Loading...
HomeMy WebLinkAbout20150903 Ver 1_Notice of Initial Credit Release_20200605Strickland, Bev From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Friday, June 5, 2020 11:50 AM To: Crocker, Lindsay; Baumgartner, Tim; Tim Morris; Phillips, Kelly D Cc: Tugwell, Todd J CIV USARMY CESAW (US); Haupt, Mac; Davis, Erin B; Wilson, Travis W.; Mickey Sugg; Crumbley, Tyler A CIV USARMY CESAW (USA); McLendon, C S CIV USARMY CESAW (USA); kathryn_matthews@fws.gov; Bowers, Todd; Merritt, Katie; Haywood, Casey M CIV USARMY CESAW (USA); Jessop, Jordan E CIV USARMY CESAW (USA) Subject: [External] Notice of Initial Credit Release / Rough Horn Swamp & Rough Horn Swamp II / Columbus County Attachments: Rough Horn_97005_LU 03_RW_NRW_Initial Release.pdf, Rough Horn II_100053_LU 03 _STR_RW_Initial Release.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good morning, The 15-Day Record Drawing review for the following projects ended June 4, 2020. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All comments received from the NCIRT are incorporated in this email. Please address IRT concerns in the MY1 Report. There were no objections to issuing the initial credit release. Please find attached the current signed ledgers. The IRT would like to visit this site after a year's monitoring data is available. Name: Rough Horn Swamp USACE ID: SAW-2015-00952 Name: Rough Horn Swamp II USACE ID: SAW-2016-02026 DWR Comments, Erin Davis: 1. Based on observations during the IRT construction site walk, a pilot channel was created within the headwater stream reaches. DWR's mitigation plan review comment #2 specified that we "would require at least 3-4 cross sections, with at least one cross section in the wooded area" if a pilot channel was constructed. Please include this cross section data and corresponding map locations in the MY1 Report. 2. No flow documentation devices (gauges or cameras) have been located along UT1, UT2-2, UT3-2 or UT4. DWR recommends that flow devices be included for these creditable headwater stream reaches to demonstrate success of the 30 day continuous flow performance standard. EPA Comments. Todd Bowers: After a thorough review, the EPA Region 4 Oceans, Wetlands and Stream Protection Branch has no substantial comments or concerns with the As-Built/MYO Report for the RHS and RHS II mitigation sites. The report appears to be in order and presents a well built and thus far, well performing site with much potential for functional uplift of aquatic resources. I really appreciated the extensive photo and video coverage of the site as I have not had the opportunity to visit the site during the design and development phase of the site. I also appreciate the amount of ground water well data over the previous 3 growing seasons to illustrate the effects of ditches, the site response after Hurricane Florence (Sept 2018) and the anticipated return of groundwater hydrology to the reestablished wetlands. EPA recommends the appropriate release of credits to proceed as planned. Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG Mitigation Project Name Rough Horn Swamp Restoration Site USACE Action ID DMS ID 97005 DWR Permit River Basin Lumber Date Project Instituted Cataloging Unit 03040203 Date Prepared County Columbus Stream/Wet. Service Area BROWN ING.KIMBERLY.DANIE Digitally signed by BROWN ING.KIMBERLY.DANIELLE.1527683510 LLE.1527683510 Date: 2020.06.05 11:08:59-04'00' Signature of Official Approving Credit Release 2015-00952 2015-0903 7/16/2015 5/13/2020 Lumber 03040203 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Proposed Releases % Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 30.00% 6.080 0.000 6.080 2020 5/13/2020 3 - Year 1 Monitoring 10.00% 2021 4 - Year 2 Monitoring 10.00% 2022 5 - Year 3 Monitoring 15.00% 2023 6 - Year 4 Monitoring 5.00% 2024 7 - Year 5 Monitoring 15.00% 2025 8 - Year 6 Monitoring 5.00% 2026 9 - Year 7 Monitoring 10.00% 2027 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 6.080 Total Gross Credits 20.267 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 6.080 Total Percentage Released 30.00% Remaining Unreleased Credits 14.187 Credit Release Milestone Non -Riparian Credits Project Credits Scheduled Releases % Proposed Releases % Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 30.00% 3.562 0.000 3.562 2020 5/13/2020 3 - Year 1 Monitoring 10.00% 2021 4 - Year 2 Monitoring 10.00% 2022 5 - Year 3 Monitoring 15.00% 2023 6 - Year 4 Monitoring 5.00% 2024 7 - Year 5 Monitoring 15.00% 2025 8 - Year 6 Monitoring 5.00% 2026 9 - Year 7 Monitoring 10.00% 2027 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 3.562 Total Gross Credits 11.873 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 3.562 Total Percentage Released 30.00% Remaining Unreleased Credits 8.311 Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Notes Contingencies (if any) Project Quantities Rough Horn Swamp Restoration Site 97005 Lumber 03040203 Columbus USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area Mitigation Type Restoration Type Physical Quantity Riparian Restoration 20.267 Non -Riparian Restoration 11.873 2015-00952 2015-0903 7/16/2015 5/13/2020 Lumber 03040203 Non -Riparian Riparian Debits Restoration Restoration Credits Beginning Balance (mitigation credits) 20.267 11.873 Released Credits 6.080 3.562 Unrealized Credits 0.000 0.000 USACE Permit DWR DCM Owning Program Req. Id TIP # Project Name # Permit # Permit # Statewide Stream & REQ-005514 PNG Sutton 2010-01309 2011-0855 3.449 Wetland ILF Program Statewide Stream & PNG Line 34 Wetland ILF Program REQ-006389 Replacement Project 2014-02235 2015-0507 1.161 Statewide Stream & PNG Line 1 Wetland ILF Program REQ-006394 Replacement 2015-00195 1.280 Statewide Stream & Smithfield Foods REQ-006930 2017-00550 1991-0022 0.040 Wetland ILF Program Expansion Statewide Stream & REQ-007528 Industrial Park Utility 2018-01004 2018-0687 0.150 Wetland ILF Program Statewide Stream & REQ-007024 Atlantic Coast Pipeline 2014-01558 3.562 Wetland ILF Program Total Credits Debited 6.080 3.562 Remaining Available balance (Released credits) 0.000 0.000 Remaining balance (Unreleased credits) 14.187 8.311 Page 2 of 2 Mitigation Project Name Rough Horn Swamp II Restoration Site USACE Action ID DMS ID 100053 DWR Permit River Basin Lumber Date Project Instituted Cataloging Unit 03040203 Date Prepared County Columbus Stream/Wet. Service Area BROWN ING.KIMBERLY.DANIELLE.152 Digitally signed by BROWN ING.KIMBERLY.DANIELLE.1527683510 7683510 Date: 2020.06.05 11:15:16-04'00' Signature of Official Approving Credit Release 2016-02026 2015-0903 4/25/2018 5/13/2020 Lumber 03040203 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Warm Stream Credits Project Credits Scheduled Releases % Proposed Releases % Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 30.00% 1,368.960 0.000 1,368.960 2020 5/13/2020 3 - Year 1 Monitoring 10.00% 2021 4 - Year 2 Monitoring 10.000 2022 5 - Year 3 Monitoring 10.00% 2023 6 - Year 4 Monitoring 5.00% 2024 7 - Year 5 Monitoring 10.00% 2025 8 - Year 6 Monitoring 5.00% 2026 9 - Year 7 Monitoring 10.00% 2027 Stream Bankfull Standard 10.00% Totals 1,368.960 Total Gross Credits 4,563.200 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,368.960 Total Percentage Released 30.00% Remaining Unreleased Credits 3,194.240 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Proposed Releases % Proposed Released # Not Approved # Releases Approved Credits Anticipated Release Year Actual Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 30.00% 6.299 0.000 6.299 2020 5/13/2020 3 - Year 1 Monitoring 10.00% 2021 4 - Year 2 Monitoring 10.00% 2022 5 - Year 3 Monitoring 15.00% 2023 6 - Year 4 Monitoring 5.00% 2024 7 - Year 5 Monitoring 15.00% 2025 8 - Year 6 Monitoring 5.00% 2026 9 - Year 7 Monitoring 10.00% 2027 Stream Bankfull Standard N/A N/A N/A N/A N/A N/A N/A Totals 6.299 Total Gross Credits 20.993 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 6.299 Total Percentage Released 30.01% Remaining Unreleased Credits 14.694 Page 1 of 2 Mitigation Project Name DMS ID River Basin Cataloging Unit County Notes Contingencies (if any) Project Quantities Rough Horn Swamp II Restoration Site 100053 Lumber 03040203 Columbus USACE Action ID DWR Permit Date Project Instituted Date Prepared Stream/Wet. Service Area Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 4,446.000 Warm Stream Enhancement II 164.000 Warm Stream Preservation 516.000 Riparian Restoration 17.079 Riparian Enhancement 5.956 Riparian Preservation 15.319 2016-02026 2015-0903 4/25/2018 5/13/2020 Lumber 03040203 Stream Stream Riparian Debits Restoration Restoration Riparian Restoration Credits Equivalent Restoration Equivalent MENNEEMEL- Credits Credits Beginning Balance (mitigation credits) 4,511.600 51.600 17.079 3.914 Released Credits 1,353.480 15.480 5.124 1.175 Unrealized Credits 0.000 0.000 0.000 0.000 USACE Permit DWR DCM Owning Program Req. Id TIP # Project Name # Permit # Permit # Statewide Stream & REQ-005686 Bojangles' Lumberton 2012-00771 2012-0727v3 0.966 Wetland ILF Program Statewide Stream & REQ-005932 Mid South Club 2007-00490 2007-0128 0.340 Wetland ILF Program Statewide Stream & REQ-006389 PNG Line 34 2014-02235 2015-0507 0.359 Wetland ILF Program Replacement Project NCDOT Stream & Wetland REQ-006688 SR 1504 - Bridge 175 - 2016-02399 0.040 ILF Program Division 6 NCDOT Stream & Wetland REQ-006702 SR 1005 - Bridge 2017-00317 0.040 ILF Program 230126 - Division 6 NCDOT Stream & Wetland SR 1112 - Bridge 19 REQ-006741 2017-00450 0.080 ILF Program Division 8 NCDOT Stream & Wetland REQ-007172 P-4900 Rail - Pembroke 2006-33096 2015-0068 0.407 ILF Program Connector NCDOT Stream & Wetland Rail - Pembroke REQ-007370 P-4900 2006-33096 2015-0068 0.050 ILF Program Connector NCDOT Stream & Wetland REQ-007370 P-4900 Rail - Pembroke 2006-33096 2015-0068 0.050 ILF Progrz lConnector Total Credits Debited 0.000 0.000 2.282 0.050 Remaining Available balance (Released credits) 1,353.480 15.480 2.842 1.125 Remaining balance (Unreleased credits) 3,158.120 36.120 11.955 2.739 Page 2 of 2