Loading...
HomeMy WebLinkAbout20080722 Ver 1_Certification of Completion_20100125L4W-xx? o s Certificate of Completion DWQ Project No. DWQ# 08-0722 County: Mecklenburg Applicant: Charlotte-Mecklenburg Utilities Project Name: Southwest Water Transmission Main Phase C Date of Issuance of 401 Water Quality Certification: April 28, 2008 Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40I/Wetlands Unit; North Carolina Division of Water Quality, 1650 Mail Serv ice Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to ' built within substantial compliance and intent of the 401 Water Quality Certific Dvim Rules, the approved plans and specifications, and other supporting materials. - ? Signature: Date: JAN 2 6 2010 Agent's Certification DENR. WAMR QUALITY WtETLWS AID STORMWATER BRANCH 1, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional 1, Michael L. McClellan, as a duly registered Professional Engineer (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Pen nittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of?ti e,`p" bti?n such that the construction was observed to built within substantial compliance / 8j- Water Quality Certification and Buffer Rules, the approved plans and specif suOaortinp- materials. Registration No.: Z4 7-1 Z Date: i Z Z Zt Q?