Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310066_Compliance Evaluation Inspection_20200702
Facility Number = -= U Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: mpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 04o�utine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: FYB__6__� Departure Time: LL7� County: V r( I � Farm Name: 0Ll 1 . VM 4 �I 1n Owner FinaiL Owner Name: j I S tt y r � Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Other Other Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. IJLayer I I ::::: Non -Layer Pullets Poults Design Current Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Region: CU;� Design Current Cattle Capacity Pop. Daity Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes ❑-?To ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes [:]No ❑NA ❑NE ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes Eq- o ❑ NA ❑ NE ❑ Yes FS o ❑ NA ❑ NE Page 1 of 3 21412015 Continued 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysi ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Facility Number: 11- Date of Inspection: a Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes © ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? [—]Yes ❑ No ❑ NA ❑ NE Stricture 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 2 SMG�I Spillway?: Designed Freeboard (in): Observed Freeboard (in): ( t 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Q>o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes LD-No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Q No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes e-No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes [ o ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [D Xo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑,N6 ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �Ko ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes []No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Io ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes �o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑'<o ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: ❑ Yes L5d4o ❑ NA ❑ NE s ❑ Waste Transfers ❑ Weather Code Rainfall Inspections ❑ Sludge Survey ❑ Yes [goo ❑ NA ❑ NE ❑ Yes Quo ❑ NA ❑ NE ❑ Yes Cg No ❑ NA ❑ NE ❑ Yes 94 ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facilit Number: 1 - Date of Inspection: 7 J t7 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes E!r o ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes E3-110 ^ ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No 8-hf'A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑-No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes En�No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 3o. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes [.}IQo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes O'fSo ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Efj�&o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E2 0 ❑ NA ❑ NE Comments (refer to question ft Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). '.eviewer/Inspector Name: '� (iYr1 Phone: 1111i 2C16 Date: 74-A_6 ,fewer/Inspector Signature: 'age 3 of 3 21412015