HomeMy WebLinkAbout20180708 Ver 1_Email_20200629Carpenter, Kristi
From:
Steenhuis, Joanne
Sent:
Monday, June 29, 2020 9:29 AM
To:
Herndon, T. Mason; Shaver, Brad
Subject:
RE: Sampson B-4813
The DWR has no problem with the changes you provided and we will note the changes in the data base and include this
email. Thanks!
Joanne Steenhuis
From: Herndon, T. Mason <tmherndon@ncdot.gov>
Sent: Monday, June 22, 2020 2:55 PM
To: Shaver, Brad <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>
Subject: Sampson B-4813
Please see attached revised Permit Drawing Sheet 4 and WISS for B-4813. These revised sheets address the rip rap slope
protect that we discussed at our field review on 6/10. The RE office provided stationing for the rip rap as 24+80 to
25+40 -L-RT. I went ahead and listed the entire 60 feet as an impacts because based on the scour that has occurred
since the original survey was completed most, if not all, of this bank stabilization will be keyed in below the existing
OHM.
Please let me know if you this is acceptable or if you require any additional information of your files. This was a courtesy
notification for NW 3/13 and corresponding WQC's. The DWR project number is 20180708 and the USACE Action ID is
SAW-2015-01089.
Thanks!
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon(@ncdot.eov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.