4-5 (N=9) Firm, gray, white, brown, micaceous, silty, Fine to coarse, SAND, moist 2142 R-9-R (N=17) 2137 3-5-7 (N=12} G-R-11 (N=19) •��°p ", � ��' xTEST��BQRING_RECORII,-_: �� Boring: B-2 Date Drilled: January 28, 2010 Project: Flowers Bakery Distribution Facility Project No.: 6695091850 Prepared By: fP(� Checked By: 5e!—)g Page 0VIACTEC Enbineerino S Consulfina, Inc. I Of 2 SOIL CLASSIFICATION AND REMARKS Elevation Depth (ft) (ft) SEE KEY SHEET FOR EXPLANATION OF CVAAVn7 C Ar.rTl AE20DUAlA mr'cKly iivl .. n • STANDARD PENETRATION TEST BLOWS/FT "W ""' tsr 6"1 Q 2()111 dtt [0 Gn 711 Sn Unr nn 2.,, 6" _. 47 50 0 a DRILLER: Techdrill L' EQUIPMENT: CME 45 - Auto Hammer O ,_ METHOD: 2 V4" Hollow Slem Auger v HOLE DIA.: 6" REMARKS: Ground water ecountered at 10.5 fuel at time of boring a 0 THIS RECORD IS A REASONABLE INTERPRETATION OF w SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER TIMES MAY DIFFER INTERFACES BETWEEN STRATA ARE ua APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. Firm, gray, white, brown, micaceous, silty, fine to coarse, SAND, moist (continued) 2127 2122 3-7-9 (N=16) 5.13-15 (N=28 ) No soil sample recovery - Heaving in auger Boring terminated at 50 feet. Boring: B-2 (late Drilled: January 28, 2010 Project: Flowers Bakery Distribution Facility Project No.: 6685091850 Prepared By: '7'�Oa Checked By: �j� Page 2 Of 2 XgACTEC Engineering & Consulting, Inc. Depth SOIL CLASSIFICATION AND REMARKS [ft) SEE KEY SHEET FOR EXPLANATION OF 0 SYMBOLS A D ABBREVATION USED 0.25 Grass/Rootmat 3 5.5 8 17 20 a DRILLER: Techdrill o EQUIPMENT: CME 45 - Auto Hammer MET14OD: 2 114" Hollow Stem Auger u I IOLE DIA.: 6" s REMARKS: Ground water ecountered at 1 1 2 feet at lime of boring - and at 9.3 feet after 24 hours c� 0 THIS RECORD IS A REASONABLE INTERPRETATION OF w SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCA'1'[ONS AND ATOTHER > TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. Elevation • STANDARD PENETRATION TEST 00 BLOWS/FT "-C°"°I Is, 6" n 0 l0 20 31) d0 50 rOtt au4n1nn s,�d6" FILL/DISTURBED RESIDUUM: Firm, reddish -brown, micaceous, sandy elastic SILT, moist 1-2-4 (N=6) RESIDUUM: Firm, clayey SAND with fine gravel (quartz), moist 2166 2-5-7 (N=12) Firm, micaceous, sandy SILT, some clay, moist 3-2-3 (N=5) Soft, brown, purplish -brown, black, micaceous, sandy SILT, moist to wet 2161 I l 2 1 _L[J(N=3) JIL 2156 1-1-2 (N-3) Loose, gray, white, brown, micaceous, silty, fine to coarse, SAND, wet 2151 1-3-4 (N=7) Boring terminated at 20 feet. TEST 3BORING' RECORD », Boring: B-3 Date Drilled: .lanuaD, 27, 2010 Project: Flowers Bakery Distribution Facility Project No.: 6685091850 Prepared By: 7AR Checked By: Page 1 Of 1 VMACTEC Engineering & Consulting, Inc.11 Depth SOIL CLASSIFICATION AND REMARKS {�> SEE KEY SHEET FOR EXPLANATION OF SYMBOLS AND ABBREV TIONS USED 0.67 0-2" GrasslRootmai, 2-8" Topsoil 3 5.5 8 10 0 a^. DRILLER: Techdrill 0 EQUIPMENT: CME 45 -Auto Hammer METHOD: 2 1/4" Hollow Stem Auger HOLE DIA.: 6" x REMARKS: Caved and dry at 6.5 feet at time of boring s r a 0 a a o THIS RECORD IS A REASONABLE INTERPRETATION OF W SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER 5 TIMES MAY DIFFER INTERFACES BETWEEN STRATA ARE Y APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE 4 GRADUAL. Elevation • STANDARD PENETRATION TEST cft) BLOWS/FT r 6lit Rt li 10 211 AD do Mi rn 7n Rn4ntnn 2"d6., —+ 2167 2162 40 2-2A . (N=6) 2-4-6 (N=10) 2-3-5 (N6B) 1-1-3 (N=4) FILL/DISTURBED RESIDUUM: Firm, brown, micaceous, sandy elastic SILT, trace clay and fine roots, moist RESIDUUM: Stiff, brown, yellowish -brown, micaceous, sandy SILT, trace fine gravel, moist Firm, brown, purplish -brown, micaceous, sandy SILT, moist + Soft, tan, purplish -brown, micaceous, sandy elastic SILT, trace clay, moist to wet Boring terminated at 10 feet. ;yc,_. ,�.: aarua Yviwu.�..�".•t:1J1\'.il ar -n -esef Boring: B-5 Date Drilled: January 28, 2010 Project: Flowers Bakery Distribution Facility Project No.: 6685091850 Prepared By: 'rp,t� Checked By: 15",--7' Page 1 Of 1 ,fMACTEC Engineering & Consulting, Inc. Depth SOIL CLASSIFICATION AND REMARKS (ft) SEE KEY SHEET FOR EXPLANATION OF 0 SYMBOLS AND ABBREVATIONS USED 0.25 Grass/Rootmat 3 5.5 10 Eievatiun 0 STANDARDY1' D PENETRATION TEST �ft) BLOW1 N]H 61 0 10 20 30 40 AMG(i -7n No Unron 2nd 6" c-d FILL/DISTURBED RESIDUUM: Firm reddish -brown, micaceous, sandy FAT CLAY, moist Z' f# CC c 4S pc-Z4� r-.x 3/ 2163 2158 • 12-3 (N=5) 3-4-6 (N= I D) 2-3-4 (N=7) 7-3-3 (N=6) RESIDUUM: Stiff, tan, reddish -brown, micaceous, sandy elastic SILT, moist • Loose, firm, tan, reddish -brown, gray, micaceous, clayey, firm to medium SAND, moist X,1 Boring terminated at 10 feet. a DRILLER: Techdrill a EQUIPMENT: CME 45 - Auto Hammer r' �` " 1i 7 TEST B©RnvGxEcoRn METHOD: 2 114" Holiow Stem Auger t h , c� HOLE DIA.: 6" REMARKS: Ground water not encountered at time of boring. Boring; B-7 vF Borehole caved at 6.8 feet after boring and ground water Date Drilled' January 27, 2010 encountered 6.5 feet after 24 hours ° Project: flowers Bakery Distribution Facility THIS RECORD 15 A REASONABLE INTERPRETATION OF Project No.: 6685091850 SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION, Prepared By: �� Checked By: SG; Page SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER j T1MES MAY DIFFER. INTERFACES BETWEEN STRATA ARE APPROXIMw TRANSITIONS BETWEEN STRATA MAYBE MACTEC Engineering & Consulting, Inc. GRADUAL. I Of 1 Depth SOIL CLASSIFICATION AND REMARKS 1ft> SEE KEY SHEET FOR EXPLANATION OF 0 SYMBOL ND ABBREVATIONS USED 0.25 3 5.5 B 15 Flevation • STANDARD PENETRATION TEST (�`) BLOWSIFT r+Ist11 6 lae " n 10 20 10 do 511 611 'n Rn ont nn 2nd 6" FILL/DISTURBED RESIDUUM: Firm, reddish -brown, micaceous, sandy elastic SILT, moist (M iq� LL=7Co� P4=4/��Z=.3�r •I x 26 RESIDUUM: Firm brown, black, micaceous, sandy SILT, moist 2167 • (N-6) Very loose, brown, white, micaceous, firm to coarse, silty SAND; little clay, trace fine gravel, moist 2-2-2 (N=4) Very loose, micaceous, fine to coarse, clavey SAND, with fine quartz fragments 2162 1-1-t (N=2) 1 . r1 2157 1-1-3 (N=4) Boring terminated at 15 feet r 0 a DRILLER: . Techdrill EQUIPMENT: CME 45 - Auto Hammer 0 METHOD: 2 114" Hollow Stem Auger HOLE DIA.: 6" REMARKS: Ground water ecountered at 11.5 feet at time of boring and at 10.5 feet after 24 hours THIS RECORD IS A REASONABLE INTERPRETATION OF m SUBSURFACE CONDITIONS AT THE EXPLORATION LOCATION. SUBSURFACE CONDITIONS AT OTHER LOCATIONS AND AT OTHER S TIMES MAY DIFFER. INTERFACES BETWEEN STRATA ARE LU APPROXIMATE. TRANSITIONS BETWEEN STRATA MAY BE GRADUAL. Boring: B-8 Date Drilled: January 27, 2010 Project: Flowers Bakery Distribution Facility Project No.: 6685091850 Prepared By: .rpa Checked By: Page 1 Of 1 IFMACTEC Engineering & Consulting, Inc. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 OMACTEC MACTEC ENGINEERING AND CONSULTING, INC. 1308 Patton Avenue - Asheville, North Carolina 28806 (828) 252-9130 phone — (828) 251-9690 fax Project Name: Flowers Bakery Distribution Facility Soil Description: Red brown micaceous Project Number: 6685-09-1850.01 sandy CLAY - Test Date: 02/04/10 USCS: CH (AASHTO: A-7-6) Atterberg Limits ASTM D 4318 (Three Paints) Sample Number: 147 (1.0-2.5) Depth (ft): 1.0 to 2.5 ft. bgs Blows % Moisture 17 58.9 25 55.4 34 52.1 uid Limit Plastic Limit Plasticitv Index Liquid Limit (ASTM D 4318) Three Points 60 59 y =-9.7121n(x) + 86.475 58 57 m 56 o 2 55 e 54 53 52 51 10 Blows 100 Prepared by/Date: 0k (, 7 Z�IZ�ZQ 1 Q Checked by/Date: 6� D 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 AYMACTEC MACTEC ENGINEERING AND CONSULTING, INC. 1308 Patton Avenue - Asheville, North Carolina 28806 (828) 252-8130 phone — (828) 251-9690 fax Project Name: Flowers Bakery Distribution Facility Soil Description: Red brown micaceous Project Number: 6685-09-1850.01 sandy clayey SILT Test Date: 02/04/10 USCS: MH (AASHTO: A-7-5) Atterberg Limits ASTM D 4318 (Three Points) Sample Number: B8 (1.0-2.5) Depth (ft): 1.0 to 2.5 ft. bgs uid Limit Slows % Moisture 19 80.1 25 74.5 35 71.5 Plastic Limit Plasticitv Index Liquid Limit (ASTM D 4318) Three Points 80 ! I y =-13.92in(x) + 120.45 79 78 77 -' 76 f 75 e 74 73 72 — 71 70 10 Blows 100 Prepared by/Date: Checked by/Date: '::%41,3 ahZ�/ Q r ,r y L1 L ' JU�V + J CiJi� r' DESIGN CALCULATIONS ' & SUPPORTING INFORMATION II HENDERSONVILLE DISTRIBUTION � FACILITY AT BLUE ROCK COMMERCE � CENTER I 1 a PREPARED FOR: BUTLER DEVELOPMENT GROUP, LLC 2727 PACES FERRY ROAD, SUITE 1-255 ATLANTA, GA 30339 PREPARED BY: ca'c'4 CIVIL DESIGN CONCEPTS, PA 200 Swannanoa River Road 1210 S. Main Street Asheville, NC 28805 Waynesville, NC 28786 Phone:828-252-5388 Phone:828-452-4410 Fax.828-252-5365 Fax:828-456-5455 www.civildesignconcepts.com ,,++++rrrirriri� % S AL JOB No. 10971 March 15, 2010 a I 0 a 0 I I I cc(c'� CIVIL DESIGN CONCEPTS, PA tProject Name: Hendersonville Distribution Facility at Blue Rock CDC Project No. 10971 ' Date: March 10, 2010 Project Narrative General 1 JUN 1 0 xceiCenter,'i i-i c�UA FY :'E,-7i0N The project consists of site work for a proposed distribution facility located off of McMurray Road in the eastern portion of Henderson County, North Carolina. The proposed project is on a 1.58-acre property and is located in the township of Flat Rock. The parcel is currently ' unoccupied with an existing asphalt road connecting the project to McMurray Road. The site is located in an industrial zoned area and currently the site is flat with the entire site being grass covered including the surrounding properties. ' Erosion Control Approximately 1.58 acres of the parcel will be disturbed. Permanent diversion ditches will be placed on both sides of the project to convey the runoff flow to a proposed sediment basin with baffles at the rear of the site. Silt fencing shall also be installed to prevent sedimentation from leaving the site. The disturbance is limited to grading/excavation for the building pad, parking areas and driving surface. Standard erosion control BMP's should sufficiently control any sediment and prevent any sediment loss from the site. ' Storm Drainage/Down Stream Evaluation-Stormwater Impact And Receiving Watercourse Information ' The project improvements consist of a new structure with additional parking and loading areas providing for a total impervious percentage of 63.8% for the project site. The receiving watercourse is Dunn Creek, which is a class C stream. The stonmwater conveyance is provided ' by grassed lined ditches that direct stormwater runoff to the rear of the site to the planned bioretention cells. There are two (2) bioretention cells designed to capture and treat the 1" storm event in accordance to the High Density requirements. Along with treatment, the runoff ' will experience a reduction in velocity before being directed off -site. The cells are designed in accordance with regulations outlined in the NCDENR BMP Manual and the Bioretention Cell Supplement Form is also enclosed. Supporting calculations, including HydroCAD, are also included to confirm the figures in the supplemental forms. Please feel free to contact our office with any questions or concerns as you review this project S:IACAD\109711Docs1EC-SD110971-Proicet Nanadvc.doc 1 200 Swannanoa River Road, Asheville, NC 28805 Phone: 828-252-5388 Fax: 828-252-5365 1 P.O. Box 5432 Asheville, NC 28813 1 1 I I 11 1 I 1 •-�.. to 1. ,%' F _}., O1� V lt/ � :f 'cr � } i pelf r ' � 'ZIOy` e� • � Cy '� 1� 7 lil s<-."` ((j \• 11 l b i •Q • Q - q . � f 1 Counrt Cen +4 ,.� _• lvvl �, -tom s �• ' � �Y . W ••JJJ •• 4 `� •• e n o� o • �` 1 ��. \ i rr+ • ill '4'i`� } 1` � s / L • .. •� 4 31 • • kthle x tea`• a N par D:to SOP Rol IF A • 2�: rr e . • �' ` - � • I •/ rr . . q �•` it H p -- . '� • • i ` • • • . • � • � • �. �� e'.1 • `: '' it - Q 11 - V•Ly. - `�' '1 1 l {�-^gin - r• C i ` fl.V �•,I N ' z. ♦ r Q' +4 1 t•� ( Im c 0• 1 •r • •71 Ct� N a 0.5 Mi Map provided by MyTopo.com 0 2000 Ft I I I I I I I ! I I t I t Permit Number: (to be provided by DWQ) ��of war�9o� Y NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM ' BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. ' The Required Items Checklist (Part III) must be printed, fitted out and submitted along with all of the required information, I. PROJECT INFORMATION Project name Hendersonville Distribution Facility at Blue Rock Commerce Center ' Contact name Jesse Gardner, P.E. Phone number 828.252-5388 Date Drainage area number DA-1 II. DESIGN INFORMATION Site Characteristics ' Drainage area 30,089 ff2 Impervious area 21,898 ff2 Percent impervious 72.8% % Design rainfall depth 1" inch Peak Flow Calculations Is preiposl control of the 1-yr, 24-hr peak flow required? Y (Y or N) 1-yr. 24-hr runoff depth 3.4 in 1-yr, 24-hr intensity 0.14 inlhr Pre -development 1-yr, 24-hr peak flow 2.640 ft3isec Post -development 1-yr, 24-hr peak flow 1.080 ff3lsec ' Pre/Post 1-yr, 24-hr peak control -1.5fi0 fl3lsec Storage Volume: Non -SA Waters Minimum volume required 1,769.0 f13 Volume provided 1,770.0 ft3 OK Storage Volume: SA Waters 1.5 runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 ' Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 1,770.0 ff2 OK ' Length: ft Width: f1 1 or- Radius Media and Soils Summary ff Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface 18 hr OK Drawdown time, total: 24 hr In -situ soil., Soil permeability 2.00 inlhr OK Planting media soil. Soil permeability 2.00 in/hr OK Soil composition t % Sand (by weight) % Fines (by weight) 87% OK 8% OK % Organic (by weight) 5% OK Phosphorus Index (P-Index) of media Form Bioretention-Rev.B July 30. 0, 2009 2009 Total: 100% 10 (unitless) OK Parts I and It. Design Summary, Page 1 of 2 Permit Number: (to be provided by DWO) 1 1 0 1 fl 1 r 1 1 1 1 Basin Elevations Temporary pool elevation Type of bioretention cell (answer "Y' to only one of the two following questions): Is this a grassed cell? is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional 6stance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation.of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? . Is the BMP located at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an 'X' in the shaded cell) Gravel and grass (Sinches gravel followed by 3-5 It of grass) Grassed swale Forebay Other 2167.00 fmsl Y (Y or N) OK N (Y or N) 2166 fmsl 0 inches Insufficient mulch depth, unless installing grassed cell. 2164 imsl 2 it Oft Y (Y or N) 2 OK 10 OK 1it 2163 fmsl 2161 fmsl 2 ft OK N (Y or N) fmsl 2166 ft Y (Y or N) OK Y (Y or N) OK It N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK f)sec N (Y or N) OK N (Y or N) OK Y (Y or N) OK Form SW 401-Btoretention-Rev.t3 Parts I and II. Design Summary, Pa July 30, 2009 9 rY e 2 of 2 9 Permit Number: (to be provided by DWQ) A ��04 war�go� > 1 NCDENR T STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lit) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Hendersonville Distribution Facility at Blue Rock Commerce Center Contact name Jesse Gardner, P.E. Phone number 828-252-5388 Date ' Drainage area number DA-2 II. DESIGN INFORMATION Site Characteristics ' Drainage area 40,266 ft2 Impervious area 24,465 ft2 Percent impervious 60.8% % Design rainfall depth 1' inch ' Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr runoff depth 3.4 in 1-yr, 24-hr intensity 0.14 inthr Pre -development 1-yr, 24-hr peak flow 2.940 ft/sec Post -development 1-yr, 24-hr peak flow 1.320 ft/sec Pre/Post 1-yr, 24-hr peak control -1.620 fl /sec Storage Volume: Non -SA Waters Minimum volume required 1,997.0 ft' Volume provided 2,000.0 ft' OK Storage Volume: SA Waters 1.5' runoff volume ft' Pre -development 1-yr, 24-hr runoff ft' Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft' Volume provided f13 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 2,000.0 ft OK t Length: ft Width: ft or- Radius Media and Soils Summary ft Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface Drawdown time, total: 18 hr OK 24 hr In -situ soil: Soil permeability 2.00 inlhr OK Planting media soit: Soil permeability 2.00 in/hr OK Soil composition t % Sand (by weight) % Fines (by weight) 87% OK 8% OK % Organic (by weight) 5% OK Total: 100% Phosphorus Index (P-Index) of media 10 (unilless) OK ' Form SW401-Sioretention-Rov.8 July 30, 2009 Parts I and II. Design Summary, Pa n 9 ry e 1 of 2 9 Permit Number: (to be provided by DWO) 1 1 I,] 1 1 1 I 1 1 1 1 Basin Elevations Temporary pool elevation Type of bioretention cell (answer 'Y' to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the uptumed elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X' in the shaded cell) Gravel and grass (flinches gravel followed by 3-5 ft of grass) Grassed swale Forebay Other 2167.00fmsl — zIGG a C7 Y (Y or N) OK N (Y or N) 2166fmsl — -7 0 inches Insufficient mulch depth, unless installing grassed cell. 2164 fmsl 2 ft n H Y (YorN) 2 OK 10 OK 1 ft 2163 fmsl 2161 fmsl 2 ft OK N (Y or N) fmsl 2166 ft Y (Y or N) OK Y (Y or N) OK I N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK ft/sec 4—,— N (Y or N) OK N (Y or N) OK Y (Y or N) OK 0 Form SW401-Bioretention-Rev.8 July30. 2009 Parts t and II. Design Summary, Page 2 of 2 Permit No: (to be assigned by D WO) III. REQUIRED ITEMS CHECKLIST 1 1 1 1 I 1 0 I 1 j 1 1 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial beiow. If a requirement has not been met, attach justification. Paget Plan In' ial Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, J Off -site drainage (if applicable), ✓ Delineated drainage basin's/(include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, ✓ Maintenance access, ✓ Recorded drainage easement and public right of way (ROW), Clean out pipe locations, Overflow device, and ✓ Boundaries of drainage easement. AIN C7 2. Plan details (1' = 30' or larger) for the bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system/ Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), Clean out pipe locations, Overflow device, and ✓ Boundaries of drainage easement. Ll cI Indicate the P-Index between 10 and 30 3. Section view of the bioretention cell (1" = 20' or larger) showing: Side slopes, 3:1 or lower ,/ Underdrain system (if applicable), and ✓ Bioretention cell layers (ground level and slope, pre-treatment, pending depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), rnigcTcc SHWf level(s), and overflow struciurej q A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and index. d 5. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: �G r�ss¢ol} A variety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and C 3 Fertilizer and watering requirements to establish vegetation. 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. C > 7. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. ou famae 9. The supporting calculations (including underdrain calculations, if applicable). A COAL r1�� 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. A 10. A copy of the deed restriction. Form SW401-8ioretention-Rev.7 Part III, Page 1 of 1 1 1 1 1 1 1 1 1 [J ca*c* CIVIL DESIGN CONCEPTS, PA Bioretention Cell Water Quality Volume (WQv) Project Name: Hendersonville Distribution Facility CDC Project Number: 10971 Bioretention Cell "1" Drainage Area, acres = 0.69 Impervious Area, acres = 0.50 Rv = 0.05 + 0.9(1) 1 = percent impervious = 72.90% Rv = run-off coefficent = 0.71 Rv = storm run-off inches / storm rainfall inches Water Quality Volume for a: inch rainfall Water Quality Volume = inches of rainfall x Rv x (1 Water Quality Volume = 1,769 cubic feet,/ Required Sire of Bioretention Area (Af) Af= (WQv) x (df)/[(k) x (hf+ df) x (tol WQv = df = filter bed depth = Af= Area provided (see plans) Volume Provided (Area/Ponding Depth)= Depth of pool above filter bed: ft/12 inches) x Drainage Area (so 1,769 cubic feet 1.00 feet 1,769 square feet 1,770 square feet 1,770 cubic feet 12 inches For bioretention devices, this volume must be drawn down within 2 days Infiltration rate (estimated) = 2.00 inches/hour Average infiltration basin pool depth = ] 2.00 inches Infiltration drawdown time = 6.00 hours Underdrain Flow Calculations Bioretention area designed so that full volume drains in 2 days (48 hours) Total Volume (from above) = 1,770 cubic feet Rate of Flow through Bioretention area = (Total Volume)/(48 hours x 3600 sec/hr) = Underdrain flow rate Underdrain Flow Rate = 1 0.010 cubic feet per second Design of Underdrains Design Flow Rate (Q) _ Diameter of Single Pipe (D) _ Size provided 0.102 <= factor of safety of 10 0.60 4" Pipe 1 1 Cat' CIVIL DESIGN CONCEPTS, PA Bioretention Cell Water Quality Volume (WQv) Project Name: Hendersonville Distribution Facility CDC Project Number: 10971 Bioretention Cell "2" ' Drainage Area, acres = 0.92 Impervious Area, acres = 0.56 Rv = 0.05 + 0.9(1) 1 = percent impervious = 60.87% 'Rv = run-off coefficent = 0.60 Rv = storm run-off inches / storm rainfall inches Water Quality Volume for a: inch rainfall Water Quality Volume = inches of rainfall x Rv x (1 R/12 inches) x Drainage Area (so Water Quality Volume = 1,997 cubic feet Required Size of Bioretention Area (Af) (WQv) x (dt)/[(k) x (hf+ df) x (tf)] 'Af= WQv = 1,997 cubic feet df = filter bed depth = 1.00 feet Af = 1,997 square feet Area provided (see plans) 2,000 square feet Volume Provided (Area/Ponding Depth)= 2,000 cubic feet Depth of pool above filter bed: 12 inches For bioretention devices, this volume must be drawn down within 2 days Infiltration rate (estimated) = 2.00 inches/hour Average infiltration basin pool depth = 12.00 inches Infiltration drawdown tirne = 6.00 hours Underdrain Flow Calculations Bioretention area designed so that full volume drains in 2 days (48 hours) Total Volume (from above) = 2,000 cubic feet Rate of Flow through Bioretention area = (Total Volume)/(48 hours x 3600 sec/hr) = Underdrain flow rate Underdrain Flow Rate = 0.012 cubic feet per second Design of Underdrains Design Flow Rate (Q) _ Diameter of Single Pipe (D) _ ISize provided 0.116 <= factor of safety of 10 0.63 �� g 4" Pipe 1S Pre -Development Pre -Development Total 2.50 cfs i S Post Dev (Cell #1) 46P Subcat Reach on Link Cell #1 (3S Post Dev (Cell #2) 45P Cell #2 1.08 cfs 1.32 cfs Post -Development Total 2.40 cfs 1 10971-BioRetention-Cells Type 1124-hr 1 yr Rainfall=3.40" Prepared by Civil Design Concepts, PA Printed 3/16/2010 HydroCADO_8.50 s/n 004679 © 2007 HydroCAD Software Solutions LLC Summary for Subcatchment 1 S: Pre -Development Runoff = 2.50 cfs @ 11.97 hrs, Volume= 5,245 cf, Depth= 0.89" ' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-36.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=3.40" Area (sf) CN Description 70,355 - 69 50-75% Grass cover, Fair, HSG B 70,355 Pervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 1 S: Pre -Development Hydrograph ®Runoff z.SD cis Type II 24-hr 1 yr Rainfall=3.40" 2 Runoff Area=70,355 sf Runoff Volume=5,245 cf Runoff Depth=0.89" Tc=5.0 min LL 1- CN' I % Time (hours) 1 I I I 10971-BioRetention-Cells Type 1I24-hr 1 yr Painfall=3.40" Prepared by Civil Design Concepts, PA Printed 3/16/2010 H droCAD® 8.50 s/n 004679 © 2007 H droCAD Software Solutions LLC Summary for Pond 6P: Cell #1 Inflow Area = 30,089 sf, 72.78% Impervious, Inflow Depth = 2.18" Inflow = 2.64 cfs @ 11.95 hrs, Volume= 5,460 cf for 1 yr event Outflow - 1.08 cfs @ 12.07 hrs, Volume= 3,885 cf, Atten= 59%, Lag= 6.8 min Primary = 1.08 cfs @ 12.07 hrs, Volume= 3,885 cf +� Routing by Stor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.05 hrs Peak Elev= 2,166.41' @ 12.07 hrs Surf.Area= 2,439 sf Storage= 2,477 cf Plug -Flow detention time= 177.4 min calculated for 3,885 cf (71 % of inflow) Center -of -Mass det. time= 79.4 min ( 888.0 - 808.6 ) Volume Invert Avail.Storage Storage Description _ #1 2,165.00' 4,141 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf -Area Perim. Inc.Store Cum.Store Wet -Area (feet) (sq-ft) feet)_ _ (cubic -feet) (cubic -feet) (sq-ft) 2,165.00 1,235 219.0 0 0 1,235 2,166.00 1,942 247.0 1,575 1,575 2,299 2,167.00 3,246 263.0 2,566 4,141 2,997 Device Routing Invert Outlet Devices #1 Device 2 2,166.00' Custom Weir/Orifice, C= 2.62 Head (feet) 0.00 0.50 0.50 1.00 1 Width (feet) 1.25 1.25 16.00 16.00 #2 Primary 2,162.00' 15.0" x 20.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 2,161.80' S= 0.0100 7' Cc= 0.900 n= 0.011 Primary OutFlow Max=1.05 cfs @ 12.07 hrs HW=2,166.40' (Free Discharge) tCulvert (Passes 1.05 cfs of 11.49 cfs potential flow) 1=Custom Weir/Orifice (Weir Controls 1.05 cfs @ 2.08 fps) [l 1 14 ' 10971-BioRetention-Cells Type If 24-hr 1 yr Rainfaff=3.40" Prepared by Civil Design Concepts, PA Printed 3/16/2010 HydroCAD® 8.50 s/n 004679 © 2007 HydroCAD Software Solutions LLC Pond 6P: Cell #1 Hydrograph 1 I 2 N U O U. I 0 1 2 3 4 5 6 7 8 9 111 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) 1 (l1 i Inflow M Primary 10971-BioRetention-Cells Type I124-hr 50 yr Rainfall=7.59" Prepared by Civil Design Concepts, PA Printed 3/16/2010 HydroCAD® 8.50 s/n 004679 OO 2007 HydroCAD Software Solutions LLC Pond 6P: Cell #1 Hydrograph 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) 1 I 1 1 1 ■ Inflow O Primary i 1 I rl� rl I a 1 11 I 10971-BioRetention-Cells Type 1124-hr 1 yr Rainfall=3.40" Prepared by Civil Design Concepts, PA Printed 3/16/2010 HydroCAD® 8.50 s/n 004679 c0 2007 HydroCAD Software Solutions LLC rSummary for Pond 5P: Cell #2 Inflow Area = 40,266 sf, 60.76% Impervious, Inflow Depth = 1.77" for 1 yr event Inflow 2.94 cfs @ 11.96 hrs, Volume= 5,955 cf Outflow - 1.32 cfs @ 12.06 hrs, Volume= 4,447 cf, Atten= 55%, Lag= 6.4 min Primary = 1.32 cfs @ 12.06 hrs, Volume= 4,447 cf Routing by Stor-Ind method, Time Span= 0.00-36.00 hrs, dt= 0.05 hrs Peak Elev= 2,166.47' @ 12.06 hrs Surf.Area= 2,012 sf Storage= 2,394 cf MPlug -Flow detention time= 163.5 min calculated for 4,447 ct (75% of inflow) Center -of -Mass det. time= 67.5 min ( 893.5 - 826.0 ) Volume Invert Avail.Storage Storage Description #1 2,165.00' 3,540 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation (feet) Surf.Area (sq-ft) Perim. (feet) Inc.S#ore (cubic -feet) Cum.Store (cubic -feet) Wet.Area _sq-ft) 2,165.00 1,274 137.0 0 0 1,274 2,166.00 1,755 171.0 1,508 1,508 2,121 2,167.00 2,321 190.0 2,031 3,540 2,696 1 Device Routing Invert Outlet Devices #1 Device 2 2,166.00' Custom Weir/Orifice, C= 2.62 Head (feet) 0.00 0.50 0.50 1.00 ' Width (feet) 1.25 1.25 16.00 16.00 #2 Primary 2,162.00' 15.0" x 25.0' long Culvert CPP, square edge headwall, Ke= 0.500 Outlet Invert= 2,161.75' S= 0.0100'/' Cc= 0.900 n= 0.011 Primary OutFlow Max=1.28 cfs @ 12.06 hrs HW=2,166.46' (Free Discharge) L2=Culvert (Passes 1.28 cfs of 11.57 cfs potential flow) L1=Custom Weir/Orifice (Weir Controls 1.28 cfs @ 2.22 fps) 1 I 0 I 1 10971-BioRetention-Cells Type // 24-hr 1 yr Rainfall=3.40" Prepared by Civil Design Concepts, PA Printed 3/16/2010 HydroCAD® 8.50 s/n 004679 O 2007 HydroCAD Software Solutions LLC Pond 5P: Cell #2 Hydrograph i� N U LL I 1 d I 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) ■ Inflow a Primary 1 10971-BioRetention-Cells Type // 24-hr 50 yr Rainfall=7.59" Prepared by Civil Design Concepts, PA Printed 3/16/2010 H droCAD® 8.50 s/n 004679 © 2007 H droCAD Software Solutions LLC Pond 5P: Cell #2 Hydrograph J 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) I 0 0 I ■ Inflow ■ Primary I STORM DRAIN CALCS HENDERSONVILLE DISTRIBUTION FACILITY AT BLUE ROCK COMMERCE CENTER HENDERSON COUNTY CDC Proj. 10971 STRUCTURE 'z x ` v ;^. INVERT ELEVATION 'z z •.�,. F. U (IN.) vi ^ G i A" "C" T. (CFS) "Q" UPper [.osierJ5.2 "N" (IN.) {FT} (F1") (FFlSIiC} FROM TO (ACRES) (CFS) Al A3 23 0.28 0.7 7.38 1.45 NA 1.45 2170.2y 2169.00.024 4.1 18 NA NA 4.85 0.25 1.29 1.29 3.5 NA A2 A3 16 0-7 7.38 NA 2170.2 2169.00.024 18 NA 5.33 NA NA 2.74 1.7 7.6 4.3 A3 EXIST 61 0.7 7.38 NA 2169.0 2168.0 0.024 18 2173.3 3.88 0.69 4.07 4.07 1,0 7.6 B1 OUTFALL 20 0.8 7.38 B1 2162.0 2161.8. 0.011 15 2167.5 5.5 6.27 0.92 5.43 5.43 1.0 9.3 5.5 B2 OUTFALL 20 0.8 7.38 B2 2162.0 2161.8 0.011 15 2167.5 6.75 IPrecipitation Frequency Data Server Pale 1 oi'4 ' POINT PRECIPITATION,. FREQUENCY ESTIMATES 5 d FROM NOAA ATLAS 14,,„. North Carolina 35.284 N 82.419 W 2109 feet from "Plerecipitatiou-Frequency Atlas ofthe Unircd States" NOAA Atlas 14, Volume 2, version ? G,KI Bmuun• U, Martin, R. Lin,'I', Par ybok, h1,Yckln, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: 'fhuMar 11 2010 iL c Qonfdence,Limits, _ � x,�Seaspnaiity r + ,L,� _Location Maps ,;� � Other Into .� ,_GIS; data ;� �Mapsa �pocsj C Precipitation Freuuenev Estimates (inches) 0 I Altl* 5 I11 15 3U Ci} 1211 30 �}5 Gfl ❑��� 3 In 6 11r 12 hrhr 24 fir g8hg��dFL'Ila ❑❑❑ (years) nun mm into rtan min nnn tlaa; rl }g }i d +} tl o �I 0.39 0.G1 0.77 1.U5 1.3i 1.54 1.68 2.19 2. 99 3.40 4. 55 4.G0 5.37 G.14 8.27 IO.l2 12.83 15.33 0.55 �0EEEE0EE�00�K����0� I( U.GI 0.98 1.24 I.SU 2.35 2.75 2.95 3.75 4.72 5.74 G.73 7.39 R.GI 9.67 12.49 14.84 18.23 2i.43 2S {L70 1.12 1.42 2.10 2.80 3.29 3.57 4.52 5.00 6.76 7.88 8.53 9.9G II.l1 14.05 I(iAG 19.84 23.2O SU O.77 1,23 I.55 2.34 3.17 3.74 4.(}8 5.17 G.32 7,59 R,8() 9.42 Il,t}4 l2.25 15.24 l7.G5 21.0E 24.43 lUU (}.84 1.33 I.GR 2.SR 3.55 4.21 4.63 5.88 7.08 8.43 9.75 I{).31 12.13 ]3.40 l(i.34 1R.77 22.11 25.53 20U 0.91 1.43 l.Rl 2.82 3.95 4.72 5.24 G.G7 790 9.3E 10.72 ] 1.21 13.23 ]4.55 17.51 14.R2 23.06 2G.50 S00 f}.99 1.57 l .98 3. 14 4.51 5.44 (i. l2 7.83 9.07 I D.5 I 12.05 12.43 14.72 1 G.10 1$.94 21.12 24.17 27.G0 lUUU 1.OG I.GS 2.IU 3.4U 4.97 G.04 G,87 8.R3 I().04 11,4E 13.()9 13.37 15.88 17.29 19.98 22.D4 24,91 2R.32 These preeipitabon frequency estimates are based on a partial durallort series. ARI is the Average Recurrence Interval. Please rotor to NOAA Atlas 14 Document for more information. NOTE, Formatting forces estimates near zero to appear as zero. U.73 0.92 1.27 LGU 1.87 2.02 2.fr2 3.34 4.08 4.R4 5.47 fi.37 7.2G 9.73 II.RS 14.97 17.R5 U.88 I.11 1.57 2.02 2.3G 2.53 3.23 4.10 5.00 5.84 G.55 7.G1 8.G0 11.29 13.55 1G.RG 14.94 * Upper bound of the 90% confidence interval Precipitation Frequency Estinates (inches) 11i1** i lfl [NFTO GU 12UM[�] 12 [EF48 4 7 lU 2U 30 45GU(years) min min min min min hr hr dtry dap day day day day der' 1� U.43 O.GR O.RS 1.17 1.4G 1.71 1.8(i 2.41 3,(}5 3.G4 4.35 4.90 5.73 G.52 R.72 I U.GS 13.45 16.06 D IU U.51 0.81 1.{)2 1.41 1.77 2.UG 2.24 2.R8 3.(iG 4.42 5.20 5.83 G.RI 7.72 U.GO U97 1.23 1.74 2.23 2.G0 2.81 3.55 4.49 5.42 G.33 G97 8.14 9.14 D.GR 1.09 1.37 1.99 2.59 3.O3 3.27 4.12 5.17 6.22 7.23 7.87 9.20 1U.27 10.27 12.48 14.27 lS.GI 17.31 15.70 IR.70 17.G8 20.R8 19.11 22.44 20.86 24,30 11.91 13.IR 14.82 2S U.7R 1.24 1.57 2.32 3.09 3.G3 394 4.9G G.12 7.32 8.4G 9.08 !i).G4 l L80 50 U.85 1.35 1.72 2.58 3.50 4.12 4.52 5.(i8 (i.92 8.21 9.45 lU.U3 11.7R l3.O1 16.U9 18.58 22.i}9 25.G1 U[} U.93 1.47 1.8G 2.85 3.93 4,G5 5.14 6.44 7.77 9.11 ] i 11.0(I 12.94 14.23 17.3! 19.77 23.2E 2G.7 2Uf} I.OU 1.59 2.01 3.13 4.39 5.23 5.84 7.37 8.70 10.07 11.55 11.96 14.14 15.49 IR.SU 2090 24.23 27.80 SOU I,ll 1,75 2.20 3.51 5.03 G.07 G.85 8.70 ]l).05 11.4D 13.00 E3.30 15.77 17. 6G 20.0(i 22.30 5.58 G.75 7.72 9.87 ] 1.20 12.45 14,15 14,33 17.03 I R,4G 21.2! 23.30 25.43 2G.24 29.0(} 24.SU l Uf}[} I .l9 l .88 2.3G 3.R2 PThe upper bound of the confidence interval at 90%confidence level is the value which 5%of the simulated quantile values for a given frequency are greater than. These precipitation frequency estimates are based on a partial duration series. ARI is the Average Recurrence Interval. lease reler to NOAA Atlas 14 Document for more information. NOTE. Formatting prevents estimates near zero to appear as zero. * Lower bound of the 90% confidence interval l Precipitation Frequency Estimates (inches) 1 ARI 5 111 IS 3U 6{} 12U 3 ]MM M24 4S 4 7 III 2U 30 45 GU (}'cars) min min min min min min fir fir day der day day [lay da► clay �l U.35 0.5G 0.69 U.95 1.19 l39 1.52 2.UU 2.55 3.15 3.79 4.32 5.U4 5.79 7.R(, 9.G1 12.23 14.65 0.41 O.GG U.83 I.IS 1.44 1.G9 1.83 2.39 3.0G 3.78 4.51 5.13 5.98 G.85 9.24 11.2G 14.28 17.05 i l U.49 U.79 1.00 L42 1.82 2.13 2.29 2,95 3.75 4.G3 5.44 G.14 7.14 8.11 10.71 12.88 l[i.UB 19.04 IU 0.55 U.R9 1.12 1,G2 2.11 2.47 2.(iG 3.41 4.30 5.31 G.26 693 8,07 9.10 I1.R5 14. 88 17.39 20.47 1S 0.(i3 I AU 1.27 1.R8 2.51 2,94 3. l8 4.07 S.U7 (,.23 7.31 7.97 4.31 10.43 13.31 15.59 I R95 22.15 5U 0.69 I.09 1.38 2.08 2.82 3.32 3.G2 4.G2 5.70 6,9G 8, 13 R.78 10.28 l 1.47 14.4f} 16.70 2U.04 23.3 ] IOU 0.74 1.18 L49 2.28 3.14 3.71 4.08 5.2E G.34 7.70 8.97 9.58 1 ].25 12.50 15.45 17.73 21.03 24,33 tD!S#ate,Mao:,: httpallidsc.nws.noaa.Gov/cgi-bin/lidsc/buildout.perl?type=pF&units=us&series=pdRstatename=N... 3/11/2010 8 i 3 6 7 P 0 2 8 r1010684 ris' deed,,gives,description-for,,f nai.t o iguration of: d7390-14,96ac°&`4:64ac`"'N0T-4 64AC."LABELED ARCEL''B^ON 'SL'D7390'&`SED7408`" Lit the 4.64ac lying directly to the.south of the 14.96ac Excise Tax S 4)- Ftt,s;]7 IN HENDEfi,SWCOUNW FEnISM OF 09DS aFF+ce..NEOAn.W.MO ES, ReMSIER.701v nor i 11 TAX BOOK: /X_Z -PAGE• a8 •� . '. Ti-e, m ud ?age Tax Lot No. , P=W Ideaditer No. Vmified,by Cmmryon the _ day of 2C) by Matt after"ItcortiftS to Angela S. Sacbx,.1612Adwvflk,H*hvmy,ft4,Eknd==nUcNC28791 This instru zxmt waa yreparcd by Angels S.-Dedwr BriefDesaip6on for.the indar . .19.6 acres - McMma Road NORTH,CAROLINA DEED: OPRRECOMBINATION THIS DEED made McNutt Investments, LLC, a North Carolina limited liability company GRANTEE McNutt hwast nertts. LLC, a North Carolina limited liability company Route 4, Box 64 Flat frock, NC -28731 Enter. in appropriate block for each party. name, address, and, If appropriate, character of entity, e.g., cot oretionorpertrtetsftip. The designation Grantor and Grantee as used herein shall Include said parties, their heirs, suers, and assigns, and shall htdude singular. pkv:&!, masculine, feminine or neuter as required by oontertt WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby admowledged. has and by rose presents does gterrt, betgah sell and convey unto the Grantee In fee.sbr#e tat certain lot or.parcel.of land situated in 19tue,Rbdge TowrrWp. Henderson County..North Carolina and more partiadedy described as follows See anacbed Fzhibit A inwrporalEd.bereip by=fwm= TO HAVE AND TO HOLD the of m;aidiot or parcel of land and all privileges and appurtenances thereto belonging to the,Granlee In.fae simple. 8 i 3 6 7 P 0 2 9 ... - --��'i�tlebv,eP►oDesty.�l��xssu�je�x'to7a,e:%onoxringeiooe�ans: �subjectta #ierrdersvn county Aa vmza>a�: . Subject to ReStrICO rfs and EaWwr fs of Record ..Subject do rVns of. -my otieconi IN WITNESS WHi;REOF,-#*Gmntx.tw-heremW,sethis,handand'seal, 70rffcorpora%,log eaumd this hvmmeent to be signed in its cmpoi nww by Its duiy.aulhoraed ON=s and its seaf,to be hereunto aflniad byauthorify of ifs Board opflinestar' the Qay and yew fhatabunwdRan. McNutt hvestrnents, LLC,•a North Carolina 'f' : .. - ;�""/ W"bo, (SEAL) MWutt State of North Carolina County of Henderson SEAL-UAMP // � �r ! � W I, LJ>< DOI - Xk FR a Notary Public of the county and State -'aforesaid, certify that Read McNutt personally appeared before me voluntarily this day and aclmowledged F that he.ie.Kanager of McNutt -Investments, LLC, and that, G z -being authorized to do so, executed the foregoing instrument 0 ,on behalf<of.McNutt, investments, ..wx. m 'Witness my hand and official stamp or seal, this day O ..of July, 2008. Z My conanission expires. � .fir dQ /p C? Notary Public -Exhibit A Recombination Beginning at spindle set,•said spindle being-looated an the centerline ofMcMun:ay Road, SR 1790, said spindle also -being :lowed North 04° Q9';52".Wes13297.28led from a KCGS monument entitled "UPWARD" having NAD 83 coordinates ofN:580609.476 and E:983712.570 and-pnmeding thence from said:B.eginning point,�Nortli-96°.04':18West] 346.07 feet to an iron stake set and thence North 030.55' 42" East.615.92 feet tom irm stake set, and thence South 940.30, 00" East 183.50 feet, and thence South 890-28'.02" East 374.95 feet, and thence South 87°.191.57"..East'123.82 feet, and thence South 86' 59' 12" East 537.62 feet, and thence South 81 *.57.05".-East-142.121 feet lo a sphulle set.inlhe centm:line of McMmmy Road (SR17") and thence along and with the centef line ofMcMurmy:Road South 05° 13' 03 West -484.32 feet and thence'South-05° 2V_07. West.l50.05_ d to the point.aud place ofBeginning, consisting of +/-19.6 acres and being a recombination of those parcels identified as " 14.96 AC McNutt Investments LLC';.and�"4.64'AC McNutt Investcaents UjC".as shown on those plats recorded on Plat Slide 7390 and Plat Slide 7408 of the Henderson'County Registry. Subject to rights.of way.and easemcd agreerncats.ofrecord. s' NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary March 30, 2010 Mr. Jesse Gardner, P.E. Civil Designs Concepts, PA P.O. Box 5432 Asheville, NC 28813 Subject: Request for Additional Information Stormwater Project No. SW1100301 Hendersonville Distribution Facility at Blue Rock Commerce Center Herderson County Dear Mr. Gardner: The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on March 19, 2010. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Some of the items on the Required Item Checklist have not been included in the application materials. Missing items are: Cell Dimensions, Recorded Drainage Easement and public right of way (ROW), and Boundaries of drainage easement. 2. Please provide supporting calculations for the swales and any other entering points to the bioretention cell in order to show the flow will not cause erosion. Inflow must enter a bioretention cell via sheet flow at 3.0 ft/sec for grassed cells or alternative energy dissipating devices must be used. If sheet flow is not attainable, as may be the case with this design, then the inflow will enter from concentrated sources and need a rip rap lined entrance, a forebay, or other energy -dissipating device. 3. The cell must be designed to include pretreatment. The supplement has "Gravel and grass" marked. The pretreatment is not shown on the plan sheets. A grass and gravel combination, consist of 8 inches of gravel followed by 3 to 5 feet of sod. Please show these details on the plans or provide another type of pretreatment. 4. The Bioretentit- , Cell Supplements are missing necessary inputs: Length and Width —or- Radius and Inlet Velocity. 5. There appears to by inconsistencies on the supplement forms and plan sheets. Please check all elevations to make L:me they match. On the supplement form, the temporary pool elevation is 2167.00 fins] but on plan sheet C7 the elevation looks to be at 2166 fins]. 6. The site plans show only one underdrain for each bioretention cell. In section 5.7 of the BMP Manual, it states a minimum of two pipes should be installed to allow for redundancy. We strongly recommend providing more than one underdrain for each cell. Wetlands and Stormwater Branch io17 Mai! Service Center, Raleigh, North Carol}na 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-6494 1 Customer Service: 1.877.623-6748 Internet: www.nmaterqua54 org An Eaual Opportunlry 1 Affirmative Action Employar NorthCarolitla Natumlly Mr. Jesse Gardner SW 1100301 - Ft. Bragg Green Fuel Facility March 30, 2010 1;S Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 30, 2010, or the application will be returned as incomplete. The return of a project will necessitate resubimittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. If you have any questions concerning this matter please feel free to call me at (919) 807-6368. Sincerely, Brian Lowther Envirorunental Engineer cc: Asheville Regional Office DWQ Central Files Stornwater Permitting -Unit Files cat' CIVIL DESIGN CONCEPTS, PA March 15, 2010 Mr. Bill Diuguid NC DENR — Division of Water Quality Wetlands and Stormwater Branch Stormwater Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Hendersonville Distribution Facility at Blue Rock Commerce Center CDC Project No: 10971 Dear Mr. Diuguid, We are seeking a Post -Construction Stormwater Permit for the above -referenced project, which is located on Reed's Way just off of McMurray Road in eastern Henderson County. The project proposes to develop a lot within a commercial subdivision for future use as a local distribution facility for bread products. Therefore please find the following items enclosed for your review and approval: • Stormwater Management Pen -nit Application Form (1 original, 1 copy) • Check for $505.00 (permit application processing fee) • Bioretention Operation and Maintenance Agreement • Design Calculations & Supporting Information(Project Narrative, Bioretention Cell Supplement, HydroCad, USGS map, etc.) • Two sets of plans, folded to 8.5" x 14" • Report of Geotechnical Exploration (MacTec) • A copy of the most current deed If you should have any questions or need any additional information during your review, please do not hesitate to contact our office with these requests. S er, P.E. i Concepts, PA S:IACAD1109711Dcks�GR-EC-SD�SIateSW Suhmittal\10971-BD2010-3-12.doe 'f LD C= J i. Mailing Address: P.O. Box 5432, Asheville, NC 28813 200 Swannanoa River Rd Asheville, NC 28805 1210 S. Main Street, Waynesville, NC 28786 DL...n.. 49R_'1 C'►_C'2Q4 L'...• Q14 _'1 C'1_CIFC DF..,, 494-AC1-AA %A V.. 474_ACA_CAC4 % v �� �►U �4 0_7� X/' - *A,C $Z;f`l t_ ) Application Completeness Review rt/ First Submittal ❑ Re -submittal Date Received: 3 ' ° Date Reviewed: By I?- -brL,(-6a4D Development/ProjectName: St-u, o cre Receiving stream name 94 ;,,.e.k �-f' buNN CzAok ? classification: G Fall-yr-h BR04ke( For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-1, WS-11, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds) Latitude and Longitude: 18 zG, n 2- - b'Z 39 Project Address: LD'T �t B/_GAe )eoc/- Cor►rn,,,irecr.. PA__-K ti/,Y- - � Jurisdiction Ao�_ n/ne.t s-e,j C2 , t� -f— Engineer name and firm: Sf ssF_ -, t., r_. C,;VP - POSrru couG+CP%-', P.R. jloop""Rotay ❑ Low Density (no curb and gutter) ❑Low Density with curb and gutter outlets L�`�gh;De:nsit❑Other !J jk - A011�104 impacts to surface waters, wetlands, and buffers (add language to cover letter anr addinfo letter) M-- BUA % Check for $505.00 included JOriginal signature (not photocopy) on application G✓Legal signature (Corporation-VPlhigher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/tliepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. 1�JJj¢ ���' For subdivided projects, a signed and notarized deed restriction statement / " Sealed, signed & dated calculations Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) Bioretention Dry Detention Basin G Filter Strip • Grass Swale u Infiltration Basin U Infiltration Trench U Level Spreader ❑ Permeable Pavement • Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road �a' Two sets of sealed, signed & dated layout & finish grading plans with appropriate details d Narrative Description of stormwater management provided id'- Soils report provided Wetlands delineated or a note on the plans that none exist on site and/or adjacent property �r Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; u,�imensions & slopes provided V Drainage areas delineated U Pervious and impervious reported for each ❑ Areas of high density L✓ spection and maintenance agreements provided c� Application complete ❑ Application Incomplete Returned: (Date) Comments ©Ky/r tw pt 4. February 9, 2009 Revision SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low -density projects ❑ No more than two dwelling units per acre or24% built upon area; ❑ Vegetated conveyances to the maximum extent practicable; ❑ Built -upon areas at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive languagelmeasures. High density projects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; U Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. ❑ .Achieve 85% average annual removal of total suspended solids. ❑ For BMPs that require.a separation from the seasonal high-water table,(SHWT), the separation shall include at least 12 inches of naturally occurring soil above the'SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); 1. ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffer Requirements o Undisturbed riparian buffers within 200 feet of water bodies within the 100-Year Floodplain and within 100 feet of water bodies that are not within the 100-Year Floodplain. Exceptions to the undisturbed buffer requirements are set forth in 15A NCAC 02B .0607 Stormwater Controls as required by 15A NCAC 02B .0602 © Control and treat the difference between the pre -development and post -development conditions for the one- year, 24-hour storm with structural controls. ❑ Development and redevelopment shall implement stormwater management measures that promote infiltration of flows and ground water recharge for the purpose of maintaining stream base flow. ❑ 85% average annual removal of total suspended solids. ❑ Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours, for detention ponds. ❑ Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one- year, 24-hour storm. ❑ Meet design or stormwater management measures set forth in 15A NCAC 2H .1008. " High Density Projects that require a 401/404 within an NSW ❑ 85% TSS ❑ 30% TN ❑ 30% TP February 9, 2009 Revision ca'c��4 CIVIL DESIGN CONCEPTS, PA April 13, 2010 Mr. Brian Lowther NC DENR — Division of Water Quality Wetlands and Stormwater Branch Stonnwater Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Re: Hendersonville Distribution Facility at Blue Rock Commerce Center Stormwater Project No.: SW1100301; CDC Project No: 10971 Dear Mr. Lowther, We have received your comments dated March 30, 2010 for the above mentioned project. Attached to this letter are two (2) copies of the revised plans, revised supplement fonns, and the additional supporting information that your comment letter requested. We have addressed your comments as follows: 1. Cell dimensions have been added to the plans and the revised supplement forms. Additionally, a proposed stormwater maintenance easement has been depicted on the plan sheet C3 along with the existing road right of way. 2. Supporting calculations for the permanent ditches and the concrete flumes are attached. Due to the constraints of the site, sheet flow is not attainable, however the attached calculations provide for an inlet velocity of less than 3 ft/second for all ditches and flumes. 3. A grass and sod pretreatment area has been provided for at each inlet into the bio-retention cells. These pretreatment areas are depicted on sheet C3 with a corresponding construction detail on sheet C7. 4. The cell dimensions have been provided on the supplement form, with a clarification that these dimensions do vary with further direction to reference the plan for exact dimensions. 5. The supplement forms temporary pool elevations have been updated to 2166, in order to match the design on the plans. 6. Two underdrains are now depicted for each bio-retention cell on sheet C3 in order to meet section 5.7 of the BMP manual. If you should have any questions or need any additional information during your review, please do not hesitate to contact our office with these requests. Sinc4rely, Jess Gardner P.E. Civ esign oncepts, PA SAA A 09M ocs�GR-EC-SDkState SW Rcsubmittallbll3aprl0.doc Mailing Address: P.O. Box 5432, Asheville, NC 28813 200 Swannanoa River Rd Asheville, NC 28805 1210 S. Main Street, Waynesville, NC 28786 Phone 828-252-5388 Fax 828-252-5365 Phone: 828-452-4410 Fax: 828-456-5455 Permit Number: (to be provided by D WQj AOaOF W A T�9OG y r RA - NCDENit Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This fora must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT, INFORMATION Project name Hendersonville Distribution Facility at Blue Rock Commerce Center Contact name Jesse Gardner, P.E. Phone number 828-252-5388 Date Drainage area number DA-1 II. DESIGN' INFORMATION Site Characteristics Drainage area 30,089 ft2 Impervious area 21.898 ft2 Percent impervious 72.8% % Design rainfall depth 1' inch Peak Flow Calculations Is prelpost control of the 1-yr, 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr runoff depth 3.4 in 1-yr, 24-hr intensity 0.14 in/hr Pre -development 1-yr, 24-hr peak flow 2.640 ft3/sec Post -development 1-yr, 24-hr peak flow 1,080 ft3lsec Pre/Post 1-yr. 24-hr peak control -1.560 ft3lsec Storage Volume: Non -SA Waters Minimum volume required 1,769.0 ft3 Volume provided 1,770.0 ft3 OK Storage Volume: SA Waters 1.5' runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 1,770.0 ft2 OK Length: 41 It OK Width: 50 ft OK -0r- Radius ft Media and Soils Summary Drawdown time, ponded volume 6 hr OK Drawdown time, to 24 inches below surface 18 hr OK Drawdown time, total: 24 hr In -Situ soil: Soil permeability 2.00 inthr OK Planting media soil: Soil permeability 2.00 in/hr OK Soil composition % Sand (by weight) 87% OK % Fines (by weight) 8% OK % Organic (by weight) 5% OK Total: 100% Phosphorus Index (P-Index) of media 10 (unitless) OK Form SW401-Bioretention-Rev.8 1„w,'In Onnp Parts I and II. Design Summary, Paqe 1 of 2 Permit Number: (to be provided by OWO) L Basin Elevations Temporary pool elevation Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with treesishrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned.elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8 inches gravel followed by 3-5 ft of grass) Grassed swate Forebay Other 2166,00 fmsl Y (Y or N) OK N (Y or N) 2166 fmsl 0 inches Insufficient mulch depth, unless installing grassed cell. 2164 fmsl 2ft t) fi Y (Y or N) 4 OK 10 OK 1 ft 2163 fmsl 2161 fmsl 2ft OK N (Y or N) fmsl 2166 ft 0 Y (Y or N) OK Y (Y or N) OK ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 2,33/2,77 ft/sec Insufficient inlet velocity unless energy dissipating devices are being used. ( SEE FL ►W) N (Y or N) OK N (Y or N) OK Y (Y or N) OK X Form SW401-Bioretention-Rev.e July 30, 2009 Parts I and II. Design Summary, Page 2 of 2 . Permit Number; 11 (to be provided by DWQ) m ok wa r�rq h NCDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This fora must be filled out, printed and submitted. The Required Items Checklist (Part tit) must be printed, filled out and submitted along with all of the required information. I11P,ROJECTj INFORMATION Project name Hendersonville Distribution Facility at Blue Rock Commerce Center Contact name Jesse Gardner, P.E. Phone number 828-252-5388 Date Drainage area number DA-2 iIiDESIGNjI WRMATION_ Site Characteristics Drainage area 40,266 ftz Impervious area 24,465 ft2 Percent impervious 60.8% % Design rainfall depth 1' inch Peak Flow Calculations Is prelpost control of the 1-yr, 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr runoff depth 3.4 in 1-yr, 24-hr intensity 0.14 in/hr Pre -development 1-yr, 24-hr peak flow 2.940 ft3lsec Post -development 1-yr, 24-hr peak flow 1.320 ft3/sec Pre/Post 1-yr, 24-hr peak control -1.620 ft3lsec Storage Volume: Non -SA Waters Minimum volume required 1,997.0 ft' Volume provided 2,000.0 ft' OK Storage Volume: SA Waters 1.5' runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ff3 Cell Dimensions Ponding depth of water 12 inches OK Ponding depth of water 1.00 ft Surface area of the top of the bioretention cell 2,000.0 ftz OK Length: 100 ft OK Width: 34 ft OK -or- Radius ft Media and Soils Summary Drawdown time, ponded volume 6 fir OK Drawdown time, to 24 inches below surface 18 hr OK Drawdown time, total: 24 hr In -situ soil: Soil permeability 2.00 in/hr OK Planting media soil: Soil permeability 2.00 inlhr OK Soil composition % Sand (by weight) 87% OK % Fines (by weight) 8% OK % Organic (by weight) 5% OK Total: 100% Phosphorus Index (P-Index) of media 10 (unitless) OK Form SW 401-Bioretention-Rev.8 July 30, 2009 Parts i and II. Design Summary, Page 1 of 2 .. t Permit Number: {to be provided by DWO) Basin Elevations Temporary pool elevation Type of bioretention cell (answer "Y' to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom 10 SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an 'X' in the shaded cell) Gravel and grass (811nches gravel followed by 3-5 ft of grass) Grassed swale Forebay Other 2166.00 fmsl Y (Y or N) OK N (Y or N) 2166 fmsl 0 inches Insufficient mulch depth, unless installing grassed cell. 2164 fmsl 2 ft 0ft Y (Y or N) 5 OK 10 OK 1ft 2163 fmsl 2161 fmsl 2ft OK N (Y or N) fmsl 2166 ft 0 Y (YorN) OK Y (YorN) OK ft N (Y or N) Show how flow is evenly distributed. Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 2.46/2.77 fUsec Insufficient inlet velocity unless energy dissipating devices are beingused. ( to PLAI-IN N (Y or N) OK N (YorN) OK Y (YorN) OK 0 Form SW401-Bioretention-Rev.8 July 30. 2009 Parts I and II. Design Summary, Page 2 of 2 POINT PRECIPITATION FREQUENCY ESTIMATES FROM NOAA ATLAS 14 North Carolina 35.284 N 82.403 W 2185 feet from "Precipitation -Frequency Atlas ofihe United States" NOAA Atlas 14, Volume 2, Version G.M. nnMln, D. Manin, B. Lin, T, Parryhok• h1.1'ekia, and D. Riley NOAA. National Wcalher Service, Silver Spring, Maryland, 20(W Extracted: 7ue Apr 13 2010 �__ Canfidence Limits Seasonality_I {-- Location Maps Other lnfo:w� CG15 data �Mapsy Precipitation Intensity Estimates (inlhr) ARI* Ifl 15 30 fill 120 12 24 48I[LFLOIFL(�1 3115 l min min min min min 3 hr 6 hr hr hr hr jj da, 4.62 .69 3.08 2.11 1.31 0.77 0.5G 0.37 D.23 0.14 0.08 f105 0.43 0.03 002 0.0i 2 4.40 3.69 2.55 l .G0 U.94 {}.G7 0.44 {L28 0.17 D. f 0 O.U6 0.04 0.03 0.02 U.02 3G��Sf 371a�13f is I2I 0 I1�S 4f s5 1DI s4 14f 3a 1o_ 1f i 1offof o71DI`D5lof 04 IaI 02 002 !{} 7.39 5.91 4.98 3.G[ 2.35 1.38 U.99 U.63 0.39 U.24 D.14 0.0E D.OS 0.04 0.43 0.02 25 8.45 6.73 5.69 4,2E 2.81 1.65 ! . l9 OF761 0.46 0.28 D. l6 0.0 O4.06 0.05 0.43 0.02 50 119.25 IL37 ]LL2j 4.G8 3.17 1.87 1.36 0.86 110.52 110.32 110.18 ILIO I{H) l U.07 E.00 T.74 5,16 3.56 2,1 1 IF557 4,98 0.5 O0.35 0.20 D.11 2{10 ]0.87 8.G2 7.25 5.G4 3.96 2.37 1.75 l.l! 0.66 0.39 0.22 Q12 5{III 1 1.93 9.44 7.92 G.30 4.52 2.73 2.04 1.3 I 0.75 0.44 0.25 0. ! 3 101)II 12.79 10.07 R.43 6.82 4.48 3.02 2,29fl 4 91 U.83 1 0.4R U.27 U.14 ' These preaptabon frequency estimates are based on a partial duration series, ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE, Formatting forces estimates near zero to appear as zero * Upper bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) ARI** 5 111 15 3{} 60 120 3 6 12 MF-F- 484 7 10 2U 30 45fill(years) min min min min min min hr hr hr hr ay day day' da)' der' day L41L =5.12 4.09 3.41 2.34 1.46 0.85 0,G2 440 0.25 0.15 0.09 ]g5]EEJO.03 0.02 O.OI 4.01 O.OI 2� EiJ 0 4.E7 4.D8 2.82 1.77 ].D3 (1,75 O,48 0.30 Fo.18 U.I I ) 66 0.04 O.f)3 Q02 0.02 0.0] D.01 0 7.27 5.82 IETEIE24IEEF694 0,59 0.37 0.23 (}.13 0.07 0.05 D.04 O.U2 0.02 FO 021 0.01 10 8.16 6.53 5.50 3.99 2.G0 ].52 L09 O.fi9 U.43 0.26 D.IS O.D8 0.05 U.04 D.03 0.02 0.02 0.02 25 9,32 7.a3 G?8 4.G5 3.10 ].82 1,32 U.E3 Q51 0.31 U.18 0.09 O.Oh f).OS (}.U3 (1.02 U.02 0.02 5U ]0.22 8.14 6.87 5.I8 3.51 2.07 I.SI 0.95 U.57 U.34 0.20 0.l4 0.07 U.05 0.03 0.03 0.02 0.02 100 I IF] ! 5 B.EG 7.4G 5.71 3.94 2.33 1.72 ] .08 U.64 (}.38 U.22 0. I I 0 08 0.06 0.04 U.03 O.D2 O.D2 957 0.24 0.12 0.08 0 0.4 0 0 Q.22U(1 331 08 003 245 O0 0 27 O 0 0.7 00403 025f1 D0205 1000 ]4,35 11.3D 9.4G 7.GG 5.59 3.39 2.58 ].GS 0.43 4.52 U.30 0.15 U.10 O.UB D.04 0.03 {}.02 0.02 ' I he upper bound of the confidence interval at 90% confidence level is Me value which 5%of the simulated quanule values for a given Irequency are greater Nan, These precipitation frequency estimates are based on a partial duratlon series. ARI is the Average Recurrence Interval. Please refer to NOAA Atlas 14 Document for more information. NOTE: Formatting prevents estmates near zero to appear as zero, * Lower bound of the 90% confidence interval Precipitation Intensity Estimates (in/hr) ARI** 5 IU 15 30fill 120 i 6 12 24 48 4 7 10 20 30 45 60 (years) min min min m!n min min I►r hr hr hr hr day day day day day day day 4,]9 3.34 2.78 1.4] ].19 0.7U 0.51 0.33 0.2l 0.13 0.08 0.04 0.03 0.02 4.02 0.41 001 0.pl �4.98 3.98 3.34 2.3U i.45 0.85 0.(il 074070.25 0.16 4.09 O.US U.04 U.03 U.02 {).02 0.01 0.01 0 5.94 4.75 4.01 Ej 1.82 ! A7 0.7G 0.49 0,31 0.19 0. ] ] 0.06 0.04 0.03 0.02 0 02 0.01 0.01 111 6.65 5.32 4.48 3?5 2.k2 1.24 0.89 0.57 4.36 0.22 0.13 E7 0.05 0.04 0.02 4A2 0,02 0,0] 2-97 7.57 G.[]3 5. ] 0 3.77 Ej l .47 I .[]fi U.GE {}.42 0.2fi 4. ! 5 4.08 0.4G 0.04 O.U3 {}.02 0.42 4.02 50 8.23 G.SG 5.54 4.17 2.83 1.66 1.21 0.77 D.47 0 29 0.17 0.09 0.06 0.05 O.D3 0.02 0.02 0.02 lull 8.92 7.09 5.97 4.57 3.15 L86 1.36 f),87 0.53 0,32 0.19 D.10 (}07 O.US 0.03 0.02 0.02 O.D2 33�3nnnnnnnnnnnnnn33nn �Kh0eu"i QaTctiES D -Al 0.9 AGC 22, 8 yc 1 J,LVri JMn A. %�P111 i688-X8-966f F'LoXAES r p,q Z" �: a►75 rt}11-ct 1 � � 1 i z. l 1� � � . mot•• ;`w-i ��.rs. ,�•.� �r"•.j._,y •,'i"sue �� Permanent Ditch (PD1) Worksheet for Triangular Channel Project Description Project File s:lacad1109711calcslditch ca.fm2 Worksheet permanent ditches Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 1.10 % Left Side Slope 2.000000 H : V Right Side Slope 2.000000 H : V Discharge 2.09 cfs Results Depth 0.67 ft Flow Area 0.90 ft2 Wetted Perimeter 3.00 ft Top Width 2.68 ft Critical Depth 0.58 ft Critical Slope 0,022939 ft/ft Velocity 2.33 ftls Velocity Head 0.08 ft Specific Energy 0.75 ft Froude Number 0.71 Flow is subcritical. 04/13/10 FlowMaster v5.13 12:18:55 PM Haeslad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Cross Section-PD 1 Cross Section for Triangular Channel Project Description Project File s:lacad1109711calcslditch ca.fm2 Worksheet permanent ditches Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Section Data Mannings Coefficient 0.030 Channel Slope 1.10 % Depth 0.67 ft Left Side Slope 2.000000 H : V Right Side Slope 2.000000 H : V Discharge 2.09 cfs 0.67 ft 1 V N H 1 NTS 04/13/10 FlowMaster v5.13 12:19:18 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Permanent Ditch (PD2) Worksheet for Triangular Channel Project Description T Project File s:lacad1109711calcslditch ca.fm2 Worksheet Permanent ditches2 Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.030 Channel Slope 1.00 % Left Side Slope 2.000000 H : V Right Side Slope 2.000000 H : V Discharge 2.99 cfs Results Depth 0.78 ft Flow Area 1.22 ft2 Wetted Perimeter 3.49 ft Top Width 3.12 ft Critical Depth 0.67 ft Critical Slope 0.021869 ft/ft Velocity 2.46 ftls Velocity Head 0.09 ft Specific Energy 0.87 ft Froude Number 0.69 Flow is subcritical. 04/13/10 FlowMaster v5.13 12:19:47 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Cross Section-PD2 Cross Section for Triangular Channel Project Description Project File s:lacad1109711calcslditch ca.fm2 Worksheet Permanent ditches2 Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Section Data Mannings Coefficient 0.030 Channel Slope 1.00 % Depth 0.78 ft Left Side Slope 2,000000 H : V Right Side Slope 2.000000 H: V Discharge 2.99 cfs 0.78 ft 9 N V H 1 NTS 04/13/10 FlowMaster v5.13 12:20:06 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Flume (FL1) Worksheet for Rectangular Channel Project Description _ Project File s:lacad1109711calcslditch ca.fm2 Worksheet Flume Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 1,0000 % Bottom Width 2.00 ft Discharge 0.75 cfs Results Depth 0.14 ft Flow Area 0.27 ft;. Wetted Perimeter 2.27 ft Top Width 2.00 ft Critical Depth 0.16 ft Critical Slope 0.005511 ft/ft Velocity 2.77 ftls Velocity Head 0.12 ft Specific Energy 0.25 ft Froude Number 1.33 Flow is supercritical. 04/13/10 FlowMaster v5.13 12:13:57 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Cross Section -Flume 1 Cross Section for Rectangular Channel Project Description Project File saacad1109711calcslditch ca.fm2 Worksheet Flume Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Section Data Mannings Coefficient 0.013 Channel Slope 1.0000 % Depth 0.14 ft Bottom Width 2.00 ft Discharge 0.75 cfs 2.00 ft 0.14 ft 1N V H 1 NTS 04/13/10 FlowMaster v5.13 12:16:00 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Flume (FL2) Worksheet for Rectangular Channel Project Description Project File s:lacad1109711calcslditch ca.fm2 Worksheet Flume Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.013 Channel Slope 1.0000 % Bottom Width 2.00 ft Discharge 0.75 cfs Results Depth 0.14 ft Flow Area 0.27 ft2 Wetted Perimeter 2.27 ft Top Width 2.00 ft Critical Depth 0.16 ft Critical Slope 0.005511 ft/ft Velocity 2.77 ftls Velocity Head 0.12 ft Specific Energy 0.25 ft Froude Number 1.33 Flow is supercritical. 04/13/10 FlowMasler v5.13 12:16:35 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Cross Section -Flume 2 Cross Section for Rectangular Channel Project Description Project File s:lacad1109711calcslditch ca.fm2 Worksheet Flume Flow Element Rectangular Channel Method Manning's Formula Solve For Channel Depth Section Data Mannings Coefficient 0.013 Channel Slope 1.0000 % Depth 0.14 ft Bottom Width 2.00 ft Discharge 0.75 cfs 2.00 ft 0.14 ft 1 N V H 1 NTS 04/13/10 FlowMaster v5.13 12:16:51 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1