Loading...
HomeMy WebLinkAbout20091318 Ver 1_More Info Received_20100126ENV EnvimnInygd/ L'Or/SU/t%f - Services Inc. January 21, 2010 Ms. Annette Lucas NC DENR DWQ Wetlands/401 Unit 1621 Mail Service Center Raleigh, NC 27699-1621 RE: Emergency Vet Clinic Boone, Watauga County, NC DWQ# 09-1318 Dear Ms. Lucas: 3764 Rominger Road Banner Elk, NC 28604 Ph: 828-297-6946 Fax: 828-297-1982 e-mail: john@env-ecs.com JA Al ? •a i ,0 v?s?SH?• ?car??. EORA" Included with this letter are the following requested items: 1. Construction Plans at scale 1"=20', sheets C-1, S-1, GDA, L-1, E-1, D-3 2. Stormwater Management and Drainage Area Map 3. Signed O&M agreements for both level spreaders 4. Completed level spreader and filter strip supplement spreadsheet for each level spreader 5. Required item checklist 6. Date stamped photos of each filter strip 7. Copy of draft deed restriction 8. Stormwater supporting calculations In addition to the above items we provide the following information: 1. Level spreader level lip elevations have been tentatively set but a note has been included on the plans for these elevations to be confirmed as appropriate and optimal by the Engineer and Environmental Consultant prior to installation. 2. In completing the level spreader supplement, the drawdown flow from the detention BMP's is the 10-year pre-development flow. The level spreaders have been sized for the 100-year post development flow. 3. The underground detention systems, level spreaders, and filter strips will not be placed into service until all contributing drainage areas area completely stabilized. 4. The areas of both proposed filter strips have been placed outside the limits of construction except for the western edge of filter strip #2 that may be • Page 2 January 21, 2010 disturbed during the installation of water and sewer lines. Any areas that are disturbed will be stabilized with coir matting, temporary seed and permanent native seeding in accordance with the plans. If you have any questions regarding these items please call me at 828-297-6946, thank you. Sincerely, J ZnC.as President, ENV Environmental Consulting Services Inc. cc: Sue Homewood, DWQ Dr. David Linzey Mike Trew, P.E. III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justli ication. Pagel Plan Initi is Sheet No. ?? - 1. Plans (1" - 50' or larger) of the entire site showing: S x- Design at ultimate build-out, - Off-site drainage (if applicable) - ?^? M t ?A Y?'1 I - Delineated drainage basins (include Rational C coefficient per basin), ' ?? s , L _ - Forebay (if applicable), - 0" Z „ ys _ r ;.v q -High flow bypass system, - 1'-3 --maintenance access, % C l> .- t - Proposed drainage easement and public right of way (ROW), and ?v A - Boundaries of drainage easement. ; v A16/ D-3 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One fort topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build-out. } 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric z'jk' Pk"?' 4. A date-stamped photograph of the filter strip that clearly shows the type of vegetation that is present, _461 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev. 5 Part III, page 1 of 1 of W A7F9 >_ y MA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! L PROJECT INFORMAT101+1 Project name Emergency Vet Clinic Contact name John Was (ENV-ECS, consultant) Phone number 828-297-6946 Date January 14, 2010 Drainage area number Area #1 (parking) 11. DESIGN INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Underground pipe detention Drawdown flow from the BMP 0.21 cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity,10-yr storm Peak flow from the 10-yr storm Where Does the Level Spreader Discharge? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of devise ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" to one of the following: Length based on the 1 in/hr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? Do not complete this section of the worksheet. ftz Do not complete this section of the worksheet. ftz Do not complete this section of the worksheet. % Do not complete this section of the worksheet. Do not complete this section of the worksheet. cfS Do not complete this section of the worksheet. min in/hr Do not complete this section of the worksheet. cfS Do not complete this section of the worksheet. N (Y or N) N (Y or N) N (Y or N) Y (Y or N) Please complete filter strip characterization below. ft 35.00 ft ft 35.00 ft 3,173.70 fmsl 3,173.00 fmsl 2.00 %u OK N (Y or N) OK 520.00 sq ft No forebay is needed. 13 ft/cfs N (Y or N) Y (Y or N) N (Y or N) 1.46 cfs N (Y or N) A bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material cfs Do not complete this section of the worksheet Do not complete this section of the worksheet T 1 ------------- NI 20,00 ft #VALUE' N (Y or N) (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. 'f Form SW401-Level Spreader, Fitter Strip, Restored Riparian Buffer-Rev.5 Parts I. and It. Design Summary, page 2 of 2 \O?pE W AT e'Q h NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! L PROJECT INFORMATION Project name Emergency Vet Clinic Contact name John Vilas (ENV-ECS, consultant) Phone number 828-297-6946 Date January 14, 2010 Drainage area number Area #2 (building) H. DESIGN INFORMATIQN For Level Spreaders Receiving Flow From a BMP Type of BMP Underground pipe detention Drawdown flow from the BMP 0.35 cfs For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area fe Do not complete this section of the worksheet. Impervious surface area fe Do not complete this section of the worksheet. Percent impervious % Do not complete this section of the worksheet. Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 in/hr storm cfs Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 10-yr storm in/hr Do not complete this section of the worksheet. Peak flow from the 10-yr storm cfS Do not complete this section of the worksheet. Where Does the Level Spreader Discharge? To a grassed bioretenfion cell? N (Y or N) To a mulched bioretention cell? N (Y or N) To a wetland? N (Y or N) To a filter strip or riparian buffer? Y (Y or N) Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer "Y" to one of the following: ft 40.00 ft ft 40.00 ft 3.175.00 fmsl 3.174.00 fmsl 2.50 % OK N (Y or N) OK 134.00 sq ft No forebay is needed. 13 ft/cfs Length based on the 1 in/hr storm? N (Y or N) Length based on the 10-yr storm? Y (Y or N) Length based on the BMP discharge rate? N (Y or N) Design flow 1.08 cfs Is a bypass device provided? N (Y or N) A bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at at angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material cfs Do not complete this section of the worksheet Do not complete this section of the worksheet ------------ of 20.00 ft #VALUE N (Y or N) (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. It Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. B I DI Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and ll. Design Summary, page 2 of 2 ` Project # B09057.3 Municipal . E¦.ag Date: 11-16-09 °"` Sheet # 13 m.? Project: Animal Emergency Clinic Des. By: EGT Client: Animal Emergency Clinic Chk• By: Subject: Parking Lot Detention System Scale: n/a Level ??"?? Determine Parkins Lot Detention System Requirements (Using Hyd raflow Hydrograph 20 07) Item Dimension 24 inch Pipe Length Required 260 ft Orifice Elevation 3175.4 ft Orifice Span 4.5 in Orifice Rise 2.0 in Weir Span 3.0 ft Weir Rise 0.5 ft Control Structure Outlet Pipe Size 12 in n'otarmino note„tinn Cvetnm Stnruva Vnlump & nutflnw (Using Hvdraflow Hvdrograoh 20071 Item Trial Routing Calculations Final Routing Calculations Routing interval 3 min 3 min Storage Volume Provided 817 cf 817 cf Storage Volume Required 815 cf 815 cf Maximum Storage Elevation 3,177.89 ft 3,177.89 ft Trial Outflow 0.201 cfs 0.201 cis Maximum Allowable Outflow 0.208 cis 0.208 cfs rhark 7d inrh Pine nptpntinn Svctpm npsign Stnragp Volume vs. Storage Volume Required Item Number Volume / Unit Volume Provided Volume Required N-12 HDPE Pie 240 If 3.16 cf * 758.40 cf 90° Manifold Bend 2 ea 11.61 cf * 23.22 cf Double Manifold Tee 2 ea 27.52 cf * 55.04 cf End Ca 6 ea 3.32 cf * 19.92 cf E?d Total Detention System Design Storage Volume Provided 8S6.S8 cf > 815 d * From ADS Table 5: Storage Volumes of Standajd Manifold Components and Related Parts Check Control Structure Storm Drainage Outlet Pipe Size Using Table 3-1 Item Pipe Post-Development Q1w 1.464 cfs Pipe Size 12 in Pipe Material HDPE Minimum Pipe Slope 8.00% Full Flow Capacity 10.918 cfs T, Zovf-loti? level sr- 13'/ions 13x I>'IG'I Mauipd ? F?e?i Project # B090573 Date: 11-16-09 sheet # 17 Project: Animal Emergency Clinic Des. By: EGT Client: Animal Emergency Clinic Chk. By.- Subject: Building Detention System Scale: n/a ?EVA 5P,Lw1L-' * ')- Determine Building Roof Area Post-Development Flow to Cistern Overflow / Detention System 11 leinm UwAn- fimu Nvdrnvranh 2W71 Item Quantity Post Development Building Roof Area to Cistern 0.0876 ac Post-Development Peak Flow to Cistern 0.668 cis Post-Development Peak Volume to Cistern 1,884 cf post-Development Peak Volume Storage in Rain Barrel/Cistern 377 cf Percentage of Roof Area Flow in Rain Barrel/Cistern 20.01% Post-Qevelopment Building Roof Area to Detention System 0.0701 cf Post-Development Peak Flow to Detention System 0.534 cfs Post-Development Peak Volume to Detention System 1,507 cf r?a+armina ru*pntinn Svstam Reauiremenis (Using Hvdraflow Hvdroaraph 2007) Item Dimension 24 inch Pipe Length Required 67 ft Orifice Span 4.0 in Orifice Rise 2.0 in Weir Span 3.0 ft Weir Rise 0.5 ft Control Structure Outlet Pipe Size 12 in Determine Detention System Storage Volume & Outflow (Using H raflow Hydrogra h 2007) Item Trial Routing Calculations Final Reding Calculations Routing Interval 3 min 3 min Stomp Volume- Provided _.. 211 d 211 cf Storage Volume Required 208 cf 208 cf Maximum Storage Elevation 3,180.05 ft 3,180.05 ft Trial Outflow 0.345 cfs 0.345 cis Maximum Allowable Outflow 0.346 cis 0.346 cfs Project # Date: Sheet # Project: Animal Emergency Clinic Des. By: Client: Animal Emergency Clinic Chk. By: Subject: Building Detention System L S Scale: rMae lr neate ntieun Cvetom nocion CtnraIIp Vn111R1p vs Stnraop Vniump Required B09057.3 11-16-09 26 EGT n/a Item Number Volume / Unit Volume Provided Volume Required 24" N-12 HDPE Pipe 60 If 3.16 cf * 189.60 cf 12" N-12 HDPE Pipe 2 If 0.81 cf * 1.62 cf 90* Manifold Bend 2 ea 11.61 cf * 23.22 cf End Cap 2 ea 3.32 cf * 6.64 cf Control Structure 2 If 6.50 cf * 13.00 cf Cistern Overflow 0.3 If 72.00 cf ** 21.60 cf Total Detention System Design Storage Volume Provided 234.08 cf > 208 cf * From ADS Table 5: Storage Volumes of Standard Manifold Components and Related Parts ** From Drawing PT-3000: 3,000 Gallon Concrete Pump Tank Check Control Structure Storm Drainage Outlet Pipe Size Using Table 3-1 Item Pipe Post-Development C,= 1.078 cis Pipe Size 12 in Pipe Material HDPE Minimum Pipe Slope 1.00% Full Flow Capacity 3.860 cis 7 /o IorIJ I(";e) ?? cis -> l3 x 1.08 Emergency Vet Clinic Dr. David Linzey 12/02/2009 Impervious Cover Table location class sq.ft. acres notes building 1 3815 parking 1 5002 drive 1 3661 walk 1 165 sidewalk 1 1026 on DOT ROW ROW flair 1 600 on DOT ROW site p 63598 1.46 easement p 4225 0.097 total site Prop. + easement 67823 1.56 Total imperv including ROW 13669 sq.ft. percent 1 0.201539 Total imperv outside ROW 11878 sq.ft. percent I 0.175132 Total imperv including ROW 13669 sq.ft. percent I w/o easement 0.214928 Total imperv outside ROW 11878 sq.ft. percent I w/o easement 0.186767 Prepared by: M. Shaun Lundy, Esq. Return To: Vetro & Lundy, P.C., P.O. Box 71-D.T.S., Boone, NC 28607 STATE OF NORTH CAROLINA COUNTY OF WATAUGA DEED RESTRICTIONS AND COVENANTS These Deed Restrictions and Covenants (hereinafter referred to as the "Restrictive Covenants") are made and entered on this the day of December, 2009 by Linzey Enterprises, LLC, A North Carolina Limited Liability Company (hereinafter referred to as "Linzey Enterprises") in accordance with the terms of that certain State Stormwater Management Permit Number (hereinafter referred to as the "Permit"), among other things, as issued by the Division of Water Quality (hereinafter referred to as the "DWQ"), as follows: RECITALS: WHEREAS, Linzey Enterprises is the record owner of that certain 1.46 +/- acre parcel of real property (hereinafter referred to as the "Subject Property") by way of that certain Deed recorded in Book of Records 1383, at Page 518 in the Watauga County Public Registry; and WHEREAS, Linzey Enterprises' intended use for the Subject Property is a maximum 13,000 +/- square foot veterinary clinic; and WHEREAS, Linzey Enterprises' intended use requires the Permit to be issued by the DWQ; and WHEREAS, the DWQ requires the foregoing Restrictive Covenants to be placed upon the Subject Property for the purposes of ensuring ongoing compliance with the Permit. Page 1 of 3 Vetro & Lundy, PC • PO Drawer 71-DTS • Boone, North Carolina 28607 NOW THEREFORE, in accordance with the terms of the Permit, Linzey Enterprises hereby states as follows: 1. The maximum allowable built-upon area of the Subject Property shall be 13,000 +/- square feet. This allotted amount includes any built-upon area constructed within the Subject Property's boundaries. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquina, but does not include raised, open wood decking, or the water surface of swimming pools. 2. All stormwater management measures installed upon the Subject Property shall comply with the conditions of and shall be maintained to function in accordance with the permit conditions in perpetuity unless otherwise authorized by the DWQ. 3. Upon completion of the project as shown on the approved, the filling in or piping of any vegetative conveyances (ditches, swales, etc.) is strictly prohibited by any person(s). 4. There shall be maintained upon the Subject Property a 30 foot wide vegetated buffer between all impervious areas and surface waters, except in the vicinity of permitted road crossings. 5. The State of North Carolina is made a beneficiary of these Restrictive Covenants to the extent necessary to maintain compliance with the Permit. 6. These Restrictive Covenants shall exist in perpetuity and shall run with the land of the Subject Property forever. 7. These Restrictive Covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, DWQ. 8. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the DWQ. 9. Should any clause or other term of these Restrictive Covenants be held void and unenforceable by a Court of competent jurisdiction, for public policy concerns or for any other reason, the remainder of the terms of these Restrictive Covenants shall remain undisturbed, legally binding, and of full force and effect. THIS SPACE IS INTENTIONALLY LEFT BLANK Page 2 of 3 Vetro & Lundy, PC - PO Drawer 71-DTS - Boone, North Carolina 28607 IN TESTIMONY WHEREOF, Dr. David W. Linzey, DVM, in his capacity as Manager of Linzey Enterprises, LLC, hereunto has set his hand and seal to these Deed Restrictions and Covenants the day and year above first written. Linzey Enterprises, LLC By: Dr. David W. Linzey, DVM, Manager (Official Seal) My commission expires. STATE OF NORTH CAROLINA COUNTY OF I, , A Notary Public for said County and State, do hereby certify that Dr. David W. Linzey, DVM personally appeared before me this day and acknowledged that he is the Manager of Linzey Enterprises, LLC, a North Carolina Limited Liability Company, and that by authority duly given and as the act of such entity, he signed the foregoing instrument in its name and on its behalf as its act and deed. Witness my hand and official seal, this the day of , 2009. (Official Seal) Notary Public My commission expires H:\CNents%Linzey, DamcftPurchase from Mt Olive College\DWO Covenants 120309.doc (seal) Notary Public Page 3 of 3 Vetro & Lundy, PC • PO Drawer 71-DTS • Boone, North Carolina 28607 Permit Number: (to be provided by DWQ) Drainage Area Number: #! /_ Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: The entire filter strip Trash/debris is present. How I will remediate the Remove the trash/ debris. The flow splitter device (if applicable) The flow sputter device is The flow splitter device is damaged. Unclog the conveyance and dispose of any sediment off-site. Make any necessary repairs or replace if damage is too large for Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential Problem: How I will remediate the problem: The swale and the level hp The swale is clogged with e Remove the sediment and dispose s diment of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo a of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish ro er erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish The filter strip Grass is too short or too long the erosion control material. Maintain grass at a height of if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dymg• problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving The receiving water Erosion or =herr signs of water. Contact the NC Division of Water damage haccurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786 . Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer 0&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible parry. Project name:Emergency Vet Clinic BMP drainage area number: l (narking) Print name:- Title: t Address: Phone: Signature:- Date: I -1 g?- JO Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, M orttnn A Red m4nd , a Notary Public for the State of Nor4h Cas i ,, , County of hwauxnr do hereby certify that personally appeared before me this Wb day of _... ;JQ n UG klU , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements Witness my hand and official seal, AJO'el''v.. ?. SEAL POH My commission expires_ Qf Zq f 11 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 Permit Number: (to be provided by DWQ) Drainage Area Number-L?_ Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: The entire filter strip Potential problem: Trash/debris is present. How I will remediate the problem: Remove the trash/debris. The flow split (if applicable) The flow splitter device is The flow splitter device is damaged. Unclog the conveyance and dispose of any sediment off-site. Make any necessary repairs or replace if damage is too large for Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer 0&M-Rev.3 Page 1 of 3 P element: Swale and the level 5 Potential roblem: The sw d is clo ed with How I will remediate the roblem: R hfip gg emove the sediment and dispose sediment of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the IeveI spreader that t is higher than the level lip, and shows stormwater has n plant a ground cover and bypassed it. er until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then Turf reinforcement is reestablish proper erosion control. Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish The filter strip Grass is too short or too long the erosion control material. Maintain grass at a height of if applicable). a proximately three to six inches Areas of bare soil and/or . Regrade the soil if necessary to erosive gullies have formed, remove the gully, and then plant a ground cover and water ,,.,+;t if ic The receiving water Sediment is building up on the filter strip. Plants are desiccated. Plants are dead, diseased or dying. Nuisance vegetation is choking out desirable species. Erosion or other signs of damage have occurred at the outlet. established. Provide lime and a? one-time fertilizer application. Remove the sediment and restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application Provide additional irrigation and fertilizer as needed. Determine the source of the problem:, soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Remove vegetation by hand if possible. If pesticide is used, do not allow it to get into the receiving water. Contact the NC Division of Water Quality local Regional Office, or the 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Emer enc Vet Clinic BMP drainage area number:2 (building) Print name: Title: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I' ----?- n, / kedkm,h,4 , a Notary Public for the State of 0dh ?arZ ling , County of____(,AJo ?V) gc? , do hereby certify that s 11U. Lin eta personally appeared before me this day of 01 0 , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, SEAL My commission expires_ Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 Emergency Vet Clinic Proposed Filter Strip Photos taken 1-21-2010 1,6 k 'E'Rs ? af?^.i' ; R4 ?f. ? rot'a .ti,'?+ e i f OM 0.lll°J t_? z e _ w -c , r Filter Strip #1: Level spreader will be at left of photo, stream is to the right. t _?wM Filter Strip #2: Level spreader will be close to the flagged stake in center of photo. Stream is visible in upper right. Limbs and debris are from recent ice storm. opt-t?k% STORM DRAINAGE & EROSION CONTROL CALCULATIONS Animal Emergency Clinic of the High Country Boone, North Carolina MESCO Project No. 809057.3 December, 2009 \\\????t CAR/ 0f ?i SEAL ?. 030752 ; fl?G ?IlIIII,?? i? JAN 2C., DEhR WATER QU,gLlry ofkm&Q, yd1; f??4NR STiOR?ti+::9*? g,?CH 10 (v By: 12-11- 09 Eric G. Tho ley, PE MUNICIPAL ENGINEERING SERVICES CO., P.A. 671 West King Street Suite A - PO Box 349 Boone, North Carolina 28607 ? 1Vlunicipal U IJU Engineering ? Services ?+ company, P.A. Gamer, N.C. ? Morehead City, N.C. Boone, N.C. R i i Municipal Services r/ Eng neering Company, P .A. \•/ Gamer, N. C ? Morehead City, N .C. Boone, N.C. PROJECT NARRATIVE Animal Emergency Clinic of the High Country iyC highway 105, Town of Bool Ie, NC Project Description This Erosion and Sedimentation Control Plan is submitted for the proposed grading activities on a parcel with an area of 1.46 acres in the Town of Boone owned by Linzey Enterprises LLCthat will be developed by Animal Emergency Clinic of the High Country LLC. The site will be accessed from NC Highway 105 by a driveway that will be shared with the adjacent property owner east of the project site (James R. Hartley). The proposed grading work on the site will consist of the removal of the remains of an existing house, the widening of the existing driveway at NC Highway 105, the proposed paved driveway into the project site, the proposed clinic building and the proposed paved parking lot for the clinic building. The proposed storm drainage work on the site will include the installation of twin 72 inch pipes to replace the existing single 72 inch pipe in Hodges Creek, an 18 inch storm drainage pipe under the proposed driveway to divert an existing ditch located just outside the east boundary of the site, an underground detention system for the proposed parking lot, a rain barrel and underground detention system for the proposed clinic building and a drainage Swale to divert an existing ditch entering the west side of the site toward Hodges Creek. A portion, of the south end of the proposed clinic building will be cantilevered over the floodway above the base flood elevation to provide no impact to Hodges Creek. The grading of the proposed parking lot will require the installation of a retaining wall on both the uphill and downhill sides of the lot. The total disturbed area on the site will be approximately 0.64 acres. mite Descrip-LIU-n The site is located on NC Highway 105, approximately 0.9 miles west of the intersection with US Highway 221/321 and across the street from the existing High Country Inn. The high point of the site is located at the north end of the parcei, with the ground generally sloping down toward Hodges Creek at the south end of the parcel. The majority of the site is currently wooded and undeveloped except for the remains of the existing house. The amount of trees removed from the site will be limited to only what is necessary to complete the proposed grading work. Adjacent Property The adjacent properties to the site consist of vacant residential property to the north, NC Highway 105 to the south, commercial property to the west and vacant commercial property to the east. Soils The proposed building, parking lot and driveway is generally underlain by residual soil consisting of silty sand and sandy silt. Weathered rock may be encountered at shallow depths. Cut and fill slopes are designed to be constructed at no steeper than a 1%H:1V slope. f k J Project # 609057.3 ;i Municipal Engineering Date: 10-8-09 Se.vf.v ? Campaor,P.A- - Gmu,MC \••/? -h-d fiYy,NC Sheet # 1 Proiect: Animal Emergency Clinic Des. By: EGT client: Animal Emergency Clinic Chk. By: Subject: Upland Storm Drainage Scale: n/a -?f 71ese DA's byf ss ?"r,>e-f d,e"Aluip-ad n v__.. rl..... -C ,. A 11 I Ir.1-,nrl f'lrninnao Aron< (Ilona? Ra tional Method) item Drainage Area #1 Drainage Area #2 Drainage Area #3 Drainage Area #4 TotaA 0.698 ac 2.201 ac 0.110 ac 4.609 ac F 0.25 0.25 0.25 0.25 centration 5 min 5 min 5 min 5 min Rational Coefficient 7.5 iph 7.5 iph 7.5 iph 7.5 iph Q1o 1.308 cfs 4.128 cfs 0.207 cfs 64, ?? 8 - - - _ r?___ n_,....-„tom, D;-- Ci7cc I lcina TahlP 1-1 vc?cI I I J A I I C ?I-. ..... Item -Z,- . .r- ----- -- Pipe 1* Pipe 2* Pipe 3-4 Q10 1.308 cfs 0.207 cfs 8.848 cfs Pipe Size 12 in 12 in 18 in Pipe Material RCP RCP HDPE Minimum Pipe Slope 1.00 % 1.00 % 0.71 % Full Flow Capacity I 1.780 cfs *** 1.780 cfs *** 9.618 cfs * Interceptor Ditch 41 Uplana or varKmg cot 64 Ouuuill', ** Interceptor Ditch #2 Upland of Parking Lot & Dumpster Pad *** 1/2 Full Flow Capacity with 1/2 Pipe RCP: Reinforced Concrete Pipe HDPE: High Density Polyethylene Pipe M!- n_.- A- .. CC,-, 11 la: r.rr ?Annnina?c Fnlintinn Ppiirp R_03C & FilJure 8.034) Item Rip Rap Apron #1 Rip Rap Apron #2 Rip Rap Apron #3 Pipe Size 18 in 12 in 12 in Manning's n i 0.012 0.013 0.013 Hydraulic Radius 0.375 ft 0.250 ft 0.250 ft Minimum Pipe Slope 0.7i % I 1.00 % 1.00 °V Pipe Velocity 5.43 cfs 4.54 cfs 4.54 cfs NCDOT Stone Class 6 6 6 Length Multiplier 6 6 6 Width Multiplier 3 3 3 Length of Apron 9 ft 6 ft 6 ft Width of Apron 5 ft 3 ft 3 ft Depth of Apron 1.5 ft 1.5 ft 1.5 ft r ? r HYDRAULIC RESULTS Discharge cfs Peak Flow Period ffiml Velocity (fpsJ Area (sq.ft) Hydraulic 1Jormal Radius ff Deoth ft 5.4 i i 0.1 r Z80 r 1.93 0.38 0.80 t 1 1 LINER RESULTS Not to Scale Reach Matting Type Stability Analysis Vegetal on Characteristics Permissible Calculated ' Safety Factor Remarks Staple Pattern Phase Class Type Density ShearSlress Shear Stress IPSO (psfJ Straight DS75 Unvegetated 1.55 1.50 1.03 STABLE Staple D HYDRAULIC RESULTS Discharge Peak Flow Velocity (Fps) Area (sq.ft) Hydraulic Normal U cfsl Period(hrsl Radiusfftl Deothfftl 5.4 0.1 F229 2.36 0.42 - 0.89 LINER RESULTS Not to Scale Matting Type Vegetation Characteristics Reach Stability Analysis Permissible Calculated Safety Factor Remarks Staple Pattern Phase Class Type Density Shear Stress Shear Stress (p, (psf) Straight Unreinforced Vegetation D Sad 75-35% 3.33 1.66 2.01 STABLE Sol Silt Loam 0.035 0.013 2- 65 STABLE L- Bottom 3.0 Width = 0.00 ft 3-0 L- Bottom 1 3.0 Width = 0.00 ft 3-0 4 - _` i Project # ng i t Municipal U L En mineer Date: Sheet # Project: Animal Emergency Clinic Des. By: Client; Animal Emergency Clinic Chk. By: Subject: Parking Lot Detention System Scale: 809057.3 10-23-09 3 EGT n/a Determine Pre-Development and Post-Development Areas & Weighted Curve Number Flows To and Bypassine Parkin Lot Detention System 4r-ch #? I Curve Numbers (Using Table 8.03e) Paved Driveway Gravel Driveway Woods-Grass Combination (Fair Condition) Open Space ;Good Condition, = = = 98 85 65 Item Pre-Development Detention System Pre-Development Detention Bypass Post-Development Detention System Post-Development Detention Bypass Total Area 0.1198 ac 0.0926 ac 0.1198 ac 0.0926 ac Paved Impervious 0.0000 ac 0.0014 ac 0.1093 ac 0.0860 ac Gravel Impervious 0.0000 ac 0.0188 ac 0.0000 ac 0.0000 ac Woods-Grass (FC) 0.1198 ac 0.0723 ac 0.0000 ac 0.0000 ac Open Space (GC) 0.0000 ac 0.0000 ac 0.0105 ac 0.0066 ac iWeighted CN i 65 70 I 95 95 Determine 10-Year, 24-Hour Pre-Development and Post-Development Peak Discharge Flows To & Bypassing Parking Lot Detention System (Using Hydraflow Hydrograph 2007) Item Pre-Development Detention System Pre-Development Detention Bypass Post-Development Detention System Post-Development Detention Bypass Time Concentration 5 min 5 min 5 min 5 min Storm Frequency 10 yr 10 yr 10 yr 10 yr Storm Duration 24 hr 24 hr 24 hr 24 hr Peak Discharge n A ?' U.4+10 crs n A') U.1+/9 cits o f' 0.898 cis i rf 0.6 do 9= cfs Time to Peak 720 min 720 min 717 min 717 min Determine Parking Lot Detention System Maximum Allowable Outflow Item Flow Post-Development Bypass Flow 0.694 cfs Pre-Development Bypass Flow 0.429 cfs Increase in Detention Pond Bypass Pre-Post Flow 0.265 cfs Pre-Development Flow 0.473 cfs Maximum Allowable Detention System Outflow 0.208 cfs ` Hydrograph Report Hydraflow Hydrographs by fntelisolve v9.23 Hyd. No, 1 Pre-Dev PL Detent ion System Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 3 min Drainage area = 0.120 ac Basin Slope = 0.0% Tc method = USER Total precip. = 6.61 in Storm duration = 24 hrs Q (cfs) Friday, Oct 23, 2009 Peak discharge = 0.473 cfs Time to peak = 720 min Hyd. volume = 1,134 cuft Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 400 Pre-Dev PL Detention System Hyd. No. 1 - 10 Year Q (cfs) 50 0.50 I i i I 0. I 0 45 0.45 I I . I 40 0 0.40 . 35 0 0.35 . 0 30 0.30 I I I . 25 0 0.25 . 20 0 C.20 . I 0 15 0.15 . 10 0 0.10 I . 0 05 . 0.05 n nn 0.00 0 180 Hyd No. 1 360 540 720 900 1080 1260 1440 1620 Time (min) ? C Hydrograph Report Hydraflow Hydrographs by Intefisolve v9.23 Hyd. No. 2 Pre-Dev PL Detention System Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 3 min Drainage area = 0.093 ac Basin Slope = 0.0 % r h 1 I c method - I ICCR - 1-j 1-1 L.I \ Total precip. = 6.61 in Storm duration = 24 hrs Friday, Oct 16, 2009 Peak discharge = 0.429 cfs Time to peak = 720 min Hyd. volume = 1;030 cuft Curve number = 70 Hydraulic length = 0 ft Time of rnnn. (TC) = 5.nn min Distribution = Type 11 Shape factor = 400 Pre-Dev PL Detention System Bypass Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 0.50 i ( I I I 0.50 I I 0 45 0.45 ? i I ? i ? I . II 0 40 0.40 . 0 35 0.35 . 0 30 0.30 . 0 25 0.25 . I I 0 20 020 I I I . I I I 15 0 0.15 . 10 0 0.10 . 05 0 . 0.05 I 0.00 n nn ' 0 3 6 Hyd No. 2 9 12 15 18 21 24 27 Time (hrs) Hydrograph Report Hydrafiow Hydrographs by Intelisolve v9.23 Hyd. No. 3 Post-Dev PL Detent ion System Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 3 min Drainage area = 0.120 ac Basin Slope = 0.0% TO mafhnrf = USER Total precip. = 6.61 in Storm duration = 24 hrs Friday, Oct 23, 2009 Peak discharge = 0.898 cfs Time to peak = 717 min Hyd. volume = 2,433 cult - Curve number = 95 Hydraulic length = 0 ft Time of canc. (TO = 5.00 min Distribution = Type Il Shape factor = 400 Q (cfs) Post-Dev PL Detention System Hyd_ No. 3 -- 10 Year Q (cfs) 1 00 1.00 I i 0.90 0.90 I I 0 80 0.80 . 0.70 0.70 0 60 0.60 . I I I 50 0 0.50 . I I 40 I 0 0.40 . I l I 30 0 0.30 . 20 0 0.20 . 10 0 0.10 . I I n nn I 1 0.00 v- 0 3 6 9 Hyd No. 3 12 15 18 21 24 Time (hrs) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 3 Post-Dev PL Detention System Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration 3 min 0.120 ac 0.0% USER 10.65 in 24 hrs -7 Friday, Oct 23, 2009 Peak discharge = 1.464 cfs Time to peak = ii ? min Hyd. volume = 4,061 cuft Curve number = 95 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 400 Post-Dev PL Detention System Q (cfs) Q (cfs) Hyd. No. 3 -- 100 Year 2.00 I 2.00 I I 1.00 I 1.00 ------- + f 0.00 0.00 0 3 6 9 12 15 18 21 24 Time (hrs) Hyd No. 3 t ¦ t a M ? s/V fY 1?n N? Hyd, og, ap,, A A IRUVUI L Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 4 Post-Dev PL Detent ion System Bypass Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 3 min Drainage area = 0.093 ac Basin Slope = 0.0% Tn method = I ICFR Total pr ecip. = 6.61 in Storm duration = 24 hrs Peak discharge = 0.694 cfs Friday, Oct 16, 2009 Time to peak = 717 min Hyd. volume = 1,881 cuft Curve number = 95 Hydraulic length = 0 ft Time of conc. (T(-) = 5.00 min Distribution = Type li Shape factor = 400 Post-Dev PL Detention System Bypass Q (cfs Q (cfs) ) Hyd. No. 4 -- 10 Year 1,00 I I 1.00 I i I 0.90 0.90 80 0 0.80 . 0 70 0.70 . 0 60 0.60 . I 50 I ( 0 0.50 . 40 I I 0 0.40 . 30 0 0.30 . 20 0 0.20 . I 10 0 0.10 . I n nn 0.00 - -- 0 3 6 9 Hyd No. 4 12 15 18 21 24 Time (hrs) Pond Report Hydraflow Hydrographs by Intelisolve v9.23 Monday, Nov 16, 2009 Pond No. 1 - AEC PL Detention System Pond Data UG Chambers - Invert elev. = 3175.40 ft, Rise x Span = 2.00 x 2.00 ft, Barrel Len = 260.00 ft, No. Barrels = 1, Slope = 0.00%, Headers = No Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cult) Total storage (cult) 0.00 3175.40 n/a 0 0 0.20 3175.60 n/a 43 43 0.40 3175.80 n/a 74 116 0.60 3176.00 n/a 90 206 0.80 3176.20 n/a 99 305 1.00 3176.40 n/a 103 4n9 1.20 3176.60 n/a 103 512 1.40 3176.80 n/a 99 611 1.60 3177.00 n/a 90 701 1.80 3177.20 n/a 74 775 2.00 3177.40 n/a 42 817 Culvert / Orifice Structures Weir Structures [A] [Bl [C] [PrfRsr] [A] [Bl [C] [D] Rise (in) = 12.00 1.00 0.00 0.00 Crest Len (ft) = 8.00 3.00 0.00 0.00 Span (in) = 12.00 4.50 0.00 0.00 Crest EI. (ft) = 3178.90 3177.40 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EL (ft) = 3175.40 3175.40 0.00 0.00 Weir Type = Riser Rect - -- Length (ft) = 15.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope (%) = 8.00 n.u^^v 0.00 „a N-Value = .012 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culveri/Orfice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) 3.00 3178.40 2.00 3177.40 1.00 3176.40 0.00 I I I I 3175.40 0.00 0.03 0.06 0.09 0.12 0.15 0.18 0.21 0.24 0.27 030 Discharge (cfs) Total Q Pond Report 10 Monday, Nov 16, 2009 Hydraflow Hydrographs by Intelisoive v9.23 Pond No. 9 - AEC PL Detentio n Syste m Pond Data UG Chambers - Invert elev. = 3175.40 ft, Rise x Span = 2.00 x 2.00 ft, Barrel Len = 260.00 ft, No_ Barrels = 1 , Slope = 0.00%, Headers = No Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 3175.40 n1a 0 0 43 0.20 3175.60 n/a 43 74 116 0.40 3175.80 n/a n1a 90 206 0.60 3176.00 80 3176.20 0 n/a 99 305 . 100 3176.40 n/a 103 409 20 3176.60 1 n/a 103 512 . 40 3176.80 1 n/a_ 99 611 . 60 3177.00 1 n/a 90 701 . 80 3177.20 1 n1a 74 775 . 2.00 3177.40 n1a 42 817 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] LB] [C] [D] Rise (in) = 12.00 1.00 0.00 0.00 Crest Len (ft) = 8.00 3.00 0.00 0.00 Span (in) = 12.00 4.50 0.00 0.00 Crest El. (ft) = 3178. 90 3177.40 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 3175.40 3175.40 0.00 0.00 Weir Type = Riser Rect --- - Length (ft) = 15.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No dope (%) = 8.00 0.00 0.00 n;a N-Value = .012 .013 .013 n1a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Muld-Stage = n1a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) 3.00 2.Oc 1.00 Stage / Storage Elev (ft) 3178.40 3177.40 3176.40 0.00 1 1 i 3175.40 0 80 160 240 320 400 480 560 640 720 800 880 Storage (cuft) Storage Pond Report 11 Hydraflow Hydrographs by Intelisolve v9.23 Monday, Nov 16, 2009 Pond No. 1 - AEC PL Detentio n System Pond Data UG Chambers - Invert elev. = 3175.40 ft, Rise x Span = 2.00 x 2.00 ft, Barrel Len = 260.00 ft, No. Barrels = 1, Slope = 0.00%, Headers = No Stage / Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr. Storage (cuft) Total storage (cuft) 00 3175.40 0 n/a 0 0 . 20 3175.60 0 n/a 43 43 . 40 3175.80 0 n/a 74 116 . 60 3176.00 0 n/a 90 206 . 80 3176.20 0 n/a 99 305 . 100 3176.40 n/a 103 409 20 3176.60 1 n/a 103 512 . 40 3176.80 1 n/a 99 611 . 60 3177.00 1 n/a 90 701 . 80 3177.20 1 n/a 74 775 . 2.00 3177.40 n/a 42 817 Culvert / Orifice Structures Weir Structures [A7 [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 1.00 0.00 0.00 Crest Len (ft) = 8.00 3.00 0.00 0.00 Span (in) = 12.00 4.50 0.00 0.00 Crest El. (ft) = 3178.90 3177.40 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 3175.40 3175.40 0.00 0.00 Weir Type = Riser Rect -- -- Length (ft) = 15.00 0.00 0.00 0.00 Multistage = Yes Yes No No Slope (%) = 8.00 0.00 0.00 n/a N-value = .012 .013 .013 n/a Orifice Coe-f. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) iviuiti-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage f Discharge Table Stage Storage Elevation Clv A Civ B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 00 0 0 3175:40 0.00 0.00 - -- 0.00 0.00 --- -- - -- 0.000 . 20 0 43 3175.60 0.05 is 0.05 is -- --- 0.00 0.00 - -- - - 0.047 . 40 0 116 3175.80 0.08 is 0.08 is - -- 0.00 0.00 -- -- - - 0.078 . 0.60 206 3176.00 0.11 is 0.10 is - - 0.00 0.00 -- - - - 0.101 0.80 305 317620 0.12 is 0.12 is -- --- 0.00 0.00 --- - - - 0.120 137 0 00 1 409 3176.40 0.14 is 0.14 is - -- 0.00 0.00 . --- -- --- --- . 1 20 512 3176.60 0.16 is 0.15 is - - 0.00 0.00 - -- - - 0.151 . 40 1 611 3176.80 0.17 is 0.17 is - -- 0.00 0.00 -- -- - -- 0.165 . 1 60 701 3177.00 0.18 is 0.18 is -- --- 0.00 0.00 --- -- - - 0.178 . 80 1 775 3177.20 0.19 is 0.19 is -- --- 0.00 0.00 - - - - 0.190 . 2.00 817 3177.40 0.20 is 0.20 is - - 0.00 0.00 - - - - 0.201 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 5 Pre-Post Dev Routing Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 3 min Inflow hyd. No. = 3 - Post-Dev PL Detention System Reservoir name = AEC PL Detention System Storage Indication method used. Q (cfs) 1.00 0.9c 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 3 Hyd No. 5 Pre-Post Dev Routing Hyd. No. 5 -- 10 Year 1.00 0.90 7_ - f 0.80 0.70 0.60 6 9 12 15 18 21 24 Hyd No. 3 i Total storage used = 815 cuft 12 Monday, Nov 16, 2009 Peak discharge = 0.201 cf"s Time to peak = 732 min Hyd. volume = 2,431 cuft Max. Elevation = 3177.39 ft Max. Storage = 815 cult Q (cfs) 21 Time (hrs) 0.50 0.40 0.30 0.20 0.10 0.00 _ Pro ect # 1309057.3 Municipal Engineerin; t Date: 11-16-09 i Services f Company, P.A. i v.?.? Sheet # 13 Boone, N.C. t: Animal Emergency Clinic P Des. By: EGT rojec Client: Animal Emergency Clinic Chk. Bv: Lot Detention System t: Parkin b S Scale: n/a g jec u 44 1 * ' 1 n _a.........:,., ,, r) t,;-m i nt nctcntinn SvrtPm Requirements (Using Hvdraf low Hydrograph 2007) vcLClu,uc . ?. „b - .? -.___ - - Dimension Itom 24 inch Pipe Length Required 260 ft E Orifice Elevation 3175.4 ft J Orifice Span 4.5 in Orifice Rise 2.0 in Weir Span 3.0 ft Weir Rise 0.5 ft Control Structure Outlet Pipe Size 12 in Q nw-flnw It kinpr Hvdraflow Hvdroeraph 2007) V C LG1111IIIG Item Trial Routing Calculations Final Routing Calculations Routing Interval 3 min 3 min IStorage Volume Provided 817 cf 817 cf Storage Volume Required 815 cf 815 cf Maximum Storage Elevation 3,177.89 ft 3,177.89 ft Trial Outflow 0.201 cfs 0.201 cfs Maximum Allowable Outflow 0.208 cfs 0.208 cfs Check 24 Inch Pipe Detention System Design Storage Volume vs. S torage voiume Kequlrea Item Number Volume / Unit Volume Provided Volume Required N-12 HDPE Pipe 240 If 3.16 cf * 758.40 cf i 90° Manifold Bend 2 ea 11.61 cf * 23.22 cf Double Manifold Tee I 2 ea l 27.52 cf * 55.04 cf End Cap 6 ea 3.32 cf * 19.92 cf Tota! Detention System Design Storage Volume Provided lTota! 856.58 cf > 815 cf * C- nnc Tnhln g• gtnraaa vnhimpr of Standard Manifo ld Components and Re I lated Parts Check Control Structure Storm Drainage Outlet Pipe Size Using Table 3-1 Item Pipe Post-Development Qioo 1.464 cfs Pipe Size 12 in Pipe Material HDPE Minimum Pipe Slope 8.00 % Full Flow Capacity 10.918 cfs Project # B09057.3 I Municipal L/ 'L ??u? ?, Engineering II Date: 11-12-09 Sen ces f Company, P, HpeAedGy,N.G Gamy, NL Sheet # 14 Baane, N.G Project: Animal Emergency Clinic Des. By: EGT Client: Anima- Emergency Clinic Chk. By: Subject: Building Detention System Scale: n/a Determine Pre-Development and Post-Develop ment Areas & Weighted Curve Number Flows To Building Detention System Curve Numbers (Using Table 8.03e) Building Roof = 98 .A/__J_ !-•r-.ra- r„m kinntinn (Fair rr)nriitinnl = 65 item Pre-Development b Detention System Post-Development . LE, Wcin Syst,.}t; Total Area 0.0876 ac 0.0876 ac Paved impervious 0.0000 ac 0.0876 ac Woods-Grass (FC) 0.0876 ac 0.0000 ac Weighted CN 65 98 Determine 10-Year, 24-Hour Pre-Development and Post-Development Peak Discharge r}_••„• T,. o.,;iA;- r;c+nrn (1 mina H,.rlraflow Hvdroeraph 2007) Item Pre-Development Building Cistern I Post-Development Building Cistern Time of Concentration 5 min 5 min Storm Frequency 10 yr 10 yr Storm Duration 24 hr 24 hr Peak Discharge 0.346 cfs 0.668 cfs Time to Peak 720 min 717 min .:?r-ii ;- inn'7_')nnQ LJCLCI all 11G rfvciab. .. v ,. ...? ......... -... .-- -- - - - ivionth 2007 2008 2009 3-Year Average January 1.43 in 1.35 in 2.70 in 1.83 in February 1 in 2.33 in 2.75 in 2.16 in March 4.35 in 4.97 in 3.17 in 4.16 in April 1.75 in 4.04 in 5.07 in 3.62 in May 1.82 in 2.57 in 7.94 in 4.11 in June 5.07 in 3.62 in 5.76 in 4.82 in July 4.68 in 4.81 in 3.48 in 4.32 in August September October 3.58 in 1.97 in 5.73 in 4.81 in 4.74 in 3.49 in 6.16 in 3.57 in 4.91 in 4.38 in 3.87 in 4.74 in November 0.77 in 1.96 in 2.97 in 1.90 in December 3.24 in 2.93 in - 3.09 in Average Rainfall 2.98 in 3.37 in 4.51 in 3.58 in Drniort ff R09057.3 I ANIunicipal En?ine? d Ii Services f Company, P.A - Date: 11-12-09 GamsKG ?/ «?•??:?= Sheet # 15 donne, N.C Project: Animal Emergency Clinic Des. By: EGT Client: Animal FmPrcrpnCy Clinl? Chk. Bv: Subject: Building Detention System Scale: n/a Determine Average Monthly Rainfall Volume Collected by Building Roof Gutter System ?tpM Building Average Monthly Rainfall 3.58 in Building Roof Area 3,815.9 sf Building Roof Area 549,490 si Rational Coefficient for Building Roof 0.95 [Average Monthly Rainfall Volume Collected 1 8,096 gal I Determine Average Monthly Required Volume for Building Veterinary Office Restrooms Toilet Flush/ Gallons/ Total Volume/ Day Flush Day 2 Toilets 15 ea * 1.6 = 24 gal Veterinary Kennel Facilities Number of I Gallons] I Total Volume/ Kennel s Kennel I J Day Dog Kennels 7 ea * 20 I = 140 gal Cat Kennels 11 ea T 20 = 220 gal Total Daily Volume for All Veterinary Items = 384 gal Total Monthly Volume for All Veterinary Items = 11,904 gal Determine Average Consecutive Days Without Rain for 2007-2009 Month 2007 2008 2009 3-Year Average January 5 days 6 days 4 days 5.0 days February 6 days 1 5 days , 8 days 6.3 days March ii days I 8 days -7 / days 8.7 days April 6 days 4 days 6 days 5.3 days May 8 days 5 days 5 days 6.0 days June 7 days 6 days 7 days 6.7 days July 3 days 4 days 4 days 3.7 days August 8 days 7 days 3 days 6.0 days September 6 days 4 days 4 days 4.7 days October 8 days 8 days 4 days 6.7 days November 8 days 13 days 8 days 9.7 days I December 5 days 3 days - days 4.0 days Average Rainfall 6.8 days 6.1 days 5.5 days 6.1 days j Municipal ? Engineering I? Services f` Company,P.A- W.ne,N.C y HwNOd Lty N.c aoooe, v.c. Project: Animal Emergency Clinic Client. Animal Emergency Clinic Subject: Building Detention System Prr?iar t # B09057.3 --- Date: 11-16-09 Sheet # 16 Des. By: EGT Chk. By: Scale: n/a notormina Psnmiirari StnrauP VnIume Combined in Rain Barrel/Cistern item Quantity Daily Rainwater Volume Required 384 gall Average Consecutive Days Without Rain 6.1 days Required Storage Volume 2,325 gal Required Storage Volume 311 cf Determine Provided Storage Volume Combined in Rain Barrel/Cistern Determine Detention Storage Volume in Cistern Below Invert from Rain Barrel Item Quantity Cistern Storage Length 12-0 ft Cistern Storage Width 6.0 ft Cistern Storage Depth 0.30 ft Cistern Detention Volume Provided 22 cf Determine Cistern & Detention Outlet Control Structure Elevations Prniort f Rn057 3 Municipal Engineering S-i Date: 11-16-09 GrnrN.G V Nuv5WGfy, N.C Sheet # 17 ?tN.C Project: Animal Emergency Clinic Des. By: EGT Client: Animal Emergency Clinic Chk. By: Subject: Building Detention System Scale: n/a 0?-L- 0Z Determine Building Roof Area Post-Development Flow to Cistern Overflow / Detention System (Using Hydraflow Hydrograph 2007) Item Quantity Post-Development Building Roof Area to Cistern 0.0876 ac Post-Development Peak Flow to Cistern 0.668 cfs Post-Development Peak Volume to Cistern 1,884 cf Post.-Development Pean Volume Storage ill main Barrel'USiel n / LI Percentage of Roof Area Flow in Rain Barrel/Cistern 20.01 % Post-Development Building Roof Area to Detention System 0.0701 cf Post-Development Peak Flow to Detention System 0.534 cfs Post-Development Peak Volume to Detention System 1,507 cf Determine Detention System Requirements (Using Hydraflow Hydrograph 2007) Item Dimension 24 inch Pipe Length Required 67 ft Orifice Span 4.0 in Orifice Rise 2.0 in Weir Span 3.0 ft Weir Rise 0.5 ft Control Structure Outlet Pipe Size 12 in Determine Detention Syster Storage Volume & Outflow (Usin€ raflow Hydrograph 2007) Item Routing interval Storage Volume Provided Storage Volume Required Maximum Storage Elevation Trial Outflow Maximum Allowable Outflow Trial Routing Calculations _ 3 min 211 cf _ 208 cf 3,180.05 ft 0.345 cfs 0.346 cfs Final Routing Calculations 3 min 211 cf 208 cf 3,180.05 ft 0.345 cfs 0.346 cfs Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 1 Pre-Dev Bldg Cistern Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval Drainage area Basin Slope Tc metho- d Total precip. Storm duration Q (cfs) 0.50 - 0.4E 0.4C 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 3 Hyd No. 1 3 min 0.088 ac 0.0% USER 6.61 in 24 hrs Pre-Dev Bldg Cistern Hyd. No. 1 - 10 Year Q (cfs) 0.50 1.8 Monday, Nov 16, 2009 Peak discharge = 0.346 cfs Time to peak = 720 min Hyd. volume = 829 cuff Curve number = 65 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 400 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 71- 0.00 6 9 12 15 18 21 24 27 Time (hrs) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 2 Past-Dev Bldg To Cistern Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval Drainage area Basin Slope Tc method Total precip. Storm duration Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 ? n nn 3 min 0.088 ac 0.0% USER 6.61 in 24 hrs Iq Monday, Nov 16, 2009 Peak discharge = 0.668 cfs Time to peak = ii / min Hyd. volume = 1,884 cult Curve number = 98 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 400 Post-Dev Bldg To Cistern Hyd. No. 2 -- 10 Year Q (cfs) 1.00 - 0.90 - 0.80 - 0.70 - 0.60 0.50 0.40 0.30 0.20 0.10 0.00 0 3 6 9 12 15 18 21 Z4 Tme (hrs) Hyd No. 2 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 2 Post-Dev Bldg To Cistern Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval Drainage area Basin Slope Tr method Total precip. Storm duration Q (cfs) 2.00 1.00 0.00 - 0 3 Hyd No. 2 3 min 0.088 ac 0.0% USER 10.65 in 24 hrs 22 Monday, Nov 16, 2009 Peak discharge = 1.078 cfs Time to peak = /i / min Hyd. volume = 3,077 cult Curve number = 98 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type 11 Shape factor = 400 Post-Dev Bldg To Cistern Hyd. No. 2 -- 100 Year 6 9 12 Q (cfs) 2.00 1.00 0.00 15 ZI Time (hrs) Hydrograph Report Hydraflow Hydrographs by Intelisoive v9.23 Hyd. No. 3 Post-Dev Bldg To Detention Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 3 min Drainage area = 0.070 ac Basin Slope = 0.0% Tc method = USER Total precip. = 10.65 in Storm duration = 24 hrs 21 Monday, Nov 16, 2009 Peak discharge = 0.863 cfs Time to peak = 717 min Hyd. volume = 2,463 cuft Curve number = 98 Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 400 Post-Dev Bldg To Detention Q (cfs Q (cfs) Hyd. No. 3 --100 Year 1.00 1.00 0.90 0.90 j 0.80 0.80 0.70 0.70 0.60 0.60 I ? 0.50 0.50 0.40 0.40 I I I 0.30 0.30 0.20 0.20 0.10 0.10 .00 0.00 0 0 3 6 9 12 15 18 21 24 Time (nrs) Hyd No. 3 Pond Report 22 Hydraflow Hydrographs by Intelisolve v9.23 Monday, Nov 16, 2009 Pond No. 1 - AEC Bldg Detention System Pond Data UG Chambers - Invert elev. = 3178.10 ft, Rise X Span = 2.00 x 2.00 ft, Barrel Len = 67.00 ft, No. Barrels = 1, Slope = 0.00°/x, Headers = No Stage / Sto rage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cuft) Total storage (cuft) 00 0 3178.10 n/a 0 0 . 20 0 3178.30 n/a 11 11 . 0 40 3178.50 n/a 19 30 . 60 0 3178.70 n/a 23 53 . 80 0 3178.90 n/a 26 79 . 100 317910 n/a 27 105 20 1 3179.30 n/a 27 132 . 40 1 3179.50 n/a 25 157 . 60 1 3179.70 n/a 23 181 . 1 80 3179.90 n/a 19 200 . 2.00 3180.10 n/a 11 211 Culvert / Orifice Structures Weir Structures [A] [B] [C] _[PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 2.00 Inactive Inactive Crest Len (ft) = 3.14 3.00 Inactive Inactive Span (in) = 12.00 4.00 0.00 0.00 Crest El. (ft) = 3181.30 3180.10 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff_ = 3.33 3.33 3.33 3.33 Invert El. (ft) = 3178.10 3178.10 0.00 0.00 Weir Type = Riser Rect - - Length (ft) = 50.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope (%) _ `inn 0.00 - i•w 0.00 n/a N-Value = .012 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfjl.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culverd0rifce outflows are analyzed under inlet (ic) and outlet (oc) control- Weir risers checked for or ifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge Elev (ft) 2.00 3180.10 31 79.9n 1.80 I i I ? I 3179.70 1.60 I I I I 3179.50 1.40 3179.30 1.2V 317910 1.00 I ? 3178.90 0.80 3178.70 0.60 I I I 3178.50 0.40 ( I I 30 3178 I 0.20 . n nn I 3178.10 0.00 0.04 Total Q 0.08 0.12 0.16 0.20 0.24 0.28 0.32 0.35 0.40 Discharge (cfs) Pond Report 23 Monday, Nov 16, 2009 Hydraflow Hydrographs by Intelisolve v9.23 Pond No. 7 - AEC Bldg Detention System Pond Data 10 ft = 3178 Rise x Span = 2.00 x 2 .00 It, Barrel Len = 67.00 ft, No. Barrels = 1, Slope = 0.00%, Headers = No LIG Chamber , . s - Invert elev. Stage / Storage Table Stage (ft) Elevation (ft) C ontour area (sgft) Incr. Storage (cuft) Total storage (cult) 0.00 3178.10 n/a 10 0 11 0.20 3178.30 "' a n1a 19 30 0.40 3178.50 n/a, 23 53 0.60 3178.70 - n1a 26 79 0.80 3178.90 /a 27 105 00 3179.10 n n/a 27 132 1.20 3179.30 n/a 25 157 1.40 3179.50 n/a 23 181 1.60 3179.70 n/a 19 200 1.80 3179.90 11 211 2.00 3180.10 n1a Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] 00 00 2 = 12 Inactive Inactive Crest Len (ft) = 3.14 3.00 Inactive Inactive Rise (in) . . 00 00 4 = 12 0.00 0.00 Crest El. (ft) = 3181.30 3180.10 0.00 0.00 Span (in) . . 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 No. Barrels (ft) Invert El = 1 1 = 3178.10 3178.10 0.00 0.00 Weir Type = Riser Rect - No . Length (ft) = 50.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No 0 vv 00 n1a 0 %?o) Slope ( N-Value I.VV _ = .012 .013 . .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi-Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/O rifice outflows are analyzed un der inlet (ic) and outlet (oc) control. Weir users checked for orifice conditions (ic) and submergence (s). Stage (ft) 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0 00 Stage f Storage Elev (ft) 3180.10 3179.90 3179.70 3179.50 3179.30 3179.10 3178.90 3178.70 3178.50 3178.30 3178.10 0 20 40 60 80 100 120 14U 101.1 IOU Storage (cult) Storage Fond Report 24 Monday, Nov 16, 2009 Hydraflow Hydrographs by Intelisolve v9.23 Pond No. 1 - AFC Bldg Detention System Pond Data UG Chambers - Invert elev. = 3178.10 ft, Rise x Span = 2.00 x 2.00 ft, Barrel Len = 67.00 ft, No. Barrels = 1, Slope = 0.00%, Headers = No Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) 0.00 3178.10 n!a 0.20 3178.30 n/a 0.40 3178.50 n/a 0.60 3178.70 n/a 0.80 3178.90 n/a 00 3179.10 n!a 1.20 3179.30 n/a 1.40 3179.50 n/a 1.60 3179.70 n/a 1.80 3179.90 n/a 2.00 3180.10 n/a Incr. Storage (cuft) 0 11 19 23 26 27 27 25 23 19 11 Total storage (cult) 0 11 30 53 79 105 132 157 181 200 211 Culvert/ O rifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 12.00 2.00 Inactive Inactive Crest Len (ft) = 3.14 3.00 Inactive Inactive Span (in) = 12.00 4.00 0.00 0.00 Crest El. (ft) = 3181.30 3180.10 0.00 0.00 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 No. Barrels = Invert El. (ft) = 3178.10 3178.10 0.00 0.00 Weir Type = Riser Rect - --- Length (ft) = 50.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No (70) Slope - '^^ - i.v? 0.00 0.00 n!a N-Value = .012 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfii.(inlhr) = 0.000 (by Contour) Multi-Stage = rt/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for o rifice conditions (ic) and subme rgence (s). Stage / Storage ! Discharg e Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User f Total cfs ft cuft ft cfs cfs cfs cfs cfs cfs cfs s cfs cfs c 00 0 0 3178.10 0.00 0.00 --- -- 0.00 0.00 - - - - - 0.000 073 0 . 20 0 11 3178.30 0.07 is 0.07 is - -- 0.00 0.00 - -- - - - . 128 0 . 40 0 30 3178.50 0.13 is 0.13 is --- - - 0.00 0.00 - - - -- . 169 0 . 0 60 53 3178.70 0.17 is 0.17 is -- - 0.00 0.00 - - - - . 20 4 0 . 0.80 79 3178.90 0.21 is 0.20 is --- -- 0.00 0.00 - - -- - - 1- . 234 0 1.00 105 3179.10 0.24 is 0.23 is --- - 0.00 0.00 - - - - . 261 0 20 1 132 3179.30 0.26 is 0.26 is -- -- 0.00 0.00 - - -- - . 286 0 . 1.40 157 3179.50 0.29 is 0.29 is --- - - 0.00 0.00 --- -- -- - . 308 0 1.60 181 3179.70 0.31 is 0.31 is -- -- 0.00 0.00 - - - -- --- . 330 0 1.80 200 3179.90 0.34 is 0.33 is -- -- 0.00 0.00 --- -- - . 350 0 2.00 211 3180.10 0.35 is 0.35 is -- --- 0.00 0.00 - - - -- - . Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.23 Hyd. No. 4 Pre-Post Development Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval Inflow hyd. No. = 3 min = 3 - Post-Dev Bldg To Detention Reservoir name = AEC Bldg Detention System Storage indication method used Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 Pre-Post Development Hyd_ No. 4 -- 10 Year 25 Monday, Nov 16, 2009 Peak discharge = 0.345 cfs Time to peak = 723 min Hyd. volume = 1,507 cuft Max. Elevation = 3180.05 ft Max. Storage = 208 cuft M6 0 3 6 9 12 15 18 21 L4 Hyd No. 4 --- Hyd No. 3 D:== Total storage used = 208 cult Q (cfs) 1.00 0.90 0.80 0.70 Lf Time (hrs) 0.60 0.50 0.40 0.30 0.20 0.10 0.00 Municipal U u?? Engineering Services Comp-y, P.A. Gamu, .YG \•/? Hareheo IXY.K- Boon4 N.C Project: Animal Emergency Clinic Client: Animal Emergency Clinic Subject: Building Detention System Project # Date: Sheet # Des. By: Chk. By: Scale: 609057.3 11-16-09 26 EGT n/a Check Detention System Design Storage Volume vs. Storage Volume Required Item Number volume /Unit Volume Provided Volume Required 24" N-12 HDPE Pipe 60 If 3.16 cf * 189.60 cf 12" N-12 HDPE Pipe 2 If 0.81 cf * 1.62 cf 90° Manifold Bend 2 ea 11.61 cf * 23.22 cf End Cap 2 ea 3.32 cf * 6.64 cf Control Structure 2 if 6.50 cf * 1 ? 00 cf Cistern overflow _t 7770.3 If 72.00 cf ** 21.60 cf Total Detention System Design Storage Volume Provided 234.08 cf > 208 cf * From ADS Table 5: Storage Volumes of Standard Manifold Components and Related Parts ** From Drawing PT-3000: 3,000 Gallon Concrete Pump Tank rkar-i, rrintr„i ctryirturP Storm Drainaee Outlet Pipe Size Using Table 3-1 Item Pipe Post-Development Qioo 1.078 cfs Pipe Size 12 in Pipe Material HDPE Minimum Pipe Slope 1.00% Full Flow Capacity 3.860 cfs Drniert # 1309057.3 LE ? i Municipal ?/ uu Engineering Date: 11-16-09 S-icu f Comp>vy, F.A. Gamy.„? ?l HdeAel Gry H.G Sheet # 27 6oonq N.G Clinic enc r l E i Des. By: EGT y g me ma Project: An nt: Animal Emergency Clinic rl?e • a?• r Chk. By: ,.?. ...,, trol C i Scale : n/a on on Subject: Eros Determine 10-Year Design Flow (Qlo) for All Disturbed Area C..r4-,,o /trap Dan,iirarl fnr All nic urbiorl ACe?S ueterI mu- aCUtlttcitLOL,v„ Item Disturbed Area #1 Disturbed Area #2 Disturbed Area 0.541 ac 0.058 ac Time of Concentration 5 min 5 min Rainfall intensity 7.5 iph 7.5 iph CW 0,40 0.40 Qio 1.62 cfs 0.18 cfs Sediment Storage Required / acre 3,600 cf 3,600 cf Sediment Storage Required 1,947 cf 210 cf Surface Area Required / cfs 435 sf 435 sf ,,. Dn,,.,'r Surface I M ca Ix if ed 706 sf 76 sf n +orminn corlimckntatinn Storage & Surface Areas Provided by Temporary Sediment Pools Item Quantity R oc k Pipe Inlet Protection r diment Storage Provided 597 cf Surface Area Provided 568 cf Inlet Protection Sediment Storage Provided 332 cf Surface Area Provided 26Q cf i Modified Stone Check Dams Sediment Storage Provided 16 cf Surface Area Provided 25 cf Stone Outlet in Silt Fence Sediment Storage Provided 108 cf Surface Area Provided 96 cf Silt Fence / ft Sediment Storage Provided 1 cf Surface Area Provided 1 cf ' Municipal Entr neering Sewices f Company, P.A. Game, N.G ? H Uead CGy, NC Boons N.G Project: Animal Emergency Clinic Client: Animal Emergency Clinic Subject: Erosion Control Project # v` Date: Sheet # Des. By: Chk. By: Scale: 1309057 .3 11-16-09 28 EGT n/a Erosion Control Measure Disturbed Area #1 Disturbed Area #2 Rork Pine Inlet Protection Provided 0 ea 1 ea Sediment Storage Provided 0 cf 597 cf Surface Area Provided 0 sf 568 sf Inlet Protection Provided 1 ea 0 ea Sediment Storage Provided. 332 cf 0 cf 'Surface Area Provided I 269 sf 0 sf Stone Check Dams Provided 3 ea 0 ea Sediment Storage Provided 48 cf 0 cf Surface Area Provided 75 sf 0 sf Stone Outlets Provided 9 ea 0 ea Sediment Storage Provided 972 cf 0 cf Surface Area Provided 864 sf 0 sf Silt Fence Length 661 ft 0 ft Sediment Storage Provided 661 cf 0 cf Surface Area Provided 661 sf 0 sf By All Measures Sediment Storage Provided 2,013 cf 597 cf Sediment Storage Required 1,947 cf 210 cf Surface Area Provided 1,869 sf 568 sf Surface Area Required 706 sf 76 sf U L'tl LEE= Municipal U? 52C kI - ?? Gamer, h'C ?% - 0wna, NC Engineering company, P.A. Project: Animal Emergency Clinic Client: Animal Emergency Clinic Subiect: Drainage Areas Map Project # 609057.3 Date: 11-16-09 Sheet # 29 Des. By: EGT Chk. By: Scale: 1" = 100` n 2 i -- ? \; v ro LEGEND Q Upland Drainage Area Number Site Drainage Area Numbers AiParking Lot Detention A, , Parking Lot Detention Bypass /,\ Buildine Detention Municipal U IJt1{??- Engineering Project # 1309057.3 t-amer,Ic NC S f C,° -*. C Date: 11-16-09 Boom, NC Sheet # 30 Project: Animal Emergency Clinic Des. By: EGT Client: Animal Emergency Clinic Chk• By: Scale: 1" = 50' Subiect: Disturbed Areas Map ,.. ...\. `?• ._ r.._ _ -•. .._.. , Off. / / ? / :?? -3260 LEGEND Site Disturbed 1 h r \? \ A - 3250 l 3 ?``, '`23p / i 22 appro .%1-d- i :71 x •.? - ..?,,, fir/-9 i 1 . ?`3J5 v eb ?` _ ,. i t 4 \o 8 76 0 2 .- d -re )? 377 =Y RoE S C hpDv? eo o (.Pp- laaa) '_?_?_ t I Table 8,0. Value of Runoff Coefficie (C) for Rational Formu 8.03.6 3b Land Use C rit Business: la Downtown areas 0.70-0.95 Neighborhood areas 0.50-0.70 Residential: Single-family areas 0.30-0.50 Multi units, detached 0.40-0.60 Multi ,.,nits, Attached 0.60-0.75 Suburban 0.25-0.40 Industrial: Light areas Heavy areas Parks, cemeteries Playgrounds Railroad yard areas Unimproved areas Streets: Asphalt Concrete Brick I Drives and walks I Roofs Land Use Lawns: Sandv soil, flat, 2% Sandy soil, ave., 2-7% Sandy soil, steep, 7% Heavy soil, flat, 2% Heavy soil, ave., 2-7% Heavy soil, steep, C 0.05-0.10 0.10-0.15 0.15-020 0.13-0.17 0.18-022 0.25-0.35 80 0.50-0. ° 0.60-0-90 Agricultural land: Bare packed soil 0.10-0.25 Smooth 0.30-0.6C 0.20-0.35 Rough 0.20-0.5C Cultivated rows 0.20-0.40 Heavy soil no crop 0.30-0.60 Heavy soil with 0.10-0.30 crop 0.20-0.50 Sandy soil no crop 0.20-0.40 Sandv soil with 0.70-0.95 crop 0.10-0.25 0.80-0.95 pasture 0.70-0.85 Heavy soil 0.15-0.45 0.75-0.85 Sandy soil 0.05-0.25 Woodlands 7°/ 0.05-0.25 0.75-0.85 NOTE: The designer must use judgement to select the appropriate C value within the range for the appropriate land use. Generally, larger areas with permeable soils, flat slopes, and dense vegetation should have lowest C values. Smaller areas with slowly permeable soils, steep slopes, and sparse vegetation should be assigned highest C values. Source: American Society of Civil Engineers Rev. 6/06 Table 8.03c Intensify Duration Frequency For use with Rational Method** ;ARI* 5 min. 10 min. 15 min. 30 min. 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hr. (years) 2 4.93 3.94 3.30 2.28 1.43 0.89 0.62 0.38 0.24 0.15 10 6.78 5.42 4.57 3.31 2.16 1.29 0.92 0.55 0.34 0.21 25 7.90 629 5.31 3.94 rn 2.62 11.5-17 1.13 n aQ v aQ 0.41 0.25 100- 9.62 7.64 6.44 4.93 3.40 2.06 1.50 0.90 0.53 0.33 'ARI* 5 min. 10 min. 15 min. 30 min. 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hr. (years) 2 5.21 4.16 3.46 2.41 1.51 0.89 0.63 0.38 0.24 0.14 10 7.06 5.65 476 3.45 2.25 1.30 0.91 0.55 0.34 0.20 25 8.09 6.44 5.45 4.03 2.69 1.56 1.10 0.66 0.40 0.24 100 9.68 7.69 6.48 4.96 3.42 2.00 1.43 0.86 0.50 0.30 Roma v V North Carolina 36,2167N, 81.6667W AR!* 5 min. 10 min. 15 min. 30 min. 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hr. (years; 2 10 25 100 5.71 7.50 8.59 10.38 4.57 6.00 6.85 8.25 3.83 5.06 5.78 6.95 2,64 3.67 4.28 5.32 1.66 2.39 2.85 3.67 1.00 1.46 1.77 2.35 0.72 1.06 1.29 1.72 00.48 0.69 0.83 1.08 0.31 0.44 0.52 0.65 0.18 0.28 0.34 0.44 ARI* 5 min. 10 min. 15 min. 30 min, 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hr. l3'ccr ?? 2 5.68 4.54 3.80 2.63 1.65 0.96 0.68 0.41 0.24 0.14 10 7.26 5.80 4.89 3.55 2.31 1.36 0.98 0.59 0.35 0.20 25 8.02 6.38 5.40 4.00 2.66 1.59 1.15 0.70 0.42 0.24 100 9.00 7.15 6.03 4.62 3.18 1.93 1.43 0.87 0.53 0.30 min. 10 min. 15 min. 30 min. 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hr. T .46 4.36 3.66 2.52 1.58 0.93 0.66 0.40 0.23 0.14 .85 5.48 4.62 3.35 2.18 1.30 0.92 0.56 0.33 0.20 25 7.39 5.89 4.98 3.69 2.46 1.49 1.06 0.65 0.39 0.23 100 7.93 6.30 5.31 4.07 2.80 1.75 1.24 0.78 0.48 0.29 * ARI is the Average Return Interval. Intensity Duration Frequency table is measured in inches per hour. 8.03.9 r ?I O, O a T Q Q yr v L? L O P ? fQ r N LL) O O M t[ 7 N CO O O Co M O Ln N N N CL] M N T C? CN N j O M M U) O CV M A N LD N CO rz- ?-? aU M O EN . ! r r N f t # N r 0 L ) O O p O - co O N cj -O C M O O L7 Ln r N LO , O N o f C r M c <D r r M 6 LO #6 $ N N N f` (D N N D N O M V Lo U) co ^ 1? O V N O ? r N N r N M ' £ N N m O N 1 O) 1 O gt? O Mu7 0 ?? ? ? 5 N O ?L 7 O r r M a 1(D ?? N M Lr) cO jjy CV t!` r N CO co N CY) M f C ?10 . ?O a(m O } 8 p [ }} 3r ? I 8 N ' D N O C U) 1 N N Lr) r • M ! ! O) N r r N Lb r N (D ('') r- I iM O M ? N U) N r V ' LO ( 4 ?t O N co m M s N g0 p O O ? r M IS r a gN M (D O M } C" co cm') LOO) r- .0 N I ' ?I O ? LA N CO N d. M ? € C-4 L" 1? Iq O qr O O 1 r 1 6 • M ## i1i N N N §pO r N Ng $ A I # C O r (`-) I? M r N O . QMj .C a Q) r N N M , N V' ., >? CO , a , N O (AN N o 1 r ? C N _ I •? 0 0 0 0 0 CD C ) € = 0 Cl 0 0 0 0 O o N ? o N ( cl V N O M O O M O ? N to M O r co I? M N co O rn CO CN II II 11 II Il II ? O O r q M t` ?e Mp' N# N t O (D C') O r O N o LO N c? V' M ' M 7 LD co N r M m m LO = C C C _O L: C O III 3i r N £ [ ' co LO O I? ? co c': .` G.,. ? c0 O) f0 ? 07 v. 't 6 LO N IQ I p$ ? O c') N 0 C' ? O N CDT o $ N i co N co ) N r ) o gg r N N c r N i C() li 03 N d ' r I? c?? ? r rn? v M r m ry m o7- N (DV CD co V N o rd N Y p O r 4 c c ? N ?' 15 CD N m C D N N [- t` O 0 7 N N Lf7 0 II r N N M V r M ' Q W '1 Ln O r r Ln co N N N d' N(O M C''). C W I? O M Y O d' O 'd' N O V' 7 c p Cn 0 m _ O C CO O C?7 O y o Cqr ?' ? Og N cc r M O O N O l t) O)? N os` ? Q cc ,{ ? 1 O O y w 9 O CD N r _ (9 ? II L > C _ O O r LD N .- Nl AA a N ? Q) L O1 1) N L' M?? ( 7 N-. 1 fl M ? W O I `?N iC r 0 C n CD 7) ' r 7 I 7 C _L -L _ Y V o O[_ ` O r 1 N O pr?r N M I t L o 3A N[Q1 g rN M C6 C > of N O= cV cl) c•3 1 S j N y - 9 f a s a I L i { E ? r - i I n O O O O ) .M r t ,' U) M O CR r O M N 0 I- rl 'Y = p N c O O C r m [ t O D7 O i?? (D c r M d) ( o LD c D O o N V O r O N r LO h N co U R LL C O 1 r N r 'T M V Lo ' Lo c0 r r r M N L ui j - Q1 U . d U C- 'C N N N 1N ('') r 0 d r r O r o r ?O r 'O r M Qi (n N O N N co (D M O N N M j L6 O. O r LA r ON (`M7 CO N N M V ' -CD 7 O) r ( i d' O O r r N M F d > ? N CA C4 Et M V' «) s V r 1 O U U M O o O m r N ?cn r m (D O O L') ? ?O . N N I N (fl Cn ?N O O N co I? d CD O) (D CD 110 O co O 7 O O N , Lf? f OM . s C; D N M ( r ? N M - N 7 c"I I- e ? € I s I i t _i t i P t 7 C( r L Z ( N O i ? W r t`L? O M 3 }{? $O r U7 ir Ln u) M C7) 't I N (D N Q) r r <Y C "I O lL] -0 f CN .0 C ZT - / ? ]jN 1 ? ? N q[ c6 ^ I` ";r ('7 r N C') <-I- V Lo N I? co O ('1 ! N (K) C +-' O CII I O i r 1 j • v (a 3 a a i u •a O 1- (n O p O r r M M O i? O N O N O O ? O r L i Q, O O p N co ( V CD N i? r O Co CC O V Lf) 00 CN O CC, O) tT r-- N N O) N co Lo L I- O L N Q Cl) Q r N CD r I? r l r N M 7 O t` C M r r N O O Q M. Ln Z ? ? I ? c N Q O (0 co O O <- (Cl N N Ln M I? I r f\ m r V Y N O r co co C Lo L6 Z O r N (- O NO T co M t m N N c) N Cb O N N Ln M Ln co LO co O (L M LO r N C l): I J C7) I` C CR M LI) m <f" N N O LD O M O M t? N r# CO ? `U L7 M_ _ € r r CO O M N (') . M (D Y O LO r 14, N r L co C r M LD (n N ('J <t Lo r CE T I` O co r N N f` r M (fl ? i y (U (( l:D O O Cn N O co U) LO LO fO? N M In? <Y O rt r O Q) O n O # O N O LO O O M 1l O N Q y 0 0 0 0 0 0 r r N M M '?' Ln t` O) ? ? O N j > f t ? ? (I) M ? V N c O N to N o r r?r?r V I? N N?N O M ( M MIC D N LO N V' ') 7 LO O N D CDah n 3 1 ! tll Q a- .2 N _O a m m O L: U C 6 v J r n 7 (6 V ? ? C t6 U c u- L: >T C W U N [0 U m 7 CU ZT C J i r O O N ¢ vti Appendices Table 8.03e Runoff curve numbers of urban areas' Curve number for -------------Cover Description------------- ---- - ----hydrologic soil group------- Average percent Cover type and hydrologic condition impervious area'- A D C D Fully developed urban areas (vegetation established) Open space (lawns, parks, golf courses, cemeteries, etc.) f Poor condition (grass cover < 50%) ............................. 6p r117 ) 86 89 l+ I Fair condition (grass cover 50% to 75%) ...... 49 69 79 84 Good condition (grass cover > 75% 39 61 74 80 Impervious areas: I{ Paved parking lots, roofs, driveways, etc. g8 98 gg g8 (excluding right-of-way) ........................... Streets and roads: Paved; curbs and storm sewers (excluding 98 98 98 98 right-of-way) ....................................... Paved; open ditches (including right-of-way) 83 89 92 93 Gravel (including right-of-way) .... 76 85 89 . 91 III (including ........................................... Dirt right-of-way) 72 82 87 89 Urban districts: Commercial and business ................................................ 85 89 92 94 95 Industrial ........................................................................... 72 81 88 91 93 Residential districts by average lot size: 178 acre or less (town houses) ......................................... 65 77 85 90 92 I 1 /4 acre ..............................................:............................. 38 61 75 83 87 1/3 acre ............................................................................. 30 57 72 81 86 i 1,12 acre ............................................................................. 25 54 70 80 85 1 acre ............................................................................... 20 51 68 79 84 2 acres .............................................................................. 12 46 65 77 82 Developing urban areas Newly graded areas 77 86 91 94 (pervious areas only, no vegetation .......... Idle lands (CN's are determined using cover types similar to those in table 2-2c). 1. Average runoff condition, and la = 0.2S- 2. The averaae percent impervious area shown was used to develop the composite CN's. Other assumptions are as follows: impervious areas are directly connected to the drainage system, impervious areas have a CN of 98, and pervious areas are considered equivalent to open space in good hydrologic condition. CN's for other combinations of conditions may be computed using Figure 8.03c or 8.03d. 3. CN's shown are equivalent to those of pasture. Composite CN's may be computed for other combinations of open space cover type. 4. Composite CN's to use forthe design of temporary measures during grading and construction should be computed using Figure 8.03c or 8.03d based on the degree of development (impervious area percentage) and the CN's for the newly graded pervious areas. Rev. 6106 8_03.17 Appendices Table 8.03g Runoff curve numbers for other agriculture lands' Curve n umbers for -------------- --Cover description------ ------------- ---- -------hydrologi c soil groups---------- Hydrologic Cover type conditions' A B C D Pasture, grassland, or range- Poor 68 79 86 89 continuous forage for grazing. 2 Fair 49 69 79 84 Good 39 61 74 80 Mead ow-continuous grass, protected - 30 58 71, 7Q from grazing and generally mowed for hay. Brush-brush-weed-grass mixture with Poor 48 67 77 83 brush the major element. s Fair 35 56 70 77 Good 30 4 48 65 73 Woods-grass combination (orchard or Poor 57 73 82 86 tree farm). s Fair 43 65 76 82 i Good 32 58 72 79 Woods 6 Poor 45 66 77 83 Fair 36 60 73 79 Good 301 55 70 77 Farmsteads-buildings, lanes, - 59 74 82 86 driveways, and surrounding lots. i Average runoff condition, and la= 0.2J. 2 Poor: <50% ground cover or heavily grazed with no mulch. Fair: 50 to 75% ground cover and not heavily grazed. Good: > 75% ground cover and lightly or only occasionally grazed. 3 Poor. <50% ground cover. Fair: 50 to 75% ground cover. Good: >75% ground cover. 4 Actual curve number is less than 30; use Cif = 30 for runoff computations. 5 CN's shown were computed for areas with 50% woods and 50% grass (pasture) cover. Other combinations of conditions may be computed from the CN's for woods and pasture. 6 Poor. Forest litter, small trees, and brush are destroyed by heavy grazing or regular burning. Fair: Woods are grazed but not burned, and some forest litter covers the soil. Good: Woods are protected from grazing, and litter and brush adequately cover the soil. Rev. 6106 8.03.19 Y Table 8.03i Precipitation Freauena Estimates For use with NRCS Method** .Yumh,• North Carolina 35.0961 N, $4.0239W ARI* 5 min. 10 min. 15 min. 30 min. 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hr. (years) 2 0.41 0.66 0.83 1.14 1.43 1.71 1.85 2.29 2.90 3.48 10 0.56 0.90 1.14 1.66 2.16 2.57 2.76 3.32 4.14 6.08 25 0.66 1.05 1.33 1.97 2.62 3.14 3.38 4.05 4.95 6.08 100 0.80 1.27 1.61 2.47 3.40 4.13 4.50 5.38 6.33 7.93 Asheville. North Carolina 35.4358N. 82.5392W ARI* 5 min. 10 min. 15 min. 30 min. 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hq- 2 (years) 0.43 0.69 0.87 1.21 1.51 1.77 1.88 2.30 2.91 3.47 10 0.59 0.94 1.19 1.72 2.25 2.60 2.74 3.29 4.10 4.91 25 0.67 1.07 1.36 2.02 2.69 3.13 3.31 196 4.83 5.79 100 0.81 1.28 1.62 2.48 3.42 4.00 4.29 5.12 6.04 7.24 Boone. North Carolina 36.2167"!. 81.6667W ARI* 5 min. 10 min. 15 min. 30 min. 60 min . 120 min. 3 hr. 6 hr. 12 hr. 24 hr. (years) 2 0.48 0.76 0.96 1.32 1.66 2.00 2.18 2.85 3.77 4.39 10 0.62 1.00 1.26 1.83 2.39 2.92 3.18 4.10 5.28 6.61 25 0.72 1.14 1.45 2.14 2.85 3.55 3.87 4.94 6.21 8.07 100 0.86 1.38 1.74 2.66 3.67 4.69 5.15 6.47 7.82 10.65 ARI* 5 min. 10 min. 15 min. 30 min. 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hr. (years) 2 0.47 0.76 0.95 1.31 1.65 1.92 2.04 2.46 2.91 3.37 10 0.60 0.97 1.22 1.77 2.31 2.72 2.93 3.55 4.23 4.90 25 0.67 1.06 1.35 2.00 2.66 3.17 3.46 4.19 5.04 5.82 100 0.75 1.19 1.51 2.31 3.18 3.85 4.29 5.22 6.36 7.30 ARI* 5 min. 10 min. 15 min. 30 min. 60 min. 120 min. 3 hr. 6 hr. 12 hr. 24 hr. (years) 2 0.46 0.73 0.91 1.26 1.58 1.85 1.98 2.36 2.81 131 10 0.57 0.91 1.16 1.68 2.18 2.60 2.77 3.37 4.02 4.76 25 0.62 0.98 1.25 1.84 2.46 2.98 3.17 3.90 4.71 526 100 0.66 1.05 1.33 2.03 2.80 3.46 3.72 4.68 5.81 7.00 * ARI is the Average Return Interval. **Precipitation Frequency Estimates are measured in inches. 8.03.36 Rev. 6/06 b ? Table 3: StoracFe Capacity of Retention/Detention Systems Using ADS N-12 Pipe -(J-.hail A:,? . 1"-'IcTI _a 12 (300) 14.45 (367) 0.81 (0.02) 2.79 (9.15) 1.24 (4.10) 2.04 0.62) 15 375 17.57 (446) 1.22 0.03) 2.11 6.92) 1.05 3.44) 2.30 0.70) 18(450) 21.20 538) 1.78 0.05 1.76 5.77 0.91 2.98 2.60 0.79} 24(600 27.80 706) 3.16 0.09) 1.16 3.80) 0.69 2.26 3.15 0.96) 30(750) 35.1 892 4.91 (0.14 0.98 3.21) 0.62 2.03 3.43 (1.05 36(900) 41.7 1059 7.07 0.20 0.80 2.62) 0.52 (1.71 3.98 1.21 42 1050) 47.7 (1212) I 9.35 "0.26) 0.65 (2.13) 0.44(i.44) 4.48 `137 48 (1200) 53.6 (1361) 12.36 (0.35) 0.53 (1.74) 0.38(l.25) 4.97 (1.51) 60(1-500) 1 65.5 (1664) 19.31 (0.55) 0.41 (1.34)__ 0.30 (0.98) _ 6.02 (1.84) ?Tal?lc 4: 1 v pical Por(1>11, A :iluc, tur A ai iolu? ?,od 1 ,yll(,?__ Loose uniform sand 0.44 Dense uniform sand 0.31 Loose angular-grained silty sand 039 Dense angular-grained silty sand 0.29 b.) Retention Systems: The minimum footprint for a retention (or recharge) system)is a function of the in situ soil's ability to accept the storm water flow. Thus, the required surface area can be calculated using Equation 8. A - qpa _qpb (8) kho Dotes: where Ar = retention surface area needed (ft) k = coefficient of permeability of native soil ($/s) h,, = hydraulic gradient = Ah/L (see Figure 5) • The coefficient of permeability (k), given in Equation 8, should be obtained through in situ or laboratory percolation tests; as values can range from less than 3.33 x 10-8 ft1s for clay to as much as 3.33 ft/s for clean ravel! In order to calculate accurate recharge rates and required retention volumes, an average k over the length of soil, L, should be used in Equation 8. • If AZ is not available, i.e. the permeability is too slow, the engineer will have to set Ar = Aa, where Aa = available area (ft"). A storage volume must be created to handle the difference. 9 -` 1 i?;-poses gran he found in A ppendiv A; these inrl?irlP "h .7 to be used f hm;r vp`NIP.gS t uS Cr S a. p laying dimensions and product numbers of all ADS manifold components and related parts. SINGLE) MANIFOLD DOUBLE MANIFOLD COMPONENT I COMPONENT 0 Am- Milk REDUCER END CAP TRIPLE MANIFOLD 90' BEND MANIFOLD COMPONENT COMPONENT I I f ?? 0 0 0 o ?( f ?I ?? IIiIIIIN SPLIT COUPLER (a) 12"-60" plain end N-12 manifolds and appurtenances (soil tight) 11 For your convenience, AutoCAD drawing blocks of the ADS standard manifold components shown in Figure 6 can be obtained upon request from ADS. All drawings are in Release 2000 format. CAROLINA PRECAST Setting the Standard P. O. Box 1061 Dunn, North Carolina 28336 (910) 892-6411 fax: (910) 892-4894 1-866-PRECAST www.carolinaprecast.com DATE: FEB. 16, 1999 DRAWING No: PT-3000 GENERAL NOTES: 1. STRUCTURAL DESIGN SPECIFICATIONS CONFORM TO LATEST ASTM C1227 SPECIFICATIONS FOR "PRECAST CONCRETE WATER AND WASTEWATER STRUCTURES", NCDOT, AND MEET THE REQUIREMENTS OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL HEALTH AND NATURAL RESOURCES. 2. CONCRETE COMPRESSIVE STRENGTH 4,000 PSI MINIMUM. 3. STEEL REINFORCING DESIGN TO CONFORM TO THE REQUIREMENTS OF ASTM C890 SPECIFICATIONS FOR "STRUCTURAL DESIGN LOADING FOR WATER AND WASTEWATER STRUCTURES" AND SHALL UTILIZE GRADE 60 RE-BARS CONFORMING TO THE REQUIREMENTS OF ASTM A615 OR WWF CONFORMING TO THE REQUIREMENTS OF ASTM A185 OR BOTH. 4. ADDITIONAL REINFORCING AT OPENINGS. 5. DESIGNED FOR H-20-44 LOADING. 6. STEPS NOT PROVIDED. 7. CONTRACTOR TO ADJUST TO GRADE AS REQUIRED. 4" GRADE RINGS TO BE SUPPLIED BY C.P.C. OR TO BE FIELD ADJUSTED USING APPROVED METHODS BY CONTRACTOR. 8. 8" DIA BLOCKOUTS. OPTIONAL 8" DIA. PIPE PENETRAT]ON WITH DURA-SEAL GASKET MEETING SPECIFICATIONS OF ASTM C923 SUPPLIED BY C.P.C. PIPE TO BE FIELD INSTALLED BY CONTRACTOR. 9. CAST IRON RING AND COVER TO BE AS PER SPECIFICATIONS, SUPPLIED BY EITHER C.P.C. OR CUSTOMER. 10. 1" BENTINITE AND MORTAR JOINT SEALANT. TO BE FIELD APPLIED BY CONTRACTOR. 11. WEIGHTS: TOP SECTION -APPROX. 17,000 LBS. BASE SECTION -APPROX. 14,500 LBS. 09 n? Appendices NEW YORK DOT DISSIPATOR _l•IETHOD FOR USE IN DEFINED CH_AINNELS (Source: `Bank and channel lining procedures", Neer York Department of Transportation. Division of Design and Construction, 1971.) NOTE: To use the following chart you must know: (1) Q full capacity (2) Qio (3) V full "J' io inhere Q = discharge in cfs and V = Velocity- in FPS. ESTEMATION OF STOKE SIZE AND DMENSIONS FOR CULVERT APRONS Step 1) Compute floc"; velocity Vo at culvert or paved channel outlet. Step 2) For pipe culverts D. is diameter. For pipe arch., arch and box culverts; and paved channel outlets, D =A where A. = cross-sectional area of flow at outlet. 0 0 For multiple culverts, use Do = 1.25 x Do of sin?le culvert. Step 3) For apron grades of 10%, or steeper, use recommendations For next higher zone. (Zones 1 through 6). a_ L } F- U t( J 5 0 Figure 8.066 Rev. 12193 8.06.E 10, 1F 20' 25' DIAMETER (Ft.) M A i s LENGTH OF APRON To PROTECT TO PREVENT SCOUR Z APRON MATERIAL TO CULVERT HOLE USE L2 ALWAYS I L2 L9 1 SONE FILLING (FINE) CL. A I ' 3 X D, I 4 x D- 2 STONE FILLING (LIGHT) CL. B 3 X Da 6 x Do 3' STONE FILLING (MEDIUM) CL. 1 i 4 X Do 8 x Do i 4 I STONE FILLING (HEAVY) CL. 1 4 X Do I 8 x D. 5 I STONE FILLING (HEAVY) CL. 2 5 X D, 10 x D II 6 STONE FILLING (HEAVY) CL. 2 I 6 X Do I 10 x D. 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, S TILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Width = 3 times pipe diz (min.) DETER VII\? ATION OF STONE SIZES FOR DU:I?IPED STONE CHANNEL LININGS AND REVETiVIENTS Step 1. Use ficrure 8.106.b-3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of rou(y hness: Diameter Mannina's Min. thickness (inches) "n" y of lining i;inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 ?vledium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev. 12/93