Loading...
HomeMy WebLinkAboutNCG110072_Inspection Report_20200701ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Town of Valdese Attention: Greg Padgett Post Office Box 339 Valdese, North Carolina 28690 NORTH CAROLINA Environmental Quality July 1, 2020 Subject: Compliance Evaluation Inspection Lake Rhodhiss WWTP Permit: NCG110000 Certificate of Coverage: NCG110072 Burke County, North Carolina Dear Mr. Padgett: Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection I conducted at the subject facility on June 25, 2020. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (828) 296-4500 or by email at Isaiah.reed@ncdenr.gov. Sincer Isaiah Reed, WQ, CEPSCI, MS4CECI Environmental Specialist Land Quality Section Enclosure: Inspection Report D_EQ� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 aonntcufauw. o.p.nm.m iumaommul WaM 828.296.4500 Compliance Inspection Report Permit: NCG110072 Effective: 06/01/18 Expiration: 05/31/23 Owner: Town of Valdese SOC: Effective: Expiration: Facility: Lake Rhodhiss WWTP County: Burke 2100 Lake Rhodhiss Dr Region: Asheville Valdese NC 28690 Contact Person: Joe McNeely Title: Phone:828-879-2131 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/25/2020 Primary Inspector: Isaiah L Reed Secondary Inspector(s): Certification: Phone: Entry Time 02:30PM Exit Time: 04:OOPM Phone: 828-296-4614 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Municipal WWiP > 1 MGD, Stormwater Discharge, COC Facility Status: ❑ Compliant 0 Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG110072 Owner- Facility: Town of Valdese Inspection Date: 06/25/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary On June 25, 2020 this facility was inspected for compliance. I met with Chris Bortnick and Greg Padgett on site. During the inspection, the following items were noted: 1) The Stormwater Pollution Prevention Plan has not been maintained. the permittee is directed to immediately review, update, and maintain the Stormwater Pollution Prevention Plan as outlined in the NCG110000 General Permit. 2) Qualitative monitoring has not been conducted or documented on site. The permittee is directed to immediately begin qualitative monitoring as outlined in the NCG110000 General Permit. 3) Evaluation of all stormwater outfalls for the presence of non-stormwater discharge has not been conducted/certified. The permittee is directed to immediately begin all non-stormwater discharge evaluations as outlined in the NCG110000 General Permit. Please give the above items your immediate attention. If you have any questions, please contact this office at (828) 296-4614 Page 2 of 3 Permit: NCG110072 Owner -Facility: Town of Valdese Inspection Date: 06/25/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? N ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ 0 ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ 0 ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑ Comment: See summary for more information. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ 0 ❑ ❑ Comment: See summary for more information. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ # Were all outfalls observed during the inspection? N ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 ❑ ❑ Comment: Page 3 of 3