Loading...
HomeMy WebLinkAboutNCC202506_NOI Application_20200629Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 6/11/2020 11:36:13 AM (NCG01 NOI Submission) Approve by Garcia, Lauren V 6/15/2020 1:29:14 PM (Review- Construction NOI 26886) • The task was assigned to Garcia, Lauren V by round robin distribution 6/11/2020 11:37 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 15, 2020 5:00 PM 6/11/2020 11:37 AM Submit by Selkane, Aziza 6/29/2020 3:32:35 PM (Payment Verification for NCC202506) * Catherine Greenberg • Selkane, Aziza assigned the task to Selkane, Aziza 6/29/2020 3:31 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: July 27, 2020 5:00 PM 6/15/2020 1:29 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 26751 NOI No. Prior Reviewer Lauren Garcia Name 1a. Project Name * Lake Forest Church 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 3694925380/93243 2. County* Lincoln 3. Highway or Street 2204 St James Church Road Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Denver 5. State * NC 6. Zip Code * 28037 7. Latitude * Enter the latitude in decimal degrees 35.4975 8. Longitude* Enter the longitude in decimal degrees (MJSTbe negative) -81.0191 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 06/29/2020 Estimated Construction Project Start Date 10. Date to End* 06/25/2021 Estimated Construction Project End Cute 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Developrrent 12. Acres to be 8.84 disturbed* (including off -site borrow and waste areas) 13. Total site area 39.55 (acres) * 14. Post- 3.20 construction (Estirrated) impervious area (acres) * NCC Project NCC-LINCO-2020-Lake Forest Church Tracking ID Assignedautorraticaly Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Forney Creek Waterbody * %rre of waterbody into which stornwater runoff will discharge 15b. Waterbody 11-119-2-3 Index No.* NCWaterbody Index Ninber Stormwater r No discharges will flow Pf Yes to additional wate rs * 15c. Additional Killian Creek Receiving Waterbody narre Waterbody 15d. Waterbody 11-119-2-(0.5) Index No. NCWaterbody Index Nanber 15e. Additional Dutchmans Creek Receiving Waterbody narre Waterbody 15f. Waterbody 11-119-(0.5) Index No. NCWaterbody Index Nunber 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Responsible Entity Name * Lake Forest Church, Evangelical Presbyterian Church It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Mitchell IF Corporation, enter Registered Agent First %rre 3. Last Name* White It Corporation, enter F;bgistered Agent Last %ne 3b. Title Treasurer. Executive Pastor 4. Permitee E-mail mwhite@lakeforest.org Address* 5. Permittee 704-948-3232 Telephone No.* 6. Permittee Mailing Street Address Address* 8519 Gilead Road Address Line 2 city State / Rovince / F;bgion Huntersville North Carolina Fbstal / Zip Code Country 28078 United States Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 8519 Gilead Road Address Line 2 city State / Ftovince / Region Huntersville North Carolina Fbstal / Zip Code Country 28078 United States 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Jeff Contact - First Name * 2. Primary Site London Contact - Last Name * 3. Title Project Manager 4. Site Contact E- JLONDON@EDIFICEINC.COM mail Address* 5. Site Contact 704-361-5846 Telephone No. 6. Organization Edifice, Inc. Name 7. Site Contact Street Address Mailing Address* 4111 SOUTH BLVD. Address Line 2 city CHARLOTTE Fbstal / Zip Code 28209 8. Consultant Name (Optional) Sean Coldren First and Last narre 9. Consultant E-mail scoldren@ces-group.net This person will be copied on all correspondence. 10. Consultant 704-849-1500 Telephone No. State / Rovince / Region North Carolina Country USA D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/02/2020 Approved * 2. E&SC Plan Project 20-COM-02 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Lincoln County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan SE & SC Letter from Lincoln County - Revised 6-10- Approval letter or 20.pdf 613.5KB Grading Permit Mast be RDFforrrat 6. Site Location Map Helpful for linear project review (Optional) Lake Forest Location Map.pdf 233.59KB Mast be RDFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NOICertification.pdf 433.37KB Form Mast be RDF format This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature 01ncwoa- L W% 77 Type Name* Mitchell White Title Treasurer, Executive Pastor Organization Legally Ibsponsible Entity Lake Forest Church, Evangelical Presbyterian Church Date * 06/11 /2020 F. Tracking and COC Info NOI Tracking No. 26886 NC Reference No. NCG01-2020-2506 Uses 'count number' variable (incremrented by SP) Certificate of NCC202506 Coverage (COC) Uses 'count number' variable (incremented by SF) No.* Count Number 2506 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. Invoice Due Date Initial Fee $ Invoice Status