HomeMy WebLinkAbout660014_Compliance Evaluation Inspection_20200629to Division of Water Resources
Facility Number - / Q Division of Soil and Water Conservation
Q Other Agency
Type of Visit: Co iance Inspection Operation Review O Structure Evaluation Q Technical Assistance
Reason for Visit: Routine Q Complaint Q Follow-up Q Referral Q Emergency Q Other Q Denied Access
Date of Visit: e,�G�"fir Arrival Time: p Departure Time: County: Region:
Farm Name: p_ r Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Phone:
Title:
Latitude:
Phone:
Integrator:
Certification Number:
Certification Number:
Longitude:
Design Current Design Current
Capacity Pop. Wet Poultry Capacity Pop.
Layer
Non -La cr
Pullets
Other
Poults
Design Current
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Daia Heifer
D Cow
Non -Dairy
Beef Stocker
Beef Feeder
Bcef Brood Cow
Dischar es and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ NA ❑ NE
b. Did the discharge reach waters of the Slate? (if yes, notify DWR) ❑ Yes No ❑ NA ❑ NE
c. What is the csti mated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (if yes, notify DWR) ❑ Yes ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes -o ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ No NA ❑ NE
of the State other than from a discharge?
Page I of 3 21412015 Continued
Facili Number: - Date of Inspection: r V7 —
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes
a. If yes, is waste level into the structural freeboard?
❑ Yes
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5
�{ ❑NA ❑NE
No ❑ NA ❑ NE
Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in): Z ��
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes No ❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes Z No ❑ NA
❑ NE
waste management or closure plan?
neat, notify DWR
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environm;�d
7. Do any of the structures need maintenance or improvement?
❑ NA
❑ Yes�No
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes ❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes No ❑ NA
❑ NE
maintenance or improvement?
Waste Application
/NooNA
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes No ❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate
Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crap Type(s): roc.
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
❑ NA
❑ NE~
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
CfNq,.
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
o
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
c
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
rNo
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes bNo [:]NA ❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis [] Waste Transfers ❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections []Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes o ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number: - Date of Inspection: T -.1 g - Zd
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes - No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check es ❑ No ❑ NA ❑ NE
tppropriate box(es) below. h.
Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes N ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes ❑ No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes ❑ No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes ❑ No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes ❑ No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes ❑ No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss reviewiinspection with an on -site representative?
❑ Yes ❑ No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes ❑ No ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
e 2 ✓' e
`1rz
3 j ✓r 261,0 1=a 5 I t~clye Svrue,'S
Reviewerilnspector Name:
Reviewer'Inspector Signature: 7
Phone: f g 71 [ 9 Ue
Date: Z5 r 26
21412015
Page 3 of 3