HomeMy WebLinkAboutWQ0016332_Permit (Issuance)_19990423State qpf North Carolina
Department of Environment
Natural Resources
;,
`FIT°
and
�.
Division of Water Quality
A P R 2 9 1999
James B. Hunt, Jr., Governor
RAW- r7,;,'==..1_.�:-
Wayne McDevitt, Secretary
C:. `a+
Kerr T. Stevens, Director
April 23, 1999
William Todd Powell, City Manager
City of Lumberton
P.O. Drawer 1388
Lumberton, NC 28359
Dear Mr. Powell:
1 � •
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
Subject: Permit No. WQ0016332
City of Lumberton
Lackey Street Shopping Center
Wastewater Collection System
Robeson County
In accordance with your application received January 11, 1999, attached is Permit No.
WQ0016332, dated April 23, 1999, to the City of Lumberton for the construction and operation of the
subject wastewater collection extension.
No flow shall be made tributary to this collection system until flow from Southwest Service
Area has been rerouted around the pump station, which serves the downtown area. Hydraulic
surcharging, created by rerouting of flow, results in non-compliance with the City of Lumberton's
NPDES Permit requirements and will be grounds for not allowing any flow to be made tributary to
this collection system. A permit modification must be applied for and granted before flow is made
tributary.
This permit shall be effective from the date of issuance until rescinded and you shall be
subject to the conditions and limitations as specified in the North Carolina Gravity Sewer Design
Criteria adopted February 12, 1996 and the attached permit.
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby
granted for the construction and operation of approximately 950 linear feet of 12-inch gravity sewer
and 5,450 linear feet of 8-inch gravity sewer to serve the Lackey Street Shopping Center project, and
the discharge of 0 GPD of collected domestic wastewater into the City of Lumberton's existing
sewerage system, pursuant to the application received January 11, 1999, and in conformity with the
North Carolina Gravity Sewer Design Criteria.
The sewage and wastewater collected by this system shall be treated in the Lumberton
Wastewater Treatment Facility (NPDES Permit No. NC0024571) prior to being discharged into the
receiving stream.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within thirty (30) days following
PO Box 29535, Raleigh, North Carolina 27626-0535 Telephone (919) 733-5083 Fax (919) 733-0719
An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper
receipt of this permit. This request must be in the form of a written petition, conforming to Chapter
150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings�P.O.
Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final
and binding.
The issuance of this permit does not preclude the Permittee from complying with any and all
statutes, rules, regulations, or ordinances which may be imposed by other government agencies
(local, state, and federal) which have jurisdiction.
If you need additional information concerning this matter, please contact Jan Arnold at
(919) 733-5083 extension 524.
Sincerely,
ICn�." Cft l ( ,,,
J C,1 Kerr T. Stevens
cc: Robeson County Health Department
Fayetteville Regional Office, Water Quality Section
Anderson Engineering & Associates, P.A.
2
NORTH CAROLINA
t ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
GRAVITY SEWER COLLECTION SYSTEMS PERMIT
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
following specified conditions and limitations:
1. This permit shall become voidable unless the facilities are constructed in accordance with the
conditions of the Division of Water Quality Gravity Sewer Design Criteria adopted February 12,
1996.
2. This permit is effective only with respect to the nature and volume of wastes described in the
application and other supporting data.
3. The facilities must be properly maintained and operated at all times.
4. This permit is not transferable. In the event there is a desire for the facilities to change
ownership, or there is a name change of the Permittee, a formal permit request must be submitted
to the Division of Water Quality (Division) accompanied by an application fee, documentation
from the parties involved, and other supporting materials as may be appropriate. The approval of
this request will be considered on its merits and may or may not be approved.
5. Construction of the gravity sewers shall be scheduled so as not to interrupt service by the
existing utilities nor result in an overflow or bypass discharge of wastewater to the surface
waters of the State.
6. Upon completion of construction and prior to operation of this permitted facility, a certification
and a copy of the record drawings (i.e., as constructed plans) must be received from a
professional engineer certifying that the permitted facility has been installed in accordance with
the Division of Water Quality Gravity Sewer Design Criteria adopted February 12, 1996, and
other supporting materials. If this project is to be completed in phases and partially certified,
you shall retain the responsibility to track further construction approved under the same permit,
and shall provide a final certificate of completion once the entire project has been completed. A
copy of the record drawings, indicating the facilities constructed in the phase being certified,
shall be submitted with each partial certification. Mail the Certification and one (1) copy of the
"Record Drawings" to the Non -Discharge Permitting Unit, P.O. Box 29535, Raleigh, NC 27626-
0535.
7. A copy of the Record Drawings shall be maintained on file by the Permittee for a minimum of
five years from the date of the completion of construction.
8. Failure to abide by the conditions and limitations contained in this general sewer permit or the
North Carolina Gravity Sewer Design Criteria may subject the Permittee to an enforcement
action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-
215.6C.
9. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance
conditions, the Permittee shall take immediate corrective action, including those as may be
required by this Division, such as the construction of additional or replacement wastewater
collection facilities.
10. Noncompliance Notification:
The Permittee shall report by telephone to the Fayetteville Regional Office, telephone number
(910) 486-1541, as soon as possible, but in no case more than 24 hours or on the next working
day, following the occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that renders the facility
incapable of adequate wastewater transport, such as mechanical or electrical failures of
pumps, line blockage or breakage, etc.; or
b. Any failure of a sewer line resulting in a by-pass directly to receiving waters without
treatment of all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report in letter form
within five (5) days following first knowledge of the occurrence. This report must outline the
actions taken or proposed to be taken to ensure that the problem does not recur.
Permit issued this the 23`d day of April, 1999
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
ft ', Kerr T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0016332
N
Permit No. WQOO16332
April 23, 1999
ENGINEER'S CERTIFICATION
Partial Final
I, , as a duly registered Professional Engineer in the
State of North Carolina, having been authorized to observe (periodically, weekly, full time) the
construction of the project,
Project Name
Location and County
for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance and intent of this permit, the approved plans and specifications, and other supporting
materials.
Signature
Date
Registration No.
The above Engineer's Certification must be completed and submitted to the address below with one
(1) copy of the "Record Drawings" (i.e., as -constructed plans) of the wastewater collection system
This project shall not be considered complete and allowed to operate until this Engineer's
Certification and the "Record Drawings" plans have been submitted. Any wastewater flow made
tributary to the wastewater collection system prior to completion of this Engineer's Certification shall
be considered a violation of the permit and shall subject the Permittee to appropriate enforcement
actions.
NORTH CAROLINA DIVISION OF WATER QUALITY
WATER QUALITY SECTION
NON -DISCHARGE PERMITTING UNIT
POST OFFICE BOX 29535
RALEIGH, NORTH CAROLINA 27626-0535
f» e�c • ccn i P.1
,Y EE v v"' E
1 3 1999 procedure 4 Request Form
riEG. 0FF10E Date:
TO FROM: Paul Rawls, Water Quality Supervisor
Fayetteville Regional Office, Water Quality Section
TO O Jan Arnold
State Engineering Review Group )
919
Telephone (919) 733-5083 x524 Fax ( �. perar,
�.19 *.}. 0p�-�
733-C-719
Application Numb: W QU 16 3 3 County:
Applicant: C i d— �- La
Project Name: 1_0 ce <f S fccJ ;„ (e �c.
,,6t
Receiving Facility:_ Lim ,r�o h permit Number: /V( vo 4 s 7 /
Flow Volum z23 a7 GPD Flow Type: om. Com. _Ind.
Engineer: 4Nd�,-s4,
Approval: - ✓ Denial:
Comments: 7-1 /=Ro til
v.tvv : p f
l� ^ v O I l0 33 2) c� z coo ( / 1tt
T1U..J - L1rvV,} r C sty. 0.1I'Gc�Lei �t...�w, eed �S��Fo. %
Regional Signature: 6�2_11-99
/ a-F S PQSC-s
_
v
FROM
C� Y. o -'u tn9,ezton
Public Works Department
DATE
FROMI
TO
ATTNi
PAGES
COMMENTS:
February 19, 1999
H. Dixon Ivey
01.02.2000 00:00
P. 1
216 SOIRH CEDAR MEET j
P..Box Im
LI f M9ERTON, NC Iwo
ONE (010) 671,1661
F# (010)6714M
RECEiV�D
Department of Water Quality Control
Ricky Revels
FEB 20
REG.
(INCLUDING HEADER)
FROM
01.02.2000 00:00
P. 2
of1'cungsitton
Public Works Department
TO: Mr. Ricky Revels, Department of Water Quality Control
FROM: H. Dixon Ivey, Public Works/Utilities Director ee1f5;r
DATE: February 18, 1999
RE: Status Report - Storm Water Separation/Diversion
Please find attached a copy of a status report from Hobbs, Upchurch & A,
Lumberton which shows the flow from the Southwest Interceptor and the
downtown area.
If you have any questions or need additional information, please contact our
(910) 671-3851.
cjw
oc: W. Todd Powell, City Manageer
BOXION
BMW NC Me
WE (Mo)aM ul
("O)sn4w
iate$ to the City of
trotipn project for
kt
FROM 01.02.2800 00:00
P. 3
�e?h11S,
MEMO Nuansulth
2005:
Soldherr►r Pies, Aro.�th
ro1o) 692 S61G
TQ. Mr, Dixon Ivey, Public Works Director
HUA PROJECT #
City of Lumberton RUA MR A'0. #
VROM: Stephaale Closson/Joe Martin
Hobbs, Upchurch & Anodates, P.A.
DATE. February IS,1999
RE: Project Status Report for the City of Lumberton, North Carolina
Brrgtneers
Broad &t vet
roliria 2838-,
10 692 7J,i2
1.1.J98U4, 09, 04
M�.SSACP; ..,.1, +vvy1 — The following provides an update for each of the sewer proiects
the, City of Lumberton
1. Flow Diversion to the Southwcat Interceptor
a. Three copies Of the amended Preliminary Engineering pel
Environmental Assessment (FA) were submitted to Constru
Loans (CG&cL) on January 29,1999,
b. Ile field surveying and horizontal control of the project 11as b
We are in the process of converting the survey points.
C. As requested by CCr&L, HUA printed and delivered four
copies of the amended PER and EA on February 12, 1999.
copies will be disteSbuted to additional state agencies for revie,
d, Thrcc copies Of the revised Application for State Loan war
CQ&L on February 12, 1999. The; revised Application reflec
project cost of $1,S66,3S0.00,
c. The en&earing design will be initiated the week of February 1
f. This project is designed to divert the Sanitary sewer flows tton
and 7 to the eXisting southwest interceptor. The divaision
remove approximately 3,860,000 gpd of flow fr,xn th,: ove
stations and primary transmission main to the Sou11,1wsA Iuterce
POMAQ Fax Note
I prepared for
1, (PERL) and
.on Grant,, d;
:n complawd.
:n additional
he additional
submit tee: i c,
the updtaed
,1999.
subsystems S
; expected to
loaded pump
0 FR04M 81.02.2000 00:00 P. 4
rojeat Stal.,t 14poN
�'+�' ojLwrnb�r[ar�
Z• Combined Sewer Separatlon project in Downtown LuInbcrt Pam 2
a A Clean Water Management Trust Fund
November 30,1998. The Brant apnlicF�t��,n W s ,subrliittecl on
b. A draft. of the High Unit C stl Gruanot Apt U0,11tio» uMot 1,,�,vic
%January 1999, Amore detailed 1 ER and VIs ,&u,'rnit e(l to CC:&L in
c• Based on a review of historic naps and site in ormatonr�ro�v �5�e vtJc�w).
catch basins in ttlteon intersections Weer 1 e i form through 1 p S 1 led by the City,
through Walnut Streets have been identified as bei»g co„Heel .c9 dir
cts and Bnrke..r
the sanitary sower system. The ma'orj cetly ii)t i
J tY Of the:sr. intem%-Inne tcd linc:c ilow
Into the 3p-inch transmission mEun that
station 43• Multi lc s t rs through St.eplici.ts4 i'ark to plurlp
areas. To hal p � 4rY sower overflows have bo;�u. re oiled ill these
P alleviate the overflow problem, r)UA is recoi llendh4 that
new storm sewers be installed through the identified arcxs, sewer line will serve a drainage basin that oovers approxiiitate I e SO w stornt
is estimated that for each inch of rain fall the, new storms -�vo; 7t
to 1.0 million gallons that would otherwise enttT the c »i� e: collect 0.5
cw
We are in the process of completing a pteliminetry oulli.ne and cost 9 ten,.
for the storm sewer project, A PM an EA cscintata
will be completed and submitted to CQBtL � the onute wr sapvication
Project information will also be forwarded to the C Pdated
Mview process. �'. T7. t , assist their
:3. Resubmittal Of Water Grant AppueAtion a. In September 1998 a Ioan application and a PER outlining
itnprovementa was submitted to NCD system
Cin'�s Project was not high on then' Mr. Sid Harrell indicated that the
an application for a Hi Unit Cost8 priority list and should be resu nutted vvit)l
b. The 1997 Water Supplyy plai, that isrant, ,
been dratted, The plan will be finalized by the end of February. ��licelioAs
e' Upon your approval of the final Water Supply Plan, the PER out inii
system improvements and
NCDENR, the updated grant application will be submitted too
***END***