Loading...
HomeMy WebLinkAbout20200369 Ver 1_RE Post Contract Meeting Minutes_20200625Strickland, Bev From: Ray Holz <rholz@restoratio nsystems.com> Sent: Thursday, June 25, 2020 11:32 AM To: Tugwell, Todd J CIV USARMY CESAW (US) Cc: Davis, Erin B; Reid, Matthew; Allen, Melonie; Alex Baldwin; Matthew Harrell; Grant Lewis Subject: [External] RE: Witt's End Post Contract Meeting Minutes CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<mailto:report.spam@nc.gov> Todd - Thank you for the prompt response. I wanted to provide a little more detail on what RS is doing to move the project forward. We have begun collecting PJD data and hope to submit the request by the end of July, if not sooner. We will copy you on the submittal so you are aware and can coordinate with the county PM. We have also started collecting topography and bathymetry of the main pond, and the surrounding area. Matthew Harrell has experience with soggy bottom testing and is going to work on collection samples with Alex. We plan to present a draft plan and supporting data to the IRT for the pond restoration near the first of September. At this time, we will also provide a more comprehensive approach to the Site's unnamed tributaries. We have had some success with acquiring additional land, including the remaining section of Waxhaw Branch to Snyder Store Rd. (this would include tributary 4's confluence with Waxhaw). If possible, we would like to have a second IRT site visit to discuss these tributaries and the pond in late September. Would it be possible for us to pencil in a site visit now? We appreciate the comment about BMPs - the figure provided with the comments certainly showed a lot of them. Once we have a full understanding of the Site's topography, including the slope of ephemeral draws coming into the pond, we will have a better understanding of where, and what type of BMPs we will propose - - I just wanted to be sure the IRT knew we would install them as needed. Thanks again for your time, and let us know what you think about penciling in a site visit for the end of September. Talk soon, RH Raymond J. Holz I Restoration Systems, LLC 1101 Haynes St. Suite 211 1 Raleigh, NC 27604 tel:919.334.9122 1 cell:919.604.9314 1 fax:919.755.9492 email: rholz@restorationsystems.com -----Original Message----- From: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Sent: Wednesday, June 24, 2020 9:29 AM To: Reid, Matthew <matthew.reid@ncdenr.gov>; Davis, Erin B <erin.davis@ncdenr.gov> Cc: Ray Holz <rholz@restorationsystems.com>; Grant Lewis <glewis@axiomenvironmental.org>; Allen, Melonie <melonie.allen@ncdenr.gov>; Alex Baldwin <abaldwin@restorationsystems.com>; Matthew Harrell <mharrell@restorationsystems.com> Subject: RE: Witt's End Post Contract Meeting Minutes Matthew, Thanks for providing these. Just a couple points on the meeting minutes: 1. Regarding the streams and use of BMPs, we do not require that BMPs are placed on all ephemeral features, but we do encourage their use where it makes sense. This would not include all ephemeral drainages, but those that may result in potential water quality, sediment loading, or other concerns. 2. For UT-4, I don't know that we necessarily concurred that this would be a restoration reach, but we did agree that the connection with Waxhaw branch needed to be captured for it to be included. While restoration may be an option, we did not have a chance to see that much of the stream, so I would reserve final judgement on the approach here. 3. 1 just wanted to reiterate that there are proposed wetland areas on the site that I do not necessarily concur with, and prior to approving any approach, I would want to get other opinions, including discussing the approach with the county PM that conducts the JD. Thanks, Todd Tugwell Mitigation Project Manager Wilmington District, US Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 (919) 554-4884 ext. 58 -Original Message ----- From: Reid, Matthew <matthew.reid@ncdenr.gov> Sent: Monday, June 22, 2020 8:47 AM To: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov> Cc: Ray Holz <rholz@restorationsystems.com>; Grant Lewis <glewis@axiomenvironmental.org>; Allen, Melonie <melonie.allen@ncdenr.gov>; Alex Baldwin <abaldwin@restorationsystems.com>; Matthew Harrell <mharrell@restorationsystems.com> Subject: [Non-DoD Source] Witt's End Post Contract Meeting Minutes FTV Attached are the Witt's End Post Contract Meeting Minutes from the site visit held on June 1, 2020. Please let me know if you have any questions, comments or would like any changes. Thanks, Matthew Reid Project Manager - Western Region North Carolina Department of Environmental Quality Division of Mitigation Services 828-231-7912 Mobile matthew.reid@ncdenr.gov <mailto:matthew.reid@ncdenr.gov> Western DMS Field Office 5 Ravenscroft Dr Suite 102 Asheville, NC 28801 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.