HomeMy WebLinkAboutNCC202834_ESC Approval Submitted_20200706ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
US Army Public Works Department
Attn: Monica A. Stephenson, Directorate
2175 Reilly Road Stop A
Fort Bragg, NC 28310-5000
NORTH CAROLINA
Environmental Quality
June 26, 2020
LETTER OF APPROVAL
RE: Project Name: FB — Runway 05-23 Rehabilitation — Pavement & Electrical
Acres Approved: 191
Project ID: CUMBE-2020-199
County: Cumberland, City: Fort Bragg, Address: Surveyor Street
River Basin: Cape Fear
Stream Classification: Other
Submitted By: ADC Engineering
Date Received by LQS: June 4, 2020
Plan Type: New
Dear Ms. Stephenson:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby
issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire
three (3) years following the date of approval, if no land disturbing activity has been undertaken, as required by Title 15A
NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit.
This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -
named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to
Annette Lucas at Annette.lucaskncdenr. og_v or Paul Clark at Paul.clarkkncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a
Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
NORT�CARQ�UNAI
Dgwb m^'°'E^"�^tdQ d; � 910.433.3300
Letter of Approval
US Army Public Works Department
June 26, 2020
Page 2 of 2
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job site.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity.
This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility
Form, which you provided. You are requested to file an amended form if there is any change in the information included
on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application
fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us
if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Jodi Pace, EI
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Clay Greene, ADC Engineering- electronic copy
Ward, Water Management Branch - electronic copy
DEMLR - Fayetteville Regional Office File