Loading...
HomeMy WebLinkAbout20050732 Ver 09_Staff Comments_20100126Lucas, Annette From: Finch, Jeremy [JFinch@ecoengr.com] Sent: Tuesday, January 26, 2010 2:11 PM To: Lucas, Annette Subject: Possibly spam: RE: Briar Chapel (Chatham County, NC) - Phase 5 South (DWQ Project # 05-0732v9) - Request for Updated SWP Approval Attachments: image001.gif; image002.jpg Annette - I discussed your re-worked language with the owner, and they are okay with committing to this. Thanks for your help and again, if you wouldn't mind, could you email me a copy of the letter so I can get this over to Chatham County this afternoon? Thanks. Jeremy From: Lucas, Annette [mailto:annette.lucas@ncdenr.gov] Sent: Tuesday, January 26, 2010 12:05 PM To: Finch, Jeremy Subject: RE: Briar Chapel (Chatham County, NC) - Phase 5 South (DWQ Project # 05-0732v9) - Request for Updated SWP Approval Jeremy - Here is how I re-worked the language - please let me know what you think: The DWQ will allow the temporary use of a sediment and erosion control device to control stormwater from Section 2 of Briar Chapel Phase 5 South. The use of the sediment control device as a stormwater BMP may occur for a period of up to 30 months after the issuance of the first Certificate of Occupancy for a Section 2 property provided that the following two conditions are met: ¦ There is an approved Sediment and Erosion Control Plan in place. ¦ The sediment and erosion control device is properly maintained. Thirty months after the first Certificate of Occupancy is issued for Section 2, the stormwater management plan that was approved by the DWQ on June 13, 2008 must be in place and operational. The structural stormwater practices as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the DWQ. Stormwater easements shall be recorded for a distance of at least ten feet on each side of all stormwater conveyances on all lots containing these structures including future access for maintenance. The stormwater easements utilizing this facility shall allow for the ability to maintain these structures, perform corrective actions as described above and shall provide for protection of the structures from potential alterations by future property owners. After the stormwater plan is implemented, please fill out a Certificate of Completion (available at: II .tt5%nc?tietlarid, (iocaiiiic.3its'C"ertiticateofCornhletion Mar2009.doc) and return it to the 401 Oversight/Express Unit, 2321 Crabtree Boulevard, Suite 250, Raleigh, NC 27604. Thanks, Annette From: Finch, Jeremy [mailto:JFinch@ecoengr.com] Sent: Tuesday, January 26, 2010 10:19 AM To: Lucas, Annette Cc: Karoly, Cyndi Subject: RE: Briar Chapel (Chatham County, NC) - Phase 5 South (DWQ Project # 05-0732v9) - Request for Updated SWP Approval Annette Thanks for working with us on this matter and working this into your busy schedule. Your help was sincerely appreciated If possible, could you email me a pdf copy of the revised SW approval letter when it is ready so I could forward to Chatham County since they are eagerly awaiting this? Thanks again. Jeremy From: Lucas, Annette [mailto:annette.lucas@ncdenr.gov] Sent: Tuesday, January 26, 2010 9:46 AM To: Finch, Jeremy Cc: Karoly, Cyndi Subject: RE: Briar Chapel (Chatham County, NC) - Phase 5 South (DWQ Project # 05-0732v9) - Request for Updated SWP Approval Jeremy - I just spoke with Cyndi Karoly and we have agreed that this language is acceptable. I will get a revised SW Approval Letter out to you today or tomorrow. Thanks, Annette From: Finch, Jeremy [mailto:JFinch@ecoengr.com] Sent: Monday, January 25, 2010 1:24 PM To: Lucas, Annette Subject: RE: Briar Chapel (Chatham County, NC) - Phase 5 South (DWQ Project # 05-0732v9) - Request for Updated SWP Approval Annette - Per our telephone conversation on Friday afternoon, I had a conversation with the owner for Briar Chapel regarding placing a time constraint on the final conversion of the wet pond BMP from a temporary sediment and erosion control basin to a forinal wet pond BMP. Based upon the current housing market and general construction practice, the owner has indicated they feel comfortable committing to having the facility converted to the final wet pond BMP condition 30 months after issuance of the first certificate of occupancy. Therefore, in lieu of the language provided in my previous letter to you last week, would you be willing to accept the following language for incorporation into an updated stormwater management plan approval: "It is understood by the DWQ that the approved wet pond BMP for Phase 5 South will be utilized as a sediment and erosion control device during construction of this phase of the project. Furthermore, so long as there is an active land disturbance permit utilizing this facility as a sediment and erosion control device, occupation of the homes may occur so long as the storm water management plan that was approved by the DWQ on June 13, 2008 is in place upon expiration of the land disturbance permit and close out of the sediment and erosion control stage of the project or 30 months after issuance of the first certificate of occupancy, whichever comes first" 2 This would require the developer to convert the facility into the final wet pond BMP condition no later than 30 months after issuance of the first certificate of occupancy (sooner if construction is completed earlier) for this phase of the project. Please let me know if this language would be acceptable. Thanks for all your help. Jeremy From: Lucas, Annette [mailto:annette.lucas@ncdenr.gov] Sent: Friday, January 22, 2010 1:42 PM To: Finch, Jeremy Subject: RE: Briar Chapel (Chatham County, NC) - Phase 5 South (DWQ Project # 05-0732v9) - Request for Updated SWP Approval Jeremy - It is sitting here on my desk and I plan to write the letter before I leave the office today. Annette From: Finch, Jeremy [mailto:]Finch@ecoengr.com] Sent: Friday, January 22, 2010 1:10 PM To: Lucas, Annette Subject: RE: Briar Chapel (Chatham County, NC) - Phase 5 South (DWQ Project # 05-0732v9) - Request for Updated SWP Approval Annette - I was just checking in to see if you received the hard copy of the clarification letter that I sent via FedEx to you for Briar Chapel and if you have had a chance to review the language. I am trying to get the updated stormwater management plan approval letter so I can send over to Chatham County in time for us to get on the agenda for the next County Commissioner's meeting. County Staff will not let this go until clarification from DWQ has been received. Please let me know if you did not receive this and I will have it hand delivered to you. Thanks Jeremy From: Finch, Jeremy Sent: Wednesday, January 20, 2010 2:09 PM To: 'Lucas, Annette' Subject: Briar Chapel (Chatham County, NC) - Phase 5 South (DWQ Project # 05-0732v9) - Request for Updated SWP Approval Hello Annette Per our telephone conversation earlier this morning, please find the attached letter regarding Briar Chapel Phase 5 South in Chatham County, NC. This letter gives a brief summary of the DWQ stonnwater management plan approvals for Briar Chapel Phase 5 South, along with a request for clarification of the permit language regarding final conversion of the wet pond BMP from a sediment & erosion control device to a permanent stormwater BMP with respect to certificate of occupancies. As we discussed, I have proposed in the letter some revised permit language that if acceptable to DWQ, will replace the language in the existing stormwater management plan approval (will require an updated stormwater management plan approval be issued with the revised language incorporated). The proposed revised language hopefully addresses both Chatham County and 3 DWQ's concern with respect to final conversion of the wet pond BMP as it relates to issuance of certificate of occupancies while allowing for construction of the site to proceed in a practical manner. For DWQ records, I am also mailing you a hard copy of the attached letter. Upon receipt and review of' this letter, please let me know if you have any questions or if any revisions to the letter are necessary. In an effort to expedite achieving plat approval with Chatham County, an email confirmation acknowledging receipt of this letter and that the proposed revisions are acceptable would be greatly appreciated. Thanks again for all your help on this project. Jeremy Finch, PE Project Manager Office: 919-287-4262 Cell: 919-624-3672 to 3ddrr-- ss h!Dc f Aft &W% [jjEuvEngineering ell ;,?r o, 1.e fo ill i?,_ Vkl.l I, 4 r??k ae1?, Inc P.O. Box 14005, Research Triangle Park, NC 27709 Design Services Focused On Client Success Please consider the environment before you print this e-mail. 4