HomeMy WebLinkAbout20161076 Ver 1_Notice of Initial Credit Release_20200617Strickland, Bev
From:
Browning, Kimberly D CIV USARMY CESAW (USA)
<Kimberly.D.Browning@usace.army.mil>
Sent:
Wednesday, June 17, 2020 10:15 AM
To:
Wiesner, Paul; Tsomides, Harry; David Tuch; Baumgartner, Tim
Cc:
Kim Browning; Davis, Erin B; Tugwell, Todd J CIV USARMY CESAW (US); Wilson, Travis
W.; Leslie, Andrea J; Byron Hamstead (byron_hamstead@fws.gov); McLendon, C S CIV
USARMY CESAW (USA); Crumbley, Tyler A CIV USARMY CESAW (USA); Haywood,
Casey M CIV USARMY CESAW (USA); Bowers, Todd; Merritt, Katie
Subject:
[External] Notice of Initial Credit Release/ NCDMS Fletcher Stream and Wetland Site/
SAW-2016-02205/ Henderson County
Attachments:
Fletcher_100004_FB 05_STR_RW_Initial Release signed.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Good morning,
The 15-Day Adaptive Management Plan As -Built review for the Fletcher Stream and Wetland Site (SAW-2016-02205) ended
June 10, 2020. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review followed the streamlined review process. All
comments received from the NCIRT are incorporated in this email. There were no objections to issuing the initial credit
release. Please find attached the current signed ledger. The MY1 credit release will be requested for the entire site in April
2021 at the next IRT credit release meeting.
Approved As-Built-MYO Project Credits:
7,253.3 SMUs (Cool)
2,758 SMUs (Cold)
8.91 WMUs (Riparian)
Approved As-Built-MYO Lengths/ Acreages:
11,653 LF
8.91 AC
NCIRT Comments:
EPA, Todd Bowers:
On February 6, 2020 a storm event totaling 3.35 inches caused additional flooding to the Weston Creek Reach via an
overbank event from Hoopers Creek. The event caused minor impacts to the adjacent agricultural area. Work was halted
and a repair plan was developed to address the remaining issues with hydrologic trespass. These repairs targeted three
key areas along the Weston Creek reach. A low swale was installed along the easement boundary near the middle of the
Weston Creek reach. This swale was designed to divert draining floodwaters within the easement and prevent trespass.
The elevation of the berm along the lower section of Weston Creek was regraded to an elevation of 2077 ft, the
preconstruction elevation. A log hedgerow was installed along the berm to buffer the impact of high flows from Hoopers
Creek. A log deflector wall was installed on the upstream bank at the mouth of Weston Creek. All of these repair areas
were seeded, live staked, and re -planted. Repairs to the Weston Creek reach, replanting, and live staking were
concluded on February 28, 2020.
It is the sponsors request that after MY6, if all criteria are being met, they will conclude monitoring of the Fletcher
mitigation project area other than Weston Creek Reach 1A and 113 and the wetland re-establishment area. In this case,
the MY7 monitoring report would consist only of data for Weston Creek Reach 1A and 113 and the wetland re-
establishment area.
At this time the EPA Region 4 Oceans, Wetlands and Streams Protection Branch has no substantial comments or
concerns with the plan put forth by the site sponsor. The sponsor should continue to closely monitor Weston Creek and
adjacent wetlands for the intended response to site modifications to minimize any ongoing hydrological trespass to
adjacent property, especially following storms of similar magnitude as listed above. I am looking forward to the inclusion
of groundwater data with the first monitoring report due at the end of 2020. Thank you once again for the opportunity
to review and provide feedback on the request for monitoring modification at the Fletcher Mitigation Site in Henderson
Co., NC.
DWR. Erin Davis:
DWR supports the requested 30% as -built credit release. We are also ok with the proposed monitoring schedule
(presented clearly in table format). Based on last year's site visit there are a few concerns such as, parallel reaches
maintaining channel features and mowing encroachments that we will be aware of during monitoring.
Thanks,
Kim
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG
Mitigation Project Name
Fletcher Stream and Wetland Site
USACE Action ID
DMS ID
100004
DWR Permit
River Basin
French Broad
Date Project Instituted
Cataloging Unit
06010105
Date Prepared
County
Henderson
Stream/ Wet. Service Area
BROWNING.KIMBERLY.DANIELLE.1527683510 Digitally signed by BROWNING.KIMBERLY.DANIELLE.1527683510
Date: 2020.06.17 10:00:28-04'00'
Signature of Official Approving Credit Release
2016-02205
2016-1076
10/4/2016
4/28/2020
French Broad 06010105
1 - For NCDMS, no credits are released during the first milestone
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria have been met:
1) Approved of Final Mitigation Plan
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property.
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan.
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankfull event performance standard has been met.
Credit Release Milestone
Cool Stream Credits
Project Credits
Scheduled
Releases %
Proposed
Releases %
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
30.00%
2,175.990
0.000
2,175.990
2020
4/28/2020
3 - Year 1 Monitoring
10.00%
2021
4 - Year 2 Monitoring
10.00%
2022
5 - Year 3 Monitoring
10.00%
2023
6 - Year 4 Monitoring
5.00%
2024
7 - Year 5 Monitoring
10.00%
2025
8 - Year 6 Monitoring
5.00%
2026
9 - Year 7 Monitoring
10.00%
2027
Stream Bankfull Standard
10.00%
Totals
2,175.990
Total Gross Credits
7,253.300
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
2,175.990
Total Percentage Released
30.00%
Remaining Unreleased Credits
5,077.310
Credit Release Milestone
Cold Stream Credits
Project Credits
Scheduled
Releases %
Proposed
Releases o/a
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
30.00%
827.400
0.000
827.400
1 2020
4/28/2020
3 - Year 1 Monitoring
10.00%
2021
4 - Year 2 Monitoring
10.00%
2022
5 - Year 3 Monitoring
10.00%
2023
6 - Year 4 Monitoring
5.00%
2024
7 - Year 5 Monitoring
10.00%
2025
8 - Year 6 Monitoring
5.00%
2026
9 - Year 7 Monitoring
10.00%
2027
Stream Bankfull Standard
10.00%
Totals
827.400
Total Gross Credits
2,758.000
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
827.400
Total Percentage Released
30.00%
Remaining Unreleased Credits
1,930.600
Page 1 of 3
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Fletcher Stream and Wetland Site
100004
French Broad
06010105
Henderson
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/ Wet. Service Area
2016-02205
2016-1076
10/4/2016
4/28/2020
French Broad 06010105
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases %
Proposed
Releases °/u
Proposed
Released #
Not Approved
# Releases
Approved
Credits
Anticipated
Release
Year
Actual
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
30.00%
2.673
0.000
2.673
2020
4/28/2020
3 - Year 1 Monitoring
10.00%
2021
4 - Year 2 Monitoring
10.00%
2022
5 - Year 3 Monitoring
15.00%
2023
6 - Year 4 Monitoring
5.00%
2024
7 - Year 5 Monitoring
15.00%
2025
8 - Year 6 Monitoring
5.00%
2026
9 - Year 7 Monitoring
10.00%
2027
Stream Bankfull Standard
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Totals
2.673
Total Gross Credits
8.910
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
2.673
Total Percentage Released
30.00%
Remaining Unreleased Credits
6.237
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Cold Stream
Restoration
2,758.000
Cool Stream
Restoration
6,770.000
Cool Stream
Enhancement II
896.000
Cool Stream
Preservation
1,249.0 00
Riparian
Restoration
8.910
Stream
Stream
Restoration
Riparian
Debits
Restoration
Equivalent
Restoration
Credits
Credits
Beginning Balance (mitigation credits)
9,886.400
124.900
8.910
Released Credits
2,965.920
37.470
2.673
Unrealized Credits
0.000
0.000
0.000
DWR
DCM Permit
Owning Program
Req. Id
TIP #
Project Name
USACE Permit #
Permit #
#
NCDOT Stream &
REQ-002570
R-0619E
NC 281 Improvements
2004-30595
2005-0071
297.000
Wetland ILF Program
NCDOT Stream &
REQ-005126
B-4034
Bridge 124 on NC 151
2009-01502-311
2009-0838
439.000
Wetland ILF Program
Page 2 of 3
Mitigation Project Name
DMS ID
River Basin
Cataloging Unit
County
Fletcher Stream and Wetland Site
100004
French Broad
06010105
Henderson
USACE Action ID
DWR Permit
Date Project Instituted
Date Prepared
Stream/Wet. Service Area
2016-02205
2016-1076
10/4/2016
4/28/2020
French Broad 06010105
Statewide Stream &
REQ-005439
Asheville Airport
2010-00036
2007-1841
60.013
Wetland ILF Program
Expansion Phases 1 and 2
Roundabout Intersection -
NCDOT Stream &
REQ-005733
R-5524C
SR 3526/SR 1419/SR
2013-00633
102.530
Wetland ILF Program
1420
NCDOT Stream &
REQ 005929
R 2518A
US 19 Improvements
2007-02197-300,
2007-1134
91.400
Wetland ILF Program
2007-02197-357
NCDOT Stream &
REQ-007164
U-3301
NC 63 Improvements
2014-01633
2016-0401
224.899
Wetland ILF Program
NCDOT Stream &
REQ-007990
I-4700A & B
I-26 Improvements - NC
2013-01883
2018-1645
1,448.091
Wetland ILF Program
280 to I-40
Roundabout Intersection -
NCDOT Stream &
REQ-005733
R-5524C
SR 3526/SR 1419/SR
2013-00633
37.470
Wetland ILF Program
1420
NCDOT Stream &
REQ-002621
R-2813B
NC 146 Widening
2007-03084-311
0.380
Wetland ILF Program
NCDOT Stream &
REQ-005502
R-5207B
SR 1006 Widening
2012-00114
0.030
Wetland ILF Program
NCDOT Stream &
REQ-005712
R-5207A
SR 1006 Widening
2013-00411
0.020
Wetland ILF Program
NCDOT Stream &
REQ-005767
B-5149
Bridge 38 on SR 1574
2013-00665
0.040
Wetland ILF Program
over Clear Creek
NCDOT Stream &
REQ-006907
I-5504
I-26 at NC 191
2014-02016
2016-1157
0.020
Wetland ILF Program
Interchange
NCDOT Stream &
REQ-007163
U-3301
NC 63 Improvements
2014-01633
2016-0401
0.070
Wetland ILF Program
NCDOT Stream &
REQ-007989
I-4700A & B
I-26 Improvements - NC
2013-01883
2018-1645
1.560
Wetland ILF Program
280 to I-40
NCDOT Stream &
REQ-008221
I-4400BB
I-26 Improvements - US
2013-01883
2018-1645
0.050
Wetland ILF Program
64 to US 25 Business
NCDOT Stream &
REQ-008224
I-4400C
I-26 Improvements - US
2013-01883
2018-1645
0.413
Wetland ILF Program
25 Business to NC 280
NCDOT Stream &
REQ-004665
R-2518A
US 19 Improvements
2007-02197-300,
2007-1134
0.090
Wetland ILF Program
2007-02197-357
Total Credits Debited
2,662.993
37.470
2.673
Remaining Available balance (Released credits)
302.987
0.000
0.000
Remaining Credits (Unreleased credits)
6,920.480
87.430
6.237
Page 3 of 3