Loading...
HomeMy WebLinkAbout20200775 Ver 1_Meeting Minutes and Landowner Contact Info_20200626Strickland, Bev From: Reid, Matthew Sent: Friday, June 26, 2020 1:40 PM To: Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B; Munzer, Olivia; Wilson, Travis W. Cc: Bryan Dick; Ian Jewell; Wiesner, Paul; Phillips, Kelly D Subject: Middendorf Post Contract Meeting Minutes and Landowner Contact Info Attachments: Middendorf Springs_IRT Post -Contract Site Visit Meeting Minutes_6-25-20.pdf OR Attached are the Post Contract Meeting Minutes for the Middendorf Springs Restoration Site from June, 6, 2020. Please let me know if you have any questions, comments or concerns with the meeting minutes. Also, below is the land owner contact information for referral to the Charlotte USACE office: Owner Name: RTB Associates, LLC and DEB, LLC Address: 28838 Kendalls Church Rd Richfield, NC 28137 Representative: Aaron Burleson Phone #: 704-985-0438 Thank you, Matthew Reid Project Manager — Western Region North Carolina Department of Environmental Quality Division of Mitigation Services 828-231-7912 Mobile matthew.reida-ncdenr.gov Western DMS Field Office 5 Ravenscroft Dr Suite 102 Asheville, NC 28801 k T: Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 PROJECT: NAME OF MEETING: RECORDED BY: DATE: LOCATION: ATTENDEES: Middendorf Springs Stream and Wetland Mitigation Site Post -Contract IRT Site Visit Ian Jewell, Bryan Dick June 8, 2020 Middendorf Springs Site, Anson County, NC Todd Tugwell (USACE) Olivia Munzer (NCWRC) Paul Wiesner (NCDEQ- DMS) Kelly Phillips (NCDEQ- DMS) Erin Davis (NCDEQ-DWR) Travis Wilson (NCWRC) Matthew Reid (NCDEQ-DMS) Bryan Dick (FNI) Ian Jewell (FNI) The following reflects our understanding of the items discussed during the subject meeting. ITEM DESCRIPTION 1. DMS started with introductions and overarching description of site. FNI provided detailed overview of site, including description of underlying geology. Noted that the site sits at the intersection of sandhills Middendorf formation and slate belt meta- argillite formation, which is hypothesized to be the cause of numerous springs and seeps on 2. site and presence of perennial flow in relatively small headwater streams. Option B in proposal is selected Option, which represents 13,000 stream mitigation units and 5 riparian wetland mitigation units. Described current impairment and impacts to streams and water quality. 3. DMS opened up discussion to general questions before site tour began. NCDWR asked why one option listed restoration for all streams while another option listed enhancement for all streams. If enhancement is possible why restore? FNI indicated that the restoration approach to the streams was considered the best approach for full ecological 4' uplift of the site, due to current level of degradation. Enhancement option was provided because it was uncertain whether IRT would agree with full need for restoration, so the option was given to provide flexibility in viewpoints. However, FNI believes based on its best scientific judgement and analysis of current conditions, that restoration on all reaches (with exception of Tributary 1B and 1C) is necessary. Question was asked by DWR as to why only one side of Tributary 1A(upper) was being proposed for protection in the Conservation Easement. Bryan responded because 5. landowner only owns one side of the stream and because FNI wanted to provide connectivity between the restored reach of Tributary 1A(lower) and Tributary 1B and 1C. No credit is being proposed for the connecting reach on which only one side is available. USACE and NCDWR stated there was confusion in proposal about what the proposed wetland saturation/hydrope riod threshold would be for the project. In one place the 6. proposal indicated 5% but the established threshold in the 2016 "Wilmington District Stream and Wetland Compensatory Mitigation Update" is 10% to 12% for Chewacla soils. FNI indicated that they intent is to follow the 2016 guidelines for the threshold, so the 5% is incorrect. Meeting Title Meeting Date Page 2 of 3 ITEM DESCRIPTION Question was asked by DWR about the width and number of proposed crossings. They would like to only see one crossing and indicated that it must be less than the proposed 80'. 7' They would like to see it get down to 30' to 40' in width. Bryan (FNI) explain that the crossing was made this wide due to past experience with farmers not being able to get large combine headers through a crossing without impact to conservation easement. However, FNI will discuss with landowners about reducing the width down to 40' to 60'. USACE indicated that they need to further investigate site to ensure compliance with water 8. quality rules. They will refer investigation to local office of USACE (Charlotte). They asked for contact information for the landowner. FNI will provide this. 9. DWR indicated that they would like to see a buffer on South Fork Jones Creek if possible. 10. For the sake of time, it was agreed that tour of the site would look at representative reaches and wetland areas rather than all streams on the site. Tour began at upstream end of Tributary 6. Based on review, USACE agreed that restoration approach could be justified here based on level of impairment. USACE asked about the 11. transition from upstream where the tributary begins to the start of proposed restoration, and how the transition to a raised streambed would occur. FNI indicated that a flatter slope would be designed in the channel from the start of restoration until the Priority I elevation was achieved, which would require a short stretch of Priority II. DWR indicated that wood structures would be preferred. Bryan explained that wood sills 12. would be the primary form of structure used for grade control and to create dynamic bedform in the channel. Tour continued to downstream end of Tributary 6. USACE noted that the flattening of the slope at the South Fork Jones Creek floodplain might create a challenge for maintaining a 13. defined steam channel for the restored tributaries. DWR asked if similar systems/reference systems could be examined across South Fork Jones Creek or elsewhere. Bryan indicated that there are likely similar systems nearby both in North and South Carolina and FNI will examine these during design for reference conditions. Tour continued upstream along Tributaries 5 and 4 and stopped at upstream end of Tributary 4b. Question was asked by DWR and NCWRC about why restoration started downstream of road when defined channel continues upstream of road. FNI explained that the channel upstream was dry when investigated in the fall of 2019 while the baseflow 14. indicators seemed to start immediately below the road. USACE indicated a jurisdictional determination will be important to establish the origin point of jurisdictional status for all tributaries and help define appropriate starting point for restoration. USACE was concerned about impacts on restored channel if upstream channel left unprotected. DWR indicated that a wetland or marsh treatment could be used to help treat and filter nutrients prior to entering conservation easement and should be considered. 15. Tour continued to upstream end of Tributary 1 and followed downstream to proposed wetland restoration area. 16. Question was asked by USACE and DWR about widening the buffers due to numerous seeps and side springs adjacent to the stream. They would like to see buffer widened if possible. At proposed wetland restoration area, USACE indicated that they would like to see a buffer 17. of the wetland, rather than wetland being the edge of the easement. Also should connect easement of wetland area to stream easement, rather than it being disconnected. Meeting Title Meeting Date Page 3 of 3 ITEM DESCRIPTION USACE indicated that jurisdictional determination of wetlands on site will be needed to establish rehabilitation versus reestablishment approach to the wetland restoration. If 18. significant impact is shown to wetland from tiling and draining and re-establishment is proposed, then will need gage data and establishment of water budget to show restoration of hydrology. DWR indicated that with rehabilitation, will need to see description of existing function and proposed function. Pre -construction function will need to be established with gage data. 19. Any areas proposed for possible alternative wetland restoration areas would also need establishment of function through gages as well, so should install gages wherever we want to have option to propose wetland restoration. Todd with USACE indicated that he thought wetland restoration area would be majority 1:1 20. credit ratio however any wetland areas upstream of Tributaries 4 and 5 would be a lower credit ratio. USACE felt downstream wetland areas have a lot of potential for uplift. Tour continued to Tributaries 1B and 1C, which are upstream of Tributary 1A. After viewing these streams, USACE and DWR were concerned that Enhancement Level I wasn't fully justified for these reaches but indicated that FNI would need to provide good 21. documentation and justification of proposed approach. USACE indicated that at tie-in point of Tributary 1B with Tributary 1A, 1B should not run parallel with 1A since this approach has created problems in the past. Both USACE and DWR indicated that minimal sinuosity would appropriate for these reaches. WRC asked where material to fill abandoned channels would come from. FNI indicated that 22. material would be found on -site, primarily from aeras lateral to the channel and from excavation of new channels. FNI will examine the fill and determine if it suitable for this use. DWR and WRC encourage monitoring of streamflow on site. WRC suggested using game 23. cameras as a visual monitoring device for presence of baseflow. FNI indicated they had a couple of these at the site and would likely add more.