HomeMy WebLinkAbout20180182 Ver 2_Cover Ltr Draft As-built Baseline MR_20200605Strickland, Bev
From: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>
Sent: Friday, June 5, 2020 7:03 AM
To: Leslie, Andrea J; Davis, Erin B; Haupt, Mac; Tugwell, Todd J CIV USARMY CESAW (US);
Kim Browning; Byron Hamstead (byron_hamstead@fws.gov); Bowers, Todd
Cc: Jones, M Scott (Scott) CIV USARMY CESAW (USA)
Subject: [External] FW: Red Barn Baseline Monitoring Report
Attachments: RD00092_Cover Letter_USACE_Red Barn.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
All,
I received the as -built report from EPR for the Red Barn Mitigation Bank. It appears to have a few incomplete items, but
overall is enough to continue with the site visit next week on June 10th. I have uploaded it to the Red Barn folder on
RIBITS at the following
link: httos://ribits.oDs.usace.armv.mil/ords/f?p=107:278:11384556353843::NO:RP.278:P278 BANK ID:4775
Please contact me if you are unable to access the file or have any questions. To those attending Wednesday, we will be
meeting at 10am on Timeless Trail, Mt Airy, Surry County(36.491789,-80.639214).
Regards,
Steve Kichefski
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District, Asheville Field Office
151 Patton Avenue, Suite 208
Asheville, NC 28801
(828)-271-7980 Ext. 4234
(828)-933-8032 cell
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at our website at
http://corpsmapu.usace.armV.mil/cm apex/f?p=136:4:0 to complete the survey online.
From: Cidney Jones <cjones@eprusa.net>
Sent: Wednesday, June 3, 2020 12:25 PM
To: Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski @usace.army.mil>
Cc: Kevin Tweedy <ktweedy@eprusa.net>
Subject: [Non-DoD Source] Red Barn Baseline Monitoring Report
Good morning Steve,
Hope this message finds you well! Please find attached a cover letter for the Draft As -built Baseline Monitoring Report
for the Red Barn Mitigation Bank Site. The report, with appendices and plan sheets, is available for download at the link
below. Please let me know if you have any trouble downloading the file.
Blockedhttps://epr-tx.sharefile.com/d-sc51a2d593aa4fadb
Best, Cidney
ECOSYSTEM
PLAWAING &
s RESTORATION
Cidney Jones, PE & CFM
Water Resources Engineer
1150 SE Maynard Road, Suite 140
Cary, NC 27511
919-388-0787 (office)
925-337-1470 (cell)
919-388-0789 (fax)
Blockedwww.eorusa. net
L LY
ECOSYSTEM
PLANNING &
' RESTORATION
Mr. Steve Kichefski
151 Patton Ave, Room 208
Asheville, NC 28801
June 3, 2020
RE: Draft As -built Baseline Monitoring Report
Red Barn Mitigation Bank Site
Surry County, North Carolina
SAW-2017-01927
Dear Mr. Kichefski,
Ecosystem Planning and Restoration, LLC
1150 SE Maynard Road, Suite 140
Raleigh, NC 27511
Phone: (919) 388-0787
www.eprusa.net
Ecosystem Planning and Restoration, PLLC (EPR) has prepared the Red Barn Mitigation Bank As -
built Baseline Monitoring Report for your review prior to the scheduled on -site field meeting on
June 10th, 2020. Following the field meeting, EPR will provide meeting notes and accept comments
on these documents.
While construction was completed in March 2020 and planting was completed in April 2020,
unforeseen delays have delayed the completion of the easement fencing and as -built survey of the
Site. The draft documents are submitted for review with a few known deficiencies EPR is working to
remedy as soon as possible and prior to submitting and Final Baseline Monitoring Report for the
Site. Noted deficiencies are listed below and are not noted in the draft documents as they will be
remedied before submitting the final report.
• The UT3 culvert was installed in the incorrect location and the roadway crossing alignment
is incorrect (see Sheet 15 in As -built Plan Sheets). The contractor will be fixing this as soon
as site wetness conditions allow.
• Fencing and a gate near the UT3 culvert have mistakenly been installed within the
conservation easement and will be moved to their correct locations as soon as wetness
conditions allow. (see Sheet 15 in As -built Plan Sheets).
• The surveyed channel top of bank feature does not match with observed site conditions
(documented in site cross sections) at the following locations. Stations match the
longitudinal profile provided in Appendix D. The surveyor will be going back out the week of
June 1 to review site conditions and verify top of bank features.
o UT1a 10+00 to 17+00
o UT2c 33+00 to 34+00
o UT3b 24+00 to 25+00
o UT3cd 35+00 to 38+00
"`�—� Providing ecosystem planning and restoration services to support a sustainable environment �..�"
Ecosystem Planning and Restoration, LLC
ECOSYSTEM 1150 SE Maynard Road, Suite 140
PLANNING
Raleigh, NC 27511
&
' RESTORATION Phone: (919) 388-0787
www.eprusa.net
• Some structures that were installed were missed in the As -built survey (e.g., the structures
between UT1 10+00 and 10+80 shown on Sheet 3 of the As -built Plan Sheets). The surveyor
will be going back out the week of June 1 to collect this missing information.
• The As -built Plan Sheets is not yet sealed by a licensed PE or PLS. The final documents, once
reviewed and confirmed to be accurate, will be sealed by a licensed PE and PLS.
Please also note that EPR is in the process of releasing three areas from the recorded conservation
easement. These areas include a pedestrian crossing over UT2c where a pedestrian bridge will be
installed; a riffle crossing connecting the properties on either side of UT3c; and an area along the
property line of UT1a where leaving an existing fence will help protect the easement against
encroachment. These easement corners will be marked this month and the paperwork to release
them has begun. EPR will submit a draft release to USACE to review before releasing these areas
from the conservation easement.
If you have any questions regarding the Draft As -built Baseline Monitoring Report, please contact me
at 919-999-0262 or via email at ktweedv@eprusa.net.
Sincerely, Kevin Tweedy, PE