Loading...
HomeMy WebLinkAbout20091269 Ver 1_More Info Received_20100114oq• 1&60( sociates, PLLC Date: January 12, 2010 To: Ian McMillan From: Victoria Waldron Small, PE NCDWQ Westcott, Small & Associates, PLLC Wetlands/401 Certification 4015 Meeting Way p Unit Suite 105 L 1650 Mail Service Center High Point, NC 27265 Raleigh, NC 27699-1650 JAN 14- 2010 oar-wO WEtuNOSM0ST We are sending you ® attached E] under separate cover the following items: ? Shop Drawings ? Estimate ? Disk ? Prints ? Specifications ® Other ? Contracts ? Copy of Letter 4 COPIES DRAWING NO DESCRIPTION DI_SPOSIT10N I Revised Impact Map and Buffer For Approval Impact Tabulations for Ardmore Park - Foot Bridge REMARKS: cc: File 4015 Meeting Way, Suite 105 9 High Point, North Carolina 27265 9 phone: 336-812-3546 *fax: 336-812-8075 OR - 14A-09 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number - Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 ?P?T !] r c' a 02 ?P?T U 03 ?P?T QjQ 04 ? P ? T DENR - waria eUnU'ry 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID b 5b. Proposed use or purpose ' 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) num er of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list :all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ® Other: Jordan Project is in which protected basin? ? Catawba ? Randleman 6b. Buffer impact 6c. 6d. 6e. 6f. T6g. number - Reason Buffer Zone 1 impane 2 impactPermanent (P) or for Stream name mitigation (square feequare feet) Temporary T im act re uired? B1 ®P ? T Trail UT to South Buffalo Creek ? Yes 154 201 ® No B2 ?P®T Fill UT to South Buffalo Creek El Yes 61 n/a slope ® No B3 ?P?T ?Yes ? No 6h. Total buffer impacts 215 201 6i. Comments: The trail will be installed without side ditches or piping, so stormwater will continue to sheet flow through the Page 5 of 10 PCN Form -Version 1.3 December 10, 2008 Version OR - 144.o9 existing vegetated buffer (primarily grass). D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed stream crossing is approximately perpendicular to the exisiting channel and is only wide enough for pedestrians. The construction of the bridge will eliminate the current foot traffic up and down the stream banks. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The bridge will be prefabricated and footings will be installed outside the stream bed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No L F54" 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps JAN 1 4 20110 2c. If yes, which mitigation option will be used for this project? ?. Mitigation bank DENR•WATER QUALITY WETLANDS AND STORWifiTER WAND ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool []cold 4d. Buffer mitigation requested '(DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form -Version 1.3 December 10, 2008 Version w 4-- ~ LL . - z . n a 0 c U) O V) Q O 04 W 0 W ? II LL- Q W > W 00 O z ( t C 0 z J Q W Q W a c? Q z Cl- = W D O U m > m 0- ? m I- J_ m U ? •- N z II p Q W W W z z z Q O O O O m J ? W W W J W LL LL L, W U 0- - LL- - LL- L.,_ z Q D =) 5 z W m m m Q ? w = O U ? m w w w II of _ ? Ul (n (n U w ? z v 9 t oy 9L - l3 .L ° 61+ L = Id k o• N •; W ? rop 1 1 1 > Y W z O sc - 00 0 9.89 l - is W W :. -... - :. ...:.:, 67-1 1--l ' alm W Of ? 1 ? UJ 0 ) Q M O 00 O %% O 10-P o LLI O ?O EL O W V) _ > w J O Q 4 V) II II O O 00 O 0) 00 I-- IIII111/1?'' 0 LO O : O Q ?= w •• .......... . \?. wow (n Z N (D U N II1111 ?j Q OC) O F :?: -4 U) Li YWO?O Q?Q? I U7 S _U ^ 0?? Cf 0 cl? v (D .9 W m0U r? zL Q LiJ? r LLJ ?z W O Z O x 0O° a_ ? O O O Z M H Li Q H N I-P z ?\ \ \ \?\ \ \ do - // u r2 \ ? ?> =\ \ 0?0 2c w rl 00 00 " - v o 7 0- \\ ? _? ?O ? p 08 C) I H ??\ \\ \ s > y ?? co 0 C ?° II j z _ \ nHD 0/1 \ W z w Li w L?j Of \\ dla "2 X? ?\ \ SS U\ \ .. . .?. ?J \\ \ \\ w LO z0Z a-M U-) N cn ° (c >z u O \ Vl2F. r-, U) LL- \0 00 ?J x ? Lu co < 1? 01 I \?; \ \\ xOw odo aw §?J LLJ Lf) P-4 Q) 0 LL,