Loading...
HomeMy WebLinkAboutNCC202694_NOI Application_20200626Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 6/24/2020 4:41:36 PM (NCG01 NOI Submission) Approve by Clark, Paul 6/25/2020 1:36:09 PM (Review- Construction NOI 27441) • The task was assigned to Clark, Paul by round robin distribution 6/24/2020 4:42 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 26, 2020 5:00 PM 6/24/2020 4:42 PM Submit by McCoy, Suzanne 6/26/2020 10:55:45 AM (Payment Verification for NCC202694) * GreenGo Energy • McCoy, Suzanne assigned the task to McCoy, Suzanne 6/26/2020 10:55 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 6, 2020 5:00 PM 6/25/2020 1:36 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Solar Lee, LLC 1 b. Specific Lot This field rray be used to list specifc lot nunbers. Numbers 2. County* Wayne 3. Highway or Street 273 Lees Country Club Road Address* Street narre only is acceptable if no address number assigned yet 4. City or Township* Mount Olive 5. State * NC 6. Zip Code * 28365 7. Latitude* Enter the latitude in decinal degrees 35.1847 8. Longitude* Enter the longitude in decir al degrees (MUST be negative) -78.0846 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 07/30/2020 Estimated Construction Project Start Date 10. Date to End * 12/30/2020 Estimated Construction Project End Date 11. SIC (Primary) * Other (9999) Standard Industrial Cassification for Developrrent 12. Acres to be 29.30 disturbed* (including off -site borrow and waste areas) 13. Total site area 38.00 (acres) * 14. Post- 1.50 construction (Estirreted) impervious area (acres) * NCC Project NCC-WAYNE-2020-Solar Lee, LLC Tracking ID Assigned autorretically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Thunder Swamp Waterbody* INbrre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 27-54-5-1 Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Responsible Entity Name * Solar Lee, LLC IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Jonathan If Corporation, enter Registered Agent First %rre 3. Last Name* Burke IF Corporation, enter F;bgistered Agent Last %ne 3b. Title Authorized Agent 4. Permitee E-mail bsb@greengoenergy.com Address* 5. Permittee 704-390-8966 Telephone No.* 6. Permittee Mailing Street Address Address* 1447 S. Tryon Street Address Line 2 Suite 201 aty Charlotte Fbstal / Zip Code 28203 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 1447 S. Tryon Street Address Line 2 Suite 201 city Charlotte Fbstal / Zip Code 28203 8. Type of Non -Government Ownership * State / Frovince / Fbgion NC Country us State / Frovince / Region NC Country us C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Padraig Contact - First Name * 2. Primary Site O'Doherty Contact - Last Name * 3. Title Construction Manager 4. Site Contact E- po@greengoenergy.com mail Address* 5. Site Contact 704-712-9794 Telephone No. 6. Organization GreenGo Energy Name 7. Site Contact Street Address Mailing Address* 1447 S. Tryon Street Address Line 2 Suite 201 city Charlotte Postal / Zip Code 28203 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/23/2020 Approved * 2. E&SC Plan Project WAYNE-2020-026 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Washington (WaRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan 2250-002 NCDEQ Approval Letter 200622.pdf 839.23KB Approval letter or Mast beRFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification 2759_001.pdf 70.53KB Form Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Jonathan F. Burke Title Authorized Agent Organization Legally Responsible Entity Solar Lee, LLC Date * 06/24/2020 F. Tracking and COC Info NOI Tracking No. 27441 NC Reference No. NCG01-2020-2694 Uses 'count number' variable (incremrented by SP) Certificate of NCC202694 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2694 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)