Loading...
HomeMy WebLinkAbout20190289 Ver 1_USACE Compliance Site Visit_20200702Strickland, Bev From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil> Sent: Thursday, July 2, 2020 3:26 PM To: John Fisher; Jerry Hack; Kevin Wurschmidt Cc: Homewood, Sue; Brandon Ashley; Teresa Andrews Subject: [External] USACE Compliance Site Visit - Publix Greensboro Refrigerated Warehouse; SAW-2018-00240 Attachments: 20200630 Compliance Maps and Pictures.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov OR This email is being sent as a follow-up to our compliance visit on 6/30/2020. In attendance were myself, Chris Hopper and April Norton with the Corps, and Kevin Wurschmidt with Gray. We looked at the 5 locations where authorized fill limits (per our Individual Permit dated 2/11/2020) intersected with streams/wetlands and other adjacent areas. This email notes our findings. Please be aware that we will follow up with a letter in the coming weeks due to several areas of documented permit non-compliance. The Sites referenced below correspond to the attached document: Compliance Site 1 (see attached map with notes and pictures): The fill slope and sediment basin exceeded the authorized fill limits, impacting an additional —41 linear feet of stream. Further, 1 to 4" of sediment from loss events at the permit site were observed along the extent of the stream from the existing rock check dam to the confluence with the larger stream, approximately 470 linear feet downstream. On -site we discussed removing the accumulated sediment from the sides of the stream channel (rather than the portion of the channel with active flow) with rakes, flat shovels, and buckets, down to where the sediment changes from construction silt/mud to the sandier natural stream bed material, along the entire 470 If reach of the stream channel. Also, options to resolve the —41 linear feet of stream filled in beyond permitted limits include restoring the original grade and contour of the stream using natural channel design, or proposing an after -the -fact permit modification. Also, just to the southwest of Compliance Site 1 it appears that a communications line was installed across the stream. As our permit did not authorize any stream impacts in this location, please describe how this utility was installed. Compliance Site 2: The fill slope in this location appeared to be installed approximately within the permitted fill limits. Evidence of sediment loss events is apparent within and along the stream channel downstream of the impact footprint. However, the sediment appears stable and within the permitted indirect impact reach of the stream. A large sediment loss event appears to have occurred in the vicinity of the sewer crossing (not yet installed); it is our understanding that Guilford Co. has addressed this issue from a sediment and erosion control perspective. Please note that the sewer crossing in this location is to be installed via jack & bore, and no impacts to the stream are authorized in this location (see permitted plans and Permit Special Condition 19). Compliance Site 3: The permitted fill area has been cleared and a check dam has been installed at what appears to be the permitted fill limits. No grading has occurred in this location and this site is currently in compliance. Compliance Site 4 (see attached map with notes): Based on my GPS data from the field it is likely that the fill limits extend approximately 15 linear feet past the authorized impact footprint. Please confirm the existing fill limits (i.e. the stream -ward edge of the rock check dam) vs. the permitted fill limits via as -built survey and report the results to me. Further, 1 to 4" of sediment from loss events at the permit site were observed along the extent of the stream and adjacent wetlands from the existing rock check dam to the rip rap just upstream from the confluence with the larger stream, approximately 573 linear feet downstream (combined with Compliance Site 5 below). On -site we discussed removing the accumulated sediment from the sides of the stream channel (rather than the portion of the channel with active flow) and adjacent wetlands (where accumulation >1") with rakes, flat shovels, and buckets, down to where the sediment changes from construction silt/mud to the sandier natural stream bed material/natural wetland soil, along the entire 573 If reach of the stream channel. A native riparian/wetland seed mix should be spread in wetland areas where accumulated sediment has been removed. Compliance Site 5 (see attached map with notes and pictures): The section of sewer required to be installed byjack & bore (see permitted plans and Permit Special Condition 19) was installed by trenching and the entirety of both stream banks were subsequently rip rapped. Further, approximately 40 linear feet of the downstream -most reach of Stream F and its fringe of adjacent wetlands has been completely rip rapped, and the stream is flowing under the rip rap. All of the above has occurred outside of the permitted fill limits of the project and is therefore an unauthorized discharge of dredged and/or fill material. Also, as discussed above, 1 to 4" of sediment from loss events at the permit site were observed along the extent of the stream and adjacent wetlands from the existing rock check dam to the rip rap just upstream from the confluence with the larger stream, approximately 573 linear feet downstream (combined with Compliance Site 4 above). On -site we discussed removing the accumulated sediment from the sides of the stream channel (rather than the portion of the channel with active flow) and adjacent wetlands (where accumulation >1") with rakes, flat shovels, and buckets, down to where the sediment changes from construction silt/mud to the sandier natural stream bed material/natural wetland soil, along the entire 573 linear feet reach of the stream channel. A native riparian/wetland seed mix should be spread in wetland areas where accumulated sediment has been removed. We also discussed possible resolution of the rip rap discharge in Stream F involving removal of the rip rap and stepping the stream down to the confluence of the larger stream via 1-foot step downs using natural channel design — after -the -fact approval of the rip rap in this small stream would be difficult as this material and installation method does not allow for aquatic life passage, and the stream will likely headcut upstream under the rip rap. Resolution of the trenched sewer line will be discussed in our forthcoming letter. Compliance Site 6 (see attached map with notes and pictures): The fill slope in this location appeared to be installed approximately within the permitted fill limits. Evidence of sediment approximately 1-4" thick from loss events at the permit site is apparent within the extent of wetlands downslope of the fill limits. On -site we discussed removing the accumulated sediment from the wetlands (where accumulation >1") with rakes, flat shovels, and buckets, down to where the sediment changes from construction silt/mud to natural wetland soil, within the entirety of the wetland. A native riparian/wetland seed mix should be spread in wetland areas where accumulated sediment has been removed. Please let me know if you have any questions or would like to discuss the resolution of the above non-compliance issues prior to receipt of or forthcoming letter. Sincerely, Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E.Bailey2@usace.army.miI We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. Mrl^J e- £ l4 r -- � ,rC-^ _ r;� • rid � .� � � � ,%� �.-, �� a � �' f f I mr MEN m Elm imm mom ME 'W-EEK NINE IN E, EMS= Ai MEER! in El ME ON EWA .Env,= me Emmbffill MEN 001141001, LpwJ OMEN 2 WE -MINI, SEE MRSHE ze', - / wr A n/ / wr A n/ In r all - it ( 7 �4 _ II It �i AF sL L I!{/ �� r �` �i *�/ a TC ''1'',I =E/O--R fu ' f (rr, . j � % fi%h r �Gr �✓ � [� �'� L j I�/i %i �� eAot; I ■E= rrr�� ■��r� 1.4 1 At �/A- fV1t I �+ -r IL x �.r r e + Q ,a 1.' 2 3 ■ 4 Legend Project Limits - 354.2 Acres 171r LOD = - Limits of Disturbance - 231.2 Acres 0 (10, m Stream Impact © Wetland Impact — — — — - Stream Buffers Zone 1 Buffer Impact - Permanent Zone 1 Buffer Impact - Temporary Zone 2 Buffer Impact - Permanent Zone 2 Buffer Impact - Temporary Perennial Stream (R3) Intermittent Stream (R4) Permanent Stream Impact Temporary Stream Impact Secondary Stream Impacts Stream Top of Bank Palustrine Forested (PFO) Wetland Palustrine Emergent (PEM) Wetland Palustrine Open Water (POW) Wetland Impacts Secondary Wetland Impacts NC DOT TIP Project: U-2581 BA - 15.1 Acres Clapp Farms,Rd 0 9 0 6/30/2020 Compliance Refe erice M �earbA/jG,/r U r— _ /1 0 q Q� NCDOT TIP Project: U-2581 BA S3 !w Bs 2j Z -0 Ei Off_ f h �1 Sto4Q,C/r /ahoy �\ l Q .moo s 1D( 411 �A4?r - _ �� ; 1�i�1�i�p1���1`i�ip � 1j►Illoi► 63 2 WS 8 f1111111111, w3. w3. 6 SI,C ? ' . ,• 1� A C 3 2� 1►iii1►►ii � ►; • • � ■ ■i%i �� 7 �,- �.� a i• �kz l�f//ii'- �.. "�-- alit w 8 • *� . :11 ''1l1' 1 •1 I. •.r r1111,1171�� = 1 •.. '1. "+a i �I�jljlr�. ►IUIl I M +a■x01 11�11111 e, l _ • �ti •�drm,R� Srrliafh O� ers< h ! S`hathers•Ln U I r ► I w19.2 I LO W 19.3 ' rf ll 7; ry• --'r 'r r _ r ..+' r '>I Sk ,`i `� = ;�z S , rr °KOU Pi .' (/%,% ±',`i'`r�s"`; r `s:r.' r �'—' r` 1 i f■, I` Gy Jrr - Iy�! 'In r,tr%-` r�� ', TrI I,• r r' J r� "�irlf I"�[7 �l.�i .. .,I ,�:rrl7i ri".• r�F f�r, "rj--.r, .Ir +y lv}it 1p.�• - r� q,+ Underground'?.,ti 5 f ? f Jack&Bore:�,`1 p°N c �dl �l '1 1 11 •s-�F_`fc — $ . -- �3'� �n ' r'�I I r m—� f _ -r l - � �' r�- rr ,, � r�;.,S � _ — �' _ _� — � 'r r U r r `11 �+r 11 r;�1 fi-- _ ___� ,� �:' � �''• ri__ [ f f r r1 = - .art _ "� '_ L i !N! r 1 . ] ` ll l+l[ r r �r IS -_ __ y - i _ r J [ r rl• rrr r;- \ 'I l 1 �], i� r �_ r/1 ,[• )� ,] 1j rr �b �'G :i [ 1 11 . v [ � -� � r // 1 + ,III II ! Il 1 •r _ l � ♦ lj1' I to -,. , ��= �- I rll l� yl l,+rl][ l-r :•rr rl(~`'� s�� la ;�.nP 17R��i r ir�a��.. • '.li, ll�l 1`,1[.� f ` J,., ,`� �� r I tir r+ + �'4'' 1�l ] '' 1 + !► ;`, rr _: � � � ^ a I �, I r 11 r � �: l ti - ,�� �: sr `:'r° 4 "_ , � �, 1 I r+' � Il h2y.1 11[ I'!+ r r;• r+N rr .. - .,� r p, I 1f I y¢ ram' V1 rrr Fry r +r I I r l `,, r = ■ ;�, 1[ .;� �,,, i�i lcl�}�i ,i�,r �` ^ �•, !¢.rr ;'rl r•r`s �r ri�i Sri', �-'-"`- _—�1`. ��' `� -�r i f�.Y,�,1+ll yr rl r[f 1, `l {1 I+tl` .`�^mot,` _ '�`YL��-ti_. 'a`�. i��t ];; ._Y �►-r lr �`, ' Vr '•y>, `�,f�_f`L-, l�~� _1��1�1r 1\1l.`�;�,��'1 1� �111f1 +yl 1 f/ +4 ' , , frl I'c •• _ �- �r'Cr rrr rrrl l�I - �_[�I ,` \ ,11 +, f r !r fry• II 1 /•' - [!' Ir !r r•� - Sri _-rr111 r11! .r'r i, f ,'1 lsl'lrli ; r If, I'-:rr;r+rr r _s,i ,, fy rr; —� ;�• 1 ,r ,y,1M , y,■y�ti•—� , 1,1 ,I fl Is ► iI w , r Il,l 1 Lam■ l5 r+ r1,1 'lt Llf-` . �,' '� -� - -� �+ ir,lyd ' l,i rr {� rsI rsr+'irrr 1I�` 1=i-`rl►' e ` r ■ ll — lrl le ]rrr r'rl rrJf +, Iti +r7L y` ` tr ,� ,l�-- r rri r J I r 1+, , I if r■rfl ,l � [[i I �yrr 7 , �'', �l 1�l+, �`■, 11 ti = l r 1 I ' ► 1 1 a 0 o M O' y = coNO E : '0 N V � rrww Vl w 3>0 l > 4J _ N E a C. o E 000 * �tW:= V ~ ' z O IX m 0 4 o � a PROJECT NAME & LOCATION IX W H W Q V I-- Z Z O �O O� J F- m OU � O= U) LL � 0 J —O X Z J 00 a DATE 12/18/2018 PROJECT NUMBER 42407 PROJECT NAME PUBLIX DESIGNED BY / DRAWN BY L. MAJOR 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by others. 2.Waters of the U.S. have been confirmed by the U.S. Army Corps of Engineers on July 3, 2018 by David Bailey (SAW-2018-00240). 3. Project limits are approximate. 4. Topography based on USGS LiDAR. 5. Cowardin Stream Classifications are based on confirmed Perennial Flow Determination. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. REVISIONS # MM/DD/YY DESCRIPTION 1 08/14/19 Impacts updated per revised layout. 2 09/17/19 Impact IUs updated. 3 09/25/19 Impacts updated per revised layout. 4 11/07/19 Impacts updated per USACE/DWR response dated 11/04/19. 5 11/22/19 Secondary impacts updated per USACE/DWR request. DRAWING DESCRIPTION PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP SCALE (FEET) 0 400 800 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALE SHEET NUMBER H:1"=400' 1OF12 Y:\805\42407-Publix Distribution Center\GIS\Wetland Impacts\42407-WTIM.mxd - r ,'- II1111 - j - - � , 1 , 1 `{ l � { 1 emu. � �.i- I ' r'I •' . \ y ]I + + ; , ' J- - - � - , ' 1 ! I ( 1 ` I 1 1 ` _ - - - - ` - - - _ - . - 1 f - .-- ❑_ Ra �• - � � r �+ � r rl rf r f+ �',{ 1'',i -' _ 1 ,'� ,+ 1 +,r I r I' ,+ +' +r , � � � � - - { � - - - ' - _ - -_ -- - - - - _ ! - _ - ,- jf .. y � ` 1 , I I 1 • f 1 ' + I r ' 1, + , +' , 1 , , I � { 1 � _ 1, - - _ Legend � , { I r ,1 I, ' 1 ; y Project Limits 354.2 Acres 1 Llmlts of Disturbance - 231.2 Acres Jo (101 m Stream Impact © Wetland Impact — — — — - Stream Buffers Zone 1 Buffer Impact - Permanent Zone 1 Buffer Impact - Temporary Zone 2 Buffer Impact - Permanent Zone 2 Buffer Impact - Temporary Perennial Stream (R3) Intermittent Stream (R4) Permanent Stream Impact Temporary Stream Impact Secondary Stream Impacts Stream Top of Bank Palustrine Forested (PFO) Wetland Palustrine Emergent (PEM) Wetland Palustrine Open Water (POW) Wetland Impacts Secondary Wetland Impacts NC DOT TIP Project: U-2581 BA - 15.1 Acres 1, -Y�-- -- - - -- _ ---- ----a^-0 77 QqL 4 4 I','I',I,r ,l,�fr �'\`'♦ ", 5`1 it �_~~��.��_'—�`�~1 __ _ll��`_�-���f__'Y tl`''�-__4''l- - -.f l�� W2.2 N - ��- y l l T `•. 1 \ ,' ,1 {1\4 ,,Y� yyyyy{y ', `i i' 1 1 l 1 , , �` '1 ,' ' - _--------- �,, �` � � _ ', `i t 1 , t t'1 t'�' ,I � ', 1 I-, _' y '{�, ',1_ 11 •i l l { l ,` , , •, ti � ' � `• • _ y Y '{ ly II , 1' ' 11 11 ' �1 ,1 I 1 I '' yy'yy ,, ` \ t}'' ,, ` `, 4' l` \ ' \ \ � \ \' `\ , `, {' `, ; l - - O _ '- • , ® r 1 - _ 1 J Jr J J J J/ J/r r I `♦ T � I y I I I i I I � � I I li , \ 1 1 ` l , \ ` , { , ` 1 , , , ,' JI + ! I ', \ �,• 1 I f�{�y , I I IJ I , I ,'If �,l r lam__ ll1 =' , , ♦\ - \ l L '\ ` { I 1 , {I , I , J , I JI + , I •• J + { { I I T-L Y I , ly y , rr r . { - \ ` -� , , , • 1 � `\ y . ' ' � p1 ! ' 1 r ' \ \ \ \t`- ' � A ♦ I I I � I r I �I � , ' _ _ _ � , ' � � ', ', l `, 1 � l l I + ' l , y r . + , / - 1 ' I r 1 r f ♦ r ' - I l i 1 , \ ` + / 1 r I � , I \ I I 1 1 + r ? 1 f r r I I♦� 1 1 �I 11 , \ ` - 1, I � � , { . , \ y 7 ,+ I '. L l ` � �Q � 11 1 + ; r _ � - - I 01 If ' r � 1 1 y l 'y`♦, , r II ` � � �'{ I III_ , r i I + � 1 , + r I I l , , - , r 4 I 1 ,♦, , 11 I �J , I 1 1 f' l • y � 1- ' 1, , r II I ' 1 I I I Q + { I I I f + , , I • ' + D�0 Y p {, O M O' y = NO coN N V rrww Vl w 3>O E0 N I: a 90 E � . Z L OO ♦+ ~ � O IX 5 m � a 0 tl. LUGATIUN W LU — W Q U Z Z � �ON J O L.L m OU � 0LL LL J —OJ `0 V / V f J a DATE 12/18/2018 PROJECT NUMBER 42407 PROJECT NAME PUBLIX DESIGNED BY I DRAWN BY L. MAJOR l 4 � I , , '+• ' ' { , I ' r r 1 '❑ I �' r 1 I } ' - L 1 a V - , ' - These plans and associated documents are the • ; + - - - exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and ♦ r J �O l - _ ' shall not be used for any purpose whatsoever, I `, I • ' _ inclusive, but not limited to construction, bidding, { 1 1 1 { + { I r' ! _ 1 i and/or construction staking without the express written consent of TIMMONS GROUP. 71 - _ _ - � l t \ `, , ', 11��♦` 't \ I I + 1 `\ ' 1 1 I _ _ I I 1 ' III 1 , r + Vt , ' l 1 1 '+ I•I �1 � ` � ' \ 1 ' - _ _ _ - / _ �! - , = ! / - r I ' 1 , r r 1 � I I VV II III . II+I 14+ - -___ --- ---- ----- --- ,' If , ! / ♦ Il ; ,' I,' rr � I 1 , ` _ _ 4 _ - - - - _ - - - - - - - - � ' , r f ,' ; + ,' , fAI , I, 11 1 I1A REVISIONS # MM/DD/YY DESCRIPTION 1 08/14/19 Impacts updated per revised layout. 2 09/17/19 Impact ID's updated. 3 09/25/19 Impacts updated per revised layout. 4 11/07/19 Impacts updated per USACE/DWR response dated 11/04/19. 5 11/22/19 Secondary impacts updated per USACE/DWR request. ' SCALE (FEET) 0 50 100 ,, I' ,' PLANS PRINTED AS 11X17 ARE HALF SCALE , + , , I - ` I ' , - /' , I r , ' ,I SCALE SHEET NUMBER 2OF12 J1 , H:1' =50' RAI Y:\805\42407-Publix Distribution Center\GIS\Wetland Impacts\42407-WTIM.mxd I � + ooking downstream from rock.dam: - at _ i + Compliance Site 1 - 6 30/ 02 *y. G {• 1 _ y A.; & it -Y_ ,F J _ + 4 ' 1 � Y J _ - - '� � .f a, AerAW AWL w -' :R _ Ito MOT +# IGP IL�.. •. I ir Mr I AL + J ' 1 • 1 f �' 1 •� � fr t V-1. Looking upstream stream at rock check � at- L -6... 0/10 A le T....7 .pq D e7s � �r'{ri�k _� 'ice �•:� 4 • .,t-��: _mot„ �� � i } ILA � Ed q f r �• r+S :-!ti _k� irr' � �1 7 Sr -{41 --r l•:F � �'� � '�'. �5 �� � I• l'"*, of � �' � • �S- iy ... �.. - F {, • TT.. tee• - - s _ �-_ '.•'�` �,'� ''� � Y.' � ., ,�� #-'':! �� ,�� _ - . . F a -�-Y a'I :• :•'s �' � '••� -` -ice �'� � • 1 , �y!,`a.I -•� 1F'� `, 4 � •• - ' � �i_ y 'y_ Yam• ` � ��i� .:Y r�71 ,.�•`ry-� �� , - _ *• ,!l •y ;ti �rl�. ;� f,• wry: r, .. �7+ `4�Fs�#� : •„ T s - y _ -4 T -+�'s - I r• +) �� �� •,ter '�QI�• - •� �' � ! f - •, �_ •'-y' •• �j,T s ��Y- � , _ - .. yY .t ' - .•. r � � • _ - M -R � _ .� ':f 1 �� �� a. .� :2�' pit` ' •� f • • :� � � ..:; ��.• J4tiay. r*. �•;� - J y 1 wJ: ' �t nA �. raf' - r# , rrJJ ,r .,r��� _ �' � ' r � '. � - t r �--•= f-�'�` ' ±. �• •:! _tom' - .w. .T � � . . i, }� � F -tip _ - - _ �r r ��•. �ti� t+ � __ � fur � l�� •� '•- •--� ��`_ _• � •Jo- _ —41 If of stream fill under check dam and sediment basin -water flow primarily from p Y _ french drain installed along filled -in portion of Stream K, Pond 1, etc. IL r i• 4 is L '� '+ •�'• r, 41 41 �. i 4Z­A�L �• 1 Y W F A Looking upstream at fill slope and o a rock p p - T checkdan It C iM,plia.ce. Site . = . , 6/30/2020 1 -•�}.' }��'ti. •i#'=.� ' f' �• +~. 'ice _— 4 Ile 3 WI r fir•. tick - ' ,off ,-• .:-`. - {+ y.�C:�f L N } ?� s ,- r. k. .ate` r� ti X— � ��� `?Ta.�' � - ,•,5, T�, r .. •Jff ' AI A- k 1.y = w � t i•_•.+4 art, � ,� , ,� o-s � %F'- � F•• � h k � - +� - roc{ ��'�� .� �� i { } '�Ic _ 'I. ~ �y'�rr +� � + • .,. t - r Check dam r • . — ; y % .�r 9L, ��'� r: 'do-• J ' ?� I � Y "_ _ +$ .s. x Sediment accumulation 1-4" deep in remainder - �•. - - � . • �• � - 'ram •. of Stream K - T •y.� rF • y - r •4} ' y J _ IPJ _6I e. AP et L NFL Vim 34. I + _ ~Ls T Li. ~r• a i + 1 , ' ` I Looking upstream' at _fill • slope an c.. heckdam at Com lwn ce Site i rti 1 •�* _ _ L• •J j L_ • l2 1 f- J _ � fir" . , ,�._ r , • �' . ; � �, � _ .L,, J �• ,rt G • r tw rF Check dam - y. r 43 'ice - - � •�-_ .� r'` `�Ki�T 1 L � '• 1 ` 7C rSediment accumulation * - 1411 deep in remainder - 3; • i 1•, of Stream K { WL • J kWh y� k ��•� _ r rL -4 �� y _r ! i f •L +.F , •k�. r J y r F 1" iij• _ � f� � � T � x •� f._! I 7Jq • }F 01 PA y S Looking upstream at fill slope and rock ''checkdam at,to},I,;S '' ,.1 0/ 021 i L FAt MW MI jr -6W IL 1jr _q 7 A R.. IV di dLo P-fJ- Lik +1� Y. L4- 2 bp or N v, ILI _Ly ��v,* 46 Mir P P Ile Sediment accumulation -4" deep in remainder er L+Aj�.P' of Stream K I'LL t% 'j .715 'qIP6 EP JP' Ir ir ti Vrr. rr' I dw Al 4L 2, % IV Al OIL A 1,6 Ll * �vf 0'- F f 4 IL 16 &AL - SPIV Z p r Nk :. , !Pr ra.9 bl! MW -MC-' o 41 z r;6� IL Ll % , it q9k%t - 1 41 4rL' r i4i WL L Iw % d %L j 11 Pk' er e- kq OL N IL br -emir 1.6 At -ew !6 L.P I Is j t�� -_ -%: q dr qp j Ar 41 % --Mf AIR dp 17- 4� RIK' r r. qr A -4T. .0. -aw V JR 4b% 41 F 4al Alt -r ;e PLq� "`zz . �.r 9 . o ■ ■ Ra. ��y ■ Legend Project Limits - 354.2 Acres 171r LOD Limits of Disturbance - 231.2 Acres 0 (101 m Stream Impact © Wetland Impact — — — — - Stream Buffers Zone 1 Buffer Impact - Permanent Zone 1 Buffer Impact - Temporary Zone 2 Buffer Impact - Permanent Zone 2 Buffer Impact - Temporary Perennial Stream (R3) Intermittent Stream (R4) Permanent Stream Impact Temporary Stream Impact Secondary Stream Impacts Stream Top of Bank Palustrine Forested (PFO) Wetland Palustrine Emergent (PEM) Wetland Palustrine Open Water (POW) Wetland Impacts Secondary Wetland Impacts NC DOT TIP Project: U-2581 BA - 15.1 Acres l I 1 ' 1 IJ I f ',' ' L � -- _ _ ti 1 / / 1 f I I , ' I • 1 I I r LC� _ l,' ' ! ' ' 1 1+�+++ ++ +S 1 \ 1 ,1 ' � � - ; - -' { 1 , / / / / , / ,' / / , r 1 r r�'y , • 1 ,' i - J f f L I I ♦ 1 r , , - 1 � 1 1 f , r r / ! / J I J / J J r I I r ,- �1, l `, 1 r ' ' J'• �1 ,` f' - , l I � J ' • I r - - 1 1 1 + � 1 ' I r//r • 1 �/ f I 1 1 + _ 3 /r __ / r/ , V I J ` I � l 1 \l ,\ f • _ r �\ 1 1 I j l , ` _ _ / ( - S '+ - - - - _ _ _ ' . 1 _' 01*4 f ,' 1 • r / _ . _ _ , 1 , l V , _ , _ - I y \ / - - `tit - l - - - 1 , 0 \t ___-- ----_- ft Underground } lam►. s - -_ ; - . j - _ Jack & Bore Q _-_ 1 4 4 1 -7�—i / 1, ti S i I 1,, \ '• I Ir - 1 i ' / . J . r_4 r J _ - Y • _ _ � _ _ — � — T 1 O J / • ! 1 S II II,. , �I D) 1 , _ - , 1 � �, 1 \ \ 1 , V f+ +I , , h V , • I 1 ,! 1, l r , r , p 1 I ' ! II , , � l 1 I _ _ • I 4+ 'I'' 1 VV ' \ , � � ' � '1 � r 1 III 1 1 ,r 1 \ _ , � f 1 ', ', VV I rJ Vf' y r - " , • / � 'OD f f \ / , I r -- _! -� If 1 \ ` \ 1. I If / / IV l•- / , 1 V Q 1 -• r f + I - • , , ` _�� `1 1 _� ' 4 1 1 I `I I + ' , r + 1 O _ , / , , I 1 JI ,� 1I '/ D a 0 O M a] y = 3 N InNO IN V � rr ww Vl w 3>O o > N E o_ 0o E 0 Z L OO ♦+ 2SZ Q¢T V '_�aslj ~ L 5 MMO W a 0 4 IX F- W V I--Q Z O z 00 —J J H m LL �U O = F— J LL 0 X —O �z J 00 a DATE 12/18/2018 PROJECT NUMBER 42407 PROJECT NAME PUBLIX DESIGNED BY / DRAWN BY L. MAJOR 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by others. 2.Waters of the U.S. have been confirmed by the U.S. Army Corps of Engineers on July 3, 2018 by David Bailey (SAW-2018-00240). 3. Project limits are approximate. 4. Topography based on USGS Li DAR. 5. Cowardin Stream Classifications are based on confirmed Perennial Flow Determination. � � ,' These plans and associated documents are the , , ,� , , i r ■ r + , , , I + , , - _ exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, - - - ' , p0and/or construction staking without the express w , , ' , r , J r f , , • , 1 r , , - ritten consent of TIMMONS GROUP. • ,! . -�.r _ ` 1 , f 1� r� 1 , , r� r , 1 yI rl 1 , , + f, � r � i+ I+1 1 f 'I 1 '� 1 f , I ,' / 1 I + • ' � / � ' _ 1 , S �' f � ,- � / /, ,• , III I I � • ,' ! ' , 1 / I{ `- I ,' ' • + � 1, Il , � ,, I' yS 0. 001 _ _ / - ■ 11rrz 1 ! f I I REVISIONS # MM/DD/YY DESCRIPTION 1 08/14/19 Impacts updated per revised layout. 2 09/17/19 Impact ID's updated. 3 09/25/19 Impacts updated per revised layout. 4 11/07/19 Impacts updated per USACE/DWR response dated 11/04/19. 5 11/22/19 Secondary impacts updated per USACE/DWR request. DRAWING DESCRIPTION PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP SCALE (FEET) 0 50 100 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALE I SHEET NUMBER -- H:1 "=50' 4OF 12 Y:\805\42407-Publix Distribution Center\GIS\Wetland Impacts\42407-WTIM.mxd x � �.r r e az • 1 + p `1a �,- 8 9 ua ■ Ra. �- ■ Legend Project Limits - 354.2 Acres F1r LOD Limits of Disturbance - 231.2 Acres 0 (101 m Stream Impact © Wetland Impact — — — — - Stream Buffers Zone 1 Buffer Impact - Permanent Zone 1 Buffer Impact - Temporary Zone 2 Buffer Impact - Permanent Zone 2 Buffer Impact - Temporary Perennial Stream (R3) Intermittent Stream (R4) Permanent Stream Impact Temporary Stream Impact Secondary Stream Impacts Stream Top of Bank Palustrine Forested (PFO) Wetland Palustrine Emergent (PEM) Wetland Palustrine Open Water (POW) Wetland Impacts Secondary Wetland Impacts NC DOT TIP Project: U-2581 BA - 15.1 Acres 4 if - r f _ , `6 _- - - t D p {, O M O' y = 1A In (4 IS M N V � rr ww Vl to 3>O Z > UJ _ N E o_ aE O . = i OO +.+ Q¢ ~ z O IX 5 m a O 4 O f I I ` - - - - - - PROJECT NAME & LOCATION r + ' ! , f f 1 M)- ce LU LU ` z J U 210 �0 U F— 0 \ 0 JO i M r \ ' 007 I , �• I� � QO 1 r r r ' r 1 I r I r 1 , Nf L 1 ,, r11 , , `\ \ 1- `__ - r r 1 +•� � ,' f - r I J , r I r r ,' r ! I r , ' r , i � \ ,', 1 +�1\ 1 � f `\ ' '\ • , - •, � r r Ir I ! + , I I I , , , \� rt � ` - 444 1 I lit 1 ` _ I 1 • i r V 1 f ->. - , ' ! , + , r , r , r , f , r 1 ` , - , , I , \ , \ ! 1 1 w1 0 2 _ r I _ • ! ` ' r - I I `' i , ` ' ' + 1 ' 1 { I .....~ _ - _- ` -f- ', + 1 a ' 'r `\L I, , , ; - •= -' 1 -. -, . , f tI r S1U.2 + `1 �. ,, 1 `t �.� ` �!1'L 'r', \`i� �• 1 I� '1 ` I r 1 ', ,'L . [ I 1 ` , ♦ t t f- 4 , - / f ,' r 1 , 1 r "� - -_ Ir 1 L' ' L !Y 1 � ' r•, f 1� 1 1 I� ' ' �. 1' I 1 1_-- � � ' 1 - _-- --, , \ DATE 12/18/2018 PROJECT NUMBER 42407 PROJECT NAME PUBLIX DESIGNED BY / DRAWN BY L. MAJOR - / •�• - 5 ` - `,` �` �� ` �' -= F -�� s , - _ - 41111111, - - _ r These and associated documents are the / ! 4 , _ - _ �- _ _ =} - -, - - _ 1 _4. _ plans exclusive property of TIMMONS GROUP and - , - {1� ' • - `� _ _ ` _ _ - _ _ _ ' - - 1i r ` - may not be reproduced in whole or in part and I (! : - \ ' - _ _ _ r _' s - _ +I 01� Q07` - _ - be shall not used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express of TIMMONS GROUP. a - r II ♦\' ,','�-',L, ,I `V �,�;�_--T� '\ `-�-`_____- [` ' --Ir I,_ --III' !,l IJI ,Ir �.r , - -. �`\i` l , -- I- •` ``, �4� - ��` +` ,� , ,- - 1 1 I .' 1 ` L �-' \ __ _' -' _ _ _ _ _ Y _ �1 ' '------------ �_ '_ f -`-- _\ \ • LL i ' ii �, ,',� Lam` ,\,�` \ -ti.� � i ,, i __ _ _ _ _ .� REVISIONS # MM/DD/YY DESCRIPTION 1 08/14/19 Impacts updated per revised layout. 2 09/17/19 Impact ID's updated. 3 09/25/19 Impacts updated per revised layout. 4 11/07/19 Impacts updated per USACE/DWR response dated 11/04/19. 5 11/22/19 Secondary impacts updated per USACE/DWR request. f i 1 r' �_ -_ ' `'♦ L, LL '� ` ' 1 ', � r ' ff r l! � ` - , , Y I f f I l 1 I ' J f ii,',', \ I \ SCALE(FEET) I, ' t IF _ PLANS PRINTED AS 11X17 ARE HALF SCALE 1 ', �, _ _ SCALE SHEET NUMBER H:1' =50' 6OF 12 Y:\805\42407-Publix Distribution Center\GIS\Wetland Impacts\42407-WTIM.mxd 1 - y rI �'f :.' 1 ' + - - 4 1 , 4 Y f 1 � ♦ L r I _ ' / I . 6 . 1 1 , +I+ ryl, i ' ` I l 1, 4 , , 4 4 I L I 1 � 4 11 f • ,' r r / I ` r 1 r f I 1 1 1++ rrr + \ ~ - Z � \ • \ ' I � I 4 I , ' � ly \ 1 ` ` I 1 f ' !' + - "/` _ _ -- ' - `• ' 1 I I I' IL + ;1+ ;i � �• � L ( r I``� r i. r I r I 4 � , I + r f- I 1 _� , r -ff � ,` / f , , f , i t, , f q;' + ,,' '- v. �] / ♦ [.� , f I f . I I 1 + + / f I + � III y I N i , I, • L � ■ 0 � � , / , 1' r / ' 1 I , , I � 1 { I + \ I ! , 1 1 r l L 11 'l l{I Y !. 4� ' - ' f f , ! r • � f ' f ' 1 1 � L 1 � � r f , r � 1 S � 4, 1\II ' Y 1 1 I • f f r f 4 1 f 1 1 I I , ,1 I ,1 ,11 f / I \� � I 1' + ' ! / � 1 ! / - 8 9 1 . - Z (2/ f , f f I ! , f l -, , 4, , O� , ■ , f s Iy ��� II _, - -• - a� ~ �• 6 � 'Pp. ' I ! � , ! ,' f, ' , ! , , / / , , 11 , 4 1 1 , , + +-I 1 1 1 4 1 L I L � 1 L r , i , 1 N i+� Nu YF '.- , - I I• r r t 1 I r r ; l I 1 l � + � J / arm RV ■ ! _ I ,I ! I + I 1 ' ; • rf f! ` f+ ti /' !' f ' '\ .. n .- -•+� 4 , I - -`� - - _ `��- + I r 1' ,I f �, /- , fr , f III , , 4 � L L � f I I 1 1 I I I 1 1 �!J //r . _ 4. If I r ; - I ' ! ! , r I I I 1 I /r , � I r I y , ♦ , 4 , r L I I \ , 1 / , , , r ;I ,,• fr/ f•� , � _ - , , • ! . I , `. I 1 ! I 1 4 , � o L+r 1 -!,/ 1; . , 1 - - - / I I r . f / , - I r ' 4 1 ., ] I \, 44 I ., � 4 Y, ♦, I fiJ fif l 1 r/ r '. Legend _ _ , _ - - .•' /' ' (/ ! , ,:!' I+ 'I ,`` ff --I r +f fl II r1 ` r ; i ' , \ If ;++1++ , �!; '+ • 1 - / r J 1 f r ,! f I r f !' � I I �, 1 � - J • f , L f � � I 1 I f � r + 1 + f 11 r++ I!/I +1 1 ; -�~_'- •r r 1 1 ! f r! f + � I , I `� / f f I f f S I f If � r I,I I , �---• 1 ' !' 11 f If' ,' I f 1 I 1 I 1 f 4 f I -- -- I I I, ,, , I ff ' ,!' ' 'I I f + � 1 Project Limits - 354.2 Acres --' ' !' r - _ ! ^ �' ,' 1 l Z r , ' • i 4 r ! , I I 4 -� ��{ -i_. L f I f - ' - _ f' f I / f / ! ' - I Il ` , r LOD �� - ;� _ r 1 , , 1 r ! 1 / I l �� ��� I I � r- _ ^' - + , ,r r f , 1 L��f�: , , ff f 1 l ' , • I,r f + '/ �/r 1h + „ Y Limits of Disturbance - 231.2 Acres � r ; Go OOl �T © Stream Impact © Wetland Impact 1 1 p — — — — - Stream Buffers Zone 1 Buffer Impact - Permanent Zone 1 Buffer Impact - Temporary f 1 f / - - / I �- 1 , , L , 1 1 1 4 ' / L ♦ I 1 l ,- ',f I ,I f I , I Zone 2 Buffer Impact - Permanent __ - _ ' I ,r r l- - - f f �4 i I + 1 f 1 r , + r ! ❑ ! / , I 1 1 I �' f� I `_/ , I!, � 1 Ir ! - - - - - - - � _ • - f � - - - ` ' ' ' f - � � I 1 Y L I r ' J r / ' Y f I f ? I l ' J f ! I / r r 1 � ..___. .. + ', 1 f II 1 I � � Ir f� r -' �I �1 1 1 `, (I ,!! ' •� ,1 , JJr, f I Zone 2 Buffer Impact - Temporary , -- _ - _ L_ I `�� �f��{ ir{ I 1 ' , f /,Jr �f~ 1 I'Y f r ' ' �! r f y` + f' � , ! Ir f r f j 1 •' Perennial Stream (R3) ., 1 l ,� I + ' f , f r + 1 I 1 f � I I , , i _' - f I r + II rl , + •� 11' f f l � l • _ � 1 � f •1 _-r' I . ' - / + ,' , I f f , 1 , 1 r I f1-, I , ' 1 ,r � f I 1 1+ 1 l 1 l Intermittent Stream (R4) , - _- -- I - - - - , •f I I + f 1 I L f / + f , I , r , r /+ !, ,_, 4 � r +' I ' + Permanent Stream Impact - . - ;1 J - - - � ♦ _ 1 - - _ l _ _ _ � _ - I f 1 Ir , Ir 1 Y r I f + I I , I I - � f 1 1 /+ rl+ r+ 1 + + + i 1 r b, Temporary Stream Impact k. , 4 _ ----- - - -_ - - - j l r ,, - •_- r, , - I !' r I r . f I f 1 , ' n l l 1 1 4 1 Secondary Stream Impacts Stream Top of Bank - ,' ' I r + . ' Palustrine Forested (PFO) Wetland __ - � ! �\ frJ _ ,' I f • f f I f I J ' 1 ,• � J � I 1 I I I I I ' . 1 ' - - , � 1 - - - � ` 1 - �- . , _ • , f , f I I I I l 1 � _ I I I , I I 4 r " f ❑ 1/ 1 1 f 1 Palustrine Emergent PEM Wetland / r ' 1 Palustrine Open Water (POW) l'` l -- -` ' . - - - - __ ` J i f ,' 1 ,+ r ,� �� \ , 1 - � � Y- , r r I I I I I + �- ! 1 f I 1 � ''• 1 f r I Wetland Impacts - -- ®- -- P - - - - 4 `-- 1 fl I ` _ ! J ! • � i r I I+I i 1 � _ ` f . r I � • � - \ , ! ' I . , + , 1� I ,f II u 1 I r 1 I I I L �_- _ J f'+If'k� i I�~ ~♦ �'� _- ` r1 I ' /` /- `L + ,I , ,' ,fr +'/ If f 11 l •' '' I I' ' 1 Secondary Wetland Impacts ' _ - -- v 4•�-~ �-- r� , i POt - ' ` _ r + t` _ _ _ - _ 1 1 1 _� , 1 1 , 1 1 4 1 1 NC DOT TIP Project: U-2581 BA - 15.1 Acres - - - - _ �_ _ _ , �� I , O , f �� _ � f , r r l 1 , r , ►�I it 10) ' , (y • [i _ f r - , r1� t If �' ,r 7� ! f, J I r I r I = 1 \ ` - - - L i , f �, J' I - � _ ! r r ❑. II ; r , J+ rr , 1 f I , I f , I ! •' , 4 _ f / , 9� , G�]\ _ Q I _•1 � + 11 / ' I l ,I I ,`, I, J /rr I INN - -�41 OJ t 1 . f f ' , \ r , r--r rr ,I _ I, , 11 ,I_I"J I,, !J + I - , ♦_ 1 I, ' ,`♦ � L ,r Ti Ir I ,j / / f ' + I I I I 4 i 1 L i , t l L ', � ', ' R' l , r • , , - 1, I -�/ ,f '+ I l 4 4 , 4 I I - I 9\ + I, I ff 'r ! 1_. J� f ' ! + I 4 T L ! . I 1 ! f ' ' ' f I 1 f I / 1 ,' � , \ � � 1 I , i � � 1 II , 1 I, ' •J I + + � r ! 1 + 1 1 1 ,. I f r I /� ! f I �, f f � 11 f I I / f L f ' I 1 f I 1 }'�, f r ♦, f ` , , + 1 Y , , f 1 1 i `; I 1 I.L;I;I I, r ,' f fr/ , 4 I, i ' . ` `1 , 1f I' I I • I f I r I ' L' L I \ `I `� � L, 'I I I ' 1 \ ` ' ♦ ' ' 1 / • r1' r � ` +J � ' 11 I I \ � 4 I I , ! , , I f ' ( / I 1 1 ' � Y I I 1 1 1 \ I j; L 1 1 - I r J � I , 1 1 L I I • ,' ,/ 11`55}j I+ I� 1 I \ J - 1 ! 1 I S 1 ' • , Y • - _ 1 Jr 11 +� + , 1 L , i �' i ,I r I' Y4 �Y 1 \ � �4 N , I1 `�I � f 'I I 'I !' 1+ l \ � l rr 'r r � J ; ' 1 t�l�J++II f 1 l +l ' '' J J J r ,I Il , ff , , , l 1 1 I r I Jf D a {'J O M a y = 7 1A InNO � rr ww Vl uJ 3>O E0 � UJ _ � N I: a Eo E O . = i OO +.+ zm a O 4 W LU — W v r-Q Z O Z �O O� J F- m OU OLL = J LL 0 X �O f n v Z J m a DATE 12/18/2018 PROJECT NUMBER 42407 PROJECT NAME PUBLIX DESIGNED BY I DRAWN BY L. MAJOR 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by others. 2.Waters of the U.S. have been confirmed by the U.S. Army Corps of Engineers on July 3, 2018 by David Bailey (SAW-2018-00240). 3. Project limits are approximate. 4. Topography based on USGS Li DAR. 5. Cowardin Stream Classifications are based on confirmed Perennial Flow Determination. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. REVISIONS # MM/DD/YY DESCRIPTION 1 08/14/19 Impacts updated per revised layout. 2 09/17/19 Impact IUs updated. 3 09/25/19 Impacts updated per revised layout. 4 11/07/19 Impacts updated per USACE/DWR response dated 11/04/19. 5 11 /22/19 Secondary impacts updated per W ACE/DWR request. DRAWING DESCRIPTION PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP SCALE (FEET) 0 50 100 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALE SHEET NUMBER H:1 "=50' 9OF 12 Y:\805\42407-Publix Distribution Center\GIS\Wetland Impacts\42407-WTIM.mxd O {� O M O' y = f/iN o 0 E N V O rr ww Vl to 3>O 0, > UJ N E a a E D . = i 00 w+ 0 V ¢ �LW 'W 0 O 0 4 PROJECT NAME &&LLOCATION IX W F— Z LU z U I-- Z Z O �O O J F— m OU � O= U) LL � 0 J 50 X Z J m a DATE 12/18/2018 PROJECT NUMBER 42407 PROJECT NAME PUBLIX DESIGNED BY / DRAWN BY L. MAJOR 1. Waters of the U.S. within the project study limits have been located using submeter, Bluetooth GPS antennas by others. 2.Waters of the U.S. have been confirmed by the U.S. Army Corps of Engineers on July 3, 2018 by David Bailey (SAW-2018-00240). 3. Project limits are approximate. 4. Topography based on USGS Li DAR. 5. Cowardin Stream Classifications are based on confirmed Perennial Flow Determination. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. REVISIONS # MM/DD/YY DESCRIPTION 1 08/14/19 Impacts updated per revised layout. 2 09/17/19 Impact ID's updated. 3 09/25/19 Impacts updated per revised layout. 4 11/07/19 Impacts updated per USACE/DWR response dated 11/04/19. 5 11/22/19 Secondary impacts updated per USACE/DWR request. PRELIMINARY JURISDICTIONAL WATERS OF THE U.S. IMPACTS MAP SCALE (FEET) 0 50 100 PLANS PRINTED AS 11X17 ARE HALF SCALE SCALE SHEET NUMBER H:1"=50' 11OF12 Y:\805\42407-Publix Distribution Center\GIS\Wetland Impacts\42407-WTIM.mxd •reamDance Site 5, `� �s- Looking upst' at) 6/30/2020A— ' d :; r... a At - SIC 4c IF ir ip F 17 P, F . . I uh N WOO _ep ki jF Or d. JCL "p- Jj I L aa 40, 0 r e + p ` 1 1 .62 3 ■ Q -may Legend Project Limits - 354.2 Acres 171r LOD = r Limits of Disturbance - 231.2 Acres 0 (101 m Stream Impact © Wetland Impact — — — — - Stream Buffers Zone 1 Buffer Impact - Permanent Zone 1 Buffer Impact - Temporary Zone 2 Buffer Impact - Permanent Zone 2 Buffer Impact - Temporary Perennial Stream (R3) Intermittent Stream (R4) Permanent Stream Impact Temporary Stream Impact Secondary Stream Impacts Stream Top of Bank Palustrine Forested (PFO) Wetland Palustrine Emergent (PEM) Wetland Palustrine Open Water (POW) Wetland Impacts Secondary Wetland Impacts NC DOT TIP Project: U-2581 BA - 15.1 Acres ~ _ 0 I ' I a lianC 0 p ce Smite"t 6 6/30/2020' S � `� O �3> Qi� M N u� C1 o o pC %I 1 r % Q Ow 7 V H r T 4 O Q 101) QD LOD 1 � I � v (p r J l 1 r I I f I , � - - - L � S� . , - , f 1 f Y , � ■ \� , ! - r rJ ri I � 1 , r _- - _ �\ `- _ -- -- _- I� ' ', ■ r'r' `rL �'�- ' -- -- --' r f _ � ~ - - - - I ! . / r! ` , I ■ ■ 1 r f , I 4 r I ■ 1 1 , I , L 1 `■ L 4 _ - _ _ 1 ' \ _ I I ' ~ r I ' r! ! 1 / 4 r r ' r 1 I + ! - � ! I' f - f I 4 I I I , ` , / Y - _ ,_ • 1 / ti` � ` _ _ I ,� ~ r , \ Y , , , , , l i ♦ 1 ` 4 f _ ` 1` f ,I I ! r / , ' ■ f ,J Y `O'` -!�" ♦ . _ �f v , ti I ■ } ■ 1 11 1 L 1 r, 1 ; - - �- - ~- - ~ __`- _~ _ +r I , ' r r /� , r f r Y, \ ;;`.`- 1 \ -- -- �f I ' r / I-♦-.�' ~f_ '�\ DATE 12/18/2018 PROJECT NUMBER 42407 PROJECT NAME PUBLIX DESIGNED BY / DRAWN BY L. MAJOR I , ■ \ , � 1 L , 4 , f , 1 - - -\ _ _ _ = . -' _ 4 - _ , - - - ' f r 1 r ! ' r f�i ` � ,` � \' \ ,` I f % I 1 ■ ■ r _ - �r ,' rr� Y r +I , / r f Y �� r Y , ,�,�,■ \` _ -__- - _ - _ - - _ I• ' W19.2 -%! 1``�~- r' '�� ' � ,r r r- , r , I I I .� r r li I I' y L ,' � - - _ _ _- _ - Ir ,11 11 �� / I ` ,. i I 1■, , 1 t /! + ' ' r ' Ir I Y , ' { ' - _ -_-- _ - - _ - _ 1' 1 r!i', lI1���Ilf ,\� ,.1 , ■ 4 ' r , ■ r 1' I I' ' I ! Ir I! l r + r I+ r \ ]- 1\� ~ _/___ / ___ f - __�Nf ---_Y -- - _ ` _ _ +I/ram-� ,tll'■ r■ ♦1`♦ ,t 1, _ _ - - _ _ _ _ _ _ - - - - - - - - - , } - ` „ ■ ■ { These plans and associated documents are the f ' ®' - ` - _ - - - - _ _ _ _ _ - _ - - - ' - _ _ \ "` \ ' , exclusive property of TIMMONS GROUP and %\ i ♦` may not be reproduced in whole or in part and ' - , ` - _ �� ■ � � , � shall not be used for any purpose whatsoever, 1 r ! r , ! I r , _ `-_ r r '_ ' 1 _ - ' - - _ - - _ - y I - - - _ `, _ , ;\ , \\ `\ - ■ l ` inclusive, but not limited to construction, bidding, 1 ` f . ~ _ _ ; ■ - _ ~ - - r " \ _ _ Jr and/or construction staking without the express I , ■' r I r ' , , 1 ] , _ r I I - - _ _ _ _ , , �� , \ \ , •* , ' `' written consent of TIMMONS GROUP. 1 , r r 1 - - �' r � -1 I , -- _ _ - - - fir+ ll r,- _ - 1 ti `i `i ♦ t'` - ,' , 1■ ~ / ~ / 4 1 f �\ _ ■ ■ L L 1 , r - _ _ - ' - - - _ _ _ , 1 1 , y ` r r , ,, t \. ♦`- L ' 1 '■ , � Y - \ , '1 , 1 - - � ` - -- - - - 'r I - � - � - � _ _ � \ _ - ` ' 1 I + 11 yI I f , I `- L♦♦\ ■ I r r - - _ _ _ \ _ L I \ r � 'L ' 1 '\ r - ' { - ■ \ , ', , 1 ` - - _ � _ _ � � _ _ ` _ _ ~ _ - D f _ _ ', � � , 1 I 1 I I ,' 1 f ' I f ' 1 ~ - ', ' + ~■ _ , l` _-- `■'\ ,,■ I I {''1+r. _ , ~Y` - - , ■ L, _ ■ L , Y 1 , 7 r r I \ \� r _ _ ■ `, \ ■ ■ 'I , { 7 I IY ■, I - - - Y -~ ' � �-Y I - - ` � - � � _ - _ _ -1 � _*�' ` ■, -, 1 1 { ] 'I I f rl I I I + + rff! fl rf r1 \ , \ I ' \ 1, f ` Y - / ' - � I / , ~ � , f - - - 1 � 1 ` ' , ♦ r ! r I 1 1 + I I I � +r f f r r \ � � r ■ Y ' ■ 1 1 I { ■ { I � 1 /` _ _ I I 1 f 1 f I I + r r r f I' ' r , r r ri, I` -� `- 1 REVISIONS # MM/DD/YY DESCRIPTION 1 08/14/19 Impacts updated per revised layout. 2 09/17/19 Impact ID's updated. 3 09/25/19 Impacts updated per revised layout. 4 11/07/19 Impacts updated per USACE/DWR response dated 11/04/19. 5 11 /22/19 Secondary impacts updated per USACE/DWR request. _ r L Y , 1 f I ■ 1 � , , I 1 - - (Yf L ' l I I + r f' + ,, ' f , r 1 `\ ', ', ■ ' f l � ,f 4- _ - , , , - - - - fr ' f I I + r I' 1' � '' .' r I.' ' �-_ l■' �'� _�� r 1 ' ■ 1 , , r - r 4 r , + r + ' r ' I r ` �� DRAWING DESCRIPTION PRELIMINARY ■ - ,-- _ -- / ' r - r ti `_ JURISDICTIONAL ' t ' - 1 Y I ' r Ir "' J -- 1 _ r _ f� r r f 1 !f f I r r 1 I■ 1 J'' I q` i-_ rr 11 I �\ WATERS OF THE -1 %', " ;' ! - - --' r_ - -__ ~ —� } — `-{{ .. \; ` 1 `1---` -' U.S. IMPACTS MAP ■i + _ � ■ , 1 , , , 1 !, I � �, r I r : - t _ + 4 , , - _ - y r 1 � _ t'���ff� �_. .r� I I r I I `I � , J- ` - ' t � 1 ■ r , - , 1 r ! -- I ~ , ■ r 1 1 1 '{ I\� ,■ ;r; r� ~ _� -- f ♦ 4 ���{ If r I f , rl f f I, I! r r rl, 1 i-, fr,, �- .�'�_ � --:-. _ := _:- - _- '_�i 1r , . .(, r• ; I f I �' III ' -♦ , ~� ' _ ', �! `, , r , r r !- ' {` -1 ' r I ' '-- r - � I { ���� ' r ' b/ /, Ire' ' I ' 1 / ~ 'r'` ��f it SCALE (FEET) 1■ ', \\ �' I' ! 1\ I fl r _, I r I , f /- - -, - ����{ !� f ' I I �f I !! ,r � I I� I r1 ff+rY � �' 1 � I ' r ' + r` ' � , r! ' ' ' ,' ' ! i '�1 `.• rrr 'I +I _ - 0 50 100 �i - ` , r - - �; - - - , t 1 ■ , , r til , ' r f r r ' ' r r I r ! r r r - f , f1+1 PLANS PRINTED AS 11X17 ARE HALF SCALE I , Y\ ` , } , , 4 , 1 , ■ , 4 ., r 1 , , r r r 1 r ; �. ' I r r r 1 f ! f'r , SCALE SHEET NUMBER ' 10 OF 12 - - - �y ', - { , ; l ' i ' ' � i j ,♦ l ' r f' f I � /r , - _ _ � � If - r' ,r � Dr I ' r , I 1 � fr,r �� - ,A ' r Ir ' 4, I , f Y:\805\42407-Publix Distribution Center\GIS\Wetland Impacts\42407-WTIM.mxd x * V-' yam, 'Y r r-. Or � � L i• 1 It 1pL r �+-- ' { yF OL T1 # Ls W-0, f , y'� J � � � � �� - `* � �� •. � � -_ _ � r_ � _ ''• — _� • �. {i { lam, L�'• jL } T•,F+fo ' _ ,f+iII..• _+. Air z SF -� g`* y -- +4P r%f � ' ; I den i F LL 4 _,P � • • - r,, - Sediment accumulation 14" deep in Wetlandho` ' W6 F ■ r + F � w: r y IP : % 7 91 1 d; # Jae +41T a, F le d do Ow, F I Ow 10 �_tI6 iilk th t I�r L 7 € 7 •Y , TT -