HomeMy WebLinkAboutNCC201095_Email RE Limits of Disturbance under New NOI_20200625Georgoulias, Bethany
From:
Adam Carroll <Adam.Carroll@timmons.com>
Sent:
Thursday, June 25, 2020 10:20 AM
To:
Georgoulias, Bethany; Pearson, Tyler B
Cc:
Sink, Scott; martinw@uncsa.edu; Eplin, Tamera
Subject:
RE: [External] RE: Construction SW Notice of Termination Request Received
Attachments:
UNCSA Limits of Disturbance Comparison.pdf
• ' External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
lgort.spam@nc.gov
Hi Tyler,
I just left you a voicemail, but I wanted to reply to this email chain as well. I spoke to Tamera, and she indicated that if the
area covered under this NOT is encompassed in the new NOI that was just accepted, then they could move forward with
the NOT since this will be covered under a new permit. This is the case, and I've attached a PDF of the limits covered
under the old NOI compared to the new NOI. As you can see, this area is covered by the new NOI so hopefully everyone
agrees that we can close out the NOT and move this site to the new NOI since it is ready to be re -disturbed under a new
and approved permit. Ideally, we could have just left the old NOI open throughout the duration of the next phase of the
project, but since that's not the case, we have ended up with overlapping NOI's.
I appreciate everyone's help in ironing out this somewhat confusing situation. Please don't hesitate to call if you have
questions (336.404.5583) and please let us know if this is acceptable.
Thanks,
Adam
From: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Sent: Thursday, June 25, 2020 10:03 AM
To: Pearson, Tyler B <tyler.pearson@ncdenr.gov>
Cc: Sink, Scott <scott.sink@ncdenr.gov>; Adam Carroll <Adam.Carroll@timmons.com>; martinw@uncsa.edu; Eplin,
Tamera <tamera.eplin@ncdenr.gov>
Subject: RE: [External] RE: Construction SW Notice of Termination Request Received
Will there need to be another inspection to verify this? If so, I will need to reject the original NOT request and have Mr.
Martin resubmit when that has been completed.
Thanks,
Bethany
Bethany Georgoulias
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
❑�
0 �L
4 1
\ 2 ' CONSTR
- - CESS GATE
CCPSTRUCTION
DOWN A
x
CONNECT SAFETY FENCE
TO EXISTING FENCE
LP
C
x
J
7
A
Sg
TCCB 805.5
I
1
1
1
J
L7
Q
TCCB 824.3
Inv 820,0
\
�\ \ \\\\
IGLF T \ - -� UGP - -UGP - - - L _ LIMITS \\
P / ITU \ C - ISTU BA E \
/'�C \ �2 RENil4VE/DEM061Ski \ TCCB 822.76
- � \ �
0 / / / - \ EXISTING.DORM BUILDIRG�FQUNDATIONS-& _ "10
T CONSTRUCTION l / - - / OF \ �OpRDINATE DRY UTILITY- \ - - `\ \ \ \ \ / \ \R/EkOV T XI AI' \ Inv 816.36
�-- O ASSOCIATEDUTiLI SERVICES �
SAFF,TY FENCE REMOVE SERVICE & �� GW
\ / dG�n ( D'SHRU �\ �
I \ O �� O REMOVAL�IW'MEP-PLAN \ \ \
I PLUG EXISTING SEWER F v I - AROUND EgCH RM BU DIN \
Lot M I LINE AT MANHOLE \ \ \ j p _ _UGP \ \ \ \ \ TYP) \
MO EXIS
E ALL
/UGP_ \ ��\
-Ply
/ / / I -UFO
I REMOVE/DEMOLISH
EXIST! G DORM BUILDING, FOUNDATIONS & �UF - \ �_
ASSOCIATED UTILITY SERVICES / / \ ` _/ Z.
O (COORDINATE DRY UTILITY
REMOVAL W/ MEP PLAN)
W Cb
R� I \3GP \ �� l� 1 / T. I \\ \ \ \ \ \ \
/ I \ I l / F _ _ I \ \ \ RELOCA ANZ \�
/ I / LIMITS OF I LP j/\ I / ) / I I I I \ � \ W/ NE ATE
DISTURBANCE (FIFE ERIFY/SIZE \\�
\ RI TO INSTALLATION)
\` I Il / I LP
0
REMOVE^
H C �dJ -WATER SERVICE \ \ \ � � � \ \ � \ \ - - _ \ I� o / � � \ � � \\� � Inv 8 15.82
\ / UGP J � � _ \� \ S, � � ��y� /
H C I UGP ` \ \ \ I� - \ \ - - REMOVE WATER - - - - - - / IIrI 50
/ RE OV1E STORM INLETS _ - \ _ UGR��UFQ- SERVICE & PIV
/ 0Gp I DI TG 803.10 \ \ \
/ & STORM ES IN COURTYARD. Inv 798.40 \ _ - - - - - - - _ -
1 \ 1 LP --,UG� \ UFO- - - - - - �� /-UFO
P TECT YARD INLETS Elec / \ � � � � _ _ / � �
��IJGp 12EMOVE WATER 25'x50' STONE /
/ W/ Box / \ \ REMOVE EXISTING - CP - _ _ R PIV III \ CONSTRUCTION
/ INLET PROTECZI/ON UNTIL REMOVE WATERLINES IN COURTYARD_ \ \ / /
If/ V\ - -UGP { R OVE EXFSTJNG aWV II \ENTRANCE
REMOVE STORM INLETS- \ \ - - - REMOVE EXISTING �C o DEWALK (TYP) I \ I \ \ 24' CONSTRUCTION
0 / & STORM PIPES IN - v - _ _ VEGETATION WITHIN - - _ _LP - �H II \ ACCESS GATE
\ \ / o / \ \ COUQSY4RD � - 8 \ II �� RELOCATE \ REMOVE SALVAGE
\LIMITS OF DISTURBANCE - _ _ - �0 I \II EXISTING EXISTING BASKETBALL
�0 HYDRANT \ 1- \ GOAL & RETURN TO OWNER
/ REMOVE EXISTING 79 I
SIDE -/A TYP Inv In 80654 II
(EXISTING FENCE 1 E ec i0 L J \ \ - _( ) REMOVE EXISTING - - - _ _ �� Out 806,29 \fl
TO REMAIN 1 Meters IV \ ` \ WATERLINES IN COURTYARD - _ REMOVE EXISTING \ II REMOVE EXISTING I_ LIMITS OF \
I - - - - - \ - - NVEGETATION AND SHRUBS STORM PIPES AND
_ X \ - W- - _ - DISTURBANCE
_ _ _ _ REMOVE WATER - W- AROUND.EACH DORM BI ILDIN \ DROP INLET
-- -- J
- - - _ - - - \ / SERVICE &PIV ( o) �� (TYP) a \ \ \ / // Dumpster
\
DEMOLITION LEGEND
EROSION CONTROL LEGEND
TEMPORARY CONSTRUCTION
ENTRANCE
SILT FENCE
STONE OUTLET
NOTE: CONTRACTOR SHALL INSPECT AND REPAIR ALL EROSION
CONTROL DEVICES ONCE PER WEEK AND AFTER EVERY RAIN
EVENT.
LIMITS OF DISTURBANCE = 1.41 AC
II
SAW CUT & REMOVE
EXISTING PAVEMENT &
SIDEWALK FOR ELEC. INSTALLATION
(COORD. W/ MEP PLAN); SAW CUT LIMITS OF
DISTURBANCE
SIDEWALK TO NEAREST JOINT
BACKFILL PAVEMENT CUT
W/ COMPACTED ABC STONE
/ FLUSH W/ EXISTING ASPHALT - ❑
iLTGrate Top Crb8 4.02 Iv797.12
I
SAN---I SAN-Q+-
r
\LJ3
COORDINATE PROPOSED I SITE ELECTRICAL FEATURES
W/ MEP DRAWINGS (TYP) \
\ UG/
\
ITY \ \ \ \
REMOVAL W/ MEP PLANS (TYP) \ IMT
REMOVE EXISTING �,BAILEY, AVERETAINING WALL\Utilit�xEasement l�\OVE EXISTING \ \
GIPS NCGS Monument
N849435.240, E 1633867.231
Elevation 823.95
III, I -
UFp _
I REMOVE/DEMOLI
EXISTING DORM BUILDI
FOUNDATIONS & ASSOCIAT
UTILITY SERVICES
(COORDINATE DRY UTILITY
REMOVAL W/ MEP PLA� )
- - - _ - -STON 4TLET _
` -(TYP DA = 0.30 AC _$ELT FENCE ` \ y RE VE WATER / a
- \ / S R3/ E &PIV REMOVE WATER
(TYP) \ \ SERVICE & PIV \ \
_-`'800\ �- \ \ \ \ 0 0 0 �-\ \ I \ 11 \ p \\ \_ �\ \ 1
\ \\\ 0 Y T \ \ \ \II \ J \
\ \ \ \ ` \ \ - - T CONSTRUCTION 1 //
\ - - \ \ \\ _ -Io \ \I \ \ 1I \ \ \ - _ SAFETY FENCE \61
- - ----------
�, - \ \'NREM(�VE/DEMOLISH \ \\ P- \ \ \/ _ REMOVE�&SALVAGE //;-------------__-----, ` _______
95. EXIS-nNQ DNM`BUILDING FOILDATION &- \ I \ \ ----
\ 'ASSQCIA E�UTILITY SERVICES \ \ I /jG F O 9 \ II \ \ \ - EXISTING OUTDOOR /j/
\ t \ - GP P II / i SEATING, TABLES, & GRIL1 V
(COORQIN�A�Ei7f�KUTILITY _ \ \ / i \
\ \ \ _ _ UFd�/ \ j )% \. j I i i r \ &RETURN TO OWNER \ \ \ /-
R>=MOb(AL WLLMEP PLAN) GQ p \ i
XIS TINTG-
-UFO \ _ -VE ATI6NA _ - - _ - _ _ _
-
U AROU AGH�ORM BUIL-DIN.0 Qec:-UG-P- - ONECFT
>\ �TY�BxoUG (� \ O
- _ -_- UFO SAFETY
90 UFO -UFO-
- et-t-T--_roi�2'OTO EXIS
-bA REMOVE H F-ENG-E \ \ \ \ ► \ \ \ \ \\ \ /\/\//XOtT�l L�YP) e 3ZAC EXISTING DORM BUILDING, FOUNDATIONS
DEMOLITION NOTES ASSOCIATED UTILITY SERVICES
I 1II
1
I----------
EXISTING i \ \ ' I
(COORDINATE DRY UTILITY \ \ - - - - - �/- \ �O �Y \ Garden Area ' 1
1. REFER TO MEP DRAWINGS FOR ELECTRICAL, FIBER, AND DRY \ \ \ \ %� _ _ - VEGETA N-*NDi31iR \ \I
UTILITY DEMOLITION. REMOVAL W/ MEP PLAN) \ \ \ EXISTING FENCE \ - - - _ - \ \ I \
REMOVE EXISTING \ \ \ \ TO REMAIN 32 _ - Inv=802. 5 AROUND CH DORM B IL I 0
VEGETATION AND SHRUBS \ \ \ - - �Tre� - -
2. REMOVE/DEMOLISH/ABANDON AFTER EROSION CONTROL � - - - - � � O
MEASURES ARE IN PLACE AND APPROVAL OF THE CITY
AROUND EACH DORM BUILDING \ ` ` - - - 18,E REMOVE/DEMOLIS O O \ <v // \ \ I \ I\ I
REFER TO EROSION CONTROL PLAN. STONE OUTLET \ \ _ - - - EXISTING DORM B_ _DING, \ \ \ � \ \ i \ I \ I , ---------
INSPECTOR. (TYP) DA = 0.34 AC ` - STONE OUTLET Tree \ _ - FOUNDATIONS & A OCIAI'EB \ \ ��/\//
- - (1YR) DA �O-3O-AC- - _ \ UTILITY SERVICES /\ \ I\ \
3. REMOVE SIDEWALK AND CURB AND GUTTER SECTIONS BY SAW � - � _ � _
DB, 1840 PG. 1064 CAR❑LINA PROPANE GAS, INC. Pin # - _ - - - ld0.0 _ - _ 800 (COORDINATE DRY ITY
CUTTING THE NEAREST CONTROL JOINT AWAY FROM THE _ - _ - - - - _ _ i \
EROSION CONTROL NOTES AREA DESIGNATED TO BE REMOVED ON THE DEMOLITION PLAN. 6834-39-5598 Pin # 6834-39-6454 _ - - _ - _ _ _ _ = ro�al�P�oR - - - - - - - - _ - \�� REMOVAL W/ MEP PLA
-_ -- _ ------on
1. DO NOT WORK OR DISTURB LAND OUTSIDE LIMITS OF CONSTRUCTION. 4. SUBSURFACE FEATURES ARE SHOWN IN APPROXIMATE - - - _- - _ - - - - - _ _ - _ - - --795 �� - - _ _ \ \ \ \\ \ \\ \\\ / \\ \\ \
LOCATION. CONTRACTOR IS RESPONSIBLE FOR SUBSURFACE �- - �� _
2. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL COMPLY WITH CITY OF
UTILITY EXPLORATION TO DETERMINE UTILITY LOCATIONS AND _
WINSTON SALEM AND NCDEQ STANDARDS. DEPTHS. - - - - - - - - - - - - - -_ - - - _ - _ 79
-_-_-�����\�� co \
3. INSPECT EROSION AND SEDIMENT CONTROL MEASURES WEEKLY AND AFTER EACH 5. CONTRACTOR SHALL VERIFY LOCATIONS AND SIZES OF ALL-_-
SIGNIFICANT RAINFALL. MAINTAIN MEASURES AS NECESSARY. EXISTING FEATURES PRIOR TO COMMENCEMENT OF �_ _ - - - -- - - - - - - - - - 785 - - - - _ - - _ ^
CONSTRUCTION.-
4. GROUND COVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS BUT NO MORE THAN
21 CALENDAR DAYS AFTER COMPLETION OF ANY PHASE OF GRADING. PERMANENT 6. CONTRACTOR SHALL LOCATE EXISTING UTILITIES PRIOR TO CONSTRUCTION. - _ -�\
GROUND COVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR NO MORE THAN _ _ - _ _ - _ _ 780 - - - - - - - - - - - - - -- _ -
21 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION. \ ��1 1�
\ \ _ C' \ \ \ \ \ \ I
7. CONTRACTOR SHALL REPAIR/REPLACE ANY EXISTING \ \ - ` \ \ \ \ \ \\\\\ \ \ \ \ \ 1 1
6. KEEP MUD OFF STREETS DURING CONSTRUCTION. - \ -FOR E- \\ \ \ 1
SIDEWALK, CURB AND GUTTER, AND/OR ASPHALT TO REMAIN
\ - / 1�� 1 I \ \ \\ \ \ I 1
7. CONTRACTOR IS TO PREVENT SURFACE AND AIR MOVEMENT OF DUST FROM DISTURBED THAT HAS BEEN DAMAGED BY CONSTRUCTION ACTIVITY. ICY�i�I 19FANj
SOIL SURFACES THAT MAY CAUSE OFF -SITE DAMAGE, HEALTH HAZARDS, AND/OR 8. TERMINATE UNUSED EXISTING UTILITY SERVICES AT THE MAIN + TRAFFIC SAFETY PROBLEMS. �
PER CITY OF WINSTON-SALEM STANDARDS. Q_
o \ .Rabbles 8.
8. INSTALL ADDITIONAL EROSION CONTROL MEASURES (I.E. SILT FENCE, STONE OUTLETS) - _
AS NECESSARY TO AVOID TRANSFER OF SEDIMENT FROM THE SITE. \ - - - - ' i - - - 201,
EROSION CONTROL SEQUENCE
1. INSTALL CONSTRUCTION ENTRANCE AT THE LOCATION SHOWN. ANY SEDIMENT ACCUMULATION ON
ADJACENT PUBLIC ROADS AS A RESULT OF THE PROJECT AND TRAFFIC FROM THE PROJECT SHALL BE
IMMEDIATELY CLEANED OFF BY THE CONTRACTOR.
2. CLEAR AND GRUB STUMPS ONLY IN AREAS REQUIRED TO INSTALL THE EROSION CONTROL DEVICES.
3. INSTALL SILT FENCE AND STONE OUTLETS AS SHOWN ON THE PLAN IN ACCORDANCE WITH CITY OF
WINSTON SALEM STANDARDS AND THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL
PLANNING DESIGN MANUAL.
4. BEGIN DEMOLITION OF EXISTING SITE FEATURES AS SHOWN ON PLAN.
5. ADJUST EROSION AND SEDIMENT CONTROL MEASURES AS NECESSARY FOR PROPER OPERATION.
INSTALL ADDITIONAL EROSION CONTROL MEASURES IF DETERMINED NECESSARY BY THE EROSION
CONTROL INSPECTOR.
6. STABILIZE DISTURBED AREAS WITH TEMPORARY GRASS SEEDING.
7. ENSURE DRAINAGE PATTERN TO STONE OUTLETS AT ALL TIMES AND ADJUST EROSION AND SEDIMENT
GROUND STABILIZATION
SITE AREA
STABILIZATION
STABILIZATION
DESCRIPTION
TIME FRAME
TIME EXCEPTIONS
• PERIMETER DIKES,
SWALES, DITCHES,
7 DAYS
NONE
AND SLOPES
• HIGH QUALITY
WATER (HQW)
7 DAYS
NONE
ZONES
• SLOPES STEEPER
IF SLOPES ARE 10' OR LESS IN
THAN 3:1
7 DAYS
LENGTH AND ARE NOT STEEPER
THAN 2:1 14 DAYS ARE ALLOWED
• SLOPES 3:1 OR
14 DAYS
7-DAYS FOR SLOPES GREATER
FLATTER
THAN 50 FEET IN LENGTH
• ALL OTHER AREA
NONE (EXCEPT FOR PERIMETERS
WITH SLOPE
14 DAYS
AND HQW ZONES)
FLATTER THAN 4:1
C�>�
\\\1\\\\\ \11111111 \\
�
\ \\
�\ \ \\\\ \ \ \ \\ \\ \ 1 I I 1 11 1 \ \ \
\ I
State of North Carolina Pin #\\
I 6837-39-9683 DB 1634 Pg 3341 \ \ \ \
I \ \ \ I
SCALE 1 "=20'
CONTROL MEASURES AS NECESSARY FOR PROPER OPERATION.
U 2O 4O
* "EXTENSIONS
OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY
8. DO NOT REMOVE EROSION CONTROL MEASURES UNTIL ALL CONTRIBUTING AREAS HAVE BEEN
BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE
PERMANENTLY STABILIZED.
COMPLIANCE IMPRACTICABLE." (SECTION II. B (2)(b))
\\\y
\ \\\ \\
1
2
3
4
5
UNC School of the
Arts - Bailey St.
Apartments
Demolition
227 WEST TRADE STREET SUITE 700
CHARLOTTE, NORTH CAROLINA 28202
TEL. 704.333.6686 FAX 704.333.2926
WWW.LS3P.COM
IIiilii
\ C
SEAL
38573
z-1:rgI v
;C)�'�cX,0 \;
A p�,
000000�
•
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
VIRGINIA I NORTH CAROLINA I WEST VIRGINIA
THIS DRAWING PREPARED AT THE
GREENSBORO OFFICE
8642 WEST MARKET STREET, SUITE 136
GREENSBORO, NC 27409
TEL 336.662.0411
FAX 336.662.0420
www.timmons.com
NC License No. C-1652
Site Development I Residential I Infrastructure I Technology
MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECTS
COPYRIGHT 2020 ALL RIGHTS RESERVED
PRINTED OR ELECTRONIC DRAWINGS AND
DOCUMENTATION MAY NOT BE REPRODUCED
IN ANY FORM WITHOUT WRITTEN PERMISSION
FROM LS3P ASSOCIATES LTD.
REVISIONS:
No. Description Date
1 Hydrant Relocation 2/28/20
PROJECT: 9202-194110
SCO ID: 19-21045-02A
DATE: 01 /20/2020
DRAWN BY: JM
CHECKED BY: AC
DEMOLITION &
EROSION
CONTROL PLAN
cmi 01