HomeMy WebLinkAboutEmail RE Further Clarification of NOI Entries - 27597 Morman, Alaina
From: Hoyt, Kelly <Kelly.Hoyt@duke-energy.com>
Sent: Tuesday, June 30, 2020 5:08 PM
To: Morman, Alaina
Cc: Brooke.Ahrens@hdrinc.com; Johanna Velasqez Qohanna.velasquez@hdrinc.com)
Subject: RE: [External] NOI application no. 27597 and Project ID NCC-CLEVE-2020-Duke Energy
Cliffside to Shelby Tie OPGW
External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
report.spam@nc.gov
Hi Alaina,
Good catch with the coordinates. I guess I mistyped that twice now. My apologies.
I will resubmit the ENOI with the correct coordinates (mid-project), and also include all potentially impacted
waterbodies. If you can call my cell phone at your convenience, I can walk through the scope of work and the reasoning
behind the extensive LOD that was agreed upon with NCDEMLR.
Cell #: 307-752-4301
Thank you,
Kelly Hoyt, PMP
Duke Energy Transmission Permitting
526 S Church St.
EC09Q
Charlotte, NC 28202
C: (307)-752-4301 0: (704)-382-3308
www.duke-energy.com [duke-energy.coml
l,DUKE
%, 'ENERGY.
From: Morman,Alaina <alaina.morman@ncdenr.gov>
Sent:Tuesday,June 30, 2020 4:53 PM
To: Hoyt, Kelly<Kelly.Hoyt@duke-energy.com>
Cc: Brooke.Ahrens@hdrinc.com;Johanna Velasqez (johanna.velasquez@hdrinc.com) <johanna.velasquez@hdrinc.com>
Subject: [EXTERNAL] RE: [External] NOI application no. 27597 and Project ID NCC-CLEVE-2020-Duke Energy Cliffside to
Shelby Tie OPGW
*** CAUTION! EXTERNAL SENDER ***
STOP &THINK! Do you know and trust this sender?Were you expecting this email? Is grammar and spelling correct?
Does the content make sense? If suspicious,then do not click links, open attachments or enter your ID or password.
Hi Kelly,
i
Attached is a copy of your previous submission for reference. As you can see, the coordinates that were entered in the
eNOI were: 32.2582, -81.5431. These coordinates do not match the coordinates you provided for Shelby Tie Station.
Also, I appreciate you explaining how the work is to be conducted, but I'm still concerned about the amount of impacted
area because the E&SC plan approval is for 71.30 acres of disturbance. Is all of that disturbance occurring only around the
wire splice locations?
Thanks,
Alaina
Alaina Morman
Environmental Specialist
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Phone: (919) 707-9236
Email: alai na.mormana-ncdenr.gov
Physical Address: 512 North Salisbury Street
Mailing Address: 1612 Mail Service Center
Raleigh, NC 27699-1612
EQr:a.- rGrCuvt
waun�nr a�.*wrn�GrrreY
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Hoyt, Kelly [mailto:Kelly.Hovt@duke-energy.com]
Sent:Tuesday,June 30, 2020 2:58 PM
To: Morman,Alaina <alaina.morman@ncdenr.gov>
Cc: Brooke.Ahrens@hdrinc.com;Johanna Velasqez (iohanna.velasguez@hdrinc.com) <johanna.velasguez@hdrinc.com>
Subject: [External] NOI application no. 27597 and Project ID NCC-CLEVE-2020-Duke Energy Cliffside to Shelby Tie OPGW
External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to
report.spam@nc.gov
Hi Alaina,
I submitted the ENOI for the Cliffside to Shelby Tie OPGW; however it has been rejected due to the below
statements. I've also included a screenshot of the email. Please recheck the project coordinates as identified in the
ENOI. Also, I want to clarify that this project will be primarily performed by helicopters with very little ground
disturbance at the splice locations.
A7,8: These coordinates are accurate for Shelby Tie Station in Shelby, NC
2
9
}
2A07
d
5.2582.-81.5431
9
D7-95%of the worked performed will be done overhead by helicopters. The splice locations for the fiber wire is where
we will need to access towers with equipment; thus, this is the only identifiable land disturbance from the approved
plans. The impacted waterbodies are accurate and indicate the potential areas where splice locations exist.
Please advise.
Thanks,
From: [ma,lto:lase rfiche(anodenr.gcN
Sent:Tuesday,June 30,202012:21 PM
To:,andy_velt r@duke-energy.Cnm
Cc:abaina.morman@ncdenr.gay;ryan.kormanik@duke-energy.corn;Ahrens,Brooke T.<Brooke.fhrensQhdrinc.camr
Sub*dl Corrstrudion Stormwater Not Not Accepted
CRUItOH:IE%TERN,4l)Thfs weal oriOnaisd from outside of tlra oqa jt zatfon_Do not ckk Inks of open attachments t"n3 you recogntze the serrder and know the contartt is safe.
This email is to notify you that your application for Duke Enw v Cliffiide to Shelby i 14w OPGW k%-as not accepted for the follovvins reason:
A7,8-the coordinates provided are for a loratiaa in Bullach County.GA.Coordinors thrates mnsr match project location.
D7-all immediately impacted watarbodies must be listed,From the site rnap it a a project may also'impact Sandy Run Creek,Yancey Branch,Seeand Broad River,i
Please submit a new N01.Contact A1aw&Mormanr&1ncdmr.eov with questions or to recen-e a PDF copy of this submission.Thank you.
Please contact The Stormavaotcr program Administrative Assistant Sar more iufarIItation at(919)707-3640. Picric reference 1`OI application no.27597 and Project M NC C
This mwil ivm ardamaticallySanomfedby Lmerf:che. Name do not respond ro tlris emad address,as responses are not ruaniiorm.
Kelly Hoyt, PMP
Duke Energy Transmission Permitting
526 S Church St.
EC09Q
Charlotte, NC 28202
C: (307)-752-4301 0: (704)-382-3308
www.duke-energy.com [duke-energy.coml
ENERGY.
3