Loading...
HomeMy WebLinkAbout20131200 Ver 6_More Information Received_20200630Staff Review Does this application have all the attachments needed to accept it into the review process?* r Yes r No ID#* Version* 6 20131200 Is this project a public transportation project?* r Yes r No Reviewer List:* Andrew Moore:eads\awmoore3 Select Reviewing Office:* Asheville Regional Office - (828) 296-4500 Does this project require a request for payment to be sent?* r Yes r No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type:* r New Project r New Project Existing ID r Pre -Application Submittal r More Information Response r Other Agency Comments r Stream or Buffer Appeal r For the Record Only (Courtesy Copy) Is this supplemental information that needs to be sent to the Corps?* r Yes r No New Project - Please check the new project type if you are trying to submit a new project that needs an official approval decision. Pre -Application Submittal - Please check the pre -application submittal if you just want feedback on your submittal and do not have the expectation that your submittal will be considered a complete application requiring a formal decision. More Information Response - Please check this type if you are responding to a request for information from staff and you have and ID# and version for this response. Other Agency Comments - Please check this if you are submitting comments on an existing project. Project Contact Information Name: Alea Tuttle who is subrritting the inforrration? Email Address: alea.tuttle@gmail.com Project Information Existing ID #: 20131200 20170001(no dashes) Existing Version: 6 1 Project Name: Harmon Dairy Stream Mitigation Project Is this a public transportation project? r Yes r No Is the project located within a NC DCM Area of Environmental Concern (AEC)? r Yes r No r Unknown County (ies) Polk Please upload all files that need to be submited. aick the upload button or drag and drop files here to attach document Corrective Action Plan 6.30.2020.pdf 2.95MB Harmon Dairy As -Built Report 6.30.2020.pdf 15.11 MB Only pdf or krm files are accepted. Describe the attachments or comments: This As -built Report documents the construction of Phases 1 and 2 of the Harmon Dairy Stream Mitigation Project (Site). Tryon Equestrian Partners (TEP) applied for a U.S. Army Corps of Engineers (USACE) 404 Permit (Action Id. No. 2013-02262) and a N.C. Division of Water Resources (DWR) 401 Water Quality Certification (Project No. 13-1200) to impact streams for the construction of the Tryon International Equestrian Facility (TIEC). Compensatory mitigation for impacts to streams is described in the mitigation plan for the Harmon Dairy Stream Mitigaton Project (Phases 1 and 2) Sign and Submit W By checking the box and signing box below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the online form." Signature: Submittal Date: Is filled in autor atically.