HomeMy WebLinkAbout20150903 Ver 1_Notice of Initial Credit Release_20200605Strickland, Bev
From: Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent: Friday, June 5, 2020 11:50 AM
To: Crocker, Lindsay; Baumgartner, Tim; Tim Morris; Phillips, Kelly D
Cc: Tugwell, Todd J CIV USARMY CESAW (US); Haupt, Mac; Davis, Erin B; Wilson, Travis W.;
Mickey Sugg; Crumbley, Tyler A CIV USARMY CESAW (USA); McLendon, C S CIV
USARMY CESAW (USA); kathryn_matthews@fws.gov; Bowers, Todd; Merritt, Katie;
Haywood, Casey M CIV USARMY CESAW (USA); Jessop, Jordan E CIV USARMY CESAW
(USA)
Subject: [External] Notice of Initial Credit Release / Rough Horn Swamp & Rough Horn Swamp
II / Columbus County
Attachments: Rough Horn_97005_LU 03_RW_NRW_Initial Release.pdf, Rough Horn II_100053_LU 03
_STR_RW_Initial Release.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good morning,
The 15-Day Record Drawing review for the following projects ended June 4, 2020. Per Section 332.8(o)(9) of the 2008
Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are
incorporated in this email. Please address IRT concerns in the MY1 Report. There were no objections to issuing the initial
credit release. Please find attached the current signed ledgers. The IRT would like to visit this site after a year's
monitoring data is available.
Name: Rough Horn Swamp USACE ID: SAW-2015-00952
Name: Rough Horn Swamp II USACE ID: SAW-2016-02026
DWR Comments, Erin Davis:
1. Based on observations during the IRT construction site walk, a pilot channel was created within the headwater
stream reaches. DWR's mitigation plan review comment #2 specified that we "would require at least 3-4 cross
sections, with at least one cross section in the wooded area" if a pilot channel was constructed. Please include
this cross section data and corresponding map locations in the MY1 Report.
2. No flow documentation devices (gauges or cameras) have been located along UT1, UT2-2, UT3-2 or UT4. DWR
recommends that flow devices be included for these creditable headwater stream reaches to demonstrate
success of the 30 day continuous flow performance standard.
EPA Comments. Todd Bowers:
After a thorough review, the EPA Region 4 Oceans, Wetlands and Stream Protection Branch has no substantial
comments or concerns with the As-Built/MYO Report for the RHS and RHS II mitigation sites. The report appears to be in
order and presents a well built and thus far, well performing site with much potential for functional uplift of aquatic
resources. I really appreciated the extensive photo and video coverage of the site as I have not had the opportunity to
visit the site during the design and development phase of the site. I also appreciate the amount of ground water well
data over the previous 3 growing seasons to illustrate the effects of ditches, the site response after Hurricane Florence
(Sept 2018) and the anticipated return of groundwater hydrology to the reestablished wetlands. EPA recommends the
appropriate release of credits to proceed as planned.
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG
Mitigation Project Name
Rough Horn Swamp Restoration Site USACE Action ID
DMS ID
97005
DWR Permit
River Basin
Lumber
Date Project Instituted
Cataloging Unit
03040203
Date Prepared
County
Columbus
Stream/Wet. Service Area
BROWN ING.KIMBERLY.DANIE
Digitally signed by
BROWN ING.KIMBERLY.DANIELLE.1527683510
LLE.1527683510
Date: 2020.06.05 11:08:59-04'00'
Signature of Official Approving Credit Release
2015-00952
2015-0903
7/16/2015
5/13/2020
Lumber 03040203
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases %
Proposed
Releases %
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
30.00%
6.080
0.000
6.080
2020
5/13/2020
3 - Year 1 Monitoring
10.00%
2021
4 - Year 2 Monitoring
10.00%
2022
5 - Year 3 Monitoring
15.00%
2023
6 - Year 4 Monitoring
5.00%
2024
7 - Year 5 Monitoring
15.00%
2025
8 - Year 6 Monitoring
5.00%
2026
9 - Year 7 Monitoring
10.00%
2027
Stream Bankfull Standard
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Totals
6.080
Total Gross Credits
20.267
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
6.080
Total Percentage Released
30.00%
Remaining Unreleased Credits
14.187
Credit Release Milestone
Non -Riparian Credits
Project Credits
Scheduled
Releases %
Proposed
Releases %
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
30.00%
3.562
0.000
3.562
2020
5/13/2020
3 - Year 1 Monitoring
10.00%
2021
4 - Year 2 Monitoring
10.00%
2022
5 - Year 3 Monitoring
15.00%
2023
6 - Year 4 Monitoring
5.00%
2024
7 - Year 5 Monitoring
15.00%
2025
8 - Year 6 Monitoring
5.00%
2026
9 - Year 7 Monitoring
10.00%
2027
Stream Bankfull Standard
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Totals
3.562
Total Gross Credits
11.873
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
3.562
Total Percentage Released
30.00%
Remaining Unreleased Credits
8.311
Page 1 of 2
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Notes
Contingencies (if any)
Project Quantities
Rough Horn Swamp Restoration Site
97005
Lumber
03040203
Columbus
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/Wet. Service Area
Mitigation Type
Restoration Type
Physical Quantity
Riparian
Restoration
20.267
Non -Riparian
Restoration
11.873
2015-00952
2015-0903
7/16/2015
5/13/2020
Lumber 03040203
Non -Riparian
Riparian
Debits
Restoration
Restoration
Credits
Beginning Balance (mitigation credits)
20.267
11.873
Released Credits
6.080
3.562
Unrealized Credits
0.000
0.000
USACE Permit
DWR
DCM
Owning Program
Req. Id
TIP #
Project Name
#
Permit #
Permit #
Statewide Stream &
REQ-005514
PNG Sutton
2010-01309
2011-0855
3.449
Wetland ILF Program
Statewide Stream &
PNG Line 34
Wetland ILF Program
REQ-006389
Replacement Project
2014-02235
2015-0507
1.161
Statewide Stream &
PNG Line 1
Wetland ILF Program
REQ-006394
Replacement
2015-00195
1.280
Statewide Stream &
Smithfield Foods
REQ-006930
2017-00550
1991-0022
0.040
Wetland ILF Program
Expansion
Statewide Stream &
REQ-007528
Industrial Park Utility
2018-01004
2018-0687
0.150
Wetland ILF Program
Statewide Stream &
REQ-007024
Atlantic Coast Pipeline
2014-01558
3.562
Wetland ILF Program
Total Credits Debited
6.080
3.562
Remaining Available balance (Released credits)
0.000
0.000
Remaining balance (Unreleased credits)
14.187
8.311
Page 2 of 2
Mitigation Project Name Rough Horn Swamp II Restoration Site USACE Action ID
DMS ID 100053 DWR Permit
River Basin Lumber Date Project Instituted
Cataloging Unit 03040203 Date Prepared
County Columbus Stream/Wet. Service Area
BROWN ING.KIMBERLY.DANIELLE.152 Digitally signed by
BROWN ING.KIMBERLY.DANIELLE.1527683510
7683510 Date: 2020.06.05 11:15:16-04'00'
Signature of Official Approving Credit Release
2016-02026
2015-0903
4/25/2018
5/13/2020
Lumber 03040203
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Warm Stream Credits
Project Credits
Scheduled
Releases %
Proposed
Releases %
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
30.00%
1,368.960
0.000
1,368.960
2020
5/13/2020
3 - Year 1 Monitoring
10.00%
2021
4 - Year 2 Monitoring
10.000
2022
5 - Year 3 Monitoring
10.00%
2023
6 - Year 4 Monitoring
5.00%
2024
7 - Year 5 Monitoring
10.00%
2025
8 - Year 6 Monitoring
5.00%
2026
9 - Year 7 Monitoring
10.00%
2027
Stream Bankfull Standard
10.00%
Totals
1,368.960
Total Gross Credits
4,563.200
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,368.960
Total Percentage Released
30.00%
Remaining Unreleased Credits
3,194.240
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases %
Proposed
Releases %
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
30.00%
6.299
0.000
6.299
2020
5/13/2020
3 - Year 1 Monitoring
10.00%
2021
4 - Year 2 Monitoring
10.00%
2022
5 - Year 3 Monitoring
15.00%
2023
6 - Year 4 Monitoring
5.00%
2024
7 - Year 5 Monitoring
15.00%
2025
8 - Year 6 Monitoring
5.00%
2026
9 - Year 7 Monitoring
10.00%
2027
Stream Bankfull Standard
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Totals
6.299
Total Gross Credits
20.993
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
6.299
Total Percentage Released
30.01%
Remaining Unreleased Credits
14.694
Page 1 of 2
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Notes
Contingencies (if any)
Project Quantities
Rough Horn Swamp II Restoration Site
100053
Lumber
03040203
Columbus
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/Wet. Service Area
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
4,446.000
Warm Stream
Enhancement II
164.000
Warm Stream
Preservation
516.000
Riparian
Restoration
17.079
Riparian
Enhancement
5.956
Riparian
Preservation
15.319
2016-02026
2015-0903
4/25/2018
5/13/2020
Lumber 03040203
Stream
Stream
Riparian
Debits
Restoration
Restoration
Riparian
Restoration
Credits
Equivalent
Restoration
Equivalent
MENNEEMEL-
Credits
Credits
Beginning Balance (mitigation credits)
4,511.600
51.600
17.079
3.914
Released Credits
1,353.480
15.480
5.124
1.175
Unrealized Credits
0.000
0.000
0.000
0.000
USACE Permit
DWR
DCM
Owning Program
Req. Id
TIP #
Project Name
#
Permit #
Permit #
Statewide Stream &
REQ-005686
Bojangles' Lumberton
2012-00771
2012-0727v3
0.966
Wetland ILF Program
Statewide Stream &
REQ-005932
Mid South Club
2007-00490
2007-0128
0.340
Wetland ILF Program
Statewide Stream &
REQ-006389
PNG Line 34
2014-02235
2015-0507
0.359
Wetland ILF Program
Replacement Project
NCDOT Stream & Wetland
REQ-006688
SR 1504 - Bridge 175 -
2016-02399
0.040
ILF Program
Division 6
NCDOT Stream & Wetland
REQ-006702
SR 1005 - Bridge
2017-00317
0.040
ILF Program
230126 - Division 6
NCDOT Stream & Wetland
SR 1112 - Bridge 19
REQ-006741
2017-00450
0.080
ILF Program
Division 8
NCDOT Stream & Wetland
REQ-007172
P-4900
Rail - Pembroke
2006-33096
2015-0068
0.407
ILF Program
Connector
NCDOT Stream & Wetland
Rail - Pembroke
REQ-007370
P-4900
2006-33096
2015-0068
0.050
ILF Program
Connector
NCDOT Stream & Wetland
REQ-007370
P-4900
Rail - Pembroke
2006-33096
2015-0068
0.050
ILF Progrz
lConnector
Total Credits Debited
0.000
0.000
2.282
0.050
Remaining Available balance (Released credits)
1,353.480
15.480
2.842
1.125
Remaining balance (Unreleased credits)
3,158.120
36.120
11.955
2.739
Page 2 of 2