HomeMy WebLinkAbout20180708 Ver 1_Design/Maps/Site Plans Revised_20200622Carpenter, Kristi From: Herndon, T. Mason Sent: Monday, June 22, 2020 2:55 PM To: Shaver, Brad ; Steenhuis, Joanne Subject: Sampson B-4813 Attachments: B-4813_Permit Drawing Sheet 4_REV_20200622.pdf, B-481317BP.3.R.78_ WIS_ 20200622.pdf Please see attached revised Permit Drawing Sheet 4 and WISS for B-4813. These revised sheets address the rip rap slope protect that we discussed at our field review on 6/10. The RE office provided stationing for the rip rap as 24+80 to 25+40 -L-RT. I went ahead and listed the entire 60 feet as an impacts because based on the scour that has occurred since the original survey was completed most, if not all, of this bank stabilization will be keyed in below the existing OHM. Please let me know if you this is acceptable or if you require any additional information of your files. This was a courtesy notification for NW 3/13 and corresponding WQC's. The DWR project number is 20180708 and the USACE Action ID is SAW-2015-01089. Thanks! Mason Herndon Environmental Program Supervisor Division 3 NCDOT- Division of Highways 910-341-2036 office 910-604-0050 mobile tmherndon@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. DETAIL 1 SPECIAL LATERAL 'V' DITCH Pi11 INef to Scale) Slope D FROM STA. 18+75 TO STA. 22+65 -L- RT FROM STA. 21+00 TO STA. 22+65 -L- LT FROM STA. 25+50 TO STA. 27+00 -L- RT WOODS NOTE: ALL DRIVEWAY RADII ARE 10' REVISED 6/22/2020 O TAYLOR'S BRIDGE COMPANY" LLC N \N A4936W DECK DRAIN DISSIPATOR PAD SEE DETAIL 2 °< 1 SPECIAL 4LATERAL'V' DI1CH I SEE DETAIL 1 k \ CIL CpEEK IS PROPERTY LINE G' ` SITE 1 WOOF — _ R SR I004 EDMOND fdATHIS RD 02 BST -L - N 87" I5' 23.0e E 4111 OEIP INV=65.48INV=65.74'— M-ING R//W�,>_ LJ I IP I / J C+ P rt 50' 25' 0 50, 100, PLANS PREPARED BY : PROJECT REFERENCE NO. SHEET NO. PARSONS B-4813 4 RALEIGH, NORTH CAROLINA, (919) 854-1345 RAN SHEET NO. 5 SCALE: 1"=100' O NC LICENSE NO.F-0246 FOR NORTH—OUNA DE- OF TRABSPORTATION ROADWAY DESIGN HYDRAULICS CHRISTINE E MAT THIS N SUNGATE DESIGN GROUP, P.A. ENGINEER ENGINEER 00 CL'B'RIP RAP 'EN`D F'Di'aRiM s�s�No t�F s�esss�sa p/ w000s _ wo�oD \ TAYLOR'S BRIDGE COMPANY, LLC �M ISFD ® xP \ \ ✓ry�,cR°� \ SITE 3 SPECIAL LATERAL 'V' DITCH JONSIE P & MICHAEL AK HOUSEMAID \ SEE DETAIL 1 L 1131P\RAP\TO PROPERTY KLI E� DETAIL 2 CL II RIP RAP DECK DRAIN ?ISSIPATORoTD m S ULDER\POINT BAN STABILIZATION I NW ro Sw1el EST. 104 TONS W EST. 110 SY GF qo' EIP O SCL II RIP RAP TO HOULDER POINT PADIPATOR PIAN �IPW 3 L L �/ DENOTES TEMPORARY RIP RAP AT EMBANKMENT IMPACTS IN SURFACE WATER "NOTE: CENTER PAD DIRECTLY BELOW ECK DRAINS (N.t -1.)GROUND 5^"^ IPN / IL L Ditch 10D i^ ,,D, DENOTES IMPACTS IN Grade SURFACE WATER GEOTEXTILE I.D' 15. GE f L= 21O Pf. SS' Z 'a Type of Llner= ,.]TONS LB RIP -RAP Type of IL—= CL'B'RI DENOTES EXCAVATION FROM STA. 23+,3rCt STA. 23+60-L-LT FROM STA.25+32 OpSTA.2\L- EIP IN WETLAND BRIDGE HYDRAULIC DATA DESIGN DISCHARGE = 2180 CFS DESIGN FREQUENCY = 50 YRS DESIGN HW ELEVATION = 58.5 FT BASE DISCHARGE = 2960 CFS BASE FREQUENCY = /00 YRS BASE HW ELEVATION = 59.6 FT OVERTOPPING DISCHARGE = 2800 CFS OVERTOPPING FREQUENCY= 100— YRS OVERTOPPING ELEVATION = 59.4 FT STA 24+89.4 —L— DATE OF SURVEY = 10—I8-20I7 W.S. ELEVATION AT DATE OF SURVEY = 49"8 FT EST.3 TONS EST. 10 SY Q 11�1;E' LBNgIN RY PLANS Z W NOT USE FOL CONSTRUCTEON A / SHOULDER BERM GUTTER /. FROM END APP.¢LAB / r' TO STA. 24+64 -L- LT / SITE 2 DOCUMENT NOT CONSIDERED FINAL / UNLESS ALL SIGNATURES COMPLETED WDD�S N�� /yp j�G 5R RY. =% F I— 1004 EDO E.�s Z5/B�// o RIP RAP AT EMBANKMENT I EST. 8 TON J EST. 18 SY GF SEE DETAIL 3 F F DENOTES FILL IN WETLAND DENOTES MECHANI2 CLEARING BM °2 LEV TIO = N 40683.3E=2 -L- ST TION 24+ 7.7 60. 5' R GHT WOODS A, L 4 i LENA D M SATORSKY SITE 4 �a SPECIAL LATERAL 'V' DITCH SEE DETAIL 1 BEGIN APPR. SLAB END BRIDGE END APPR.SLAB -L- STA.23+20.31 - - + • 9.69 BEGIN BRIDGE -L- STA.23+31.31 N 1GRI'l' GREU, TL-3 �,. v , TL-3 8:1 8:7 N 87" 15' 23.Cr E 8.1GREU, TL-3 III 1 TYP GREU, TL-3 8.1 d Ll P PLl BRIDGE/ROADWAY RELATIONSHIP FOPS - FULL DEPTH PAVED SHOULDER NOT TO SCALE SBG - SHOULDER BERM GUTTER 93 IINMM 9`ill ■■��00■MM1 ■■■■�i■III '''►��l�... ■'■■■■■■■■■■■■■■■1 ■■■■■■■■■ ■■■■■■■■■■■■■■■■■1 17 18 19 20 21 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Bank Stabili- zation (ft) 1 22+46 to 23+50 -L-LT ROADWAY FILL < 0.01 < 0.01 0.02 31 2 24+24 to 24+67-L- LT ROADWAY FILL < 0.01 < 0.01 < 0.01 3 24+05-L- BANK STABILIZATION < 0.01 41 IMPERVIOUS DIKE < 0.01 4 26+19 to 26+47-L-LT ROADWAY FILL < 0.01 < 0.01 5 24+80 to 25+40 -L-RT Bank Stabilization 20 TOTALS: 0.01 < 0.01 0.04 < 0.01 < 0.01 0 0 92 *Rounded totals are sum of actual impacts NOTES: 6/22/2020