HomeMy WebLinkAbout20180310 Ver 1_Visual Monitoring_As-Built_20191018AS-BUILT
OCTOBER 18,2019
PHOTOS POST-CONSTRUCTION
OCTOBER 18,2019
LOG VAN E
48 FT LONG
2 % SLOPE
15 DEGREE ANGLE
BOULDER VAN E
81 FT LONG
3 % SLOPE
20 DEGREE ANGLE
BOULDER TOE PROTECTION
STA 2+40 TO 2+90
BANK GRADING AT 2:1
SOIL GEOLIFTS TO BKF STAGE
700 GR COIR MATTING TO TOB
STA 0+00 TO 2+40
AS-BUILT
OCTOBER 18,2019