Loading...
HomeMy WebLinkAbout660014_Compliance Evaluation Inspection_20200629to Division of Water Resources Facility Number - / Q Division of Soil and Water Conservation Q Other Agency Type of Visit: Co iance Inspection Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: Routine Q Complaint Q Follow-up Q Referral Q Emergency Q Other Q Denied Access Date of Visit: e,�G�"fir Arrival Time: p Departure Time: County: Region: Farm Name: p_ r Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Other Phone: Title: Latitude: Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -La cr Pullets Other Poults Design Current Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Daia Heifer D Cow Non -Dairy Beef Stocker Beef Feeder Bcef Brood Cow Dischar es and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE b. Did the discharge reach waters of the Slate? (if yes, notify DWR) ❑ Yes No ❑ NA ❑ NE c. What is the csti mated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (if yes, notify DWR) ❑ Yes ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes -o ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No NA ❑ NE of the State other than from a discharge? Page I of 3 21412015 Continued Facili Number: - Date of Inspection: r V7 — Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes a. If yes, is waste level into the structural freeboard? ❑ Yes Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 �{ ❑NA ❑NE No ❑ NA ❑ NE Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): Z �� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes Z No ❑ NA ❑ NE waste management or closure plan? neat, notify DWR If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environm;�d 7. Do any of the structures need maintenance or improvement? ❑ NA ❑ Yes�No ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application /NooNA 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crap Type(s): roc. 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ NA ❑ NE~ 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes CfNq,. ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes o ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes c ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes rNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes bNo [:]NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis [] Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections []Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: - Date of Inspection: T -.1 g - Zd 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes - No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check es ❑ No ❑ NA ❑ NE tppropriate box(es) below. h. Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes ❑ No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss reviewiinspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes ❑ No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). e 2 ✓' e `1rz 3 j ✓r 261,0 1=a 5 I t~clye Svrue,'S Reviewerilnspector Name: Reviewer'Inspector Signature: 7 Phone: f g 71 [ 9 Ue Date: Z5 r 26 21412015 Page 3 of 3