Loading...
HomeMy WebLinkAbout20200187 Ver 1_Linville River _Ruffin St bridge project_Div 11_20200626 Wanucha, Dave From:Hining, Kevin J Sent:Friday, June 26, 2020 8:43 AM To:Wanucha, Dave Cc:Mitchell, Robert K Subject:RE: \[External\] Linville River /Ruffin St bridge project_Div 11 Attachments:Avery 1 bridge photos.pdf Hey Dave, Yep, that’s the temporary causeway. Also, the site is unique in that 80-90% of the flow is on the 221 side of the project, and the causeway is on the other side. The side with the causeway is a flat, shallow pool with very little flow, so while we have a causeway going out to the middle bent, it should be diverting/blocking very little flow. The attachment above has a photo on it that will hopefully help show this (bottom of the page). Hope that gives you what you need, but give me a shout if not. The 401 # is 20200187. Thanks and hope all is well! Kevin Kevin Hining Division 11 Environmental Officer North Carolina Department of Transportation 828-386-7202 cell kjhining@ncdot.gov 801 Statesville Rd. PO Box 250 North Wilkesboro, NC 28659 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ From: Wanucha, Dave <dave.wanucha@ncdenr.gov> Sent: Friday, June 26, 2020 8:24 AM To: Hining, Kevin J <kjhining@ncdot.gov> Subject: Fwd: \[External\] Linville River /Ruffin St bridge project 1 Hi Kevin, Just a heads up. I’m not familiar with the project, but what Kevin explained sounds correct. I’ll touch base with you in a few hours and then respond to Mr Erno. Thanks. Dave Wanucha Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Begin forwarded message: From: "Mitchell, Robert K" <kevin.mitchell@ncdenr.gov> Date: June 26, 2020 at 7:25:07 AM EDT To: Harry Erno <thes99@gmail.com> Cc: "Wanucha, Dave" <dave.wanucha@ncdenr.gov> Subject: RE: \[External\] Linville River /Ruffin St bridge project Morning Mr. Erno. This project was permitted out of our Winston Salem Office. Dave Wanucha is the contact. I have copied him on the email if he wants to add anything or if you have additional questions. I’m not familiar with this particular design, but I can say that one of our requirements when doing work in a stream is that the water be diverted around the work area in order to minimize impacts to downstream resources. This is important in reducing turbidity and sedimentation especially if there are trout in the stream. On larger bodies of water such as the Linville River we also permit temporary causeways into the water to provide a platform to do the work. Not sure if this is the case on this project, but that might be what you are seeing (Dave can confirm this). DOT runs hydraulic models to make sure there is no flooding impact upstream or downstream. These temporary causeways are removed when the work is complete and the stream is restored to its original contours. Hope this helps. Kevin Mitchell Environmental Specialist II Division of Water Resources 401 & Buffer Transportation Permitting NC Department of Environmental Quality 2 828-296-4650 Office 828-231-1580 Mobile Email Kevin.mitchell@ncdenr.gov NC DEQ Asheville Regional Office 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Harry Erno \[mailto:thes99@gmail.com\] Sent: Thursday, June 25, 2020 5:39 PM To: Mitchell, Robert K <kevin.mitchell@ncdenr.gov> Subject: \[External\] Linville River /Ruffin St bridge project CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hello Kevin, I received your contact information from Dan Boss. I contacted him because of my concern about the way the construction company that is working on the Ruffin Street bridge project in Linville is diverting the water in the river. It appears that they are narrowing the flow of the river (which I am pretty sure is not allowed without the Army Corp of Engineers permission). My concern with the narrowing of the water flow is that this neighborhood is prone to flooding as it is and if they are in fact narrowing the flow, it will only exacerbate the problem. I am hoping that the boulders, etc that they are filling the river with now is simply a platform for them to work on while they build the bridge and that the Fill will be removed once the project is complete. Do you know whether this is the case or not? I appreciate your response. 3 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 4