HomeMy WebLinkAbout20140129 Ver 1_Field Notes 20180619_20180618Strickland, Bev
From: Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent: Tuesday, June 9, 2020 10:23 AM
To: Davis, Erin B; Haywood, Casey M CIV USARMY CESAW (USA); Tugwell, Todd J CIV
USARMY CESAW (US); Bowers, Todd; Wilson, Travis W.
Subject: [External] Little Buffalo notes
Attachments: Field Notes Little Buffalo 20180619.pdf
Follow Up Flag: Follow up
Flag Status: Completed
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
These are my field notes from our site visit in June 2018 for this close-out, if you're interested. Sounds like not much has
changed.
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG
1
Meeting Notes
Date: June 19, 2018
Type of Site: NCDMS Stream Site
Prepared By: Kim Browning
Sponsor/Provider: NCDMS
Meeting Type: Monitoring Site Review
County: Cabarrus
Action ID: SAW-
Basin and HUC: Yadkin - 03040105
Project Name: Little Buffalo
Coordinates:
I °N
°W
Attendees:
Kim Browning
DWR-Mac Haupt
DMS-Paul, Kelly
Louis Berger- Robin, Matt Hilthouse, Doug, Austin
Notes, Sketch, etc.:
MY4. 5 year site. MIT Plan not reviewed by IRT
previously, close out site.
Cattle in buffer last 3 years, invasive, flow concerns on two tribs, areas of low growth. Gages?
UT2 & 3- limited Flow. UT 2 didn't have continuous flow 30 days in year 2. UT5 had gauge installed this year. UT3
had repair work, El type work on Ell area. Patchwork from cattle getting in. UT2 more of a linear wetland rather than
channel, silted in. 4 plots didn't meet veg but meets with volunteers, some bare areas. Plan to do some planting this
fall, may need more monitoring time. VP11 has a lot of shallow bedrock, copper mining, copper toxicity to veg.
Crossing being taken out, dealing with property office with DMS. Beaver dams at top of project, still backwater in some
areas, pulling out by hand. Invasives Tree of Heaven Palawnia, privet.
Reach 1 upper mainstem, veg sparse in VP11, floods. Beaver dam backing water up. P2 floodplain, bare soil. Buffer
narrow on one side
UT2- more wetland like , pond above, flat with no slope. They can't find the gauge at the bottom of channel(pressure
transducer). Mac asked for another gauge half way up the channel towards pond. There is a gauge at top. Mac asked
to do a transect for veg. Cattle have been in this area. Veg is very low vigor here.
Reach 3 R area has some minor bank erosion. Good substrate and good veg.
Reach 4, near UT3, veg is low vigor. Cattle were grazing this area. Veg is a concern.
UT3- Ell currently water in channel. R at top. Some work was done in MY2 because cattle were in here, more like El
work. Veg is low vigor here. Putting gauge in middle of this reach.
UT5- no flow. Veg in channel. Soils have some redox but not hydric in most areas. Probably not credible.
UT6- one small area where it flows subsurface about 10 feet
Action Items: