Loading...
HomeMy WebLinkAboutNC0032077_Inspection_20200630NORTH CAROLINA DIVISION OF WATER QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)l 1. Control Authority (POTW) Name: _Contentnea Metropolitan Sewerage District 2. Control Authority Representative(s): _Renee Smith 3. Title(s): _Pretreatment Coordinator 4. Last Inspection Date: _5-9-2018 Inspection Type (Check One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ❑ NO N/A 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO Order Type, Number, Parameters: PCS CODING Trans.Code Main Program Permit Number L�u I N I C 1 0 10 13 12101717 Are Milestone Dates Being Met? [—]YES [—]NO MM/DD/YY Inspec.Type 1 6 130 1 201 LPG (DTIA) (TYPI) Inspector Fac. Type I S I L-1 —1 (INSP) (FACC) 7. Current Number Of Significant Industrial Users SIUs ? 3 SIDS 8. Current Number Of Categorical Industrial Users CIUs ? 1 CIUS 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Enter the Higher Number of 9 or 10 0 NOIN 12. Number of SIUs With No IUP, or With an Expired IUP 0 NOCM 13. Number of SIUs in SNC for Either Reporting or Limits Violations During Either of the Last 2 0 Semi -Annual Periods Total Number of SIUs in SNC PSNC 14. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods 0 MSNC 15. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods 0 SNPS 16. Number of SIUs In SNC For Both Reporting and Limits Violations During Either of the Last 2 0 Semi-annual Periods POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during SNC for either of the Last 2 Semi -Annual Periods? Not Been Published for SNC for Public Notice?(May refer to PAR if Excessive SIUs in SNC) Not Put 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits Or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? ❑ YES ® NO ❑ YES ® NO Limits: N/A Reporting: N/A dished: N/A N/A ❑ YES ® NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO 1/2020 DMR verified 26. If NO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: NC DWQ Pretreatment Compliance Inspection (PC1) Form Updated 7/25/07 Page 1 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 10/1/2015 ® Yes ❑ No 1/26/2016 ® Yes ❑ No 9/30/2020 Industrial Waste Survey (IWS) 11/12/2015 ® Yes ❑ No 12/21/2015 ® Yes ❑ No 10/1/2020 Sewer Use Ordinance SUO 12/17/2012 ® Yes ❑ No 1/4/2013 ® Yes ❑ No Enforcement Response Plan ERP 3/2/2020 ® Yes ❑ No 3/17/2020 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 1 1/15/2015 ® Yes ❑ No 2/5/2015 ® Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION) 29. User Name 1. Winterville Machine Works 2.Carolina Classics 3. Weyerhaeuser Catfish 30. IUP Number 1111 1114 1115 31. Does File Contain Current Permit? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 32. Permit Expiration Date 9/30/2021 9/30/2021 9/30/2021 33. Categorical Standard Applied I.E. 40 CFR, Etc. Or N/A 413, Subpart A N/A N/A 34. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No to Permit Issue Date? 35. Does File Contain an Inspection Completed Within Last Calendar Year? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? a. ®Yes ❑No a. ®Yes ❑No a. ®Yes ❑No b. If No, is One Needed? See Inspection Form from POTW b. ❑Yes []No b. ❑Yes ❑No j b. ❑Yes ❑No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ®Yes❑No❑N/A ❑Yes❑NoON/A ❑Yes❑No®N/A Organic Management Plan TOMP ? 38. a. Does File Contain Original Permit Review Letter from the Division? a. ®Yes []No a. ®Yes []No a. ®Yes ❑No b. All Issues Resolved? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete ® Yes ❑ No ®Yes ❑ No ® Yes ❑ No its Sampling as Required by IUP, including flow? 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its ❑Yes❑NoON/A ❑Yes❑No®N/A ❑Yes❑No®N/A Sampling as Required by IUP, including flow? 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports ❑Yes❑No®N/A ❑Yes❑NoON/A ❑Yes❑No®N/A on time? 42a. For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑NoON/A file includeprocess/dilution flows as Required by IUP? 42b. For categorical IUs with Production based limits, does file include ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑NoON/A production rates and/or flows as Required b IUP? 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No All Limits Non -Compliance from Both POTW and SIU Sampling? N/A N/A 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify ❑Yes❑NoON/A ❑Yes❑NoON/A ❑Yes❑NoON/A All Re ortm Non -Compliance from SIU Sampling? 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A a.❑Yes❑No®N/A a.❑Yes❑No®N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A c. If applicable, Did POTW reample within 30 days of becoming aware c.❑Yes❑No®N/A of SIU limit violations in the POTW's sampling of the SIU? c.❑Yes❑No®N/A c.❑Yes❑No®N/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ® No ❑ Yes ® No 11 ❑ Yes ® No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken ®Yes❑No❑N/A ❑Yes®No❑N/A ❑Yes®No❑N/A as Specified in the POTW's ERP OVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑No®N/A ❑Yes❑NoON/A ❑Yes❑No®N/A 49. Does The File Contain Proof Of Penalty Collection? ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No®N/A 50. a. Does the File Contain Any Current Enforcement Orders? a.❑Yes❑No®N/A a.❑Yes❑No®N/A a.❑Yes❑No®N/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This ❑ Yes ® No ❑ Yes ® No ❑ Yes ® Requested Information For You? n NC DWQ Pretreatment Compliance Inspection (PCI) Form Updated 7/25/07 Page 2 FILE REVIEW COMMENTS: On July 8, 2019 a Notice of Violation was sent to Winterville Machine Works for a Ph violation. The facility was reminded: Headworks Analysis is due on 9-30-2020 Industrial Waste Survey is due on 10-1-2020 INDUSTRY INSPECTION PCS CODING: Trans.Code Main Program Permit Number L�u 1 1 1 I I I I I I l 1. Industry Inspected: 2. Industry Address: 3. Type of Industry/Product: 4. Industry Contact: Phone: Fax: MM/DD/YY Inspec.Type Inspector Fac. Type l I I l I S l ! 2 I (DTIA) (TYPI) (INSP) (FACC) Title: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ❑ YES ❑ NO 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ❑ YES ❑ NO B. Plant Tour ❑ YES ❑ NO C. Pretreatment Tour ❑ YES ❑ NO D. Sampling Review ❑ YES ❑ NO E. Exit Interview ❑ YES ❑ NO Industrial Inspection Comments: OVERALL SUMMARY AND COMMENTS: Comments: _Files were readily available and neatly organized. Requirements: Recommendations: NOD: ❑ YES ❑ NO NOV: ❑ YES ❑ NO QNCR: ❑ YES ❑ NO POTW Rating: Satisfactory X Marginal UnSatisfactory PCI COMPLETED BY: 54A&Cs19 DATE: June 30, 2020 NC DWQ Pretreatment Compliance Inspection (PC1) Form Updated 7/25/07 Page 3