Loading...
HomeMy WebLinkAbout20000783 Ver 2_Triage Comments_20100129Use this form instead of writing inside the folder Triage Comment Sheet DWQ# L 0-78 >> \/ C Triaged By: Reviewer 1 Date: 2 ?' `? Reviewer 2 Date: Reviewer 3 Date: ? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) ? Issue with conditions (Reviewer 1) ? Issue with conditions (Reviewer 2) ? More Information (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) Send to Regions (Reviewer 1) 52, ? Send to Regions (Reviewer 2) SATriage FormsUriage Issue Sheet.doc PLEASE PRINT CLEARLY 00-0783v2 Traditions AML comments January 29, 2010 Per the requirements of the NC Stormwater BMP Manual and the Neuse Riparian Buffer Rule, the outlet structures from wet detention ponds I and N must be discharged through a correctly designed level spreader. Level spreader design requirements are set forth in Chapter 8 of the North Carolina Stormwater BMP Manual. Please provide one Level Spreader Supplement Form for each proposed level spreader, including the Required Items checklist and all items listed therein. The BMP Manual and Supplement Forms are available at: litter:?rt?il.ncdenr.orL,, l' eb/wc%s/su%bmp-manual. 2. Please provide a full-size plans at a scale of 1" = 60' or larger showing the entire site design with its storm drainage system, including conveyance devices and BMPs and one foot topographic contours. 3. Please provide documentation of the Town of Wake Forest's approval of the stormwater management plan for this project by providing EITHER: A valid approval letter from the Town of Wake Forest indicating that the proposed activity has an approved SMP and one copy of the approved SMP, including plan details, calculations and other supporting information, OR • A set of stormwater plan details and calculations stamped as "Approved" by the Town of Wake Forest.