Loading...
HomeMy WebLinkAbout20200849 Ver 1_Shoreline Stabilization_20200629Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 6/26/2020 1:28:18 PM (Submittal) Approve by Montalvo, Sheri A 6/29/2020 11:15:48 AM (Non -DOT - Approver) • The task was assigned to Montalvo, Sheri A 6/26/2020 1:28 PM Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Owner Information: Name: * Leonard Gamberg Email:* gambergl@gmail. c om Phone Number:* (910)384-3395 (xxx)xxx-xxxx Mailing Address:* Street Address 10840 HASTY RD Address Line 2 City LAURINBURG F bstal / Zip Code 28352 Is there an agent working on the r Ye: project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Leonard Gamberg, Shoreline Stabilization State / Rovince / Fbgion NC Country United States If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed acti\ity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that ha\e been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Property Address Lookup:* Street Address 192 Crain ct Address Line 2 city mount gilead Rbstal / Zip Code 27306 Latitude:* 35.267600 State / Rovince / Pegion nc Country United States Longitude:* 80.088099 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* shoreline diagram .pdf 831.53KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* A59CCDA8-1001-46BE-BF15- 3.37MB 0019E267D5C1.heic 4. Location of the property (where work is to be conducted) Nearest Town:* Mount Gilead County:* Montgomery Lake/ river/ ocean adjacent to Lake Tillery property: Subdivisions name or site address:* 192 Cram Ct/ Lot#14 The Peninsula at Lake Tillery Include phasellot nunber Directions to site:* from lillys bridge road turn onto twin harbor driver continue onto hide -a -way trail/ holly harbor trail .3 mi turn right onto cherokee trail .2 mi turn right onto Canyon loop rd 282 ft turn left to stay on Canyon Loop Rd .1 mi turn right toward Crain Ct destination will be on your right .2 mi (192 Crain Ct) Rease include road narres and nunbers, landrrerks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential Fbsidential, undeveloped, etc. 6. Pro pertySize .15 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Natural rock shoreline stabilization with natural boulders 12"-24" placed on top of mat insulation against shoreline 8. How will the work be done?* 17 From Land F From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining w alls, etc.) 100 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 240 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) bare dirt with 11 small trees Sketch: survey sketch.pdf 2.43MB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I have given true, accurate, and complete information on this form; a I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit this form. Full Name:* LeonardGamberg Signature: Initial Review Is this accepted into the review process?* Project Number:* 20200849 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Chad Turlingtoweads\ccturlington Fayetteville Regional Office - (910) 433-3300 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 Lake (At Full Pond/ Normal water Level) Full l'• ond/ ��.. � -- � � -. �.� ��It- �� � amain Normal Water Level i,■,,,r, Shoreline If '4. %, VVwy i +'�i aq i 4Yr Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ftx 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation _. -.t e_Y r_--r^-,-.-I .-+......+.,.-..� --1, — buildinPrc_ rntaininu wallr,_ dnckS. etc_ 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 to a n a _' L „xc 0 •c ~i - CA O ai v Y `i C ��}• 7 O vu =v=3 r +^ c On vw4.�i- j` " c t- N � 13 W d Q a D o'er= m q �mC G'�ww a�v3n� gnA Oil \. -- - -------- --___ _ MontgomeiyCounty, NC WebGIS 5128/20, 4:16 PM Disclaimer: The information contained on this page is No r to De Hpw Vh• construed or used as a survey or legal description. Map information is 190 ft 380 ft believed to be accurate but accuracy is not guaranteed. 0 ►ORES: ,IN: 'inNoDash: 3wneriDl: game-1: tame_2: kddr_1: 'ity: State: Zip: StrName: StrType: PhyAddress: Deed —Acre: TaxDistDeS: TownshipDs: VolFireDes: NeighDesc: Legal-1: Legal_2: Legal_3: DeedBook: DeedPage: DeedYear: TransDate: SalesAmt: Salesinstr: LandASVCur. LandUse YN: ApprCode: ApprCdDesc: ClassCode: ClassCdDes: Mutipleimp: FCODE: TownshipCd: TotASVCur: Layer: Patil .15 6575 15;: 6575155� 64815 `- 108401 LAURIN[ NC 28352 CRAIN CT CRAIN C 0.15 LAKE T PEE DEI FIRE DS 2026 LEONARD C ROBIN K ,STY RD LOT 14 !I PENINSIJL 740 862 2014 2014082 85000 WD li 99825 C N 01 RESIDEi ' 1 f RESIDEW 000 PARCELr] 13 998251 tY FIRE ,E TILLERY AT LAKE T AT LT AT LT #14 DISTRICT: 1 Layer: Fire Districts Name: Tillery Layer. Townships Name: PEE DEE Layer: Proposed Voting Commissioner's I Districts _ District: 1 Layer: Zoning Zoning: Residential 1 i City: Layer: Voting District Precincts Name: PEE y Layer_ Watersheds Class: WS-IV 7 Name: Lake Tillery River Basin: Yadkin i Page 1 of 1 https://www.webgis.net/Common/print-php E'