Loading...
HomeMy WebLinkAbout20180310 Ver 1_Visual Monitoring_As-Built_20191018AS-BUILT OCTOBER 18,2019 PHOTOS POST-CONSTRUCTION OCTOBER 18,2019 LOG VAN E 48 FT LONG 2 % SLOPE 15 DEGREE ANGLE BOULDER VAN E 81 FT LONG 3 % SLOPE 20 DEGREE ANGLE BOULDER TOE PROTECTION STA 2+40 TO 2+90 BANK GRADING AT 2:1 SOIL GEOLIFTS TO BKF STAGE 700 GR COIR MATTING TO TOB STA 0+00 TO 2+40 AS-BUILT OCTOBER 18,2019