Loading...
HomeMy WebLinkAbout20170547 Ver 1_Meeting Minutes_ CR Site Visit_June 1 2020_20200618Strickland, Bev From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: Todd and Erin, Wiesner, Paul Thursday, June 18, 2020 8:27 AM Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B Allen, Melonie; Bradley Breslow; Ryan Medric; Kim Browning Meeting Minutes_601 East Credit Release Site Visit -June 1, 2020_DMS# 95756_SAW# 2013-00265 DWR# 20140547 601 East_95756_IRT Credit Release Memo -June 2020.pdf Follow up Completed The meeting minutes from the June 1, 2020 IRT credit release site visit are attached. Please let us know if you have any questions, comments or concerns. Rya n, Please include the final meeting minutes in the 2020 MY6 report for reference. Thanks Paul Wiesner Western Regional Supervisor North Carolina Department of Environmental Quality Division of Mitigation Services 828-273-1673 Mobile Pau l.wiesner(cancdenr.gov Western DMS Field Office 5 Ravenscroft Drive Suite 102 Asheville, N.C. 28801 {�YTy Mln/n!TiiwJ�� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 M E M O R A N D U M 3600 Glenwood Avenue, Suite 100 TO: Paul Wiesner - DMS FROM: Ryan Medric - RES DATE: 6/11/2020 fires Raleigh, North Carolina 27612 919.209.1052 tel. 919.829.9913 fax RE: 601 East MY5 (2019) IRT Credit Release Site Visit Attendees: IRT: Todd Tugwell (USACE), Mac Haupt (NCDWR), Erin Davis (NCDWR) DMS: Paul Wiesner RES: Brad Breslow, Ryan Medric Site Visit Date: June 1, 2020 The IRT, DMS, and RES had a site visit at the 601 East Stream Restoration Site to discuss the Monitoring Year 5 (2019) credit release. The main topics of discussion were the potential flow issues, beaver dams, and encroachment. Details are bulleted below: - Flow was observed throughout all project reaches, however, the IRT requested the flow gauge on Reach 1 be moved further upstream towards the ephemeral reach. On 6/3/2020 RES moved the flow gauge from XS2 up to XS 1. - The IRT observed beaver dams on Reach 2 and 3 and encroachment along Reach 4. RES addressed these items on 6/2/2020 (photos attached). The IRT noted that RES needs to be timelier when addressing maintenance issues. - The IRT also observed missing easement signage and small areas of easement scalloping/encroachment. RES agreed to repair any easement scalloping/encroachment and agreed to ensure all required easement marking and signage are updated and present by the end of MY6 (2020) monitoring. - Reach 2 showed far less parrotfeather than previously observed. RES will continue observing/treating the parrotfeather as necessary. - General site vegetation was above average in height, especially along the channel. A few small bare herbaceous areas were noted likely due to bench cutting during construction. - At the end of the meeting, the IRT agreed to release 2019 project credit as proposed by DMS. Beaver dam removal and livestaking Easement marking and planting � Headcut repair with seeding and coir logs