Loading...
HomeMy WebLinkAbout20180182 Ver 2_RE IRT Meeting Minutes - June 10 2020_20200616 (4)Strickland, Bev From: Kevin Tweedy <ktweedy@eprusa.net> Sent: Tuesday, June 16, 2020 8:32 AM To: Leslie, Andrea J; Davis, Erin B; Steve Kichefski Cc: Tugwell, Todd J CIV USARMY CESAW (US); Haupt, Mac; Kim Browning; Wilson, Travis W.; Cidney Jones Subject: RE: [External] Red Barn IRT Meeting Minutes - June 10, 2020 • ' External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ort.s am nc. ov Andrea - Thanks. The crossing on UT3 is already in place, the contractor will just be moving some of the fill dirt for the road crossing out of the easement. So we are not planning to remove the pipe that is already installed. It is a smooth walled culvert like the others on the project. We will keep in mind the recommendation for corrugated pipe in future projects. -Kevin From: Leslie, Andrea J <andrea.leslie@ncwildlife.org> Sent: Friday, June 12, 2020 2:07 PM To: Davis, Erin B <erin.davis@ncdenr.gov>; Kevin Tweedy <ktweedy@eprusa.net>; Steve Kichefski <Steven.1.kichefski@usace.army.mil> Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Cidney Jones <cjones@eprusa.net> Subject: RE: [External] Red Barn IRT Meeting Minutes -June 10, 2020 Thanks for these, Kevin. Just one note — on the new crossing (on UT3?) that would have a culvert — please make sure that is not smooth -walled HDPE material. Andrea Andrea Leslie Mountain Habitat Conservation Coordinator NC Wildlife Resources Commission 645 Fish Hatchery Rd., Building B Marion, NC 28752 828-803-6054 (office) 828-400-4223 (cell) www.ncwildlife.org lgi lus.�oo le.coml® [facebook.coml®[twitter.coml � [youtube.coml Get NC Wildlife Update delivered to your inbox from the N.C. Wildlife Resources Commission. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. From: Davis, Erin B <erin.davis@ncdenr.gov> Sent: Friday, June 12, 2020 9:15 AM To: Kevin Tweedy <ktweedy@eprusa.net>; Steve Kichefski < Steven. I.kichefski@usace.army.mil> Cc: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Haupt, Mac <mac.haupt@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Cidney Jones <cjones@eprusa.net> Subject: RE: [External] Red Barn IRT Meeting Minutes -June 10, 2020 Hi Kevin, Thanks for turning around the meeting minutes so quickly. And again DWR appreciated the level of detail provided in your draft as -built report. I have two minor comments on the meeting minutes: • While it is still early, there were a few areas of sparse groundcover which should be watched for erosion and may warrant reseeding. • From DWR's perspective, the addition of photo points during your annual visual monitoring inspection should be sufficient to document the pedestrian easement break/crossing condition in lieu of trail cam installation. Many thanks, Erin Erin B. Davis, PWS Stream & Wetland Mitigation Specialist 401 & Buffer Permitting Branch Division of Water Resources Department of Environmental Quality 919-817-0360 cell erin.davis(cDncdenr.gov From: Kevin Tweedy [mailto:ktweedy@eprusa.net] Sent: Thursday, June 11, 2020 4:28 PM To: Steve Kichefski <Steven.I.kichefski@usace.army.mil> Cc: Tugwell, Todd J CIV USARMY CESAW (US)<Todd.J.Tugwell@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Davis, Erin B <erin.davis@ncdenr.gov>; Haupt, Mac <mac.haupt@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Cidney Jones <cjones@eprusa.net> Subject: [External] Red Barn IRT Meeting Minutes -June 10, 2020 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good seeing everyone yesterday. Attached are draft meeting minutes for review/comment. We'll be working with Steve over the next few weeks to get everything buttoned up on the site. Thanks! -Kevin ECOSYSTEM PLANNING & RESTORATION Kevin Tweedy, PE Vice President Principal Water Resources Engineer 1150 SE Maynard Road Suite 140 Cary, NC 27511 919-388-0787 (office) 919-999-0262 (cell) 919-388-0789 (fax) Blockedwww.eprusa. net