Loading...
HomeMy WebLinkAboutWQ0029945_More Information (Requested)_20200625ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality June 25, 2020 DAVID M. MOHR, PE — CHIEF OPERATIONS OFFICER ONSLOW WATER AND SEWER AUTHORITY 228 GEORGETOWN ROAD JACKSONVILLE, NORTH CAROLINA 28540 Subject: Application No. WQ0029945 Additional Information Request Summerhouse Wastewater Reclamation WWTP High -Rate Infiltration System Onslow County Dear Mr. Mohr: Division of Water Resources' Central and Regional staff has reviewed the application package received April 13, 2020. However, additional information is required before the review may be completed. Please address the items on the attached pages no later than the close of business on July 27, 2020. Please be aware that you are responsible for meeting all requirements set forth in North Carolina rules and regulations. Any oversights that occurred in the review of the subject application package are still the Applicant's responsibility. In addition, any omissions made in responding to the outstanding items, or failure to provide the additional information on or before the above requested date may result in your application being returned as incomplete. Please reference the subject application number when providing the requested information. All revised and/or additional documentation shall be signed, sealed and dated (where needed), and submitted electronically. If you have any questions regarding this request, please do not hesitate to contact me at (919) 707- 3660 or tessa.monday@ncdenr.gov. Thank you for your cooperation. Sincerely, %wv -t A," Tessa Monday, Environmental Engineer Division of Water Resources cc: Wilmington Regional Office, Water Quality Regional Operations Section (Electronic Copy) Miles Galloway, PE — The Wooten Company (Electronic Copy) Permit Application File DEQ �� North Carolina Department of Environmental Quality I Division of Water Resources _ 512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 NORTH CAftOLINA DepanmamofEnWoomentalMari /� 919.707.9000 Mr. David M. Mohr, PE June 25, 2020 Page 2 of 2 A. Hydrogeologic Report (15A NCAC 02T .0704(e)): Comments from Poonam Giri (Central Office Hydrogeologist), Morella Sanchez -King (Wilmington Regional Office Supervisor), and Bryan Lievre (Wilmington Regional Office Engineer). Provide additional information on the design of the groundwater lowering system, including a map which identifies the extent of the system. 2. The proposal indicates that three to four piezometers would be installed between the pond and one of the existing drains. Information provided indicates that at least three piezometers were installed, however no information was provided on the location of the existing drain. Please update the site sketch to show the location of the existing drains. 3. Provide information on the installation of the constructed piezometers (materials, methods, drilling log, etc.). 4. Please show the following (within 500 feet of the facility area): a. All wells and piezometers, including usage and construction details; b. Ephemeral, intermittent, and perennial streams; c. Springs, lakes, ponds, and other surface drainage features; and d. Review and compliance boundaries. 5. Provide a description of the site hydrogeology, including groundwater discharge features, drainage features, existing and abandoned wells, and other features that may affect the movement of the treated wastewater, including the groundwater lowering system. 6. Provide a discussion of the current groundwater flow regime of the site and the post modification groundwater flow regime, focusing on the relationship of the system and basin to groundwater receptors, groundwater discharge features, and groundwater flow media. 7. Provide modeling results of the mounding analysis to predict the level of the seasonal high water table after increased wastewater application. 8. Identify the source of the rainfall data provided in the application. 9. Indicate what equipment was utilized to obtain water elevation data. 10. Indicate the depth of Basin #2 relative to mean sea level, or another datum at the site (if known). 11. Address if additional measurements were obtained after January 10, 2020 to observe the Groundwater Pump Station Data to equalize. 12. Provide the MODFLOW modeling results of the increased loading rate during the pilot study. 13. As indicated in the approved pilot study proposal, provide a comparison of the pilot test results to the original MODFLOW modeling results for the basin.