Loading...
HomeMy WebLinkAbout20200883 Ver 1_401 Application_20200707DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form April 11, 2020 Ver 3.1 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned 20200883 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Stephanie Goss:eads\szgoss Information for Initial Review la. Name of project: COURTESY COPY - Stoltmann Rip Wrap 1a. Who is the Primary Contact?* Frank Stoltmann Traditional Southern Construction 1b. Primary Contact Email:* traditionalsouthern20l7@gmail.com Date Submitted 7/7/2020 Nearest Body of Water Hyco Lake Basin Roanoke Water Classification roa Site Coordinates Latitude: 36.498474 A. Processing Information County (or Counties) where the project is located: Person Is this a NCDMS Project r Yes r No Longitude: -79.148904 Is this project a public transportation project?* r Yes r No la. Type(s) of approval sought from the Corps: W Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version#* 1 Reviewing Office* Raleigh Regional Office - (919) 791-4200 1c. Primary Contact Phone:* (919)270-4394 U 1b. What type(s) of permit(s) do you wish to seek authorization? r Nationwide Permit (NWP) r Regional General Permit (RGP) W Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? C' Yes r No 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express r Non-404 Jurisdictional General Permit r' Riparian Buffer Authorization r Individual Permit le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: r Yes r No For the record onlyfor Corps Permit: r Yes r No 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? C Yes r No B. Applicant Information 1d. Who is applying for the permit? W Owner r Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Frank Stoltmann 2b. Deed book and page no.: 17/395 2c. Responsible party: 2d.Address Street Address 60 Freckled Point Address Line 2 city Semora Postal / Zip Code 27343 2e. Telephone Number: (919)270-4394 2g. Email Address:* traditionalsouthern20l7@gniail.com State / Ffovince / Region NC Country Person 2f. Fax Number: u ................ C. Project Information and Prior Project History U 1. Project Information 1b. Subdivision name: (if appropriate) Whetstone 1c. Nearest municipality/ town: Ro)boro 22 Project Identification 2a. Property Identification Number: A24 214 2c. Project Address Street Address 65 Freckled Point Address Line 2 City Semora Fbstal / Zip (ode 27343 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Hyco Lake 3b. Water Resources Classification of nearest receiving water:* roa 3c. What river basin(s) is your project located in?* Roanoke 3d. Please provide the 12-digit HUC in which the project is located. 030101040505 4. Project Description and History 2b. Property size: 1.03 State / Ftovince / Rion NC Country Person 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The land was previously undeveloped but is being developed for residential use. The land is located along Hyco Lake. The purpose is to add rip wrap to the shoreline to prevent erosion from boat traffic. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 0 4g. List the total estimated linear feet of all existing streams on the property: 0 4h. Explain the purpose of the proposed project:* Add stone rip wrap and fabric along shoreline to prevent erosion 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* Stone and fabric rip wrap will be installed along the shoreline to prevent erosion using a backhoe and manual labor. 4j. Please upload project drawings for the proposed project 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No r Unknown Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary U 1a. Where are the impacts associated with your project? (check all that apply): C Wetlands r Streams -tributaries F Buffers [ Open Waters r Pond Construction E. Impact Justification and Mitigation u 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Minimal machinery will be used to deliver and install stone rip wrap 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Any and all tracks will be repaired 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: it is located at Hyco Lake F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: surrounding areas were previously undeveloped 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15ANCAC 02H .1003(2)? r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r' Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes f• No 3b. If you answered "no," provide a short narrative description. This is common rip wrap used at hyco lake 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?' r Yes r No r Unknown 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Hyco lake does not have any endangered species Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Hyco Lake is not an essential fish habitat 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Hyco lake is not a cultural perservation status 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8c. What source(s) did you use to make the floodplain determination?* gis Miscellaneous Comments Miscellaneous attachments not previously requested. Signature R By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Frank Stoltmann Signature Date 7/7/2020