HomeMy WebLinkAboutNCC202694_NOI Application_20200626Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 6/24/2020 4:41:36 PM (NCG01 NOI Submission)
Approve by Clark, Paul 6/25/2020 1:36:09 PM (Review- Construction NOI 27441)
• The task was assigned to Clark, Paul by round robin distribution 6/24/2020 4:42 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 26, 2020 5:00 PM
6/24/2020 4:42 PM
Submit by McCoy, Suzanne 6/26/2020 10:55:45 AM (Payment Verification for NCC202694)
* GreenGo Energy
• McCoy, Suzanne assigned the task to McCoy, Suzanne 6/26/2020 10:55 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 6, 2020 5:00 PM
6/25/2020 1:36 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting IT No
an NOI that was r Yes
rejected before?
1a. Project Name * Solar Lee, LLC
1 b. Specific Lot This field rray be used to list specifc lot nunbers.
Numbers
2. County* Wayne
3. Highway or Street 273 Lees Country Club Road
Address* Street narre only is acceptable if no address number assigned yet
4. City or Township* Mount Olive
5. State * NC
6. Zip Code * 28365
7. Latitude* Enter the latitude in decinal degrees
35.1847
8. Longitude* Enter the longitude in decir al degrees (MUST be negative)
-78.0846
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
07/30/2020
Estimated Construction Project Start Date
10. Date to End *
12/30/2020
Estimated Construction Project End Date
11. SIC (Primary) *
Other (9999)
Standard Industrial Cassification for Developrrent
12. Acres to be
29.30
disturbed*
(including off -site borrow and waste areas)
13. Total site area 38.00
(acres) *
14. Post- 1.50
construction (Estirreted)
impervious area
(acres) *
NCC Project NCC-WAYNE-2020-Solar Lee, LLC
Tracking ID Assigned autorretically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Thunder Swamp
Waterbody* INbrre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 27-54-5-1
Index No.* NCWaterbody Index Number
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization
Legally Responsible Entity
Name *
Solar Lee, LLC
IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
2. First Name *
Jonathan
If Corporation, enter Registered Agent First %rre
3. Last Name*
Burke
IF Corporation, enter F;bgistered Agent Last %ne
3b. Title
Authorized Agent
4. Permitee E-mail bsb@greengoenergy.com
Address*
5. Permittee 704-390-8966
Telephone No.*
6. Permittee Mailing Street Address
Address* 1447 S. Tryon Street
Address Line 2
Suite 201
aty
Charlotte
Fbstal / Zip Code
28203
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
V Yes
Street Address
1447 S. Tryon Street
Address Line 2
Suite 201
city
Charlotte
Fbstal / Zip Code
28203
8. Type of Non -Government
Ownership *
State / Frovince / Fbgion
NC
Country
us
State / Frovince / Region
NC
Country
us
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Padraig
Contact - First
Name *
2. Primary Site
O'Doherty
Contact - Last
Name *
3. Title
Construction Manager
4. Site Contact E-
po@greengoenergy.com
mail Address*
5. Site Contact
704-712-9794
Telephone No.
6. Organization
GreenGo Energy
Name
7. Site Contact
Street Address
Mailing Address*
1447 S. Tryon Street
Address Line 2
Suite 201
city
Charlotte
Postal / Zip Code
28203
8. Consultant Name
(Optional)
First and Last narre
9. Consultant E-mail
This person will be copied on all correspondence.
10. Consultant
Telephone No.
State / Rovince / Region
NC
Country
us
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 06/23/2020
Approved *
2. E&SC Plan Project WAYNE-2020-026
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Washington (WaRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan 2250-002 NCDEQ Approval Letter 200622.pdf 839.23KB
Approval letter or Mast beRFformat
Grading Permit
6. Site Location Map Helpful for linear project review
(Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans.
7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support
the application. Include additional waterbodies for linear projects if necessary.
8. NOI Certification 2759_001.pdf 70.53KB
Form Mist be RDFfornat
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
Type Name * Jonathan F. Burke
Title Authorized Agent
Organization Legally Responsible Entity
Solar Lee, LLC
Date * 06/24/2020
F. Tracking and COC Info
NOI Tracking No. 27441
NC Reference No. NCG01-2020-2694
Uses 'count number' variable (incremrented by SP)
Certificate of NCC202694
Coverage (COC) Uses 'count number' variable (incremented by SP)
No.*
Count Number 2694
Sequential number for submittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)