Loading...
HomeMy WebLinkAbout20180708 Ver 1_Email_20200629Carpenter, Kristi From: Steenhuis, Joanne Sent: Monday, June 29, 2020 9:29 AM To: Herndon, T. Mason; Shaver, Brad Subject: RE: Sampson B-4813 The DWR has no problem with the changes you provided and we will note the changes in the data base and include this email. Thanks! Joanne Steenhuis From: Herndon, T. Mason <tmherndon@ncdot.gov> Sent: Monday, June 22, 2020 2:55 PM To: Shaver, Brad <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Subject: Sampson B-4813 Please see attached revised Permit Drawing Sheet 4 and WISS for B-4813. These revised sheets address the rip rap slope protect that we discussed at our field review on 6/10. The RE office provided stationing for the rip rap as 24+80 to 25+40 -L-RT. I went ahead and listed the entire 60 feet as an impacts because based on the scour that has occurred since the original survey was completed most, if not all, of this bank stabilization will be keyed in below the existing OHM. Please let me know if you this is acceptable or if you require any additional information of your files. This was a courtesy notification for NW 3/13 and corresponding WQC's. The DWR project number is 20180708 and the USACE Action ID is SAW-2015-01089. Thanks! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon(@ncdot.eov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.