Loading...
HomeMy WebLinkAbout20081121 Ver 2_More Info Received_20100129Summey Engineering Associates, PLLC SEA Engineering- Land Planning • Consulting PLLC PO Box 968 - Asheboro, NC 27204 (336) 328-0902 / Fax: (336) 328-0922 / Mack@asheboro.com TRANSMITTAL / ?f c? pocko s Date: January 27, 2010 To: NCDENR-Division of Water Quality 401 Oversight & Express Permits Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604 ATTN: Ms. Annette Lucas, PE Phone: 919-715-3425 We are sending you attached the following items: ? Shop Drawings ? Samples ? Prints ? Specifications ® Plans ? Disk Re: os- l la.I U a' Diamonds Keep S/D DWQ Project #08-1121 V2 Randolph County, NC Revised Plans SEA Job No. E-1524 ? Copy of Letter ? Other # Copies Drawing # Description Disposition 1 ea. Response Letter 2 sets Revised Plans & Supporting Documentation 11ff@[q0V@ JAN 2 2 V 010 Remarks: Annette, here are the revised plans and supporting documentation for this project. If you need anything else just let me know. Thanks! Mack By: aZ4-'.' H. Mack ummey, PE II c: File Summey Engineering Associates, PLLC Engineering - Land Planning - Consulting P.O. Box 968 Asheboro, NC 27204 Phone: 336-328-0902 - Fax: 336-328-0922 January 26, 2010 Re: Diamonds Keep Subdivision Response Letter DWQ # 08-1121v2 Randolph County, NC SEA Job No. E-1524 Ms. Sue Homewood North Carolina Division of Water Quality Winston-Salem Regional Office 585 Waughtown Street Winston-Salem, North Carolina 27107 Dear Sue: Enclosed are two (2) sets of revised plans and supporting material you requested per your letter dated November 25, 2009. Posted below are your Comments and our Responses to your letter. DWO Comments: Comment: 1. Please provide cross sectional details showing the provisions for aquatic life passage (burial of culvert 20% for culverts < 48 inches, and 1-foot for culverts > 48 inches). Response: Cross sectional details are now provided to show how Arch pipe is being placed to allow for aquatic life passage. The Arch pipe carries the base flow for the creek. The two (2) 72" pipe are specifically designed to function only during high flow storm events and will remain dry most of the time. See Details on Sheet 18. Comment: 2. Per the requirements of the General Certification, all work shall be done "in the dry". Therefore, dewatering methods will be necessary to temporarily dewater the stream channels during structure installations. Please provide a construction sequence that details the method of dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. Response: Detailed plans and a Detailed Sequence of Construction are now provided to outline to order of construction activities to ensure all work is done in the dry. This will be utilized by a by-pass channel and coffer dams sequenced to allow for the work to be done in the dry. See Sheet 19 for plan views, elevations and the Sequence of Construction. Comment: 3. Per the requirements of GC 3705, please enumerate all temporary impacts (in addition to permanent impacts already indicated) to the stream channel. Temporary impacts include areas of disturbance necessary for proper pipe installation, proper dewatering, as well as any impacts from temporary erosion control measures or fill stabilization. Please note that temporary impacts should be minimized to the maximum extent practical. Response: The temporary impacts include the placement of coffer dams in the stream channel to dewater the work area. This area adds 2 areas approximately 15 ft wide by 10 ft long or a total of 20 if of additional temporary impacts. This Temporary disturbance feature has been added to the PCN Form under Section C.3 - Stream Impacts. The method by which is being proposed for construction minimizes the amount of disturbed area to the creek bed. All rip rap will be removed once coffer dams are no longer needed. Total permanent length is 138', temporary is 20' and is indicated on the PCN Form. Stormwater Management Plan Review Comments: Comment: 4. Overall, the DWQ accepts your approach of treating offsite area in lieu of providing stormwater treatment for drainage areas 7 and 8. However, please describe the current and future uses of the land in the offsite drainage area as well as an estimation of the current and future imperviousness of the offsite area. Response: The current use of the off-site property is a single family residential subdivision called Windemere Heights. This has been the use of the property for many years. It is our understanding that there are a few lots that have not built out due to the lack of sewer in the area. Sewer in proposed within the next 5-10 years so Single family homes may be constructed. Zoning for Windemere Heights is limited to Single Family Units so no Multi-Family or high density developments could be built. Below we summarize the current and possible proposed state of the offsite areas: Overall Offsite Drainage Area = 21.24 Acres Current Offsite Impervious Area = 2.45 Acres Future Offsite Impervious Area = 3.42 Acres ((max. build out) assuming 2500 sf home, driveway and out building for lots not developed) {This is not 3.42 Ac. additional to the 2.45 Ac but would be a total estimated build out meaning only 0.97 acres of Impervious area would be added to the existing 0.97 Ac. in the future equaling 3.42 Ac.}. Comment: 5. For all proposed stormwater BMPs, please provide soils test that has been conducted within the footprint of every proposed BMP to document the level of the SHWT. This information should be attached. Also, the BMP Supplement Forms and plan sheets should be updated to reflect the new information. The DWQ will not approve these BMPs without a soils test that has been sealed by an appropriately qualified individual. Response: Enclosed is a signed & sealed report detailing the SHWT levels provided by a Licensed Soil Scientist who performed the work on-site. Comment: 6. For all proposed BMPs, please provide a construction sequence that explains how the BMP will be protected during the project construction. Response: The rough grading is complete for the entire project so there will not be a major earth moving operation being performed. However, the wet detention ponds will be used as sediment basins with skimmers for each phase until construction is complete. Once the fine grading/seeding/mulching and paving is complete on each phase, the basins will be cleaned out, wetland plantings installed and pond or sand filter will be converted to its permanent function. A sequence of construction is detailed for each BMP. The BMP will not be put into operation until the site is stabilized since this is basically an "after the fact" project. Comment: 7. For all Wet Detention Ponds, please fill out the "Volume, temporary pool" blank in the Supplement Forms. Response: This has been provided as requested on the Supplement Forms. Comment: 8. Please show the level of the temporary pools on the wet detention pond profiles. Response: This has been provided on the detail sheets for each pond. Comment: 9. Please correct all discrepancies and errors in the Supplement Forms and plan sheets. For example, for Basin 1, the size of the orifice on the Supplement Form is stated to be 2 inches, but the plan sheet says 2.5 inches. Response: These items have been corrected. Comment: 10. Please correct errors in the values of driving head that have been entered into the Wet Detention Basin Supplement Forms. The driving head is equal to the Temporary Pool elevation minus the Permanent Pool elevation. Response: This item has been corrected. Comment: 11. For the sand filters, please provide specifications for the sand media material that is to be used. Response: The sand specification is located on the plan but has been shown at each section on the detail sheets for clarification. We appreciate your working with us on this project and we are dedicated to its completion. Please note that no further phases of the project will be disturbed until all approvals from your office have been obtained. Once these approvals are obtained, the pond for Phase 1 will be installed and each additional BMP as necessary for each specific phase. Should you have any questions or concerns or require any additional information, please do not hesitate to contact me directly at 336-328-0902. Very Truly Yours, Summey Engineering Associates, PLLC H. Mack Summey, Jr., PE HMSJ/hmsj Cc: Mr. Gary White, Diamond W Builders, LLC File R{ % seof S.1--k 08-aka 1 L)a- C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ®P ? T Fill Bottom of pond ? Yes ? Corps 254 removed ® No ? DWQ . W2 ? P ®T Fill - Temporary Forrested ® Yes ? No ? Corps ? DWQ .001 W3 ®P ? T Fill Bottom of ? Yes ? Corps 140 removed pond ® No ? DWQ . W4 ®P ? T Fill Forrested ® Yes ? No ? Corps ? DWQ .051 W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts .446 2h. Comments: " .001 Ac. included but is temporary impact for Sewer. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ -non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ? T Culvert Caraway Creek ® PER ? INT ® Corps ® DWQ 15' 66' S2 ®P ? T Rip Rap Caraway Creek ® PER ? INT ® Corps ® DWQ 15' 72' S3 ? P ®T Rip Rap - Temporary Caraway Creek ® PER ? INT ® Corps ® DWQ 15 10" S4 ? P ®T Rip Rap - Temporary Caraway Creek ® PER ? INT ® Corps ® DWQ 15 101* S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 138' (*20') 3i. Comments: 138' Involves crossing of creek with pipe, "2 -10' sections are temporary coffer dams that will be removed. Page 5 of 11 PCN Form - Version 1.3 December 10, 2008 Version Scott F. Cole Licensed Soil Scientist 312 Copple's Road Ext. Asheboro, NC 27205-0711 H: (336) 873-7991; M: (336) 460-4554 Summey Engineering Associates Attn: Mr. Mack Summey 1342 E. Salisbury Street Asheboro, NC 27203 January 26, 2010 Re: Identification of the seasonal high-water table for storm-water devices in the Diamonds Keep subdivision located on Archdale Road, Randolph County, NC. Mr. Summey, Per your request, soil conditions were evaluated at multiple locations on the above-referenced property to determine the depth of the seasonal high-water table. Work was conducted to satisfy requirements set forth in the North Carolina Division of Water Quality Stormwater Best Management Practices Manual. Soil borings around proposed wet ponds and future sand filters were evaluated. Samples were collected with hand augers. The seasonal high-water table is determined by a field evaluation for soil wetness conditions. Soil wetness conditions are determined by the presence of colors with a chroma of 2 or less (in Munsell color notation) in mottles or the horizon matrix. Colors of chroma 2 or less due to relic minerals from the parent material (underlying rock) are not considered as indicators for soil wetness conditions. RESULTS 0 Site 1: Wet pond (lot #5) i'0 rj I Base elevation: 742.69' Seasonal high-water observed 6.5' below surface Seasonal high-water elevation: 736.19' • Site 2: Wet pond (behind lot #21) ?0 r1j 2 Base elevation: 721.02' Seasonal high-water not observed within 7' of surface (714.021) Note: Base elevation is 1.25' (15 inches) above bottom of pond. • Site 3: Wet pond (behind lots #195-197) PO ri I 2 Base elevation: 726.15' Seasonal high-water observed 1.5' (18 inches) below surface Seasonal high-water elevation: 724.65' • Site 4: Wet pond (south of lot #201) ?v r A \'? Base elevation: 704.66' Seasonal high-water not observed within 7' of surface (697.661) Site 5: Sand filter (front of lots #67 & 68) 5O.W,a ?: 1-?_ ( 5 Base elevation: 707.9' Seasonal high-water not observed within 16' of surface (691.9') • Site 6: Sand filter (front of lots #64 & 65) So,,. a N--z \-?_ e 4- Base elevation: 704.14' Seasonal high-water not observed within 13' of surface (691.14') The attached map shows the location of each sampling point, its elevation, and the elevation at which the seasonal high-water table was observed (if applicable). I am pleased to be of service in this matter and will be available, if necessary, to provide additional services that may aid in the successful completion of this project. Thank you, C Scott F. Cole North Carolina Licensed Soil Scientist PAN V O W r M W 63 ??o n II W O O ?D rt a I -4-4 ..a m s"< t ma O : Z N \ O .r V O N a o A CL j 3x m nm e m .... ct, p O i! v NN 00 m co) < 3 7 A .? ° '4 ; 2 of - ........... .. G tr A, • NO m N 0 O M - 99L ..991... ^rrrr 1> - 78B S? a ~ mJ 91L Ise t m w a , a 742 o ZiL N ¦W MM u M! . ¦ y V a N M sa S 706 . w 969 '??' ff +??..... c A 702 V6g a 718 714 X10 ZOL 90L. 718 1 l4•B O ?y A A Permit No. (to be provided by DWQ) OF WA149 A*A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Diamond Keep Subdivision Contact person H. Mack Summey, Jr., PE Phone number 336-328-0902 Date 1/27/2010 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 691,733 ftz Impervious area, post-development 203,860 ftz % impervious 29.47 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 18,200 ft3 OK Volume provided 19,050 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume ft3 ft3 ft3 ft3 ft3 (Y or N) 2.8 in 0.30 (unitless) 0.50 (unitless) 0.12 in/hr OK 0.57 ft3/sec 0.96 ft3/sec 0.39 ft3/sec 739.25 fmsl 737.50 fmsl 736.19 fmsl 739.25 fmsl fmsl 734.50 fmsl fmsl 734.50 ft N (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 12,590 ftz Area REQUIRED, permanent pool SA/DA ratio Area PROVIDED, permanent pool, Apenpwl Area, bottom of 1 Oft vegetated shelf, Abot shelf Area, sediment cleanout, top elevation (bottom of pond), Abd wd Volumes Volume, temporary pool Volume, permanent pool, Vpem-pool Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vperm-pool Area provided, permanent pool, Aperm_pool Average depth calculated Average depth used in SA/DA, dav, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Aperm pool Area, bottom of 1 Oft vegetated shelf, Abot shelf Area, sediment cleanout, top elevation (bottom of pond), Abet-pond "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, deV, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cc) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (CW) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: 9,131 ftz 1.32 (unitless) 9,181 ftz OK 12,500 ft` 5,163 ftz 19,050 ft3 OK 59,088 ft3 11,450 ft3 19.4% % OK 85 % N (Y or N) Y (Y or N) 1.32 (unitless) Y (Y or N) 59,088 ft' 9,181 ftz 3.00 ft OK 3.0 ft OK N (Y or N) 9,181 ftz 12,500 fe 5,163 ftz -734.50 ft 3.00 ft OK ft Y (Y or N) 2.50 in inz 0.60 (unitless) 1.75 ft N (Y or N) (unitless) (unitless) ft ft ft3/sec ft3/sec ft3/sec 3.00 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 2.0 :1 OK Y (Y or N) OK 1.5 It OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Shear Gate is provided to drain pond. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) O?OF W AT, 9O ? r ? y 1. PROJECT INFORMATION Project name Diamond Keep Subdivision Contact person H. Mack Summey, Jr., PE Phone number 336-328-0902 Date 10/14/2009 Drainage area number II. DESIGN INFORMATION Site Characteristics Drainage area 871,200 ft2 Impervious area, post-development 336,719 ft2 % impervious 38.65 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 29,200 ft3 OK 29,702 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) 2.8 in 0.30 (unitless) 0.50 (unitless) 0.12 in/hr OK 0.72 ft3/sec 1.20 ft3/sec 0.48 ft3/sec 717.20 fmsl 717.20 fmsl 714.02 fmsl 715.50 fmsl fmsl 712.50 fmsl fmsl 712.50 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.e-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 19,671 ft' Area REQUIRED, permanent pool 13,678 ft' SA/DA ratio 1.57 (unitless) Area PROVIDED, permanent pool, Aperm pool 15,272 fe OK _ Area, bottom of 1Oft vegetated shelf, Abot shelf 19,650 ft Area, sediment cleanout, top elevation (bottom of pond), Abot?ohd 7,939 ft Volumes Volume, temporary pool 29,702 ft3 OK Volume, permanent pool, Vperm-pool 88,046 ft3 Volume, forebay (sum of forebays if more than one forebay) 17,610 ft3 Forebay % of permanent pool volume 20.0% % OK SAIDA Table Data Design TSS removal 85 % Coastal SA/DA Table Used? N (Y or N) Mountain/Piedmont SA/DA Table Used? Y (Y or N) SA/DA ratio 1.57 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vpenpool 88,046 ft' Area provided, permanent pool, Aperm_pool 15,272 ft Average depth calculated 3.00 It OK Average depth used in SA/DA, day, (Round to nearest 0.5ft) 3.0 It OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Aperm-pool 15,272 ft` Area, bottom of 1 Oft vegetated shelf, Abut shelf 19,650 ft Area, sediment cleanout, top elevation (bottom of pond), Abot_p0ed 7,939 ff "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) -712.50 ft Average depth calculated 3.00 ft OK Average depth used in SA/DA, day, (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 3.00 in Area of orifice (if-non-circular) in' Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 1.70 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (Cw) (unitless) Length of weir (L) ft Driving head (H) It Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Storage volume discharge rate (through discharge orifice or weir) ft3/sec Storage volume drawdown time 3.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 It OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.5 It OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Shear Gate Provided to drai n pon Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) OF W A 7-f;,? O? ? y o I. PROJECT INFORMATION Project name Diamond Keep Subdivision Contact person H. Mack Summey, Jr., PE Phone number 336-328-0902 Date 10/14/2009 Drainage area number 12 II. DESIGN INFORMATION Site Characteristics Drainage area 747,054 ftz Impervious area, post-development 165,528 ft2 % impervious 22.16 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 31,250 ft3 OK 32,635 ft3 OK, volume provided is equal to or in excess of volume required. to ft3 ft3 ft3 ft3 (Y or N) 2.8 in 0.30 (unitless) 0.50 (unitless) 0.12 in/hr OK 1.40 ft3/sec 2.30 ft3/sec 0.90 ft3/sec 728.25 fmsl 726.50 fmsl 726.50 fmsl 726.50 fmsl fmsl 723.50 fmsl fmsl 723.50 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev.8-9/17/09 Paris I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 21,335 ftz Area REQUIRED, permanent pool 7,097 ftz SA/DA ratio 0.95 (unitless) Area PROVIDED, permanent pool, Apes Pool 15,887 ft` OK Area, bottom of 1 Oft vegetated shelf, AW shelf 21,300 ft` Area, sediment cleanout, top elevation (bottom of pond), Abotyond 5,531 ft` Volumes Volume, temporary pool 32,635 ft3 OK Volume, permanent pool, Vperm-pool 129,904 ft3 Volume, forebay (sum of forebays if more than one forebay) 25,990 ft3 Forebay % of permanent pool volume 20.0% % OK SAIDA Table Data Design TSS removal 85 % Coastal SA/DA Table Used? N (Y or N) Mountain/Piedmont SA/DA Table Used? Y (Y or N) SA/DA ratio 0.95 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vperm-pwl 129,904 ft' Area provided, permanent pool, Apen-pool 15,887 ft Average depth calculated 3.00 ft OK Average depth used in SA/DA, day, (Round to nearest 0.5ft) 3.0 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Aperm_pool 15,887 ft` Area, bottom of 1 Oft vegetated shelf, AW shelf 21,300 ft` Area, sediment cleanout, top elevation (bottom of pond), Abot pod 5,531 ftz "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) -723.50 ft Average depth calculated 3.00 ft OK Average depth used in SAIDA, da,, (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 3.25 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 1.75 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Storage volume discharge rate (through discharge orifice or weir) ft3/sec Storage volume drawdown time 3.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.5 ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Shear Gate is provided to drain pond. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2 Permit NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) ?OF W A TF9QG o r O Y I. PROJECT INFORMATION Project name Diamond Keep Subdivision Contact person H. Mack Summey, Jr., PE Phone number 336-328-0902 Date 10/14/2009 Drainage area number 13 II. DESIGN INFORMATION Site Characteristics Drainage area 478,724 ft Impervious area, post-development 182,081 ftz % impervious 38.03 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided 15,700 ff3 OK 15,927 ff3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.8 in 0.30 (unitless) 0.50 (unitless) 0.12 in/hr OK 0.39 ft3/sec 0.66 ft3/sec 0.27 ft3/sec 703.50 fmsl 701.50 fmsl 697.66 fmsl 701.50 fmsl fmsl 698.50 fmsl fmsl 698.50 ft Is there additional volume stored above the state-required temp. pool? N (Y or N) Elevation of the top of the additional volume fmsl Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 9,763 ftz Area REQUIRED, permanent pool 7,899 ft' SAIDA ratio 1.65 (unitless) Area PROVIDED, permanent pool, Apen-pod 7,934 ft` OK Area, bottom of 1Oft vegetated shelf, Abot shelf 9,723 fe Area, sediment cleanout, top elevation (bottom of pond), Abot?ortd 3.027 ftL Volumes Volume, temporary pool 15,927 ft3 OK Volume, permanent pool, Vperm pool 44,884 ft3 Volume, forebay (sum of forebays if more than one forebay) 8,980 ft3 Forebay % of permanent pool volume 20.0% % OK SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 1.65 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vperm-pool 44,884 ft' Area provided, permanent pool, Apempwl 7,934 ft` Average depth calculated 3.00 It OK Average depth used in SAIDA, de,,, (Round to nearest 0.5ft) 3.0 It OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Aperm-pool 7,934 ft` Area, bottom of 1Oft vegetated shelf, Abot shelf 9,723 ft` Area, sediment cleanout, top elevation (bottom of pond), Abot?or,d 3,027 ft2 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) -698.50 ft Average depth calculated 3.00 It OK Average depth used in SAIDA, day, (Round to nearest 0.5ft) It Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.25 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 1.80 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow ft3/sec Post-development 1-yr, 24-hr peak flow ft3/sec Storage volume discharge rate (through discharge orifice or weir) ft3/sec Storage volume drawdown time 3.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 2.0 :1 OK Y (Y or N) OK 1.5 It OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Shear Gate is provided to drain p Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 2 of 2