Loading...
HomeMy WebLinkAboutNCC202727_ESC Approval Submitted_20200629ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROUNA Environmental Quality June 1, 2020 LETTER OF APPROVAL Express Option McKee Homes, LLC Attn: Jessica De La Cruz, Accounting Specialist 109 Hay Street; Suite 301 Fayetteville, NC 28301 RE: Project Name: Fairfield Farms — Lot.246 Acres Approved: 0.33 Project ID: CUMBE-2020-190 County: Cumberland, City: Carvers Creek, Address: Carswell Dr River Basin: Cape Fear Stream Classification: Other Submitted By: Averette Engineering Co., P.A. Date Received by LQS: June 1, 2020 Plan Type: Express Dear Ms. De La Cruz: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at de .nc.gov/NCGOL Please direct questions about the NOI form to Annette Lucas at Annette.hicasrilncdenr.gov or Paul Clark at Paul.clarknncdenngov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. IIN N North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources IEFayetteville Regional office ( 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 r 910.433,3300