Loading...
HomeMy WebLinkAbout20200829 Ver 1_Shoreline Stabilization_20200625Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/23/2020 7:13:28 PM (Submittal) Approve by Montalvo, Sheri A 6/25/2020 3:03:47 PM (Non -DOT - Approver) • The task was assigned to Montalvo, Sheri A 6/23/2020 7:13 PM Submission Form I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Owner Information: Name: * mark seiler Email:* aseilertwo@yahoo. com Phone Number:* (704)650-5614 (xxx)xxx-xxxx Mailing Address:* Street Address 345 Tuskarora Trail Address Line 2 City Mooresville Fbstal / Zip Code 28117 Is there an agent working on the r Ye: project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* seiler shoreline stabilazation State / Rovince / Fbgion NC Country Us If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed acti\ity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that ha\e been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Property Address Lookup:* Street Address 138 Lucent Lane Address Line 2 city Mooresville Fbstal / Zip Code 28117 Latitude:* 35.509209 State / Province / Pegion NC Country US Longitude:*-80.951486 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* shoreline stabilazation map.jpg 462.56KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* shoreline pictures.jpg 747.33KB 4. Location of the property (where work is to be conducted) Nearest Town:* Mooresville County:* Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* 138 Lucent Lane Mooresville NC 28117 lot 251A Include phase/lot number Directions to site:* Take Brawley School Rd. head west to Tuskarora Trail, turn right go about a mile and turn right on Lucent Lane, go about a block down and 138 is on the right hand side of the road with a gravel drive and marked by a wood address post. Please include road narres and numbers, landnarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* residentail Vacant lot Residential, undeveloped, etc. 6. Property Size .741 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Maintenance of existing riprap shoreline , and maintenance of existing seawall to prevent erosion 8. How will the work be done?* V From Land 17 From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 612 ft2 same as existing rip rap square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward: * (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 153 ft2 same as existing rip rap square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) removal of a single dead tree stump to allow rip rap shoreline stabilization - see attached picture Sketch: stump.jpg 1.57MB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): a $240.00 for impacts to lake (below normal water level) of less than 1 acre a $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I have given true, accurate, and complete information on this form; a I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act") a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND a I intend to electronically sign and submit this form. Full Name:* mark seiler Signature: Initial Review Is this accepted into the review process?* Project Number:* 20200829 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 Lake (At Full Pond/ Normal Water Level) I— — — — — — — — — — — — — — 1 Maintenance of existing rip rap 1 -- 1 6' below 760 and 1' above 760' 1 Maintenance of ty 1 along entire property shoreline 1 existing retaining Dead tree stump t _ _ _ _ _ _ wall{ Z— — — — — — � I Full Pond/ Normal Water Level --------------- -f .--- ------------- e —153'Shoreline .' Existing permitted boat dock # 7923 w x v� Boat Ramp Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing —only a single dead tree stump is to be removed to facilitate riprap maintenance 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation — 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. No new structures, maintenance only S. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation — no excavation or dredging included in this project. 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 6 Maintenance of existing shoreline rip rap: 153 feet of existing riprap shoreline to have top dressing of rip rap added r ++� r "�4 —25' x 3' Area of erosion to be r. repaired and ' protected with hDrao Maintenance of existing retaining wall: Removal of stump to stabilize shoreline with rip rap Maintenance of seawall, protect with riprap FORM: SSGP 10-2013 Page 5 of 6 v r r� Also IV �4 %V, • - ly j A